- CN105117531B CN105117531B CN201510476367.5A CN201510476367A CN105117531B CN 105117531 B CN105117531 B CN 105117531B CN 201510476367 A CN201510476367 A CN 201510476367A CN 105117531 B CN105117531 B CN 105117531B
- Authority
- CN
- China
- Prior art keywords
- blasting scheme
- explosion
- blasting
- scheme
- initiator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The present invention discloses a kind of bursting work processing method and system, wherein, method includes step:A, it creates blasting scheme or modifies to the blasting scheme created;B, the parameter of blasting scheme is configured and changes the explosion delay data of electric detonator and preserves;C, after preview is carried out to blasting scheme and is determined, blasting scheme is preserved;D, blasting scheme is saved in CPU management cards;E, CPU management cards are inserted into initiator, and blasting scheme is imported into initiator;F, initiator verifies blasting scheme data integrity.The present invention is designed by flexible blasting scheme and intuitive blasting scheme preview, and live explosion effectively can be handled, improve the accuracy, tightness and demolition effect of explosion.And the tomorrow requirement of live explosion development is adapted to, live explosion that can be growing to complexity is accurately and rapidly designed blasting scheme.
Description
Technical field
The present invention relates to explosion field more particularly to a kind of bursting work processing methods and system.
Background technology
Explosion (blasting) is that explosive is utilized to be compressed caused by explosion in empty gas and water, native stone medium or object, is loose
Dynamic, destruction, throwing and lethal effect, a special kind of skill to accomplish the end in view.Pack or powder charge are in native stone medium or works
Explosion time, make native stone medium or works generate compression, deformation, destroy, loose and throwing the phenomenon that, be mainly used for a cubic meter work
Dismounting of journey and metal building object and structures etc..The range of research includes:The property and application method of explosive, fire tool, dress
Medicine(Pack)Detonation in various media, powder charge is to the contact demolition and non-contact demolition of target, all kinds of bursting works
Tissue and implementation.
As bursting work is gradually spread, the design of blasting scheme is increasingly sophisticated, and initiator screen is small, complicated for operation,
So existing blasting scheme processing method accuracy, tightness and effect are to be improved.
Therefore, the prior art has yet to be improved and developed.
Invention content
In view of above-mentioned deficiencies of the prior art, the purpose of the present invention is to provide a kind of bursting work processing method and it is
System, it is intended to solve the problems, such as that existing blasting scheme design accuracy, tightness and effect are to be improved.
Technical scheme is as follows:
A kind of bursting work processing method, wherein, including step:
A, it creates blasting scheme or modifies to the blasting scheme created;
B, the parameter of blasting scheme is configured and changes the explosion delay data of electric detonator and preserves;
C, after preview is carried out to blasting scheme and is determined, blasting scheme is preserved;
D, blasting scheme is saved in CPU management cards;
E, CPU management cards are inserted into initiator, and blasting scheme is imported into initiator;
F, initiator verifies blasting scheme data integrity.
The bursting work processing method, wherein, in the step C, blasting scheme is saved as into excel files.
The bursting work processing method, wherein, the explosion matrix of blasting scheme includes:Hole-by-hole initiating, by row explosion
And diagonal explosion data.
The bursting work processing method, wherein, the parameter of blasting scheme includes:Line number, is in the ranks delayed and arranges at columns
Between be delayed.
The bursting work processing method, wherein, in the step F, initiator passes through the first two word in blasting scheme
The burst point number of section verifies blasting scheme data integrity.
A kind of bursting work processing system, wherein, including:
Creation module, for creating blasting scheme or modifying to the blasting scheme created;
Configuration module, for the explosion delay data of the parameter of blasting scheme and modification electric detonator to be configured and preserves;
Blasting scheme after to blasting scheme progress preview and determining, is saved as excel files by previewing module;
Preserving module, for blasting scheme to be saved in CPU management cards;
Import modul, for CPU management cards to be inserted into initiator, and blasting scheme is imported into initiator;
Correction verification module verifies blasting scheme data integrity for initiator.
