CN105155911B CN201510562172.2A CN201510562172A CN105155911B CN 105155911 B CN105155911 B CN 105155911B CN 201510562172 A CN201510562172 A CN 201510562172A CN 105155911 B CN105155911 B CN 105155911B
Authority
CN
China
Prior art keywords
arm
cross
cut
tower body
triangle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510562172.2A
Other languages
English (en)
Other versions
CN105155911A (zh
Inventor
朱晓鹏
张天忠
穆弘
程斌
王力
罗正帮
赵晖
王东
陈彦焰
李昆梅
刘琨
杨雪锋
郑少将
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd, Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201510562172.2A priority Critical patent/CN105155911B/zh
Publication of CN105155911A publication Critical patent/CN105155911A/zh
Application granted granted Critical
Publication of CN105155911B publication Critical patent/CN105155911B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种采用三角形横担布置的双回路双侧开断钢管杆塔。它包括塔身、顶层地线横担、上层导线横担、下层导线横担,所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担;所述上层导线横担分三层,每层自塔身平行目标开断线路布置两边横担,自塔身背向开断侧垂直目标开断线路布置一边横担;所述下层导线横担分三层,每层自塔身面向开断侧布置一边三角形横担。本发明仅采用一基杆塔实现双回路双侧开断,减少了杆塔数量;开断后形成四回路继续走线,避免四回路分支杆的使用,不改变相邻杆塔的导线布置方式,降低了邻塔改造的可能。

Description

一种采用三角形横担布置的双回路双侧开断钢管杆塔
技术领域:
本发明涉及高压输电线路技术领域,尤其涉及一种采用三角形横担布置的双回路双侧开断钢管杆塔。
背景技术:
在现有高压输电线路工程中,经常出现双回输电线路同时开断接入新建变电站的情况,通常采用在原双回线路下方新建两基双回路耐张杆塔,形成两条双回线路继续走线,随着城区高压走廊逐渐紧张,要求线路开断后通过四回路分支杆形成一条四回线路走线,该开断方式存在新建杆塔数量较多,占地面积较大,线路走廊较宽等问题,实施难度较大。
发明内容:
本发明的目的是提供一种采用三角形横担布置的双回路双侧开断钢管杆塔,仅采用一基杆塔实现双回路双侧开断, 减少了杆塔数量;开断后形成四回路继续走线,避免四回路分支杆的使用,不改变相邻杆塔的导线布置方式,降低了邻塔改造的可能。
为了解决背景技术中存在的问题,本发明采用以下技术方案:它包括塔身、顶层地线横担、上层导线横担、下层导线横担,所述塔身顶端设置有顶层地线横担,顶层地线横担下方设置有上层导线横担,上层导线横担下方设置有下层导线横担;
所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担;
所述上层导线横担分三层,每层自塔身平行目标开断线路布置两边横担,自塔身背向开断侧垂直目标开断线路布置一边横担;
所述下层导线横担分三层,每层自塔身面向开断侧布置一边三角形横担;
所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向。
本发明相比于现有技术方案具有以下优点:
1)不改变目标开断线路导线布置,降低了目标开断线路相邻杆塔难以满足电气间隙要求的可能;
2)仅利用一基本专利杆塔即可完成双回路双侧开断,新建杆塔数量较少,节约投资;
3)开断形成四回线路继续走线,原四回路分支塔可根据现场实际情况采用直线杆(或小角度转角杆)代替,降低了杆塔使用条件,缩减了线路走廊;
4)三角形横担有利于抵消目标开断线路与开断后形成线路对横担的受力,整体结构更稳定。
附图说明:
图1为本发明的结构示意图;
图2为图1的右视图;
图3为顶层地线横担的结构示意图;
图4为上层导线横担的结构示意图;
图5为下层导线横担的结构示意图;
图6为本发明接线示意图。
具体实施方式:
参照图1-2,本发明它包括塔身1、顶层地线横担2、上层导线横担3、下层导线横担4,所述塔身1顶端设置有顶层地线横担2,顶层地线横担2下方设置有上层导线横担3,上层导线横担3下方设置有下层导线横担4;
参照图3,所述顶层地线横担2自塔身1背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担。
参照图4,所述上层导线横担3分三层,每层均呈T字型,每层自塔身1平行目标开断线路布置两边横担,自塔身1背向开断侧垂直目标开断线路布置一边横担。
参照图5,所述下层导线横担4分三层,每层自塔身1面向开断侧布置一边三角形横担。
参照图1-5,所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向。所述三角形横担顶点垂直于底边高的长度由原线路导地线布置决定;所述三角形横担底边的长度由开断形成四回线路导地线布置决定。
参照图6,于目标线路下方新建一基本发明杆塔,在上层导线横担中垂直于目标开断线路的横担上悬挂线路远离开断侧的导线,平行于目标开断线路的横担上悬挂开断后形成线路,利用上层导线横担中平行于线路方向的横担稍部悬挂跳线串,利用跳线串与跳线实现线路连通。在下层导线横担中三角形底边的两端处悬挂目标开断线路导线与开断后形成线路导线,顶层地线横担的垂直于目标开断线路地线的一边横担悬挂目标开断线路的地线,顶层地线横担的三角形横担的底边横担的两端处悬挂开断线路地线及开断后形成线路地线。
所述上层导线横担平行于目标开断线路方向的横担长度由开断后形成线路的导线布置方式决定,垂直于目标开断线路方向的横担长度由原线路的导线布置方式决定。
所述顶层地线横担、上层导线横担、下层导线横担长度及间距需考虑导线间和导地线间电气距离、导线与塔身的电气距离、上下层相邻导线间的最小水平偏移距离。

Claims (1)

1.一种采用三角形横担布置的双回路双侧开断钢管杆塔,其特征在于,它包括塔身、顶层地线横担、上层导线横担、下层导线横担,所述塔身顶端设置有顶层地线横担,顶层地线横担下方设置有上层导线横担,上层导线横担下方设置有下层导线横担;
所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角形横担;
所述上层导线横担分三层,每层自塔身平行目标开断线路布置两边横担,自塔身背向开断侧垂直目标开断线路布置一边横担;
所述下层导线横担分三层,每层自塔身面向开断侧布置一边三角形横担;
所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向。
CN201510562172.2A 2015-09-07 2015-09-07 一种采用三角形横担布置的双回路双侧开断钢管杆塔 Active CN105155911B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510562172.2A CN105155911B (zh) 2015-09-07 2015-09-07 一种采用三角形横担布置的双回路双侧开断钢管杆塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510562172.2A CN105155911B (zh) 2015-09-07 2015-09-07 一种采用三角形横担布置的双回路双侧开断钢管杆塔

Publications (2)

Publication Number Publication Date
CN105155911A CN105155911A (zh) 2015-12-16
CN105155911B true CN105155911B (zh) 2018-03-13

Family

ID=54796917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510562172.2A Active CN105155911B (zh) 2015-09-07 2015-09-07 一种采用三角形横担布置的双回路双侧开断钢管杆塔

Country Status (1)

Country Link
CN (1) CN105155911B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356429A (zh) * 2018-11-26 2019-02-19 中国能源建设集团陕西省电力设计院有限公司 一种110kV双回路钻越塔
CN109914897B (zh) * 2019-03-31 2024-02-23 中国电建集团福建省电力勘测设计院有限公司 双回架空线路开断用三向横担钢管杆

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5809734A (en) * 1996-11-04 1998-09-22 Turner; Daryl Truss structure for a utility pole
CN203412348U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 一种y形横担布置的双回路单侧回路开断输电钢管杆
CN203603572U (zh) * 2013-10-25 2014-05-21 国家电网公司 多回路十字交跨钢管杆
CN103924814B (zh) * 2014-05-05 2016-03-09 国家电网公司 应用于输变电线路中的双开环钢管杆
CN205046931U (zh) * 2015-09-07 2016-02-24 安徽华电工程咨询设计有限公司 一种采用三角形横担布置的双回路双侧开断钢管杆塔

Also Published As

Publication number Publication date
CN105155911A (zh) 2015-12-16

Similar Documents

Publication Publication Date Title
CN105298201B (zh) 输电线路电缆终端立体引下装置
CN104201634B (zh) 一种单回线路交叉开断方法
CN105178682A (zh) 双回路单侧开断电缆引下直线塔
CN105155914A (zh) 一种单回输电线路开断角钢塔
CN205116866U (zh) 输电线路电缆终端立体引下装置
CN105155911B (zh) 一种采用三角形横担布置的双回路双侧开断钢管杆塔
CN104196301B (zh) 一种交叉换位塔
CN104314355B (zh) 一种横担异形的t接钢管杆
CN102005712B (zh) 双回紧凑型输电线路跳线为水平绕跳的耐张转角塔
CN105257067A (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN205046931U (zh) 一种采用三角形横担布置的双回路双侧开断钢管杆塔
CN103001165A (zh) 同塔双回路单线换位塔
CN205046915U (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN205577567U (zh) 一种双回路双t接钢管杆
CN102810364A (zh) ±500kV同塔双回线路用单挂点双线夹双联V型瓷绝缘子串
CN105257061A (zh) 一种单回路变呼高杆塔
CN105155910B (zh) 一种采用v字型组合串的单回路开断钢管杆塔
CN204370879U (zh) 一种新型交叉换位塔
CN204754412U (zh) 一种单侧横担同时下两回电缆的终端杆
CN203412350U (zh) 一种双回路单侧回路电缆方式开断的输电钢管杆
CN105155912B (zh) 一种采用三角形横担的单回路开断钢管杆塔
CN105155909B (zh) 一种单回路开断成不同相序排列的钢管杆塔
CN205046914U (zh) 一种采用三角形横担的单回路开断钢管杆塔
CN105735731B (zh) 一种双回路双t接钢管杆
CN206091522U (zh) 既有单回路耐张铁塔电缆引下杆

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhu Xiaopeng

Inventor after: Li Kunmei

Inventor after: Liu Kun

Inventor after: Yang Xuefeng

Inventor after: Zheng Shaojiang

Inventor after: Zhang Tianzhong

Inventor after: Mu Hong

Inventor after: Cheng Bin

Inventor after: Wang Li

Inventor after: Luo Zhengbang

Inventor after: Zhao Hui

Inventor after: Wang Dong

Inventor after: Chen Yanyan

Inventor before: Zhu Xiaopeng

Inventor before: Li Kunmei

Inventor before: Liu Kun

Inventor before: Yang Xuefeng

Inventor before: Zheng Shaojiang

Inventor before: Dong Jiangrong

Inventor before: Luo Zhengbang

Inventor before: Zhao Hui

Inventor before: Wang Li

Inventor before: Zhang Tianzhong

Inventor before: Cheng Bin

Inventor before: Wang Dong

Inventor before: Chen Yanyan

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180117

Address after: Jinzhai road in Baohe District of Hefei city of Anhui Province, No. 122 230001

Applicant after: Anhui Huadian Engineering Consultating & Design Co., Ltd.

Applicant after: Guo Wang Anhui Power Company Hefei Power Supply Company

Applicant after: State Grid Anhui Electric Power Company

Applicant after: Economic Technology Research Institute of State Grid Anhui Electric Power Company

Address before: Jinzhai road in Baohe District of Hefei city of Anhui Province, No. 122 230001

Applicant before: Anhui Huadian Engineering Consultating & Design Co., Ltd.

Applicant before: Guo Wang Anhui Power Company Hefei Power Supply Company

Applicant before: State Grid Anhui Electric Power Company

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant