CN105137810A - 直流控制保护系统rtds仿真模型的校核方法及校核系统 - Google Patents
直流控制保护系统rtds仿真模型的校核方法及校核系统 Download PDFInfo
- Publication number
- CN105137810A CN105137810A CN201510553885.2A CN201510553885A CN105137810A CN 105137810 A CN105137810 A CN 105137810A CN 201510553885 A CN201510553885 A CN 201510553885A CN 105137810 A CN105137810 A CN 105137810A
- Authority
- CN
- China
- Prior art keywords
- control
- protection system
- realistic model
- direct current
- rtds
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Inverter Devices (AREA)
- Direct Current Feeding And Distribution (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种直流控制保护系统RTDS仿真模型的校核方法,其包含:分别通过启动响应校核、稳态参数校核、阶跃响应校核以及交流系统故障校核,比较直流控制保护系统RTDS仿真模型和直流实际控制保护装置的变化曲线,评估直流控制保护系统RTDS仿真模型的准确性。其优点是:运用该方法能够确保仿真模型与实际控制保护装置的准确性、一致性。
Description
技术领域
本发明涉及电力系统技术领域,具体涉及一种直流控制保护系统RTDS仿真模型的校核方法及校核系统。
背景技术
大规模直流密集接入、交直流交互影响问题突出、直流系统无功电压控制复杂等因素,对华东电网的规划和运行造成了重大影响,为确保华东特高压交直流混联电网的安全稳定运行,我们建立了基于RTDS的直流输电系统详细模型,其包含了直流一次系统仿真模型以及直流控制保护系统仿真模型,能够准确模拟直流输电的实际物理特性以及交直流系统之间的相互影响机理,由于直流控制保护系统在建模时做了简化只保留了与直流暂态和稳态响应密切相关的功能模块,所以其与实际控制保护装置并非完全相同,那么如何确保其与实际控制保护装置的一致性,那就需要对模型的准确性进行校核。
发明内容
本发明的目的在于提供直流控制保护系统RTDS仿真模型的校核方法及校核系统,运用该方法能够校验仿真模型与实际控制保护装置的准确性、一致性。
为了达到上述目的,本发明通过以下技术方案实现:
一种直流控制保护系统RTDS仿真模型的校核方法,其特征是,包含:
启动响应校核,比较在直流启动时直流控制保护系统RTDS仿真模型和直流实际控制保护装置的变化曲线;
稳态参数校核,比较直流稳态运行以及直流功率稳态调节过程中直流控制保护系统RTDS仿真模型和直流实际控制保护装置的变化曲线;
阶跃响应校核,比较功率阶跃响应、电流阶跃响应、电压阶跃响应以及熄弧角阶跃响应过程中直流控制保护系统RTDS仿真模型和直流实际控制保护装置的变化曲线;
交流系统故障校核,比较整流侧和逆变侧三相短路和单相短路故障时直流控制保护系统RTDS仿真模型和直流实际控制保护装置的变化曲线。
上述的直流控制保护系统RTDS仿真模型的校核方法,其中,所述的启动响应校核中具体的比较内容包含:
直流电流、直流电压、触发角、熄弧角。
上述的直流控制保护系统RTDS仿真模型的校核方法,其中,所述的稳态参数校核中具体的比较内容包含:
直流稳态运行时整流侧和逆变侧直流功率、直流电流、直流电压、触发角、熄弧角、交流滤波器投入组数、换流变分接头位置,以及在直流功率稳态调节过程中直流电压、直流电流、触发角、熄弧角、直流有功功率、交直流交换无功功率变量。
上述的直流控制保护系统RTDS仿真模型的校核方法,其中,所述的阶跃响应校核中具体的比较内容包含:
直流电流、直流电压、触发角、熄弧角。
上述的直流控制保护系统RTDS仿真模型的校核方法,其中,所述的交流系统故障校核中具体的比较内容包含:
直流电流、直流电压、触发角、熄弧角。
上述的直流控制保护系统RTDS仿真模型的校核方法,其中,包含:
直流控制保护系统RTDS仿真模型;
直流实际控制保护装置,其连接一实时数字仿真器;
第一直流一次系统RTDS仿真模型,其连接所述的直流控制保护系统RTDS仿真模型;
第二直流一次系统RTDS仿真模型,其连接所述的直流实际控制保护装置;
启动响应校核模块,其分别连接所述的直流控制保护系统RTDS仿真模型和直流实际控制保护装置;
稳态参数校核模块,其分别连接所述的直流控制保护系统RTDS仿真模型和直流实际控制保护装置;
阶跃响应校核模块,其分别连接所述的直流控制保护系统RTDS仿真模型和直流实际控制保护装置;
交流系统故障校核模块,其分别连接所述的直流控制保护系统RTDS仿真模型和直流实际控制保护装置。
本发明与现有技术相比具有以下优点:运用该方法能够校验仿真模型与实际控制保护装置的准确性、一致性。
附图说明
图1为本发明的系统框图。
具体实施方式
以下结合附图,通过详细说明一个较佳的具体实施例,对本发明做进一步阐述。
如图1所示;一种直流控制保护系统RTDS仿真模型的校核方法,其包含:启动响应校核,比较在直流启动时直流控制保护系统RTDS仿真模型1和直流实际控制保护装置2的变化曲线;稳态参数校核,比较直流稳态运行以及直流功率稳态调节过程中直流控制保护系统RTDS仿真模型1和直流实际控制保护装置2的变化曲线;阶跃响应校核,比较功率阶跃响应、电流阶跃响应、电压阶跃响应以及熄弧角阶跃响应过程中直流控制保护系统RTDS仿真模型1和直流实际控制保护装置2的变化曲线;交流系统故障校核,比较整流侧和逆变侧三相短路和单相短路故障时直流控制保护系统RTDS仿真模型1和直流实际控制保护装置2的变化曲线。
其中,稳态参数校核中的直流功率稳态调节过程主要是通过改变直流功率指令值,将直流功率由3000MW回降至2000MW,以及将直流功率由2000MW上升至3000MW;
其中,阶跃响应校核中的功率阶跃响应过程是通过将整流侧直流功率由3000MW向下阶跃1500MW,持续时间为1秒;电流阶跃响应过程是通过将直流电流由3000A向下阶跃240A,持续时间为1秒;电压阶跃响应是将整流侧直流电压由500kV向下阶跃50kV,持续时间为1.5s;熄弧角阶跃响应是将逆变侧熄弧角向上阶跃10°,持续时间为1.5s。
其中,交流系统故障校核中的逆变侧三相短路是在逆变侧交流系统设置三相金属性短路接地故障,持续时间为100ms;逆变侧三相短路是在逆变侧交流系统设置三相金属性短路接地故障,持续时间为700ms;逆变侧单相短路是在逆变侧交流系统设置单相金属性短路接地故障,持续时间为100ms。
所述的启动响应校核中的比较内容包含:直流电流、直流电压、触发角、熄弧角。
所述的稳态参数校核中的比较内容包含:直流稳态运行时整流侧和逆变侧直流功率、直流电流、直流电压、触发角、熄弧角、交流滤波器投入组数、换流变分接头位置,以及在直流功率稳态调节过程中直流电压、直流电流、触发角、熄弧角、直流有功功率、交直流交换无功功率变量。
所述的阶跃响应校核中的比较内容包含:直流电流、直流电压、触发角、熄弧角。
所述的交流系统故障校核中的比较内容包含:直流电流、直流电压、触发角、熄弧角。
一种直流控制保护系统RTDS仿真模型的校核系统,其包含:直流控制保护系统RTDS仿真模型1,RTDS实时数字仿真器本身具备录波功能,直流控制保护系统RTDS仿真模型1还连接第一直流一次系统RTDS仿真模型;直流实际控制保护装置2,其连接一实时数字仿真器,用于对直流实际控制保护装置2进行仿真录波,所述的直流实际控制保护装置2还连接到第二直流一次系统RTDS仿真模型;分别连接所述的直流控制保护系统RTDS仿真模型1和直流实际控制保护装置2的启动响应校核模块3、稳态参数校核模块4、阶跃响应校核模块5以及交流系统故障校核模块6,各个校核模块可分别设置需要的响应时间、阶跃变化电压、变化功率等参数;本实施例中,所述的第一直流一次系统RTDS仿真模型与第二直流一次系统RTDS仿真模型相同,这样能使模型与实际装置两者达到校核仿真录波过程同步进行的目的,且能进一步提高校核的精确性,提高校核效率。
尽管本发明的内容已经通过上述优选实施例作了详细介绍,但应当认识到上述的描述不应被认为是对本发明的限制。在本领域技术人员阅读了上述内容后,对于本发明的多种修改和替代都将是显而易见的。因此,本发明的保护范围应由所附的权利要求来限定。
Claims (6)
1.一种直流控制保护系统RTDS仿真模型的校核方法,其特征在于,包含:
启动响应校核,比较在直流启动时直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2)的变化曲线;
稳态参数校核,比较直流稳态运行以及直流功率稳态调节过程中直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2)的变化曲线;
阶跃响应校核,比较功率阶跃响应、电流阶跃响应、电压阶跃响应以及熄弧角阶跃响应过程中直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2)的变化曲线;
交流系统故障校核,比较整流侧和逆变侧三相短路和单相短路故障时直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2)的变化曲线。
2.如权利要求1所述的直流控制保护系统RTDS仿真模型的校核方法,其特征在于,所述的启动响应校核中的比较内容包含:
直流电流、直流电压、触发角、熄弧角。
3.如权利要求1所述的直流控制保护系统RTDS仿真模型的校核方法,其特征在于,所述的稳态参数校核中的比较内容包含:
直流稳态运行时整流侧和逆变侧直流功率、直流电流、直流电压、触发角、熄弧角、交流滤波器投入组数、换流变分接头位置,以及在直流功率稳态调节过程中直流电压、直流电流、触发角、熄弧角、直流有功功率、交直流交换无功功率变量。
4.如权利要求1所述的直流控制保护系统RTDS仿真模型的校核方法,其特征在于,所述的阶跃响应校核中的比较内容包含:
直流电流、直流电压、触发角、熄弧角。
5.如权利要求1所述的直流控制保护系统RTDS仿真模型的校核方法,其特征在于,所述的交流系统故障校核中的比较内容包含:
直流电流、直流电压、触发角、熄弧角。
6.一种直流控制保护系统RTDS仿真模型的校核系统,其特征在于,包含:
直流控制保护系统RTDS仿真模型(1);
直流实际控制保护装置(2),其连接一实时数字仿真器;
第一直流一次系统RTDS仿真模型,其连接所述的直流控制保护系统RTDS仿真模型(1);
第二直流一次系统RTDS仿真模型,其连接所述的直流实际控制保护装置(2);
启动响应校核模块(3),其分别连接所述的直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2);
稳态参数校核模块(4),其分别连接所述的直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2);
阶跃响应校核模块(5),其分别连接所述的直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2);
交流系统故障校核模块(6),其分别连接所述的直流控制保护系统RTDS仿真模型(1)和直流实际控制保护装置(2)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510553885.2A CN105137810B (zh) | 2015-09-02 | 2015-09-02 | 直流控制保护系统rtds仿真模型的校核方法及校核系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510553885.2A CN105137810B (zh) | 2015-09-02 | 2015-09-02 | 直流控制保护系统rtds仿真模型的校核方法及校核系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105137810A true CN105137810A (zh) | 2015-12-09 |
CN105137810B CN105137810B (zh) | 2017-11-21 |
Family
ID=54723192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510553885.2A Active CN105137810B (zh) | 2015-09-02 | 2015-09-02 | 直流控制保护系统rtds仿真模型的校核方法及校核系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105137810B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107479016A (zh) * | 2017-06-23 | 2017-12-15 | 中国电力科学研究院 | 一种柔性直流电网直流高速测量装置性能检测方法及系统 |
CN109541313A (zh) * | 2018-11-12 | 2019-03-29 | 南方电网科学研究院有限责任公司 | 一种交直流混联系统的阻抗仿真扫描方法与装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1038703A2 (en) * | 1999-03-26 | 2000-09-27 | Carrier Corporation | Voltage control using engine speed |
US20100196043A1 (en) * | 2009-01-30 | 2010-08-05 | Brother Kogyo Kabushiki Kaisha | Power Supply Circuit Identification Device for Identifying a Type of a Power Supply Circuit and Image Forming Apparatus |
CN201974488U (zh) * | 2010-12-31 | 2011-09-14 | 中国南方电网有限责任公司电网技术研究中心 | 一种换流变压器保护rtds实时数字闭环试验系统 |
CN103257582A (zh) * | 2013-03-29 | 2013-08-21 | 国家电网公司 | 一种基于rtds的直流控制保护仿真装置 |
CN103257576A (zh) * | 2013-03-29 | 2013-08-21 | 国家电网公司 | 一种熄弧角启动控制仿真装置 |
-
2015
- 2015-09-02 CN CN201510553885.2A patent/CN105137810B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1038703A2 (en) * | 1999-03-26 | 2000-09-27 | Carrier Corporation | Voltage control using engine speed |
US20100196043A1 (en) * | 2009-01-30 | 2010-08-05 | Brother Kogyo Kabushiki Kaisha | Power Supply Circuit Identification Device for Identifying a Type of a Power Supply Circuit and Image Forming Apparatus |
CN201974488U (zh) * | 2010-12-31 | 2011-09-14 | 中国南方电网有限责任公司电网技术研究中心 | 一种换流变压器保护rtds实时数字闭环试验系统 |
CN103257582A (zh) * | 2013-03-29 | 2013-08-21 | 国家电网公司 | 一种基于rtds的直流控制保护仿真装置 |
CN103257576A (zh) * | 2013-03-29 | 2013-08-21 | 国家电网公司 | 一种熄弧角启动控制仿真装置 |
Non-Patent Citations (2)
Title |
---|
崔勇等: "基于RTDS的高压直流输电控制功能研究", 《华东电力》 * |
齐一: "基于RTDS的直流控制保护系统建模及仿真", 《华东电力》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107479016A (zh) * | 2017-06-23 | 2017-12-15 | 中国电力科学研究院 | 一种柔性直流电网直流高速测量装置性能检测方法及系统 |
CN109541313A (zh) * | 2018-11-12 | 2019-03-29 | 南方电网科学研究院有限责任公司 | 一种交直流混联系统的阻抗仿真扫描方法与装置 |
CN109541313B (zh) * | 2018-11-12 | 2021-01-08 | 南方电网科学研究院有限责任公司 | 一种交直流混联系统的阻抗仿真扫描方法与装置 |
Also Published As
Publication number | Publication date |
---|---|
CN105137810B (zh) | 2017-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190067939A1 (en) | Multi-time-scale digital/analog hybrid simulation system and method for power distribution network and storage medium | |
CN103065016B (zh) | 确定引起直流换相失败的交流系统故障范围的方法 | |
Yang et al. | Development of converter based reconfigurable power grid emulator | |
US20210242680A1 (en) | Power electronics converter based reconfigurable grid emulation platform | |
Mathur et al. | Fault analysis of unbalanced radial and meshed distribution system with inverter based distributed generation (IBDG) | |
CN103605829A (zh) | 对交直流混联电网进行电磁暂态仿真的等值建模方法 | |
Jalili-Marandi et al. | A real-time dynamic simulation tool for transmission and distribution power systems | |
CN103944507A (zh) | 基于逆变器型式试验的光伏电站低电压穿越性能评价方法 | |
CN103500261A (zh) | 直流输电系统故障模拟方法 | |
CN103558481A (zh) | 同塔并架多回直流线路耦合作用引发换相失败的判别方法 | |
CN104617576B (zh) | 考虑直流控制特性的多直流馈出交流电网故障计算方法 | |
CN102904254A (zh) | 电气化铁路注入电力系统谐波的仿真方法 | |
CN103760893A (zh) | 交流控制保护装置频率适应性的闭环试验系统及试验方法 | |
Xiao et al. | Electro-mechanical transient modeling of MMC based multi-terminal HVDC system with DC faults considered | |
CN110135039A (zh) | 风电汇集地区三相电压不平衡度确定方法及装置 | |
Chainho et al. | General modeling of multi-terminal VSC-HVDC systems for transient stability studies | |
CN104135038B (zh) | 一种交直流混联系统不对称故障分析方法 | |
Li et al. | Analysis and calculation method for multiple faults in low-resistance grounded systems with inverter-interfaced distributed generators based on a PQ control strategy | |
CN105182797A (zh) | 基于rtds的直流输电仿真建模方法及仿真系统 | |
CN103475016A (zh) | 高压直流输电工程中换流站的仿真方法 | |
CN105137810A (zh) | 直流控制保护系统rtds仿真模型的校核方法及校核系统 | |
CN105429187A (zh) | 一种多直流馈入评估方法 | |
CN109066621A (zh) | 一种有源配电网的故障电流计算方法、系统及设备 | |
Davoudi et al. | Effects of unsymmetrical power transmission system on the voltage balance and power flow capacity of the lines | |
CN113437732B (zh) | 一种光伏发电并网联络线纵联保护方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20151228 Address after: 200002 Nanjing East Road, Shanghai, No. 181, No. Applicant after: State Grid Shanghai Municipal Electric Power Company Applicant after: East China Electric Power Test & Research Institute Co., Ltd. Address before: 200002 Nanjing East Road, Shanghai, No. 181, No. Applicant before: State Grid Shanghai Municipal Electric Power Company |
|
GR01 | Patent grant | ||
GR01 | Patent grant |