The bursting work processing system, wherein, in previewing module, blasting scheme is shown with dynamic diagram.
The bursting work processing system, wherein, the explosion matrix of blasting scheme includes:Hole-by-hole initiating, by row explosion
Or diagonal explosion data.
The bursting work processing system, wherein, the parameter of blasting scheme includes:Line number, is in the ranks delayed and arranges at columns
Between be delayed.
The bursting work processing system, wherein, the burst point number that initiator passes through the first two byte in blasting scheme
Blasting scheme data integrity is verified.
Advantageous effect:The present invention is designed by flexible blasting scheme and intuitive blasting scheme preview, can be to existing
Field explosion is effectively handled, and improves the accuracy, tightness and demolition effect of explosion.And live explosion hair is adapted to
The tomorrow requirement of exhibition, live explosion that can be growing to complexity are accurately and rapidly designed blasting scheme.
Description of the drawings
Fig. 1 is a kind of flow chart of bursting work processing method preferred embodiment of the present invention.
Fig. 2 is a kind of structure diagram of bursting work processing system preferred embodiment of the present invention.
Specific embodiment
The present invention provides a kind of bursting work processing method and system, to make the purpose of the present invention, technical solution and effect
Clearer, clear and definite, the present invention is described in more detail below.It should be appreciated that specific embodiment described herein is only
To explain the present invention, it is not intended to limit the present invention.
Referring to Fig. 1, Fig. 1 is a kind of flow chart of bursting work processing method preferred embodiment of the present invention, as shown in the figure,
It includes step:
S1, newly-built blasting scheme modify to the blasting scheme created;
S2, be configured blasting scheme parameter and change electric detonator explosion delay data and preserve;
S3, after preview is carried out to blasting scheme and is determined, blasting scheme is preserved;
S4, blasting scheme is saved in CPU management cards;
S5, CPU management cards are inserted into initiator, and blasting scheme is imported into initiator;
S6, initiator verify blasting scheme data integrity.
In the present invention, in step sl, it first creates a blasting scheme or the blasting scheme to having created carries out
Modification, then carries out next processing procedure.
In step s 2, be configured the parameters of blasting scheme, parameter therein include line number, columns, delay in the ranks and
It is delayed between row, then preserves each parameter.The explosion delay data of local electric detonator is changed as requested, blasting scheme
Explosion matrix includes Hole-by-hole initiating, by row explosion, diagonal explosion etc. data.For irregular explosion matrix, Ke Yigen
It is delayed according to additions and deletions blow-up point and setting explosion is needed.In explosion delay data, maximum delay be no more than 16000 milliseconds, such as
It is 100 milliseconds.Then it by the explosion delay data of modification and preserves.
In step s3, in step s3, after blasting scheme is provided with, preview can be carried out to blasting scheme(Such as with
Dynamic diagram mode is shown), judge whether the delay of each blow-up point meets design requirement, it is such as not quick-fried by design idea
It is broken, it can return to step S1 and redesign blasting scheme.Such as meet design requirement, it is determined that and preserve blasting scheme.Specifically may be used
Blasting scheme is saved as into excel files.
In step s 4, if temporarily without initiator, blasting scheme can first be saved as to the table of excel types,
During the explosion file importing CPU management of local excel file formats is blocked Deng next time
In step s 5, CPU management cards are inserted into initiator, and blasting scheme is imported into initiator.Specifically will
CPU management cards are inserted into initiator, and initiator has monitored that CPU management card insertion enters, then the explosion that will be preserved in CPU management cards
Plan document is imported into initiator.
In step s 6, blasting scheme is verified, can specifically passes through the burst point of the first two byte in blasting scheme
It is several that blasting scheme data integrity is verified.
Based on the above method, the present invention also provides a kind of bursting work processing system, as shown in Fig. 2, it includes:
Creation module 100, for creating blasting scheme or modifying to the blasting scheme created;
Configuration module 200, for the explosion delay data of the parameter of blasting scheme and modification electric detonator to be configured and protects
It deposits;
After to blasting scheme progress preview and determining, blasting scheme is preserved for previewing module 300;
Preserving module 400, for blasting scheme to be saved in CPU management cards;
Import modul 500, for CPU management cards to be inserted into initiator, and blasting scheme is imported into initiator;
Correction verification module 600 verifies blasting scheme data integrity for initiator.
Further, in previewing module 300, blasting scheme is shown with dynamic diagram.
Further, the explosion matrix of blasting scheme includes:Hole-by-hole initiating, by row explosion or diagonal explosion data.
Further, the parameter of blasting scheme includes:Line number, columns are in the ranks delayed and are delayed between arranging.
Further, initiator by the burst point number of the first two byte in blasting scheme to blasting scheme data integrity into
Row verification.
It has been described in detail in the method for technical detail in front about above-mentioned modular unit, therefore has no longer been described in detail.
In conclusion the present invention is designed by flexible blasting scheme and intuitive blasting scheme preview, it can be to existing
Field explosion is effectively handled, and improves the accuracy, tightness and demolition effect of explosion.And live explosion hair is adapted to
The tomorrow requirement of exhibition, live explosion that can be growing to complexity are accurately and rapidly designed blasting scheme.
It should be understood that the application of the present invention is not limited to the above, it for those of ordinary skills, can
To be improved or converted according to the above description, all these modifications and variations should all belong to the guarantor of appended claims of the present invention
Protect range.
Claims (8)
1. a kind of bursting work processing method, which is characterized in that including step:
A, it creates blasting scheme or modifies to the blasting scheme created;
B, the parameter of blasting scheme is configured and changes the explosion delay data of electric detonator and preserves;
C, after preview is carried out to blasting scheme and is determined, blasting scheme is preserved;
D, blasting scheme is saved in CPU management cards;
E, CPU management cards are inserted into initiator, and blasting scheme is imported into initiator;
F, initiator verifies blasting scheme data integrity;
In the step F, initiator is by the burst point number of the first two byte in blasting scheme to blasting scheme data integrity
It is verified;
In the step C, after blasting scheme is provided with, preview is carried out to blasting scheme, judging the delay of each blow-up point is
No to meet design requirement, such as not by design idea explosion, then return to step A, such as meets design requirement, it is determined that and by explosion side
Case preserves.
2. bursting work processing method according to claim 1, which is characterized in that in the step C, blasting scheme is protected
Save as excel files.
3. bursting work processing method according to claim 1, which is characterized in that the explosion matrix of blasting scheme includes:
Hole-by-hole initiating, by row explosion and diagonal explosion data.
4. bursting work processing method according to claim 1, which is characterized in that the parameter of blasting scheme includes:Line number,
Columns is in the ranks delayed and is delayed between arranging.
5. a kind of bursting work processing system, which is characterized in that including:
Creation module, for creating blasting scheme or modifying to the blasting scheme created;
Configuration module, for the explosion delay data of the parameter of blasting scheme and modification electric detonator to be configured and preserves;
Blasting scheme after to blasting scheme progress preview and determining, is saved as excel files by previewing module;
Preserving module, for blasting scheme to be saved in CPU management cards;
Import modul, for CPU management cards to be inserted into initiator, and blasting scheme is imported into initiator;
Correction verification module verifies blasting scheme data integrity for initiator;
Initiator verifies blasting scheme data integrity by the burst point number of the first two byte in blasting scheme;
After blasting scheme is provided with, preview is carried out to blasting scheme, judges whether the delay of each blow-up point meets design and want
It asks, is not such as returned to modification then by design idea explosion, such as met design requirement, it is determined that and preserve blasting scheme.
6. bursting work processing system according to claim 5, which is characterized in that in previewing module, with dynamic diagram exhibition
Show blasting scheme.
7. bursting work processing system according to claim 5, which is characterized in that the explosion matrix of blasting scheme includes:
Hole-by-hole initiating, by row explosion or diagonal explosion data.
8. bursting work processing system according to claim 5, which is characterized in that the parameter of blasting scheme includes:Line number,
Columns is in the ranks delayed and is delayed between arranging.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510476367.5A CN105117531B (en) | 2015-08-06 | 2015-08-06 | A kind of bursting work processing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510476367.5A CN105117531B (en) | 2015-08-06 | 2015-08-06 | A kind of bursting work processing method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105117531A CN105117531A (en) | 2015-12-02 |
CN105117531B true CN105117531B (en) | 2018-07-06 |
Family
ID=54665519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510476367.5A Active CN105117531B (en) | 2015-08-06 | 2015-08-06 | A kind of bursting work processing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105117531B (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101373475A (en) * | 2008-10-21 | 2009-02-25 | 北大方正集团有限公司 | Method and system for reprocessing variable data content |
CN103020158A (en) * | 2012-11-26 | 2013-04-03 | 中兴通讯股份有限公司 | Report form creation method, device and system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8804147B2 (en) * | 2012-07-31 | 2014-08-12 | Google Inc. | Semantic printing options |
-
2015
- 2015-08-06 CN CN201510476367.5A patent/CN105117531B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101373475A (en) * | 2008-10-21 | 2009-02-25 | 北大方正集团有限公司 | Method and system for reprocessing variable data content |
CN103020158A (en) * | 2012-11-26 | 2013-04-03 | 中兴通讯股份有限公司 | Report form creation method, device and system |
Also Published As
Publication number | Publication date |
---|---|
CN105117531A (en) | 2015-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Fang et al. | 3D numerical modeling of projectile penetration into rock-rubble overlays accounting for random distribution of rock-rubble | |
Li et al. | Effect of eccentric edge initiation on the fragment velocity distribution of a cylindrical casing filled with charge | |
GB2457208A (en) | Process for assembling a loading tube | |
CN105224875A (en) | A kind of secure startup system of terminal and method | |
CN104881610B (en) | A kind of defence method for virtual table hijack attack | |
CN106547648A (en) | Backup data processing method and device | |
US20220099424A1 (en) | Apparatus, method and computer program product for designing blasting order | |
CN114543603B (en) | Determination method and device for mine blasting edge hole distance | |
CN105117531B (en) | A kind of bursting work processing method and system | |
Chen et al. | Study on random initiation phenomenon for sympathetic detonation of explosive | |
CN102855439B (en) | One kind performs file self checking method and device | |
Králik et al. | Numerical analysis of the exterior explosion effects on the buildings with barriers | |
CN116187122A (en) | Method and device for arranging blast holes, terminal equipment and medium | |
Yi et al. | Numerical simulation for the influence of delay time on the rock fragmentation | |
McKenzie | Blasting near open pit walls | |
Chen et al. | Parallel control to fragments of a cylindrical structure driven by explosive inside | |
Morris et al. | Parametric study of energetic simulation for geothermal applications | |
Ma et al. | Numerical simulation and experimental study on shaped charge warhead of guided ammunition | |
Yavuz et al. | Numerical and experimental investigation of jet formation and particulation in shaped charges with tulip-like steel liners | |
Randles et al. | SPH simulation of fragmentation in the MK82 bomb | |
CN111381846A (en) | Data verification method for electronic controller safe refreshing | |
CN109510825A (en) | Dynamic base encryption method and device and the anti-abduction method and apparatus of dynamic base | |
Wang et al. | Research on numerical simulation of tantalum explosively formed projectile forming driven by detonation | |
Wang et al. | Analysis on formulas of concrete plate under contact explosion | |
Yao et al. | Research on the damage law of reinforced concrete beams caused by cuboid explosives under contact explosion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |