CN105129621A - Warehouse with bridge grabbing crane - Google Patents

Warehouse with bridge grabbing crane Download PDF

Info

Publication number
CN105129621A
CN105129621A CN201510642422.3A CN201510642422A CN105129621A CN 105129621 A CN105129621 A CN 105129621A CN 201510642422 A CN201510642422 A CN 201510642422A CN 105129621 A CN105129621 A CN 105129621A
Authority
CN
China
Prior art keywords
warehouse
grabbing crane
bridge
bridge grabbing
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510642422.3A
Other languages
Chinese (zh)
Other versions
CN105129621B (en
Inventor
刘伟庆
董宁宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Engineering Group Co Ltd
Sinopec Nanjing Engineering Co Ltd
Original Assignee
Sinopec Engineering Group Co Ltd
Sinopec Nanjing Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Engineering Group Co Ltd, Sinopec Nanjing Engineering Co Ltd filed Critical Sinopec Engineering Group Co Ltd
Priority to CN201510642422.3A priority Critical patent/CN105129621B/en
Publication of CN105129621A publication Critical patent/CN105129621A/en
Application granted granted Critical
Publication of CN105129621B publication Critical patent/CN105129621B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The invention discloses a warehouse with a bridge grabbing crane. The warehouse comprises the bridge grabbing crane which is transversely arranged at the top of the warehouse. The bridge grabbing crane can move back and forth in the length direction of the warehouse and is provided with grab buckets which can move back and forth along the bridge grabbing crane. An overhead trestle is longitudinally arranged below the bridge grabbing crane, and the operating direction of the overhead trestle is the same as the operating direction of the bridge grabbing crane. The overhead trestle is located in the position of the longitudinal center line of the warehouse. A feeding conveyer is arranged on the bridge surface of the overhead trestle. A discharging conveyer is longitudinally arranged below the overhead trestle. Receiving hoppers are arranged on the discharging conveyer. The warehouse with the bridge grabbing crane has the advantages that firstly, the way that feeding and discharging are conducted in the warehouse is adopted, and uniform operation is facilitated; secondly, the two grab buckets are used for grabbing materials, and thus the production capacity and the working efficiency are improved; thirdly, the discharging height is reduced, raising dust is reduced, and the operating environment of the warehouse with the bridge grabbing crane is improved; and finally, the way that discharging is conducted in the warehouse is adopted, part of facilities outside the warehouse are omitted, and construction investment cost is reduced.

