CN105117850A - Auxiliary intelligent reviewing system for power transmission and transformation project design - Google Patents

Auxiliary intelligent reviewing system for power transmission and transformation project design Download PDF

Info

Publication number
CN105117850A
CN105117850A CN201510544569.9A CN201510544569A CN105117850A CN 105117850 A CN105117850 A CN 105117850A CN 201510544569 A CN201510544569 A CN 201510544569A CN 105117850 A CN105117850 A CN 105117850A
Authority
CN
China
Prior art keywords
design
engineering
evaluation
project
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510544569.9A
Other languages
Chinese (zh)
Inventor
马静波
穆俊杰
张逸青
田娟娟
郑晓洁
黄静
乔明华
王长运
李建辉
朱渊
陈锐郭
崔荣
刘华勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI BOWEI NEW TECHNOLOGY CO LTD
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Chongqing Electric Power Co Ltd
Original Assignee
JIANGXI BOWEI NEW TECHNOLOGY CO LTD
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI BOWEI NEW TECHNOLOGY CO LTD, State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Chongqing Electric Power Co Ltd filed Critical JIANGXI BOWEI NEW TECHNOLOGY CO LTD
Priority to CN201510544569.9A priority Critical patent/CN105117850A/en
Publication of CN105117850A publication Critical patent/CN105117850A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an auxiliary intelligent reviewing system for power transmission and transformation project design. The auxiliary intelligent reviewing system comprises the following realization steps of: project key feature index system library building; design information collection and checking; key feature index intelligent comparison and evaluation; and statistical analysis. The auxiliary intelligent reviewing system has the advantages that the centralized management on the design reviewing of projects at 110kV or below 110kV, and the reviewing efficiency is improved; a complete data management platform can be built for filing and reviewing service information and data in a unified way; the project design quality informatization evaluation can be performed, and a design credit performance tracking system can be completed; and a project techno-economic indicator system can be built, unified reviewing measurement standards can be provided, and the intelligent reviewing of the project design can be assisted.

