CN105155912B - 一种采用三角形横担的单回路开断钢管杆塔 - Google Patents

一种采用三角形横担的单回路开断钢管杆塔 Download PDF

Info

Publication number
CN105155912B
CN105155912B CN201510562188.3A CN201510562188A CN105155912B CN 105155912 B CN105155912 B CN 105155912B CN 201510562188 A CN201510562188 A CN 201510562188A CN 105155912 B CN105155912 B CN 105155912B
Authority
CN
China
Prior art keywords
arm
cross
cut
tower body
offs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510562188.3A
Other languages
English (en)
Other versions
CN105155912A (zh
Inventor
赵晖
穆弘
王宇坤
徐进
王力
朱晓鹏
罗正帮
郑少将
吕冬春
周建
吴义阳
董江戎
尹雪超
王梦博
夏琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huadian Engineering Consulting and Design Co Ltd, Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd, Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Anhui Huadian Engineering Consulting and Design Co Ltd
Priority to CN201510562188.3A priority Critical patent/CN105155912B/zh
Publication of CN105155912A publication Critical patent/CN105155912A/zh
Application granted granted Critical
Publication of CN105155912B publication Critical patent/CN105155912B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

一种采用三角形横担的单回路开断钢管杆塔。它包括塔身、顶层地线横担、上层导线横担、中层导线横担、下层导线横担,所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担;所述上层导线横担自塔身面向开断侧布置一边三角形横担;所述中层导线横担自塔身平行目标开断线路方向布置两边横担,自塔身背向开断侧垂直目标开断线路布置一边横担;所述下层导线横担自塔身面向开断侧布置一边三角形横担;本发明仅采用一基杆塔实现了单回路开断的问题,减少了新建杆塔数量,开断后形成双回路继续走线,避免双回路分支杆的使用,不改变相邻杆塔的导线布置方式,降低了邻塔改造的可能。

Description

一种采用三角形横担的单回路开断钢管杆塔
技术领域:
本发明涉及高压输电线路技术领域,尤其涉及一种采用三角形横担的单回路开断钢管杆塔。
背景技术:
在高压输电线路中,将单回路开断形成双回线路接入新建变电站是常见系统方案之一,现有单回路开断方案主要分以下两种。
1)在被开断线路下方新建一基双回路耐张杆,耐张杆横担平行被开断线路方向布置。采用钢管杆架设的单回线路通常呈“上”字型排列,采用钢管杆架设的双回线路两侧导线通常呈垂直排列,易造成相邻直线塔导线悬垂串偏离铅直状态,存在不能满足原单回路杆塔电气间隙要求的可能。
2)在被开断线路下方新建两基单回路耐张杆,将线路开断后接入双回路耐张杆继续走线。新建单回路耐张杆塔数量较多,占地较大,走廊较宽,工程投资及实施难度较大。
发明内容:
本发明的目的是提供一种采用三角形横担的单回路开断钢管杆塔,仅采用一基杆塔实现了单回路开断的问题,减少了新建杆塔数量,开断后形成双回路继续走线,避免双回路分支杆的使用,不改变相邻杆塔的导线布置方式,降低了邻塔改造的可能。
为了解决背景技术中存在的问题,本发明采用以下技术方案:它包括塔身、顶层地线横担、上层导线横担、中层导线横担、下层导线横担,所述塔身顶端设置有顶层地线横担,顶层地线横担下方设置有上层导线横担,上层导线横担下方设置有中层导线横担,中层导线横担下方设置有下层导线横担;
所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担;
所述上层导线横担自塔身面向开断侧布置一边三角形横担;
所述中层导线横担自塔身平行目标开断线路方向布置两边横担,自塔身背向开断侧垂直目标开断线路布置一边横担;
所述下层导线横担自塔身面向开断侧布置一边三角形横担;
所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向。
本发明相比于现有技术方案具有以下优点:
1)不改变目标开断线路导线布置,降低了目标开断线路相邻杆塔难以满足电气间隙要求的可能;
2)仅利用一基杆塔即可完成双回路双侧开断,新建杆塔数量较少,节约投资;
3)开断形成双回线路继续走线,原双回路分支塔可根据现场实际情况采用直线杆(或小角度转角杆)代替,降低了杆塔使用条件,缩减了线路走廊;
4)三角形横担有利于抵消目标开断线路与开断后形成线路对横担的受力,整体结构更稳定。
附图说明:
图1为本发明的结构示意图;
图2为图1的右视图;
图3为顶层地线横担的结构示意图;
图4为上层导线横担、下层导线横担的结构示意图;
图5为中层导线横担的结构示意图;
图6为本发明接线示意图。
具体实施方式:
参照图1-2,本发明它包括塔身1、顶层地线横担2、上层导线横担3、中层导线横担4、下层导线横担5,所述塔身1顶端设置有顶层地线横担2,顶层地线横担2下方设置有上层导线横担3,上层导线横担3下方设置有中层导线横担4,中层导线横担4下方设置有下层导线横担5。
参照图3,所述顶层地线横担2自塔身1背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担。
参照图4,所述上层导线横担自塔身1面向开断侧布置一边三角形横担,所述下层导线横担与上层导线横担一样,也是自塔身1面向开断侧布置一边三角形横担。
参照图1-4,所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向。所述三角形横担顶点垂直于底边高的长度由原线路导地线布置决定,所述三角形横担底边的长度由开断形成双回线路导地线布置决定。
参照图5,所述中层导线横担4自塔身1平行目标开断线路方向布置两边横担,自塔身1背向开断侧垂直目标开断线路布置一边横担。所述中层导线横担平行于目标开断线路方向的横担长度由开断后形成线路的导线布置方式决定,垂直于目标开断线路方向的横担长度由原线路的导线布置方式决定。
参照图6,于目标线路下方新建一基本发明杆塔,将目标开断线路导线的中相悬挂在上层导线横担中底边横担的顶点处,将目标开断线路导线的背向开断侧的导线悬在中层导线横担中垂直于目标开断线路导线的一边横担上,将开断后形成线路悬挂在中层导线横担中平行线路方向的两边横担上,将目标开断线路导线靠近开断侧的导线悬挂在下层导线横担中底边横担的顶点处,将地线悬挂在顶层地线横担的直于目标开断线路导线的一边横担及三角形横担中底边横担的顶点处;中层导线横担处平行于目标开断线路的横担梢部悬挂跳线串,开断后形成线路与原线路利用跳线串与跳线实现线路连通。
所述顶层地线横担,上层导线横担,中层导线横担,下层导线横担长度及间距需考虑导线间和导地线间电气距离、导线与塔身的电气距离、上下层相邻导线间的最小水平偏移距离。

Claims (1)

1.一种采用三角形横担的单回路开断钢管杆塔,其特征在于,它包括塔身、顶层地线横担、上层导线横担、中层导线横担、下层导线横担,所述塔身顶端设置有顶层地线横担,顶层地线横担下方设置有上层导线横担,上层导线横担下方设置有中层导线横担,中层导线横担下方设置有下层导线横担;
所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担;
所述上层导线横担自塔身面向开断侧布置一边三角形横担;
所述中层导线横担自塔身平行目标开断线路方向布置两边横担,自塔身背向开断侧垂直目标开断线路布置一边横担;
所述下层导线横担自塔身面向开断侧布置一边三角形横担;
所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向。
CN201510562188.3A 2015-09-07 2015-09-07 一种采用三角形横担的单回路开断钢管杆塔 Active CN105155912B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510562188.3A CN105155912B (zh) 2015-09-07 2015-09-07 一种采用三角形横担的单回路开断钢管杆塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510562188.3A CN105155912B (zh) 2015-09-07 2015-09-07 一种采用三角形横担的单回路开断钢管杆塔

Publications (2)

Publication Number Publication Date
CN105155912A CN105155912A (zh) 2015-12-16
CN105155912B true CN105155912B (zh) 2018-01-26

Family

ID=54796918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510562188.3A Active CN105155912B (zh) 2015-09-07 2015-09-07 一种采用三角形横担的单回路开断钢管杆塔

Country Status (1)

Country Link
CN (1) CN105155912B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927189A (zh) * 2020-07-28 2020-11-13 国网安徽省电力有限公司经济技术研究院 一种单回路可调相开断塔

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2538711A1 (de) * 1975-08-30 1977-03-10 Bbc Brown Boveri & Cie Fuehrungseinrichtung fuer mehrfachleitungen
KR101018845B1 (ko) * 2008-09-17 2011-03-04 한국전력공사 송전용 철탑
CN203412346U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 一种新型单回路开断杆塔
CN203412348U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 一种y形横担布置的双回路单侧回路开断输电钢管杆
CN204370879U (zh) * 2014-08-06 2015-06-03 赵晖 一种新型交叉换位塔
CN205046914U (zh) * 2015-09-07 2016-02-24 安徽华电工程咨询设计有限公司 一种采用三角形横担的单回路开断钢管杆塔

Also Published As

Publication number Publication date
CN105155912A (zh) 2015-12-16

Similar Documents

Publication Publication Date Title
CN203412348U (zh) 一种y形横担布置的双回路单侧回路开断输电钢管杆
CN104201634B (zh) 一种单回线路交叉开断方法
CN105155908A (zh) 一种重冰区交流干字型耐张塔
CN105155914A (zh) 一种单回输电线路开断角钢塔
CN104196301B (zh) 一种交叉换位塔
CN105257067A (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN105155912B (zh) 一种采用三角形横担的单回路开断钢管杆塔
CN106567595A (zh) 一种四回路电缆开断耐张塔
CN105155911B (zh) 一种采用三角形横担布置的双回路双侧开断钢管杆塔
CN105155910B (zh) 一种采用v字型组合串的单回路开断钢管杆塔
CN206016392U (zh) 一种双回路双侧开断输电线路杆塔
CN205046915U (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN205046931U (zh) 一种采用三角形横担布置的双回路双侧开断钢管杆塔
CN204370879U (zh) 一种新型交叉换位塔
CN205577567U (zh) 一种双回路双t接钢管杆
CN205046914U (zh) 一种采用三角形横担的单回路开断钢管杆塔
CN206091522U (zh) 既有单回路耐张铁塔电缆引下杆
CN203412350U (zh) 一种双回路单侧回路电缆方式开断的输电钢管杆
CN106555496A (zh) 一种双回架空输电线路电缆开断引下转角塔
CN106639489A (zh) 500kV大角度阶梯式地线单回路钻越塔
CN206128807U (zh) 雁翅型混压四回路钢管塔
CN205000712U (zh) 一种单回路开断成不同相序排列的钢管杆塔
CN206220619U (zh) 一种单回架空输电线路电缆t接引下耐张塔
CN109898913A (zh) 一种500kV双回路直线钻越塔
CN205046913U (zh) 一种采用v字型组合串的单回路开断钢管杆塔

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhao Hui

Inventor after: Zhou Jian

Inventor after: Wu Yiyang

Inventor after: Dong Jiangrong

Inventor after: Yin Xuechao

Inventor after: Wang Mengbo

Inventor after: Xia Qi

Inventor after: Mu Hong

Inventor after: Wang Yukun

Inventor after: Xu Jin

Inventor after: Wang Li

Inventor after: Zhu Xiaopeng

Inventor after: Luo Zhengbang

Inventor after: Zheng Shaojiang

Inventor after: Lv Dongchun

Inventor before: Zhao Hui

Inventor before: Zhou Jian

Inventor before: Wu Yiyang

Inventor before: Yin Xuechao

Inventor before: Wang Mengbo

Inventor before: Xia Qi

Inventor before: Wang Li

Inventor before: Zhu Xiaopeng

Inventor before: Dong Jiangrong

Inventor before: Wang Yukun

Inventor before: Luo Zhengbang

Inventor before: Xu Jin

Inventor before: Zheng Shaojiang

Inventor before: Lv Dongchun

GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180108

Address after: Jinzhai road in Baohe District of Hefei city of Anhui Province, No. 122 230022

Applicant after: Anhui Huadian Engineering Consultating & Design Co., Ltd.

Applicant after: STATE GRID ANHUI ELECTRIC POWER COMPANY, WUHU POWER SUPPLY COMPANY

Applicant after: Economic Technology Research Institute of State Grid Anhui Electric Power Company

Address before: Jinzhai road in Baohe District of Hefei city of Anhui Province, No. 122 230001

Applicant before: Anhui Huadian Engineering Consultating & Design Co., Ltd.

Applicant before: STATE GRID ANHUI ELECTRIC POWER COMPANY, WUHU POWER SUPPLY COMPANY