Description

Bridge grabbing crane warehouse
Technical field
The present invention relates to chemical enterprise powder material mechanization transportation field, particularly relate to a kind of bridge grabbing crane warehouse.
Background technology
In chemical enterprise powder material mechanization transportation field, often select bridge grabbing crane warehouse, the transportation device into and out of warehouse selects conveyer.According to People's Republic of China's chemical industry standard " chemical powder material stockyard and warehouse design specification " HG20568-2014 4.2.4 article, " mechanization transportation technological design handbook " (Chemical Industry Press 1998.4 the 1st edition the 213rd, 214 pages), the prior art in such warehouse commonly uses following arrangement: transported material enters the feeding conveyor (as shown in Figure 1) of equipment employing in position, limit, storehouse in warehouse, or adopts the feeding conveyor (as shown in Figure 2) in Ku Ding position; In storehouse, delivery device then adopts the dump car appended by feeding conveyor; Feeding equipment adopts the hopper of lower position or the hopper of high position; The equipment that transported material goes out warehouse adopts outfeed belt conveyor; In warehouse, transport material, charging (feeding) equipment adopts bridge grabbing crane.
The weak point of above-mentioned arrangement is:
(1), when employing is positioned at the feeding conveyor on limit, storehouse, the transhipment idle travel of bridge grabbing crane dolly is longer, and efficiency is low, and working ability is low, and cannot carry out homogenization operation;
(2), when adopting the feeding conveyor being positioned at top, storehouse, though can carry out homogenization operation, warehouse height is higher, and construction investment is large; During discharging, airborne dust is large, and airborne dust affects the operation conditions of hoisting crane and shortens its service life;
(3) outfeed belt conveyor needs configuration trestle or underground vestibule, adds floor area and construction investment.
Therefore, above-mentioned technical barrier urgently to be resolved hurrily.
Summary of the invention
Goal of the invention: for prior art Problems existing, the present invention proposes a kind ofly to be convenient to homogenization operation, bridge grabbing crane warehouse that work efficiency is high.
Technical scheme: bridge grabbing crane warehouse of the present invention, comprise the bridge grabbing crane be located at warehouse top cross and arranged, this bridge grabbing crane can move around along warehouse length direction, and this bridge grabbing crane is equipped with the grab bucket that can move around along it, bridge grabbing crane is also equipped with bridge grabbing crane operator's compartment, bridge grabbing crane dolly, and bridge grabbing crane dolly drives grab bucket to move around on trolley track; Longitudinally the overhead trestle consistent with bridge grabbing crane service direction is arranged below this bridge grabbing crane, and this overhead trestle is positioned at warehouse longitudinal center line position, the bridge floor of overhead trestle is provided with feeding conveyor, longitudinally lay out material conveyer below overhead trestle, this outfeed belt conveyor is provided with for receiving the material that falls in grab bucket and making material fall into hopper on outfeed belt conveyor.
Wherein, described bridge grabbing crane is laterally provided with one group of trolley track and two bridge grabbing crane dollies that can travel along this trolley track, and each bridge grabbing crane dolly is equipped with a grab bucket.
Preferably, described hopper is symmetrical arranged centered by overhead trestle, and this hopper is connected with outfeed belt conveyor by chute.
Preferably, at least two hoppers are set along interval on this outfeed belt conveyor, wherein set the number of hopper according to the length in warehouse, ensure discharging efficiency.
When two grab bucket runs simultaneously, two grab bucket captures material and throws in in corresponding hopper, greatly improves work efficiency.
The bridge floor of described overhead trestle arranges relief hole, the cover plate for avoiding solid accumulation is set simultaneously above outfeed belt conveyor; Described outfeed belt conveyor is arranged on below ground, arranges the cover plate for avoiding solid accumulation on earth's surface simultaneously; Preferably, described cover plate is herringbone cover plate.
Wherein, described feeding conveyor and outfeed belt conveyor are belt conveyer, long linear conveyer, embedded scraper transporter, conveyor screw or pipe chain-linked conveyer.
Beneficial effect: the present invention compared with prior art, its remarkable advantage is: (1) is compared with the feeding conveyor arrangement of limit, storehouse, feeding conveyor is laid along its position of center line in warehouse of the present invention, not only realize coming and going at the uniform velocity discharging in storehouse, be convenient to homogenization operation, cancel conveyer and trestle outside storehouse simultaneously, reduce floor area outside storehouse, decrease the construction investment cost of trestle; (2) the two grab bucket of warehouse of the present invention configuration, the transhipment stroke of bridge grabbing crane dolly can be made to be reduced to the half of warehouse span, increase work efficiency, two grab bucket works simultaneously and is equivalent to 2 bridge grabbing crane work, productive capacity significantly improves, and decreases equipment investment cost.(3) compared with the top material inlet conveyer arrangement of storehouse, the feeding conveyor height reduction in warehouse of the present invention, can reduce the whole height in warehouse on the one hand, reduces construction investment, also significantly reduce discharging height on the other hand, avoid airborne dust affect working environment and cause secondary pollution;
Accompanying drawing explanation
Fig. 1 is the warehouse section arrangement plan of prior art " charging of limit, storehouse ";
Fig. 2 is the warehouse section arrangement plan of prior art " storehouse top material inlet ";
Fig. 3 is bridge grabbing crane warehouse of the present invention birds-eye view;
Fig. 4 is the A-A section-drawing of Fig. 3;
Fig. 5 is the B-B section-drawing of Fig. 3;
Fig. 6 is that outfeed belt conveyor of the present invention is arranged in underground section-drawing;
Fig. 7 is the C-C section arrangement plan of Fig. 3.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme of the present invention is described further.
As shown in Figure 3, Figure 4, bridge grabbing crane warehouse of the present invention, comprises bridge grabbing crane 1, grab bucket 2, overhead trestle 3, feeding conveyor 4, outfeed belt conveyor 5, hopper 6; Wherein, bridge grabbing crane 1 lateral arrangement is in top, warehouse, and transverse direction is here along span direction, warehouse, and this bridge grabbing crane 1 can move along warehouse length direction, wherein minor face distance definition in warehouse is warehouse span B, and the long back gauge in warehouse is defined as warehouse length L; This bridge grabbing crane 1 is equipped with grab bucket 2, and this grab bucket 2 can move around along bridge grabbing crane 1; Overhead trestle 3 is longitudinally arranged in below this bridge grabbing crane 1, and overhead trestle 3 can meet the space requirement of operated by personnel's feeding conveyor 4 apart from the height of bridge grabbing crane 1; Overhead trestle 3 is also consistent with bridge grabbing crane 1 sense of motion, and longitudinal direction is here along warehouse length direction, and this overhead trestle 3 is positioned at warehouse longitudinal center line position, and trestle length is less than or equal to the length in warehouse; Feeding conveyor 4 is located on the bridge floor of overhead trestle 3, and at the uniform velocity discharging in storehouse; Outfeed belt conveyor 5 is longitudinally arranged in below overhead trestle 3, and this outfeed belt conveyor 5 is provided with hopper 6, and grab bucket captures in warehouse heaps material, and by material input in this hopper 6, then by outfeed belt conveyor 5 by material transportation to the production facilities outside storehouse.
As shown in Figure 4 and Figure 5, described bridge grabbing crane 1 is laterally provided with one group of trolley track and two bridge grabbing crane dollies 7 that can travel along this trolley track, and each bridge grabbing crane dolly 7 is equipped with a grab bucket 2.
This grab bucket 2 drives it to move along trolley track by bridge grabbing crane dolly 7 respectively, and corresponding hopper 6 is symmetrical arranged centered by overhead trestle 3, and hopper 6 bore is comparatively large, in order to receive the material fallen in grab bucket 2.
As shown in Figure 4, hopper 6 is symmetrical arranged centered by overhead trestle 3, chute 8 below hopper 6 and above outfeed belt conveyor 5 between, in order to connect hopper 6 and outfeed belt conveyor 5, the material in hopper 6 finally falls into outfeed belt conveyor 5 by chute 8.
Certainly, hopper 6 and chute 8 also have many forms, and chute cross section can be circular or square, and other similar structures all can realize object of the present invention.
Two grab buckets of above-mentioned outfit follow bridge grabbing crane dolly 7 when moving on trolley track, grab bucket captures material in warehouse and throws in in corresponding hopper, the forced stroke of single grab bucket can be the half of whole trolley track stroke, two grab bucket works simultaneously and is equivalent to 2 bridge grabbing crane work, productive capacity significantly improves, decrease equipment investment cost, greatly improve discharging efficiency.
As shown in Fig. 3, Fig. 7, along on outfeed belt conveyor 5 at a certain distance interval multiple hopper 6 is set, wherein require according to warehouse length L and warehouse design the number setting hopper, ensure the discharging efficiency in warehouse.
As shown in Fig. 3, Fig. 5, Fig. 6, the bridge floor of overhead trestle 3 arranges relief hole 9, and the material that feeding conveyor 4 unloads directly can fall in warehouse via relief hole, now above outfeed belt conveyor 5, arranges cover plate 10, for avoiding solid accumulation, thus affect follow-up draw operation; As shown in Figure 6, outfeed belt conveyor 5 is arranged on below ground, in order to avoid material fall into, aheap under outfeed belt conveyor on, at earth's surface place, cover plate 10 is set.Preferably, cover plate 10 is herringbone cover plate 11, and material like this is not concentrated on cover plate 10, but falls from cover plate 10 top along its both sides, and material drops on outside overhead trestle, is convenient to grab bucket and captures.
Feeding conveyor 4 and outfeed belt conveyor 5 are belt conveyer, embedded scraper transporter, conveyor screw or pipe chain-linked conveyer, when this feeding conveyor 4 can adopt belt conveyer, and be provided with dump car 12 upper, material can directly be laid on the load-transfer device of belt conveyer, or be contained in dump car 12, dump car 12 can move along with belt conveyer, even discharging in storehouse.
As shown in Figure 4, this bridge grabbing crane warehouse also comprises stock retaining wall 13, and this stock retaining wall is located at both sides, warehouse, is convenient to heap and the homogenizing of material in warehouse.As shown in Figure 4, bridge grabbing crane 1 is also equipped with bridge grabbing crane operator's compartment 14.
Bridge grabbing crane warehouse of the present invention workflow:
(1) as shown in Figure 3, when warehouse charging, by feeding conveyor 4 and attached dump car 12, material is transported in storehouse from storehouse, and at the uniform velocity discharging in storehouse;
(2) as shown in Figure 7, when material is transported in warehouse, start bridge grabbing crane 1, bridge grabbing crane dolly 7 drives that grab bucket 2 is transported material in warehouse, casting; When wherein bridge grabbing crane is equipped with two grab buckets, two bridge grabbing crane can one man operation, and operation of singly grabbing bucket, also can doublely operate simultaneously, and two grab bucket runs simultaneously; When two grab bucket runs simultaneously; the operating rights that a bridge grabbing crane operator's compartment 14 has two bridge grabbing crane can be set; another bridge grabbing crane operator's compartment 14 only has the operating rights of grab bucket 2; stroke protection switch established respectively by 2 bridge grabbing crane dollies 7 simultaneously, avoids influencing each other.
(3), when having homogenizing to require, by " tiling is directly got " mode, that is: feeding conveyor 4 and the at the uniform velocity discharging on overhead trestle 3 of attached dump car 12, fall through relief hole 9, forms triangle stockpile 15; Two grab buckets of crane in bridge type, along triangle stockpile 15 end face feeding, casting, discharging, form stockpile 16, namely complete homogenization operation.
(4) as shown in Fig. 4, Fig. 7, when warehouse discharging, start two bridge grabbing crane, bridge grabbing crane operator's compartment 14 controls bridge grabbing crane dolly 7 and drives grab bucket 2 to capture material input in hopper 6, again through chute 8 by mass transport to outfeed belt conveyor 5, finally by outfeed belt conveyor 5 by mass transport in the process units outside warehouse.
Embodiment 1 outfeed belt conveyor is arranged in the embodiment in ground bridge grabbing crane warehouse
The height in bridge grabbing crane warehouse of the present invention is 14.50m, the overhead trestle longitudinally arranged at EL7.00m place of central authorities, warehouse and feeding conveyor, at the large Car Track of EL12.00m place, top, warehouse lateral arrangement bridge grabbing crane, EL ± 0.00m plane lays out material conveyer and vestibule, discharge bucket is connected with outfeed belt conveyor by chute, and being equipped with high-order hopper, the top mark height of high-order hopper is that stock retaining wall is longitudinally arranged in long limit in both sides, EL6.00m. warehouse; Wherein, EL is the abbreviation of English word elevation, is meant to absolute altitude (relative level).
Embodiment 2 outfeed belt conveyor is arranged in the embodiment in underground bridge grabbing crane warehouse
The height in bridge grabbing crane warehouse of the present invention is 14.50m, the overhead trestle longitudinally arranged at EL7.00m place of central authorities, warehouse and feeding conveyor, at the large Car Track of EL12.00m place, top, warehouse lateral arrangement bridge grabbing crane, EL-2.40m plane lays out material conveyer and vestibule, discharge bucket is connected with outfeed belt conveyor by chute, and being equipped with high-order hopper, the top mark height of high-order hopper is that stock retaining wall is longitudinally arranged in long limit in both sides, EL6.00m. warehouse.

