CN105139490A - Door access management method for unattended transformer station - Google Patents

Door access management method for unattended transformer station Download PDF

Info

Publication number
CN105139490A
CN105139490A CN201510471233.4A CN201510471233A CN105139490A CN 105139490 A CN105139490 A CN 105139490A CN 201510471233 A CN201510471233 A CN 201510471233A CN 105139490 A CN105139490 A CN 105139490A
Authority
CN
China
Prior art keywords
station
personnel
server
gate
transformer station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510471233.4A
Other languages
Chinese (zh)
Other versions
CN105139490B (en
Inventor
徐楠
王超
李传毅
黄震宇
华珉
周骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201510471233.4A priority Critical patent/CN105139490B/en
Publication of CN105139490A publication Critical patent/CN105139490A/en
Application granted granted Critical
Publication of CN105139490B publication Critical patent/CN105139490B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Telephonic Communication Services (AREA)

Abstract

The invention relates to a door access management method for unattended transformer station. According to the method, a worker who wants to go into an unattended transformer station sends an application to a server by a smart phone; then the server forwards the application to the mobile phone of a corresponding manager; after the application is approved, the result is sent to the server through a command; if the server judges that the applicant has reach the door of the transformer station in an accessible time section, the server sends the work command that allows the entrance to a corresponding on-site access control facility, the on-site access control facility starts the operation function of a remotely-controlled door, the smart phone can be used to open the remotely-controlled door, and the remotely-controlled door will automatically close after a preset opening time is reached. The intelligent door access management can be achieved by the provided method, the entrance of workers can be traced and managed, and the shortages of artificial operation for opening the door are overcome.

Description

A kind of gate management method for unattended operation transformer station
Technical field
The present invention relates to unattended operation transformer station, specifically a kind of gate management method for unattended operation transformer station.
Background technology
Unattended operation transformer station is the operation and management mode of a kind of advanced person of transformer station.It refers to that, by automatic technologies such as microcomputer telecontrols, operator on duty obtains relevant information in the distance, and carries out control and management to the equipment of transformer station.Do not arrange fixing operation maintenance post on duty in unattended operation transformer station, its operational management work is responsible for by transformer station's O&M active station.
The personnel of current unattended operation transformer station pass in and out management and generally adopt concentrator station personnel to the mode of target unmanned station checking work ticket enabling.There are following problems in which:
(1) by the configuration of existing operations staff, send someone to carry out gate switching manipulation to unmanned Shou Zhi transformer station and will cause larger waste to personnel, vehicle resources.
(2) concentrator station personnel amount is limited at present, the business be responsible for is more, even if send special messenger to carry out gate switching manipulation to scene, be also often the pattern that employing one people is responsible for multiple unmanned station, namely same person will be serial to multiple unmanned station and open (or closedown) gate.The stand-by period that staff to be entered the station is longer must be caused like this, and cause effectively enter the station every day greatly to shorten time.
(3) personnel that at present comprehensively cannot record transformer station by the anti-control of transformer station's door manually carried out pass in and out situation, and tracing function is poor afterwards.
(4) current transformer station's gate management system can not carry out supervision transformer station turnover situation in conjunction with transformer station's technical precaution system information in real time and effectively.
(5) can not timely or long-range supervision and control substation gate when accident occurs.
Summary of the invention
The object of this invention is to provide a kind of gate management method for unattended operation transformer station, the present invention is by interactive information technology, integrate substation security system, set up concentrator station security system intelligent platform, realize the gate intelligent management that staff passes in and out transformer station, without the need to artificial enabling, and inbound case can be monitored in real time, the application historical information that enters the station is reviewed.In order to solve the mode opened the door to target unmanned station checking work ticket owing to adopting concentrator station personnel in existing unmanned station, cause the wasting of resources, problem that personnel enter the station the stand-by period long and retrospective of inbound case, the property monitored difference.
For achieving the above object, the solution of the present invention is: a kind of gate management method for unattended operation transformer station, described gate management method erecting stage door control devices in transformer station, build-in services device in concentrator station, the managerial personnel of personnel to be entered the station and each transformer station all carry with smart mobile phone, APP for Intelligent door keyholed back plate reason is installed in described smart mobile phone, described APP is provided with account management module, the Request For Work module that enters the station and the work auditing module that enters the station; Described gate management method specifically comprises the steps:
(1) when staff of entering the station prepares to enter the station, first log in APP by the account management module of smart mobile phone APP, and to be entered the station application information by the application module writes that enters the station, send to server application of entering the station;
(2), after server receives the application information that enters the station sent wait personnel of entering the station, according to compass of competency and the authority setting of each transformer station, the managerial personnel that the described application information that enters the station is sent to corresponding transformer station are held APP;
(3) managerial personnel are audited the described application information that enters the station by work of the entering the station auditing module of described APP, and in examination & verification by afterwards, examination & verification are sent to server by instruction;
(4) whether comprehensive distinguishing application is audited and is passed through by server, if judge applicant correspondence transformer station outdoors, and within the period allowing to enter the station, then the work order allowing to enter the station is sent to the on-the-spot door control devices of corresponding transformer station;
(5) the on-the-spot door control devices described in and the remote control gate of transformer station with the use of, after on-the-spot door control devices receives the instruction that allows to enter the station, opening remote control door operation function, application personnel of entering the station send door open command by smart mobile phone, remote control gate is opened, and after reaching the enabling duration of setting, remote control gate is closed automatically.
According to the gate management method for unattended operation transformer station of the present invention, in described step (1), the described application information that enters the station comprises power transformation name of station to be entered, working time of entering the station, the action and carry out the information such as number of work of entering the station, if it is consistent that these information and substation gate pass in and out management system, then examination & verification is passed through.
According to the gate management method for unattended operation transformer station of the present invention, in described step (4), server logs in the account of APP and the cell-phone number of binding according to personnel to be entered the station, identify the identity of personnel to be entered the station, or pass through recognition of face, judge the identity of personnel to be entered the station, and determined the position of applying for residing for the personnel of entering the station by the mobile location-based service function of smart mobile phone.
According to the gate management method for unattended operation transformer station of the present invention, the unlatching of described on-the-spot door control devices record transformer substation remote-control door, closing information, and form daily record and upload onto the server, the application record and server stores enters the station, described APP is provided with log query module, for enter the station information to server lookup history in the future.
According to the gate management method for unattended operation transformer station of the present invention, described server is connected with display, for showing the application information of personnel to be entered the station, the information that enters the station, remote control gate unlatching and closing information, passing in and out situation by the personnel of concentrator station personnel to transformer station and monitoring.
According to the gate management method for unattended operation transformer station of the present invention, described on-the-spot door control devices is provided with camera, realizes the Taking Pictures recording function of gate turnover personnel.
The beneficial effect that the present invention reaches:
(1) the present invention carries with smart mobile phone by personnel to be entered the station, send to server end application of entering the station by smart mobile phone, server end is audited application of entering the station, examination & verification is by rear, server end and on-the-spot door control devices are by wireless network interactive information, transmission allows to enter the station instruction to on-the-spot door control devices, and server end carries out real time record and monitoring by display to inbound case, realizes the gate intelligent management that staff passes in and out transformer station.Greatly alleviate concentrator station person works load, reduce the wasting of resources, reduce and wait for the stand-by period of staff of entering the station, can timely or long-range supervision and control substation gate when accident occurs.
(2) server is the center of contact smart phone user end, on-the-spot door control devices, and possess journal function, on-the-spot door control devices can record the open and close information of substation gate, formation daily record uploads onto the server, the application of entering the station of smart mobile phone APP also can be recorded in the server, server can record the opening and closing operations daily record at all applications, examination & verification, approval and substation field gate, smart mobile phone APP is provided with log query module, inquired about by the history of APP to the personnel of entering the station situation out of the station after being convenient to, possess the function of afterwards reviewing.
(3) server of the present invention is connected with display, and for showing the application information of personnel to be entered the station, the information that enters the station, remote control gate open and closing information, is convenient to the personnel of concentrator station personnel to transformer station and passes in and out situation and monitor in real time.
Accompanying drawing explanation
Fig. 1 is gate management method process flow diagram of the present invention;
Fig. 2 is structure principle chart of the present invention.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment, the present invention is further detailed explanation.
The personnel of current unattended operation transformer station pass in and out management, generally adopt the mode that concentrator station personnel open the door to target unmanned station checking work ticket.The mode of this enabling easily causes the problem that personnel's stand-by period is long, waste resource, and does not possess trackability to staff's inbound case.
To enter the station mode Problems existing at present unmanned station enabling, the invention provides a kind of can automatically basis entering the station the application of personnel, to the gate management method that the keying of substation gate manages.As shown in Figure 1, Intelligent door control management method of the present invention erecting stage door control devices in each transformer station, build-in services device in concentrator station, and personnel to be entered the station carry with the smart mobile phone for application of entering the station, the present invention is according to the turnover management expectancy of current unattended operation transformer station, develop a APP for gate management, described APP is arranged on smart mobile phone.
Smart mobile phone APP of the present invention is held and is write to each other by server end between on-the-spot door control devices, and smart mobile phone APP end does not directly communicate with between on-the-spot door control devices.Smart mobile phone APP hold with between server and on-the-spot door control devices all communicated by wireless network with between server, in the present embodiment, the APP end of described smart mobile phone by GPRS network or other Internet network and server communication, interactive information.
Described APP is provided with account management module, the Request For Work module that enters the station, the work auditing module that enters the station and log query module, described account management module comprises registration and logs in unit and personal information unit, described registration logs in the unit application personnel that are used for entering the station and logs in APP according to login account, described personal information unit is for storing account and the phone number of applicant person of entering the station, and account and phone number may be used for identification when entering the station application.The described Request For Work module that enters the station fills in for application personnel of entering the station the application information that enters the station, and comprises power transformation name of station to be entered, working time of entering the station, the action and carry out number of work of entering the station, and sends to server to audit.The application information that enters the station that the described auditing module that enters the station sends to for reception server, and the application information that enters the station is audited, if entered the station, to pass in and out management system consistent for application information and substation gate, then examination & verification is passed through, and examination & verification is sent to server by instruction.Described log query module is used for and server communication, to enter the station information, be convenient to review afterwards to server request query history.
As shown in Figure 2, specific works process of the present invention is as follows:
1, when staff of entering the station prepares to enter the station, first APP is logged in by the account management module of smart mobile phone APP, and by entering the station, application module writes comprises power transformation name of station to be entered, working time of entering the station, the action and carry out the application informations that enter the station such as number of work of entering the station, and sends to server application of entering the station.
2, the managerial personnel that the described application information that enters the station is sent to corresponding transformer station according to compass of competency and the authority setting of each transformer station, are held APP after receiving the application information that enters the station sent wait personnel of entering the station by server.
3, managerial personnel are audited the described application information that enters the station by work of the entering the station auditing module of described APP, it is consistent that if the application information that enters the station described and substation gate pass in and out management system, then examination & verification is passed through, and examination & verification is sent to server by instruction, if not by examination & verification, then send not by auditing instruction to server.Managerial personnel carry out the examination & verification of application information by the APP of smart mobile phone end, convenient and swift, are beneficial to and audit whenever and wherever possible.
4, if server receives the instruction audited and pass through, then server is according to the account of application personnel and the phone number of binding of entering the station, confirm to enter the station the identity of applicant, and according to the mobile location-based service function of smart mobile phone, confirm that application is entered the station the position of personnel, if judge applicant correspondence transformer station outdoors, and within the period allowing to enter the station, then the work order allowing to enter the station is sent to the on-the-spot door control devices of corresponding transformer station.
If server receives the unsanctioned instruction of examination & verification, then directly send and forbid that the work order of entering the station is to on-the-spot door control devices.
5, described on-the-spot door control devices and the remote control gate of transformer station match and use, each unmanned substation is all configured with an on-the-spot door control devices, the output terminal of described on-the-spot door control devices and remote control gate wireless connections, after on-the-spot door control devices receives the instruction that allows to enter the station, opening remote control door operation function, application personnel of entering the station send door open command by smart mobile phone, remote control gate is opened, and application personnel of entering the station are entered the station.
If on-the-spot door control devices receives the work order forbidding entering the station, then remote control gate operating function is not opened, and remote control gate cannot be opened.
6, be provided with enabling duration in described APP, reach the enabling duration of setting at opening time after, remote control gate is closed automatically.
On-the-spot door control devices described in the present embodiment is provided with camera, realizes the Taking Pictures recording function of gate turnover personnel, and technical precaution camera also can be allowed to realize interlock.
Described server is connected with display, for showing the application information of personnel to be entered the station, the information that enters the station, remote control gate unlatching and closing information, passing in and out situation monitor by the personnel of concentrator station personnel to transformer station.
The present invention carries with smart mobile phone by personnel to be entered the station, send to server end application of entering the station by smart mobile phone, server end is audited application of entering the station, examination & verification is by rear, server end and on-the-spot door control devices are by wireless network interactive information, transmission allows to enter the station instruction to on-the-spot door control devices, and server end carries out real time record and monitoring by display to inbound case, realizes the gate intelligent management that staff passes in and out transformer station.Greatly alleviate concentrator station person works load, reduce the wasting of resources, reduce maintenance and wait for the stand-by period of staff of entering the station, can timely or long-range supervision and control substation gate when accident occurs.
Server is the center of contact smart phone user end, on-the-spot door control devices, and possess journal function, on-the-spot door control devices can record the open and close information of substation gate, formation daily record uploads onto the server, the application of entering the station of smart mobile phone APP also can be recorded in the server, server can record the opening and closing operations daily record at all applications, examination & verification, approval and substation field gate, smart mobile phone APP is provided with log query module, inquired about by the history of APP to the personnel of entering the station situation out of the station after being convenient to, possess the function of afterwards reviewing.

Claims (6)

1. the gate management method for unattended operation transformer station, it is characterized in that: described gate management method erecting stage door control devices in transformer station, build-in services device in concentrator station, the managerial personnel of personnel to be entered the station and each transformer station all carry with smart mobile phone, APP for Intelligent door keyholed back plate reason is installed in described smart mobile phone, described APP is provided with account management module, the Request For Work module that enters the station and the work auditing module that enters the station; Described gate management method specifically comprises the steps:
(1) when staff of entering the station prepares to enter the station, first log in APP by the account management module of smart mobile phone APP, and to be entered the station application information by the application module writes that enters the station, send to server application of entering the station;
(2), after server receives the application information that enters the station sent wait personnel of entering the station, according to compass of competency and the authority setting of each transformer station, the managerial personnel that the described application information that enters the station is sent to corresponding transformer station are held APP;
(3) managerial personnel are audited the described application information that enters the station by work of the entering the station auditing module of described APP, and in examination & verification by afterwards, examination & verification are sent to server by instruction;
(4) whether comprehensive distinguishing application is audited and is passed through by server, if judge application enter the station personnel correspondence transformer station outdoors, and within the period allowing to enter the station, then the work order allowing to enter the station is sent to the on-the-spot door control devices of corresponding transformer station;
(5) the on-the-spot door control devices described in and the remote control gate of transformer station with the use of, after on-the-spot door control devices receives the instruction that allows to enter the station, opening remote control door operation function, application personnel of entering the station send door open command by smart mobile phone, remote control gate is opened, and after reaching the enabling duration of setting, remote control gate is closed automatically.
2. the gate management method for unattended operation transformer station according to claim 1, it is characterized in that, in described step (1), the described application information that enters the station comprises power transformation name of station to be entered, working time of entering the station, the action and carry out the information such as number of work of entering the station, if it is consistent that these information and substation gate pass in and out management system, then examination & verification is passed through.
3. the gate management method for unattended operation transformer station according to claim 1, it is characterized in that, in described step (4), server logs in the account of APP and the cell-phone number of binding according to personnel to be entered the station, identify the identity of personnel to be entered the station, or by recognition of face, judge the identity of personnel to be entered the station, and determined the position of applying for residing for the personnel of entering the station by the mobile location-based service function of smart mobile phone.
4. the gate management method for unattended operation transformer station according to claim 1, it is characterized in that, the unlatching of described on-the-spot door control devices record transformer substation remote-control door, closing information, and form daily record and upload onto the server, the application record and server stores enters the station, described APP is provided with log query module, for enter the station information to server lookup history in the future.
5. the gate management method for unattended operation transformer station according to claim 1, it is characterized in that, described server is connected with display, for showing the application information of personnel to be entered the station, the information that enters the station, remote control gate unlatching and closing information, passing in and out situation by the personnel of concentrator station personnel to transformer station and monitoring.
6. the gate management method for unattended operation transformer station according to claim 1, is characterized in that, described on-the-spot door control devices is provided with camera, realizes the Taking Pictures recording function of gate turnover personnel.
CN201510471233.4A 2015-08-04 2015-08-04 A kind of gate management method for unattended operation transformer station Active CN105139490B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510471233.4A CN105139490B (en) 2015-08-04 2015-08-04 A kind of gate management method for unattended operation transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510471233.4A CN105139490B (en) 2015-08-04 2015-08-04 A kind of gate management method for unattended operation transformer station

Publications (2)

Publication Number Publication Date
CN105139490A true CN105139490A (en) 2015-12-09
CN105139490B CN105139490B (en) 2018-03-09

Family

ID=54724819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510471233.4A Active CN105139490B (en) 2015-08-04 2015-08-04 A kind of gate management method for unattended operation transformer station

Country Status (1)

Country Link
CN (1) CN105139490B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106204835A (en) * 2016-07-06 2016-12-07 苏州华安普电力科技股份有限公司 A kind of Unmanned Transformer Place safety door Ore-controlling Role based on mobile phone A PP
CN106251452A (en) * 2016-08-15 2016-12-21 国网辽宁省电力有限公司鞍山供电公司 A kind of unattended operation transformer station enters the station long-range Licensing Methods and execution system
CN106652137A (en) * 2016-12-27 2017-05-10 上海斐讯数据通信技术有限公司 WIFI-based scenic spot entrance guard examination system and use method thereof
CN107610306A (en) * 2017-10-26 2018-01-19 国网黑龙江省电力有限公司信息通信公司 A kind of computer room gate control system and the control method for entering computer room
CN108777014A (en) * 2018-05-25 2018-11-09 淮南万泰电气有限公司 Gate-ban Monitoring System used in a kind of power transformation
CN108898710A (en) * 2018-06-22 2018-11-27 合肥迪鑫信息科技有限公司 A kind of fingerprint unlocking system and method for unlocking for fixing lock
CN109712291A (en) * 2018-12-26 2019-05-03 广州市巽腾信息科技有限公司 Open method, device and the server of electronic gate
CN109830023A (en) * 2019-03-02 2019-05-31 浙江弘电智能科技有限公司 A kind of intelligent building access control system
CN111243156A (en) * 2020-04-29 2020-06-05 四川智水信息技术有限公司 Transformer substation safety access and operation and maintenance system
CN111915780A (en) * 2020-08-17 2020-11-10 国网河南省电力公司濮阳供电公司 Intelligent safety management and control system for two-dimensional code entering and exiting transformer substation
CN113393607A (en) * 2021-06-24 2021-09-14 广东电网有限责任公司 Intelligent electric power security method and system
CN113506394A (en) * 2021-06-28 2021-10-15 上海欣能信息科技发展有限公司 Remote permission system and remote permission method based on transformer substation operation management and control

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6476732B1 (en) * 2000-05-10 2002-11-05 Ford Global Technologies, Inc. Passive automatic door opener
CN201562306U (en) * 2009-09-11 2010-08-25 王远洲 Intelligent door lock control system
CN101894404A (en) * 2010-07-29 2010-11-24 深圳市戴文科技有限公司 Method for realizing access control, terminal, access control device and access control system
CN102654924A (en) * 2011-03-02 2012-09-05 黄金富 China mobile entrance guard security system and corresponding entrance guard system security method
CN103455875A (en) * 2013-08-12 2013-12-18 安徽省安银金融机具设备有限公司 Intelligent networked gun and bullet cabin management system
CN103679884A (en) * 2013-12-02 2014-03-26 大连智慧城科技有限公司 Casual user authorization device and method for internet door control
CN104183043A (en) * 2014-08-26 2014-12-03 国家电网公司 Unattended security protection system of transformer substation
CN204010098U (en) * 2014-08-26 2014-12-10 国家电网公司 Transformer station's unmanned safety-protection system
CN104240013A (en) * 2014-08-25 2014-12-24 中国航天科工集团第四研究院指挥自动化技术研发与应用中心 Door access control method and door access control platform

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6476732B1 (en) * 2000-05-10 2002-11-05 Ford Global Technologies, Inc. Passive automatic door opener
CN201562306U (en) * 2009-09-11 2010-08-25 王远洲 Intelligent door lock control system
CN101894404A (en) * 2010-07-29 2010-11-24 深圳市戴文科技有限公司 Method for realizing access control, terminal, access control device and access control system
CN102654924A (en) * 2011-03-02 2012-09-05 黄金富 China mobile entrance guard security system and corresponding entrance guard system security method
CN103455875A (en) * 2013-08-12 2013-12-18 安徽省安银金融机具设备有限公司 Intelligent networked gun and bullet cabin management system
CN103679884A (en) * 2013-12-02 2014-03-26 大连智慧城科技有限公司 Casual user authorization device and method for internet door control
CN104240013A (en) * 2014-08-25 2014-12-24 中国航天科工集团第四研究院指挥自动化技术研发与应用中心 Door access control method and door access control platform
CN104183043A (en) * 2014-08-26 2014-12-03 国家电网公司 Unattended security protection system of transformer substation
CN204010098U (en) * 2014-08-26 2014-12-10 国家电网公司 Transformer station's unmanned safety-protection system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106204835A (en) * 2016-07-06 2016-12-07 苏州华安普电力科技股份有限公司 A kind of Unmanned Transformer Place safety door Ore-controlling Role based on mobile phone A PP
CN106251452A (en) * 2016-08-15 2016-12-21 国网辽宁省电力有限公司鞍山供电公司 A kind of unattended operation transformer station enters the station long-range Licensing Methods and execution system
CN106652137A (en) * 2016-12-27 2017-05-10 上海斐讯数据通信技术有限公司 WIFI-based scenic spot entrance guard examination system and use method thereof
CN107610306A (en) * 2017-10-26 2018-01-19 国网黑龙江省电力有限公司信息通信公司 A kind of computer room gate control system and the control method for entering computer room
CN108777014A (en) * 2018-05-25 2018-11-09 淮南万泰电气有限公司 Gate-ban Monitoring System used in a kind of power transformation
CN108898710A (en) * 2018-06-22 2018-11-27 合肥迪鑫信息科技有限公司 A kind of fingerprint unlocking system and method for unlocking for fixing lock
CN109712291A (en) * 2018-12-26 2019-05-03 广州市巽腾信息科技有限公司 Open method, device and the server of electronic gate
WO2020135079A1 (en) * 2018-12-26 2020-07-02 巽腾(广东)科技有限公司 Method and device for opening electronic gate, and server
CN113330491A (en) * 2018-12-26 2021-08-31 巽腾(广东)科技有限公司 Opening method and device of electronic gate and server
CN109830023A (en) * 2019-03-02 2019-05-31 浙江弘电智能科技有限公司 A kind of intelligent building access control system
CN111243156A (en) * 2020-04-29 2020-06-05 四川智水信息技术有限公司 Transformer substation safety access and operation and maintenance system
CN111915780A (en) * 2020-08-17 2020-11-10 国网河南省电力公司濮阳供电公司 Intelligent safety management and control system for two-dimensional code entering and exiting transformer substation
CN113393607A (en) * 2021-06-24 2021-09-14 广东电网有限责任公司 Intelligent electric power security method and system
CN113506394A (en) * 2021-06-28 2021-10-15 上海欣能信息科技发展有限公司 Remote permission system and remote permission method based on transformer substation operation management and control

Also Published As

Publication number Publication date
CN105139490B (en) 2018-03-09

Similar Documents

Publication Publication Date Title
CN105139490A (en) Door access management method for unattended transformer station
CN107665419B (en) Labor service real-name management system of intelligent building site management and control platform of national power grid
CN103679906B (en) Entrance guard management system and method based on wireless network
CN108280910B (en) Building entrance guard linkage control system for intelligent building
CN105788040A (en) Dynamic authorization system for office building visitors and management method
CN104751545A (en) System, method and device for processing permissions of door lock
CN105035904A (en) Intelligent monitoring system for elevator safe operation based on IOT (Internet of Things) technology
CN204791237U (en) Wireless Intelligence entrance guard's intercom system
CN109858892A (en) A kind of Aptitude Operation Order Sheet System
CN204808397U (en) Computer lab basic station corollary equipment centralized management system
CN105139489A (en) Intelligent access control management device for unattended transformer station
CN104952136A (en) Wireless intelligent access control talk-back system
CN207867582U (en) A kind of entrance guard device based on a variety of identification functions of cloud
CN108596811A (en) A kind of intelligent micro fire-fighting station administration system
CN108717743A (en) A kind of visitor preengages recognition of face intelligent entrance guard or gate system
CN201430657Y (en) Public security network video monitoring system
CN111724514A (en) Cloud access control system based on AI intelligent sound box application and implementation method
CN111784901A (en) Cloud access control system based on cloud computing and mobile internet and implementation method
CN210442835U (en) Intelligent management control system for instrument equipment
CN113949723A (en) Heterogeneous compatible system of thing networking sign for management of wisdom community
CN111462370A (en) Intelligent community access control system and control method
WO2008090262A1 (en) System and apparatus for information management at construction sites and the like
CN111240382B (en) Intelligent laboratory management method, device and system
WO2023116250A1 (en) Vehicle maintenance method and system
CN103559652A (en) Communication work-ticket management system based on unattended substation and operation method of communication work-ticket management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant