CN105155653B - The first rain part flow arrangement of sensing flow velocity - Google Patents

The first rain part flow arrangement of sensing flow velocity Download PDF

Info

Publication number
CN105155653B
CN105155653B CN201510546029.4A CN201510546029A CN105155653B CN 105155653 B CN105155653 B CN 105155653B CN 201510546029 A CN201510546029 A CN 201510546029A CN 105155653 B CN105155653 B CN 105155653B
Authority
CN
China
Prior art keywords
rain
filter cartridge
flow velocity
induction
isolation base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510546029.4A
Other languages
Chinese (zh)
Other versions
CN105155653A (en
Inventor
李习洪
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Smart Ecological Environmental Protection Co ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201510546029.4A priority Critical patent/CN105155653B/en
Publication of CN105155653A publication Critical patent/CN105155653A/en
Application granted granted Critical
Publication of CN105155653B publication Critical patent/CN105155653B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)
  • Filtration Of Liquid (AREA)

Abstract

本发明公开了一种感应流速初雨分流装置,包括井体,井体上设有进水管和出水管,井体内壁上部固定有过滤筒,过滤筒底部连有隔离底座,隔离底座下方的井体内壁围成初雨收集室,隔离底座上开有与初雨收集室连通的过水通道,隔离底座上方的过滤筒上固定连有导流板,导流板上设有流速感应结构且开有连接绳过孔,流速感应结构上连有连接绳,连接绳一端与流速感应结构固定连接,另一端穿过连接绳过孔与密封球固定连接,密封球与过水通道密封配合;初雨收集室上连有初雨弃流管。本发明依靠感应进水的流速来决定是否弃流,初雨弃流充分,整个过程水力自控,无需外界动力,操作简单,具有节能、耐用及不易堵塞的优点。

The invention discloses an induction flow rate initial rain diversion device, which comprises a well body, on which a water inlet pipe and a water outlet pipe are arranged, a filter cartridge is fixed on the upper part of the inner wall of the well body, and an isolation base is connected to the bottom of the filter cylinder, and the well below the isolation base is The inner wall encloses the initial rain collection chamber, and the isolation base is provided with a water passage connected with the initial rain collection chamber, and the filter cylinder above the isolation base is fixedly connected with a deflector, and the deflector is provided with a flow rate sensing structure and opened. There is a connection rope hole, and the flow velocity sensing structure is connected with a connection rope. One end of the connection rope is fixedly connected to the flow velocity sensing structure, and the other end is fixedly connected to the sealing ball through the connection rope hole, and the sealing ball is sealed and matched with the water passage; The collection chamber is connected with the first rain abandonment flow pipe. The invention depends on the flow rate of the incoming water to determine whether to abandon the flow, the first rain abandons the flow fully, the whole process is hydraulically controlled, no external power is needed, the operation is simple, and it has the advantages of energy saving, durability and not easy to be blocked.

Description

感应流速初雨分流装置Induction flow velocity primary rain diversion device

技术领域technical field

本发明涉及雨水回收利用技术,具体地指一种感应流速初雨分流装置。The invention relates to rainwater recovery and utilization technology, in particular to an induction flow velocity primary rain diversion device.

背景技术Background technique

随着城市大气污染及地面污染的增多,雨水径流污染愈加严重,尤其是污染物较多的初期雨水(简称初雨),国内外众多研究表明,径流的初期雨水水质很差,有些地区的初雨的污染物指标最高值已远远高于典型城市生活污水,因此对初雨的处理和处置是雨水回收利用的技术关键,目前对初雨径流多采用弃流的处置方式,也有采用截流管网系统进行初雨截流的,其利用截流管网系统将初雨截流至污水管道,送至污水处理厂进行净化处理,而降雨后期的雨水污染程度较轻,经过预处理后,直接排入自然水体,但目前的初雨截流设施存在以下缺点:1)截流管网系统结构复杂,操作和维护难度大;2)在对后期雨水进行排放前的预处理时设备容易堵塞;3)通常需要通过电动阀门、堰门进行截流,能耗大,使用寿命不长。With the increase of urban air pollution and ground pollution, the pollution of rainwater runoff is becoming more and more serious, especially the initial rainwater with more pollutants (referred to as initial rain). Numerous studies at home and abroad have shown that the initial rainwater quality of runoff is very poor. The highest value of rain pollutant indicators is much higher than that of typical urban domestic sewage. Therefore, the treatment and disposal of early rain is the key technology of rainwater recycling. If the initial rain is intercepted by the network system, it uses the interception pipe network system to intercept the initial rain to the sewage pipe and send it to the sewage treatment plant for purification treatment. The rainwater pollution in the later period of the rainfall is relatively light. After pretreatment, it is directly discharged into the natural environment. However, the current initial rainwater interception facilities have the following disadvantages: 1) The structure of the interception pipe network system is complex, and operation and maintenance are difficult; 2) The equipment is easy to be blocked during the pretreatment of the later rainwater before discharge; 3) Usually, it needs to pass Electric valves and weir gates are used to intercept the flow, which consumes a lot of energy and has a short service life.