Claims (9)

1. a bridge grabbing crane warehouse, comprise the bridge grabbing crane (1) be located at warehouse top cross and arranged, this bridge grabbing crane (1) can move around along warehouse length direction, and this bridge grabbing crane (1) is equipped with the grab bucket (2) that can move around along it, it is characterized in that: longitudinally arrange the overhead trestle (3) consistent with its service direction in this bridge grabbing crane (1) below, and this overhead trestle (3) is positioned at warehouse longitudinal center line position, the bridge floor of overhead trestle (3) is provided with feeding conveyor (4), overhead trestle (3) below longitudinally lays out material conveyer (5), and be provided with in outfeed belt conveyor (5) top for receiving the material that falls in grab bucket (2) and making material fall into hopper (6) on outfeed belt conveyor (5).
2. bridge grabbing crane warehouse according to claim 1, it is characterized in that: described bridge grabbing crane (1) is laterally provided with one group of trolley track and two bridge grabbing crane dollies (7) that can travel along this trolley track, and each bridge grabbing crane dolly (7) is equipped with a grab bucket (2).
3. bridge grabbing crane warehouse according to claim 2, is characterized in that: described hopper (6) is symmetrical arranged centered by overhead trestle (3).
4. bridge grabbing crane warehouse according to claim 2, it is characterized in that: described hopper (6) is symmetrical arranged centered by overhead trestle (3), this hopper (6) is connected with outfeed belt conveyor (5) by chute (8).
5. bridge grabbing crane warehouse according to claim 1,3 or 4, is characterized in that: arrange at least two hoppers (6) along the upper interval of described outfeed belt conveyor (5).
6. bridge grabbing crane warehouse according to claim 1, it is characterized in that: the bridge floor of described overhead trestle (3) offers relief hole (9), the cover plate (10) for avoiding solid accumulation being set in outfeed belt conveyor (5) top simultaneously.
7. bridge grabbing crane warehouse according to claim 1, is characterized in that: described outfeed belt conveyor (5) is arranged on below ground, arranges the cover plate (10) for avoiding solid accumulation on earth's surface simultaneously.
8. bridge grabbing crane warehouse according to claim 6 or 7, is characterized in that: described cover plate is herringbone cover plate (11).
9. bridge grabbing crane warehouse according to claim 1, is characterized in that: described feeding conveyor (4) and outfeed belt conveyor (5) are belt conveyer, long linear conveyer, embedded scraper transporter, conveyor screw or pipe chain-linked conveyer.
CN201510642422.3A 2015-09-30 2015-09-30 Bridge grabbing crane warehouse Active CN105129621B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510642422.3A CN105129621B (en) 2015-09-30 2015-09-30 Bridge grabbing crane warehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510642422.3A CN105129621B (en) 2015-09-30 2015-09-30 Bridge grabbing crane warehouse

Publications (2)

Publication Number Publication Date
CN105129621A true CN105129621A (en) 2015-12-09
CN105129621B CN105129621B (en) 2016-09-28

Family

ID=54715286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510642422.3A Active CN105129621B (en) 2015-09-30 2015-09-30 Bridge grabbing crane warehouse

Country Status (1)

Country Link
CN (1) CN105129621B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106494905A (en) * 2016-12-12 2017-03-15 河南卫华重型机械股份有限公司 A kind of bridge-type chain bucket reclaimer of the continuous feeding in many storehouse lattice raw material workshops
CN110748890A (en) * 2019-10-29 2020-02-04 江苏赛诺常矿起重机械有限公司 Garbage sludge co-treatment process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3572524A (en) * 1967-11-28 1971-03-30 Von Roll Ag Mechanical equipment for charging sludge and/or semisolid and fluid waste material into rotary incinerating kilns
JPH05208793A (en) * 1992-01-30 1993-08-20 Fujita Corp Excavated earth conveyance control device
JP2001132926A (en) * 1999-11-04 2001-05-18 Osaka Godo Keiso Kk Controlling device for rubbish crane-metering machine
CN202130863U (en) * 2011-05-20 2012-02-01 丁洁 Distribution mechanism for stacking fire coal to coal shed of bridge type coal grab
CN202675341U (en) * 2012-07-11 2013-01-16 光大环保科技发展(北京)有限公司 Feeding system of reciprocating multi-stage hydraulic mechanical grate furnace
CN202864493U (en) * 2012-10-22 2013-04-10 洛阳涧光石化设备有限公司 Coke load and transport system used in delayed coking
CN203461509U (en) * 2012-05-11 2014-03-05 利勃海尔-韦尔克嫩青有限公司 Bulk material transfer device
CN205011270U (en) * 2015-09-30 2016-02-03 中石化南京工程有限公司 Overhead crane with grab warehouse

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3572524A (en) * 1967-11-28 1971-03-30 Von Roll Ag Mechanical equipment for charging sludge and/or semisolid and fluid waste material into rotary incinerating kilns
JPH05208793A (en) * 1992-01-30 1993-08-20 Fujita Corp Excavated earth conveyance control device
JP2001132926A (en) * 1999-11-04 2001-05-18 Osaka Godo Keiso Kk Controlling device for rubbish crane-metering machine
CN202130863U (en) * 2011-05-20 2012-02-01 丁洁 Distribution mechanism for stacking fire coal to coal shed of bridge type coal grab
CN203461509U (en) * 2012-05-11 2014-03-05 利勃海尔-韦尔克嫩青有限公司 Bulk material transfer device
CN202675341U (en) * 2012-07-11 2013-01-16 光大环保科技发展(北京)有限公司 Feeding system of reciprocating multi-stage hydraulic mechanical grate furnace
CN202864493U (en) * 2012-10-22 2013-04-10 洛阳涧光石化设备有限公司 Coke load and transport system used in delayed coking
CN205011270U (en) * 2015-09-30 2016-02-03 中石化南京工程有限公司 Overhead crane with grab warehouse

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106494905A (en) * 2016-12-12 2017-03-15 河南卫华重型机械股份有限公司 A kind of bridge-type chain bucket reclaimer of the continuous feeding in many storehouse lattice raw material workshops
CN110748890A (en) * 2019-10-29 2020-02-04 江苏赛诺常矿起重机械有限公司 Garbage sludge co-treatment process

Also Published As

Publication number Publication date
CN105129621B (en) 2016-09-28

Similar Documents

Publication Publication Date Title
US20240182238A1 (en) Mobile support structure for bulk material containers
CN106458437B (en) It is used to support the transport of agent and the equipment of storage
US9776813B2 (en) Mobile dry material storage
WO2022088475A1 (en) Rectangular warehouse with multi-channel feeding, full-plane discharging and folding-type scraping
CN205011270U (en) Overhead crane with grab warehouse
US9309052B2 (en) Flow-retarding chutes and spouts and method for delivering dry bulk free-flowing material to a location
CN105129621A (en) Warehouse with bridge grabbing crane
CN114933117A (en) Storage yard system
WO2022088476A1 (en) Multi-channel feeding and full-plane discharging telescopic scraping rectangular material warehouse
CN205953062U (en) Waste material transportation changes row device
CN106494905A (en) A kind of bridge-type chain bucket reclaimer of the continuous feeding in many storehouse lattice raw material workshops
CN203667459U (en) Concrete aggregate belt conveying and sorting device
CN104627696A (en) Large reciprocating feeder
CN216104928U (en) Self-flow type discharging and warehousing device
CN206265907U (en) A kind of material handling system
CN104044832A (en) Material storage and feeding device for movable grouting station
CN209922449U (en) Rectangular raw material warehouse
CN204777502U (en) Raw materials conveyer
CN105888722A (en) Construction method for slag discharging and carrying of L-shaped slag discharging table of rail transportation inclined shaft of long and large tunnel
CN103171885B (en) To turn back buffer slide chute and installation method thereof
CN217050741U (en) Assembled high-order feed bin structure
CN206529064U (en) A kind of novel granary multiple spot heap feeding device
CN205366937U (en) Transfer chain that peripheral material is stacked to centre
CN219525337U (en) Ore yard bottom feed system
CN102046501A (en) An apparatus for storing rolling material in a pile and reclaiming from the pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: No. 3 horses horses Science Park Avenue in Qixia District of Nanjing City, Jiangsu province 210049

Patentee after: SINOPEC NANJING ENGINEERING & CONSTRUCTION Inc.

Patentee after: Sinopec Engineering (Group) Co.,Ltd.

Address before: 211112 No. 1189, Jian Jian Road, Jiangning District, Jiangsu, Nanjing

Patentee before: SINOPEC NANJING ENGINEERING & CONSTRUCTION Inc.

Patentee before: Sinopec Engineering (Group) Co.,Ltd.