Description

Project of transmitting and converting electricity design intelligent evaluation backup system
Technical field
The present invention relates to a kind of project of transmitting and converting electricity design intelligent evaluation backup system, belong to field of power.
Background technology
At present in electrical network Project design evaluation course, there is difficult points such as reporting data is uneven, evaluation lacks unified criterion, information filing difficulty, main difficulty be embodied in following some:
(1) design review lacks unified criterion
In evaluation course, expert is general evaluates according to management of appraising requirement and experience, but lacks a set of unification for each intermediate item, reasonably evaluate module, and each experts' evaluation degree of depth and requirement are not quite similar; Affect design review work standardization, hinder carrying out of design guidance, modular working.
(2) engineering design, evaluation data deficiencies effectively manage
Project can be ground, just establish the version of submitting to a higher level for approval or revision in stage, closing in version, authorize version design data and the evaluation such as review minutes, review comment data exists data dispersion, form variation, lack unified filing, cause the collection of data, add up, search the time and efforts of at substantial, the company that restricts to a certain extent is to the fine-grained management of project appraisal business.
(3) design data reports shortage standardization
Because each designing institute professional standards there are differences, so exist, projected depth differs, the uneven congruent problem of declaration material, design data lacks the workload that standardization adds project preview, and data preparation rate is low, repeatedly repeatedly report data by impact evaluation scheduling and evaluation efficiency.
(4) the more difficult coordination of meeting affairs arrangement is evaluated
According to reasons such as design data preparation rate, project construction schedule requirements in real work, evaluation plan performs and evaluation meeting arrangement needs adjustment flexibly to adapt to actual conditions, but existing management of appraising mode is not easy to coordinate predetermined formal review meeting schedule between project owner unit and designing unit, evaluation expert, and personnel's difficulty is concentrated.
(5) designing quality lacks measurement and statistics
Designing quality lacks unified record and evaluation management system inside the province at present, is not easy to owner unit, designing institute's professional standards are fully understood by evaluation unit and situation is accepted in engineering design.
Summary of the invention
The object of the invention is for the deficiencies in the prior art, provide a kind of project of transmitting and converting electricity to design intelligent evaluation backup system.
System of the present invention comprises:
(1) engineering key characteristic index system storehouse
Set up comprehensive, a suitable engineering key characteristic index parameter auxiliary evaluation system storehouse in systems in which, for design review provides Data Comparison parameter.Key characteristic index system specifies different index item, standard value or term of reference respectively for different works category in storehouse, allows to set up many cover index system tables, and support expert's periodic maintenance and management according to different design proposals.
(2) verification collected by design data
System will according to material upload bibliographic structure, the design data form report designing unit and must pass item and carry out strict automatic Verification.
(3) key characteristic index intelligent comparison is evaluated
System is automatically collected designing institute and is reported engineering design data and make a report on basis, gathers project data.When expert's preview, formal review or closing in are evaluated, system supplymentary expert weighs engineering electric pressure, works category, scale etc. by engineering key characteristic index item, the key index data of automatically mating similar engineering from engineering key characteristic index system storehouse contrast, and are convenient to expert and utilize historical experience Fast Evaluation engineering design rationality.Meanwhile, support that expert arranges threshold values, control design case parameter value domain of walker, system carries out early warning for the parameter item exceeding domain of walker, is convenient to expert's quick position design problem point, fills in review comment.
When expert's preview, formal review or closing in are evaluated, system is according to lectotype selection rule, equipment and materials price data, lectotype selection rationality in Auto-matching, contrast, source of early warning detailed list of materials, and estimate equipment in approximately-estimated cost file, material price meter row rationality.
(4) statistical study
Can grind by the engineering of systematic collection, just design and review data based on, according to through grinding institute's actual requirement, customize all kinds of business datum statistical function, such as Project evaluation quantity statistics, evaluation statistics, project investment statistics, version of submitting to a higher level for approval or revision and authorization version are examined and made cuts rate statistics, universal design utility ratio statistics etc.
Beneficial effect of the present invention:
(1) 110kV and following engineering design evaluation centralized management can be strengthened, improve evaluation efficiency
Normalizable design data declares the degree of depth and form, improves design review data preparation rate, unified management evaluation overall process; Thus strengthen 110kV and following engineering centralized review management, meet the requirement of State Grid Corporation of China's two-stage centralized review management, promote engineering design evaluation efficiency.
(2) complete data management platform can be set up, unified filing evaluation Business Information and data
Can grind from collection, Consolidation Project, just establish review data to start with, realize the reliable filing of 35kV and above electricity power engineering design data and evaluation achievement, centralized stores and resource sharing; Meet project to submit to a higher level for approval or revision version and the right needs of authorization version data effective ratio.
(3) engineering design quality Information Evaluation can be carried out, well designed standing performance tracking system
By Custom Design quality score standard scale, evaluate, well designed unit standing performance tracking system for Project evaluation designing quality, auxiliary evaluation designing unit designed capacity, sets up design access system, and provides foundation for quality score statistical study.
(4) engineering technical-economic index system can be set up, unified evaluation criterion is provided, the intelligent evaluation of supporting item design
Assembled item evaluation data and technical-economic index data, carry out statistical study to all kinds of engineering proposal, crucial technical-economic index, the crucial technical-economic index data of project of establishing and improve; For intellectuality evaluation provides data supporting, auxiliary expert's expedited review engineering design, cost rationality.
Embodiment
System of the present invention comprises: (1) engineering key characteristic index system storehouse
Set up comprehensive, a suitable engineering key characteristic index parameter auxiliary evaluation system storehouse in systems in which, for design review provides Data Comparison parameter.Key characteristic index system specifies different index item, standard value or term of reference respectively for different works category in storehouse, allows to set up many cover index system tables, and support expert's periodic maintenance and management according to different design proposals.
(2) verification collected by design data
System will according to material upload bibliographic structure, the design data form report designing unit and must pass item and carry out strict automatic Verification.
(3) key characteristic index intelligent comparison is evaluated
System is automatically collected designing institute and is reported engineering design data and make a report on basis, gathers project data.When expert's preview, formal review or closing in are evaluated, system supplymentary expert weighs engineering electric pressure, works category, scale etc. by engineering key characteristic index item, the key index data of automatically mating similar engineering from engineering key characteristic index system storehouse contrast, and are convenient to expert and utilize historical experience Fast Evaluation engineering design rationality.Meanwhile, support that expert arranges threshold values, control design case parameter value domain of walker, system carries out early warning for the parameter item exceeding domain of walker, is convenient to expert's quick position design problem point, fills in review comment.
When expert's preview, formal review or closing in are evaluated, system is according to lectotype selection rule, equipment and materials price data, lectotype selection rationality in Auto-matching, contrast, source of early warning detailed list of materials, and estimate equipment in approximately-estimated cost file, material price meter row rationality.
(4) statistical study
Can grind by the engineering of systematic collection, just design and review data based on, according to through grinding institute's actual requirement, customize all kinds of business datum statistical function, such as Project evaluation quantity statistics, evaluation statistics, project investment statistics, version of submitting to a higher level for approval or revision and authorization version are examined and made cuts rate statistics, universal design utility ratio statistics etc.

Claims (1)

1. a project of transmitting and converting electricity design intelligent evaluation backup system, is characterized in that:
(1) engineering key characteristic index system storehouse
Set up comprehensive, a suitable engineering key characteristic index parameter auxiliary evaluation system storehouse in systems in which, for design review provides Data Comparison parameter;
Key characteristic index system specifies different index item, standard value or term of reference respectively for different works category in storehouse, allows to set up many cover index system tables, and support expert's periodic maintenance and management according to different design proposals;
(2) verification collected by design data
System will according to material upload bibliographic structure, the design data form report designing unit and must pass item and carry out strict automatic Verification;
(3) key characteristic index intelligent comparison is evaluated
System is automatically collected designing institute and is reported engineering design data and make a report on basis, gathers project data;
When expert's preview, formal review or closing in are evaluated, system supplymentary expert weighs engineering electric pressure, works category, scale by engineering key characteristic index item, the key index data of automatically mating similar engineering from engineering key characteristic index system storehouse contrast, and are convenient to expert and utilize historical experience Fast Evaluation engineering design rationality; Meanwhile, support that expert arranges threshold values, control design case parameter value domain of walker, system carries out early warning for the parameter item exceeding domain of walker, is convenient to expert's quick position design problem point, fills in review comment;
When expert's preview, formal review or closing in are evaluated, system is according to lectotype selection rule, equipment and materials price data, lectotype selection rationality in Auto-matching, contrast, source of early warning detailed list of materials, and estimate equipment in approximately-estimated cost file, material price meter row rationality;
(4) statistical study
Can grind by the engineering of systematic collection, just design and review data based on, according to through grinding institute's actual requirement, customize all kinds of business datum statistical function, such as Project evaluation quantity statistics, evaluation statistics, project investment statistics, version of submitting to a higher level for approval or revision and authorization version are examined and made cuts, and rate is added up, universal design utility ratio statistics.
CN201510544569.9A 2015-08-31 2015-08-31 Auxiliary intelligent reviewing system for power transmission and transformation project design Pending CN105117850A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510544569.9A CN105117850A (en) 2015-08-31 2015-08-31 Auxiliary intelligent reviewing system for power transmission and transformation project design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510544569.9A CN105117850A (en) 2015-08-31 2015-08-31 Auxiliary intelligent reviewing system for power transmission and transformation project design

Publications (1)

Publication Number Publication Date
CN105117850A true CN105117850A (en) 2015-12-02

Family

ID=54665832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510544569.9A Pending CN105117850A (en) 2015-08-31 2015-08-31 Auxiliary intelligent reviewing system for power transmission and transformation project design

Country Status (1)

Country Link
CN (1) CN105117850A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105989546A (en) * 2016-04-13 2016-10-05 国网吉林省电力有限公司经济技术研究院 Power transmission and transformation construction cost basic data collection and analysis system
CN107230163A (en) * 2017-06-07 2017-10-03 北京友泰科技发展有限责任公司 The system and method for power engineering quality in site supervision and check
CN107292578A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 The online estimating and examining system of high voltage distribution network project feasibility study and method
CN107730218A (en) * 2017-11-20 2018-02-23 广东电网有限责任公司电网规划研究中心 A kind of power transformation result of design display platform operation system
CN109784876A (en) * 2019-03-04 2019-05-21 上海会米策信息科技有限公司 Review system and method on line
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN110135671A (en) * 2018-02-08 2019-08-16 国网青海省电力公司经济技术研究院 The method for building up of project of transmitting and converting electricity technical-economic index analysis model building sample database
CN110135670A (en) * 2018-02-08 2019-08-16 国网青海省电力公司经济技术研究院 The method for building up of project of transmitting and converting electricity technical economy intelligent evaluation
CN112036816A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Intelligent evaluation method for power distribution network engineering cost
CN112634436A (en) * 2020-12-21 2021-04-09 上海金曲信息技术有限公司 Equipment lightweight display system of power system BIM model
CN112801530A (en) * 2021-02-05 2021-05-14 江西清能高科技术有限公司 Intelligent review system based on semantic splitting and working method
CN113095800A (en) * 2021-06-09 2021-07-09 中国铁塔股份有限公司湖北省分公司 Base station construction investment approval method, device, equipment and storage medium
CN114880943A (en) * 2022-05-24 2022-08-09 安及义实业(上海)有限公司 Bioreactor design method and system based on database
CN117273394A (en) * 2023-11-17 2023-12-22 中铁四局集团有限公司 Intelligent equipment selection allocation analysis management method based on big data

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107292578A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 The online estimating and examining system of high voltage distribution network project feasibility study and method
CN105989546A (en) * 2016-04-13 2016-10-05 国网吉林省电力有限公司经济技术研究院 Power transmission and transformation construction cost basic data collection and analysis system
CN107230163B (en) * 2017-06-07 2020-09-08 北京友泰科技发展有限责任公司 System for on-site quality supervision and inspection of power engineering
CN107230163A (en) * 2017-06-07 2017-10-03 北京友泰科技发展有限责任公司 The system and method for power engineering quality in site supervision and check
CN107730218A (en) * 2017-11-20 2018-02-23 广东电网有限责任公司电网规划研究中心 A kind of power transformation result of design display platform operation system
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN110135671A (en) * 2018-02-08 2019-08-16 国网青海省电力公司经济技术研究院 The method for building up of project of transmitting and converting electricity technical-economic index analysis model building sample database
CN110135670A (en) * 2018-02-08 2019-08-16 国网青海省电力公司经济技术研究院 The method for building up of project of transmitting and converting electricity technical economy intelligent evaluation
CN109784876A (en) * 2019-03-04 2019-05-21 上海会米策信息科技有限公司 Review system and method on line
CN112036816A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Intelligent evaluation method for power distribution network engineering cost
CN112634436A (en) * 2020-12-21 2021-04-09 上海金曲信息技术有限公司 Equipment lightweight display system of power system BIM model
CN112801530A (en) * 2021-02-05 2021-05-14 江西清能高科技术有限公司 Intelligent review system based on semantic splitting and working method
CN113095800A (en) * 2021-06-09 2021-07-09 中国铁塔股份有限公司湖北省分公司 Base station construction investment approval method, device, equipment and storage medium
CN114880943A (en) * 2022-05-24 2022-08-09 安及义实业(上海)有限公司 Bioreactor design method and system based on database
CN114880943B (en) * 2022-05-24 2023-02-03 安及义实业(上海)有限公司 Bioreactor design method and system based on database
CN117273394A (en) * 2023-11-17 2023-12-22 中铁四局集团有限公司 Intelligent equipment selection allocation analysis management method based on big data
CN117273394B (en) * 2023-11-17 2024-02-06 中铁四局集团有限公司 Intelligent equipment selection allocation analysis management method based on big data

Similar Documents

Publication Publication Date Title
CN105117850A (en) Auxiliary intelligent reviewing system for power transmission and transformation project design
CN106570784B (en) Voltage monitoring integrated model
CN112488558A (en) Energy consumption monitoring and analyzing system based on industrial internet
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN109426205A (en) A kind of industrial intelligent Optimization of Energy Saving system
CN106873487A (en) With energy equipment energy consumption long distance control system
CN102419834B (en) Enterprise energy settlement system
CN106300652A (en) A kind of user side energy-saving electric management system
CN106251052A (en) The county's grid power blackout management and control of a kind of ground and analysis decision plateform system
CN112149842A (en) Power grid maintenance management method and device
CN103646329A (en) Interregional and interprovincial electricity trading operational control method
CN108898239A (en) A kind of site selection method for distribution transformer based on data analysis
CN203504286U (en) Power consumption intelligent acquisition and energy efficiency real-time on-line analysis system for large-scale power plant
Amaral et al. Energy management systems
CN116933952B (en) Park low-carbon energy scheduling system based on visualization of Internet of things
CN106296000A (en) The foundation in the comprehensive storehouse of project of transmitting and converting electricity technical-economic index
CN104463505A (en) Operation state on-line monitoring method based on detail data
CN114218216A (en) Resource management method, device, equipment and storage medium
WO2018161238A1 (en) Remote monitoring system for energy consumption of energy-using equipment
CN107565579B (en) Multi-source cooperative management and control system and method for improving reactive voltage control level
CN110135670A (en) The method for building up of project of transmitting and converting electricity technical economy intelligent evaluation
Zhou et al. Operating Analysis and Data Mining System for Power Grid Dispatching
Li et al. Evaluation and application of wind power integration capacity in power grid on the basis of security constrained economic dispatch
Kopylova et al. System analysis and approaches to the developement of the automated electrical energy consumption and supply system of the food industry enterprise
CN205861784U (en) A kind of power distribution network power consumption monitor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151202

WD01 Invention patent application deemed withdrawn after publication