发明内容Contents of the invention

本发明的目的就是要提供一种感应流速初雨分流装置,该装置操作简单,清洗便捷,无需外界动力。The object of the present invention is to provide an induction flow rate initial rain diversion device, which is easy to operate, easy to clean, and does not require external power.

为实现上述目的,本发明采用的技术方案是:一种感应流速初雨分流装置,包括井体,所述井体上设有进水管和出水管,所述井体内壁上部固定有过滤筒,所述过滤筒底部连有隔离底座,所述隔离底座下方的所述井体内壁围成初雨收集室,所述隔离底座上开有与所述初雨收集室连通的过水通道,所述隔离底座上方的所述过滤筒上固定连有导流板,所述导流板上设有流速感应结构且开有连接绳过孔,所述流速感应结构上连有连接绳,所述连接绳一端与所述流速感应结构固定连接,另一端穿过所述连接绳过孔与密封球固定连接,所述密封球与所述过水通道密封配合;所述初雨收集室上连有初雨弃流管。In order to achieve the above object, the technical solution adopted by the present invention is: an induction flow rate initial rain diversion device, including a well body, the well body is provided with a water inlet pipe and a water outlet pipe, and a filter cartridge is fixed on the upper part of the inner wall of the well body, The bottom of the filter cartridge is connected with an isolation base, and the inner wall of the well under the isolation base forms an initial rain collection chamber, and the isolation base is provided with a water passage communicating with the initial rain collection chamber. A flow deflector is fixedly connected to the filter cartridge above the isolation base, and the flow velocity sensing structure is provided on the flow deflector and a connection rope hole is opened. The flow velocity sensing structure is connected with a connection rope, and the connection rope One end is fixedly connected with the flow velocity sensing structure, and the other end is fixedly connected with the sealing ball through the hole of the connecting rope, and the sealing ball is sealed and matched with the water passage; the initial rain collecting chamber is connected with an initial rain Discard flow tube.

本发明通过流速感应结构、导流板,密封球及隔离底座等结构的妥善配合将污染物浓度较高的初雨从雨水中分离出来,使得初雨经初雨弃流管进入污水管道送入污水处理厂进行集中处理,同时,水质较好的后期雨水经过滤筒过滤后从出水管流出,进行回收利用,整个过程依靠感应进水的流速来决定是否弃流,初雨弃流充分;利用本装置对雨水进行预处理,可以去除雨水中大部分的污染物,有效控制了进入蓄水池的雨水中污染物的浓度,从而解决了雨水在回收利用前初雨弃流的工程问题;本装置利用降雨前后期的雨水流速大小变化完成前期的初雨自动弃流及后期的雨水收集过滤,全程水力自控,无需外界动力,具有操作简单、节能、耐用的优点;当降雨结束,感应挡板在感应挡板回位扭簧的扭力下复位,处于竖直状态,密封球脱离隔离底座,这样井内剩余的雨水就可以从初雨弃流管排出,排出的同时,对井体底部沉积的泥沙进行冲洗,从而利用井体内自身雨水实现对井体底部沉积泥沙的自动冲洗,使得本装置不易堵塞;本装置结构简单,清洗方便,尤其适用于屋顶雨水的雨落管、径流雨水的集中入口或雨水回收利用的进水口处。The invention separates the primary rain with high pollutant concentration from the rainwater through the proper cooperation of the flow velocity sensing structure, deflector, sealing ball and isolation base, so that the primary rain enters the sewage pipeline through the primary rain discarding pipe The sewage treatment plant conducts centralized treatment. At the same time, the late rainwater with good water quality is filtered by the filter cartridge and flows out of the outlet pipe for recycling. The whole process depends on the flow rate of the incoming water to determine whether to abandon the flow. The initial rain abandonment is sufficient; The device pre-treats rainwater, which can remove most of the pollutants in the rainwater, effectively control the concentration of pollutants in the rainwater entering the reservoir, and thus solve the engineering problem of rainwater abandonment before recycling; The device utilizes the changes in the flow rate of rainwater before and after the rainfall to complete the automatic abandonment of the first rain in the early stage and the collection and filtration of rainwater in the later stage. The whole process is hydraulically self-controlled and does not require external power. Resetting under the torsion force of the return torsion spring of the induction baffle, it is in a vertical state, and the sealing ball is separated from the isolation base, so that the remaining rainwater in the well can be discharged from the first rain abandonment pipe, and at the same time, the mud deposited at the bottom of the well body The sand is flushed, so that the rainwater in the well body can be used to automatically flush the sediment deposited at the bottom of the well body, so that the device is not easy to be blocked; the device has a simple structure and is easy to clean, especially suitable for the concentration of rainwater on the roof and runoff rainwater Inlets or inlets for rainwater recycling.

进一步地,所述流速感应结构包括感应挡板和对称固定在所述导流板上的固定板,所述感应挡板底端与所述固定板间连有销轴,所述销轴上设有感应挡板回位扭簧。Further, the flow velocity sensing structure includes an induction baffle and a fixed plate symmetrically fixed on the deflector, a pin shaft is connected between the bottom end of the induction baffle and the fixed plate, and the pin shaft is provided with There is an induction baffle return torsion spring.

进一步地,所述过水通道包括顶端的导入部和底端的密封部,所述导入部为倒锥形通道,其断面直径从上往下递减,其顶部断面直径大于所述密封球直径,其底部断面直径与所述密封部断面直径相等,所述密封部为圆柱形通道,其断面直径小于所述密封球直径。Further, the water passage includes an introduction part at the top and a sealing part at the bottom, the introduction part is an inverted tapered channel, its cross-sectional diameter decreases from top to bottom, and its top cross-sectional diameter is larger than the diameter of the sealing ball, which The cross-sectional diameter of the bottom is equal to the cross-sectional diameter of the sealing part, and the sealing part is a cylindrical channel whose cross-sectional diameter is smaller than that of the sealing ball.

进一步地,所述过滤筒为顶部和底部分别敞开的滤网筒,所述过滤筒筒壁左侧开有进水口,所述进水管与所述进水口对接,所述出水管与所述过滤筒筒壁右侧对接;所述过滤筒筒壁的前侧与后侧之间连有所述导流板。Further, the filter cartridge is a filter cartridge with open top and bottom respectively, a water inlet is opened on the left side of the wall of the filter cartridge, the water inlet pipe is connected to the water inlet, and the water outlet pipe is connected to the filter The right side of the cylinder wall is butted; the deflector is connected between the front side and the rear side of the filter cylinder wall.

进一步地,所述进水管的管径大于所述初雨弃流管的管径。Further, the pipe diameter of the water inlet pipe is larger than the pipe diameter of the first rain abandonment pipe.

进一步地,所述过滤筒底部设有卡板,所述隔离底座与所述卡板卡接。Further, a clamping plate is provided at the bottom of the filter cartridge, and the isolation base is clamped with the clamping plate.

进一步地,所述井体内壁中部设有限位凸起,所述过滤筒底端限位于所述限位凸起上。Further, a limiting protrusion is provided in the middle of the inner wall of the well, and the bottom end of the filter cartridge is limited on the limiting protrusion.

进一步地,所述导流板与所述隔离底座间留有过水间隙。Further, there is a water gap between the deflector and the isolation base.

进一步地,所述初雨弃流管开设在所述井体侧壁底端。Further, the primary rain jettison pipe is set at the bottom end of the side wall of the well body.

更进一步地,所述过滤筒顶部连有提手。定期清洗本装置时,只需提起提手,就可以将包括过滤筒,导流板,流速感应结构及密封球在内的整个装置内部的芯子提出,然后对该芯子进行清洗,清洗完毕后就可以将芯子整体在放到井体内,清洗过程方便快捷。Furthermore, a handle is attached to the top of the filter cartridge. When cleaning the device regularly, you only need to lift the handle to lift the core inside the device, including the filter cartridge, flow deflector, flow rate sensing structure and sealing ball, and then clean the core. After that, the core can be put into the well body as a whole, and the cleaning process is convenient and quick.

附图说明Description of drawings

图1为一种感应流速初雨分流装置在对初雨进行弃流时的状态结构示意图。Fig. 1 is a schematic diagram of the state structure of an induction flow velocity primary rain diversion device when the primary rain is discarded.

图2为一种感应流速初雨分流装置在对后期雨水进行过滤排放时的状态结构示意图。Fig. 2 is a schematic diagram of the state structure of an induction flow rate initial rain diversion device when filtering and discharging later rainwater.

具体实施方式detailed description

下面结合附图对本发明作进一步的详细说明,便于更清楚地了解本发明,但它们不对本发明构成限定。The present invention will be further described in detail below in conjunction with the accompanying drawings to facilitate a clearer understanding of the present invention, but they do not limit the present invention.

如图1,图2所示一种感应流速初雨分流装置,包括井体1,所述井体1上设有进水管2和出水管3,所述井体1内壁中部对称设有多个限位凸起1-2,井体1内壁上部设有可取出的过滤筒4,过滤筒4底端限位于所述限位凸起1-2上;过滤筒4为顶部和底部分别敞开的滤网筒,过滤筒4顶部连有提手14,底部连有隔离底座5,所述过滤筒4筒壁左侧开有进水口4-1,所述进水管2与所述进水口4-1对接,所述出水管3与所述过滤筒4筒壁右侧对接,所述过滤筒4筒壁的前侧与后侧之间连有导流板7,所述过滤筒4底部设有一圈环形的卡板4-2,所述隔离底座5与所述卡板4-2卡接,所述隔离底座5下方的所述井体1内壁围成初雨收集室1-1,所述隔离底座5上开有与所述初雨收集室1-1连通的过水通道6,导流板7位于隔离底座5上方,且导流板7左右侧均与隔离底座5间留有过水间隙13,所述导流板7上设有流速感应结构8且开有连接绳过孔9,所述流速感应结构8包括感应挡板8-1和两块对称侧立固定在所述导流板7上的固定板8-2,所述感应挡板8-1底端与所述固定板8-2间连有销轴,所述销轴两端分别装有感应挡板回位扭簧,即:感应挡板8-1通过销轴固定在导流板7中心,感应挡板8-1可以绕着销轴中心旋转运动,在没有水流冲击感应挡板8-1时,感应挡板回位扭簧的扭力使感应挡板8-1处于竖直状态,当进水管2有水流时,水流的冲击力撞击感应挡板8-1,可以使得感应挡板8-1克服感应挡板回位扭簧的扭力旋转90度而变成水平状态;感应挡板8-1上连有柔性的连接绳10,所述连接绳10一端与感应挡板8-1固定连接,另一端穿过所述连接绳过孔9与密封球11固定连接,所述密封球11与所述过水通道6密封配合,所述过水通道6包括顶端的导入部6-1和底端的密封部6-2,所述导入部6-1为倒锥形通道,其断面直径从上往下递减,其顶部断面直径大于所述密封球11直径,其底部断面直径与所述密封部6-2断面直径相等,所述密封部6-2为圆柱形通道,其断面直径小于所述密封球11直径,密封球11为实心球体,其重力远大于自身的浮力;所述初雨收集室1-1上连有初雨弃流管12,初雨弃流管12开设在所述井体1侧壁底端,进水管2的管径大于所述初雨弃流管12的管径。As shown in Fig. 1 and Fig. 2, an induction flow rate initial rain diversion device includes a well body 1, and the well body 1 is provided with a water inlet pipe 2 and a water outlet pipe 3, and the middle part of the inner wall of the well body 1 is symmetrically provided with a plurality of The limit protrusion 1-2, the upper part of the inner wall of the well body 1 is provided with a removable filter cartridge 4, and the bottom end of the filter cartridge 4 is limited on the limit protrusion 1-2; the filter cartridge 4 is open at the top and bottom respectively The filter cartridge, the top of the filter cartridge 4 is connected with a handle 14, and the bottom is connected with an isolation base 5, and the left side of the filter cartridge 4 is provided with a water inlet 4-1, and the water inlet pipe 2 is connected to the water inlet 4-1. 1 docking, the outlet pipe 3 is docked with the right side of the wall of the filter cartridge 4, a deflector 7 is connected between the front side and the rear side of the wall of the filter cartridge 4, and a bottom of the filter cartridge 4 is provided An annular clamping plate 4-2, the isolation base 5 is clamped with the clamping plate 4-2, and the inner wall of the well body 1 below the isolation base 5 forms a primary rain collection chamber 1-1, the The isolation base 5 is provided with a water passage 6 communicating with the first rain collection chamber 1-1, and the deflector 7 is located above the isolation base 5, and the left and right sides of the deflector 7 are connected to the isolation base 5 for passing water. Gap 13, the deflector 7 is provided with a flow velocity sensing structure 8 and has a connecting rope hole 9, the flow velocity sensing structure 8 includes an induction baffle 8-1 and two symmetrical sideways fixed on the guide The fixed plate 8-2 on the plate 7, the bottom end of the induction baffle 8-1 and the fixed plate 8-2 are connected with a pin shaft, and the two ends of the pin shaft are respectively equipped with induction baffle return torsion springs , that is: the induction baffle 8-1 is fixed on the center of the deflector 7 through the pin shaft, and the induction baffle 8-1 can rotate around the center of the pin shaft. When there is no water flow impacting the induction baffle 8-1, the induction baffle The torsional force of the return torsion spring makes the induction baffle 8-1 in a vertical state. When there is water flow in the water inlet pipe 2, the impact force of the water flow hits the induction baffle 8-1, which can make the induction baffle 8-1 overcome the induction baffle The torsion of the return torsion spring rotates 90 degrees to become a horizontal state; the induction baffle 8-1 is connected with a flexible connecting rope 10, and one end of the connecting rope 10 is fixedly connected with the induction baffle 8-1, and the other end passes through The connecting rope through hole 9 is fixedly connected with the sealing ball 11, and the sealing ball 11 is in sealing fit with the water passage 6, and the water passage 6 includes an introduction part 6-1 at the top and a sealing part 6-1 at the bottom. 2. The introduction part 6-1 is an inverted tapered channel, its cross-sectional diameter decreases from top to bottom, its top cross-sectional diameter is larger than the diameter of the sealing ball 11, and its bottom cross-sectional diameter is the same as that of the sealing part 6-2. equal, the sealing part 6-2 is a cylindrical passage, and its cross-sectional diameter is smaller than the diameter of the sealing ball 11, and the sealing ball 11 is a solid sphere whose gravity is much greater than its own buoyancy; Be connected with the first rain abandonment flow pipe 12, the first rain abandonment flow pipe 12 is offered at the bottom end of the side wall of the well body 1, and the pipe diameter of the water inlet pipe 2 is greater than the pipe diameter of the first rain abandonment pipe 12.

上述感应流速初雨分流装置的工作过程如下:如图1所示,在降雨初期,雨水通过地面径流进入雨水管道后,再通过进水管2进入本装置,由于初雨比较脏,污染物浓度较高,开始由于进水流速比较小,感应挡板8-1在感应挡板回位扭簧的扭力作用下处于竖直状态,密封球11在连接绳10的牵引下与隔离底座5脱开分离,初雨进入本装置后就直接从初雨弃流管12流出,再进入污水管道送入污水处理厂进行处理;如图2所示,随着降雨的持续,降雨强度越来越大,雨水流速随之越来越高,水流撞击感应挡板8-1,使感应挡板8-1发生90度旋转,密封球11下降至隔离底座5的过水通道6内,与过水通道6的密封部6-2形成密封配合,使得后期的雨水经过滤筒4过滤后,再经出水管3流出,进行回收利用;当降雨结束,感应挡板8-1在感应挡板回位扭簧的扭力下复位,处于竖直状态,密封球11脱离隔离底座5,这样井内剩余的雨水就可以从初雨弃流管12排出,排出的同时,可实现对井体1底部沉积的泥沙进行冲洗;定期清洗本装置时,只需提起提手14,就可以将包括过滤筒4,导流板7,流速感应结构8及密封球11在内的整个装置内部的芯子提出,然后对该芯子进行清洗,清洗完毕后就可以将芯子整体在放到井体1内,清洗过程方便快捷。The working process of the above-mentioned induction flow rate initial rain diversion device is as follows: as shown in Figure 1, at the initial stage of rainfall, rainwater enters the rainwater pipe through the ground runoff, and then enters the device through the water inlet pipe 2. Since the initial rain is relatively dirty, the concentration of pollutants is relatively high. At the beginning, due to the relatively small water inlet flow rate, the induction baffle 8-1 is in a vertical state under the torsion of the induction baffle return torsion spring, and the sealing ball 11 is separated from the isolation base 5 under the traction of the connecting rope 10 After the first rain enters the device, it will directly flow out from the first rain abandonment pipe 12, and then enter the sewage pipe and send it to the sewage treatment plant for treatment; as shown in Figure 2, as the rainfall continues, the rainfall intensity is increasing, and the rainwater The flow velocity becomes higher and higher thereupon, and the water flow hits the induction baffle 8-1, causing the induction baffle 8-1 to rotate 90 degrees, and the sealing ball 11 descends into the water passage 6 of the isolation base 5, and is connected to the water passage 6. The sealing part 6-2 forms a sealing fit, so that after the later rainwater is filtered by the filter cartridge 4, it flows out through the outlet pipe 3 for recycling; Reset under torsion, in a vertical state, the sealing ball 11 is separated from the isolation base 5, so that the remaining rainwater in the well can be discharged from the first rain abandonment pipe 12, and at the same time, the sediment deposited at the bottom of the well body 1 can be washed When cleaning this device on a regular basis, only need to mention the handle 14, the core inside the whole device including the filter cartridge 4, the deflector 7, the flow rate sensing structure 8 and the sealing ball 11 can be proposed, and then the core After cleaning, the whole core can be placed in the well body 1, and the cleaning process is convenient and fast.

利用本装置对雨水进行预处理,可以排出降雨前期70~80%的污染物,有效控制了进入蓄水池的雨水中污染物的浓度,从而解决了雨水在回收利用前初雨弃流的工程问题。Using this device to pretreat rainwater can discharge 70-80% of the pollutants in the early stage of rainfall, and effectively control the concentration of pollutants in the rainwater entering the storage tank, thus solving the project of rainwater abandonment before recycling question.

Claims (9)

1.一种感应流速初雨分流装置,包括井体(1),所述井体(1)上设有进水管(2)和出水管(3),其特征在于:所述井体(1)内壁上部固定有过滤筒(4),所述过滤筒(4)底部连有隔离底座(5),所述隔离底座(5)下方的所述井体(1)内壁围成初雨收集室(1-1),所述隔离底座(5)上开有与所述初雨收集室(1-1)连通的过水通道(6),所述隔离底座(5)上方的所述过滤筒(4)上固定连有导流板(7),所述导流板(7)上设有流速感应结构(8)且开有连接绳过孔(9),所述流速感应结构(8)上连有连接绳(10),所述连接绳(10)一端与所述流速感应结构(8)固定连接,另一端穿过所述连接绳过孔(9)与密封球(11)固定连接,所述密封球(11)与所述过水通道(6)密封配合;所述初雨收集室(1-1)上连有初雨弃流管(12);所述流速感应结构(8)包括感应挡板(8-1)和对称固定在所述导流板(7)上的固定板(8-2),所述感应挡板(8-1)底端与所述固定板(8-2)间连有销轴,所述销轴上设有感应挡板回位扭簧。1. A kind of induction flow rate initial rain diversion device, comprises well body (1), is provided with inlet pipe (2) and water outlet pipe (3) on described well body (1), is characterized in that: described well body (1) ) is fixed with a filter cartridge (4) on the inner wall, and the bottom of the filter cartridge (4) is connected with an isolation base (5), and the inner wall of the well body (1) below the isolation base (5) encloses a first rain collection chamber (1-1), the isolation base (5) is provided with a water passage (6) communicating with the first rain collection chamber (1-1), and the filter cartridge above the isolation base (5) (4) is fixedly connected with a deflector (7), and the deflector (7) is provided with a flow velocity sensing structure (8) and has a connection rope through hole (9), and the flow velocity sensing structure (8) A connecting rope (10) is connected to it, one end of the connecting rope (10) is fixedly connected to the flow velocity sensing structure (8), and the other end is fixedly connected to the sealing ball (11) through the connecting rope hole (9) , the sealing ball (11) is sealed with the water passage (6); the initial rain collection chamber (1-1) is connected with the initial rain flow pipe (12); the flow velocity sensing structure (8 ) includes an induction baffle (8-1) and a fixed plate (8-2) symmetrically fixed on the deflector (7), and the bottom end of the induction baffle (8-1) is connected to the fixed plate ( 8-2) A pin shaft is connected between them, and an induction baffle return torsion spring is arranged on the pin shaft. 2.根据权利要求1所述的感应流速初雨分流装置,其特征在于:所述过水通道(6)包括顶端的导入部(6-1)和底端的密封部(6-2),所述导入部(6-1)为倒锥形通道,其断面直径从上往下递减,其顶部断面直径大于所述密封球(11)直径,其底部断面直径与所述密封部(6-2)断面直径相等,所述密封部(6-2)为圆柱形通道,其断面直径小于所述密封球直径。2. The induction flow velocity initial rain diversion device according to claim 1, characterized in that: the water passage (6) includes an introduction portion (6-1) at the top and a sealing portion (6-2) at the bottom, so that The introduction part (6-1) is an inverted tapered channel, its cross-sectional diameter decreases from top to bottom, its top cross-sectional diameter is larger than the diameter of the sealing ball (11), and its bottom cross-sectional diameter is the same as that of the sealing part (6-2) ) section diameters are equal, and the sealing part (6-2) is a cylindrical passage whose section diameter is smaller than that of the sealing ball. 3.根据权利要求1所述的感应流速初雨分流装置,其特征在于:所述过滤筒(4)为顶部和底部分别敞开的滤网筒,所述过滤筒(4)筒壁左侧开有进水口(4-1),所述进水管(2)与所述进水口(4-1)对接,所述出水管(3)与所述过滤筒(4)筒壁右侧对接;所述过滤筒(4)筒壁的前侧与后侧之间连有所述导流板(7)。3. The induction flow rate initial rain diversion device according to claim 1, characterized in that: the filter cartridge (4) is a filter cartridge with the top and bottom open respectively, and the left side of the filter cartridge (4) wall is open. There is a water inlet (4-1), the water inlet pipe (2) is docked with the water inlet (4-1), and the water outlet pipe (3) is docked with the right side of the filter cartridge (4) wall; the The deflector (7) is connected between the front side and the rear side of the cylinder wall of the filter cylinder (4). 4.根据权利要求1所述的感应流速初雨分流装置,其特征在于:所述进水管(2)的管径大于所述初雨弃流管(12)的管径。4 . The induction flow velocity primary rain diversion device according to claim 1 , characterized in that: the diameter of the water inlet pipe ( 2 ) is larger than the diameter of the primary rain abandonment pipe ( 12 ). 5.根据权利要求1或3所述的感应流速初雨分流装置,其特征在于:所述过滤筒(4)底部设有卡板(4-2),所述隔离底座(5)与所述卡板(4-2)卡接。5. The induction flow rate initial rain diversion device according to claim 1 or 3, characterized in that: the bottom of the filter cartridge (4) is provided with a clamping plate (4-2), and the isolation base (5) is connected to the Clamping plate (4-2) is clamped. 6.根据权利要求1所述的感应流速初雨分流装置,其特征在于:所述井体(1)内壁中部设有限位凸起(1-2),所述过滤筒(4)底端限位于所述限位凸起(1-2)上。6. The induction flow rate initial rain diversion device according to claim 1, characterized in that: the middle part of the inner wall of the well body (1) is provided with a limiting protrusion (1-2), and the bottom end of the filter cartridge (4) is limited Located on the limit protrusion (1-2). 7.根据权利要求1所述的感应流速初雨分流装置,其特征在于:所述导流板(7)与所述隔离底座(5)间留有过水间隙(13)。7 . The induction flow velocity initial rain diversion device according to claim 1 , characterized in that there is a water gap ( 13 ) between the deflector ( 7 ) and the isolation base ( 5 ). 8.根据权利要求1所述的感应流速初雨分流装置,其特征在于:所述初雨弃流管(12)开设在所述井体(1)侧壁底端。8. The flow velocity induction diversion device for initial rain according to claim 1, characterized in that: the first rain abandonment pipe (12) is set at the bottom end of the side wall of the well body (1). 9.根据权利要求1所述的感应流速初雨分流装置,其特征在于:所述过滤筒(4)顶部连有提手(14)。9 . The induction flow velocity initial rain diversion device according to claim 1 , characterized in that: a handle ( 14 ) is connected to the top of the filter cartridge ( 4 ).
CN201510546029.4A 2015-08-28 2015-08-28 The first rain part flow arrangement of sensing flow velocity Active CN105155653B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510546029.4A CN105155653B (en) 2015-08-28 2015-08-28 The first rain part flow arrangement of sensing flow velocity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510546029.4A CN105155653B (en) 2015-08-28 2015-08-28 The first rain part flow arrangement of sensing flow velocity

Publications (2)

Publication Number Publication Date
CN105155653A CN105155653A (en) 2015-12-16
CN105155653B true CN105155653B (en) 2017-06-20

Family

ID=54796664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510546029.4A Active CN105155653B (en) 2015-08-28 2015-08-28 The first rain part flow arrangement of sensing flow velocity

Country Status (1)

Country Link
CN (1) CN105155653B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522345B (en) * 2016-11-28 2021-12-28 武汉市政工程设计研究院有限责任公司 Automatic formula inlet for stom water device of damming of first rain
CN109785742B (en) * 2018-12-18 2021-03-19 黎明职业大学 Advertisement screen with three-dimensional facial expression recognition scoring evaluation device
CN111649240A (en) * 2020-06-16 2020-09-11 张宗凤 Steel structure support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100825944B1 (en) * 2007-08-14 2008-04-28 (주)엔포텍 Early Rainwater Treatment Unit
KR20110018758A (en) * 2009-08-18 2011-02-24 (주)예일엔지니어링 Initial excellent separator
CN201906513U (en) * 2010-11-19 2011-07-27 上海竞舟水处理设备有限公司 Rainwater discharge and filter device
CN202324062U (en) * 2011-11-24 2012-07-11 无锡市政设计研究院有限公司 Rainwater split-flow device
CN103147486A (en) * 2013-03-28 2013-06-12 四川大学 Device for improving sewer of high-rise building to fill ground water
CN204919756U (en) * 2015-08-28 2015-12-30 武汉圣禹排水系统有限公司 Response velocity of flow is rain diverging device just

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100825944B1 (en) * 2007-08-14 2008-04-28 (주)엔포텍 Early Rainwater Treatment Unit
KR20110018758A (en) * 2009-08-18 2011-02-24 (주)예일엔지니어링 Initial excellent separator
CN201906513U (en) * 2010-11-19 2011-07-27 上海竞舟水处理设备有限公司 Rainwater discharge and filter device
CN202324062U (en) * 2011-11-24 2012-07-11 无锡市政设计研究院有限公司 Rainwater split-flow device
CN103147486A (en) * 2013-03-28 2013-06-12 四川大学 Device for improving sewer of high-rise building to fill ground water
CN204919756U (en) * 2015-08-28 2015-12-30 武汉圣禹排水系统有限公司 Response velocity of flow is rain diverging device just

Also Published As

Publication number Publication date
CN105155653A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN105089133A (en) Automatic hydraulic-control initial rainwater diverting device
CN204940471U (en) Waterpower self-control is rain part flow arrangement just
CN106554100B (en) Oily water treatment equipment and treatment method thereof
CN102351390A (en) Highly efficient swirling desanding apparatus for sludge
CN201055713Y (en) Waterpower rotational flow sand sinking dirt removing device
CN203017830U (en) Continuous type sand filter
CN203634951U (en) Automatic dirt-discharging cyclone separator
CN204411852U (en) A kind of backwashing pipeline filter
CN204919756U (en) Response velocity of flow is rain diverging device just
CN201445837U (en) Sewage-sludge separation device
CN105155653A (en) First rain diversion device capable of inducing flow velocity
CN204983108U (en) Initial rain flow removing device
CN204919791U (en) Water conservancy automatic control rain reposition of redundant personnel just mechanism
CN100546692C (en) Sewage treatment device containing solid impurities
CN204198514U (en) A kind of desulfurization wastewater separation system
CN204224331U (en) A kind for the treatment of system of dyeing and printing sewage dirt material
CN109113140A (en) Wash platform water purification recyclable device
CN203916161U (en) Grinding machine sewage-treatment plant
CN213265952U (en) A catering wastewater treatment device
CN105155667B (en) The first rain diversion mechanism of waterpower self-control
CN203701248U (en) Comprehensive recycling device for waste water resource of thermal power plant
CN215667881U (en) Device for improving oil extraction rate of kitchen waste
CN104355423B (en) A kind of processing system of dyeing and printing sewage dirt material
CN207845358U (en) A kind of full-automatic separation of solid and liquid sewage disposal system
CN205294992U (en) Campus intelligence water conservation treatment facility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 509 Weihu Road, Shamao Street, Hannan District, Wuhan City, Hubei Province, 430090

Patentee after: Wuhan Shengyu Smart Ecological Environmental Protection Co.,Ltd.

Address before: 430056 zhuanyang science and Technology Industrial Park, Wuhan Economic and Technological Development Zone, Wuhan City, Hubei Province

Patentee before: WUHAN SHENGYU DRAINAGE SYSTEM Co.,Ltd.