CN105093939B - Building control system design and commissioning device and method - Google Patents
Building control system design and commissioning device and method Download PDFInfo
- Publication number
- CN105093939B CN105093939B CN201510110618.8A CN201510110618A CN105093939B CN 105093939 B CN105093939 B CN 105093939B CN 201510110618 A CN201510110618 A CN 201510110618A CN 105093939 B CN105093939 B CN 105093939B
- Authority
- CN
- China
- Prior art keywords
- design
- control system
- data
- building control
- wiring diagram
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Programmable Controllers (AREA)
Abstract
The invention proposes a kind of design of building control system and commissioning device and methods, the equipment includes: design and inspection unit, can automatically generate design and system configuration document and bin wiring diagram based on the design data of importing to implement the deployment and debugging of subsequent building control system;Auxiliary unit is debugged, auxiliary can execute the field adjustable for being directed to designed building control system after disposing the building control system according to the design and system configuration document and bin wiring diagram.Building control system design disclosed in this invention and commissioning device and method enable to design process not easy to make mistakes and can guarantee the global consistency of system and can be improved fielded system debugging efficiency.
Description
Technical field
The present invention relates to system design and commissioning device and methods, design and adjust more particularly, to building control system
Try device and method.
Background technique
Currently, the scale and complexity with building control system increasingly improve, large buildings are effectively designed and debugged
Control system becomes more and more important.
In existing technical solution, the designer of building control system usually completes building control system as follows
The design of system: obtaining the architectural composition figure of target building according to demand, artificially selects to be directed to based on the architectural composition figure therewith
The field controller of each building equipment, and according to selected field controller artificially determine or write and is corresponding using journey
Sequence and logic and the wiring diagram for designing each bin then carry out the installation and debugging of field device based on the wiring diagram, such as
Technical solution described in patent document US20050119767A1.
However, there are the following problems for above-mentioned existing technical solution: (1) due to needing according to specific architectural composition figure people
Site organisation's field device and design wiring diagram, therefore design process is easy to malfunction and it is difficult to ensure that the entirety of system is consistent
Property;(2) due to needing complete artificially field adjustable each unit equipment and system configuration, therefore the efficiency of system debug is lower.
Accordingly, there exist following demands: providing the entirety for enabling to design process not easy to make mistakes and can guaranteeing system
Consistency and the building control system design and commissioning device and method that can be improved fielded system debugging efficiency.
Summary of the invention
In order to solve the problems existing in the prior art scheme, the invention proposes enable to design process to be not easy
It malfunctions and can guarantee the global consistency of system and can be improved the building control system of fielded system debugging efficiency to set
Meter and commissioning device and method.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of design of building control system and commissioning device, the building control system design and commissioning device include:
Design and inspection unit, the design and inspection unit can automatically generate design based on the design data of importing
And system configuration document and bin wiring diagram are to implement the deployment and debugging of subsequent building control system;
Auxiliary unit is debugged, the debugging auxiliary unit can connect according to the design and system configuration document and bin
Auxiliary executes the field adjustable for being directed to designed building control system after line chart disposes the building control system.
In scheme disclosed above, it is preferable that the design data includes the side by filling in design parameter template
The first design data that formula imports and/or by user provided by the design and inspection unit 1 on user interface directly
The second design data that the mode of input data imports.
In scheme disclosed above, it is preferable that the design parameter template can be right based on scheduled first rule
The reasonability and logical validity of the design data of user's filling are checked in real time, to prompt and ensure that user's input meets
The design data of first rule, wherein the reasonableness check includes the data format and data of the data to being inputted
The inspection of content.
In scheme disclosed above, it is preferable that the design and inspection unit can analyze the design data, and
And abnormal examination is carried out to analysis result data, and institute is automatically generated based on the analysis result data after abnormal examination therewith
State design and system configuration document and bin wiring diagram.
In scheme disclosed above, it is preferable that the design and inspection unit analyze the design as follows
Data: classifying the design data according to the data field classified index for presetting and storing, and according to presetting
Rule basic operations are carried out to each data classification, to obtain categorized and operation analysis result data.
In scheme disclosed above, it is preferable that the design and inspection unit are as follows to analysis number of results
According to progress abnormal examination: based on scheduled Second Rule to the analysis result data as caused by the first design data imported
Reasonability and logical validity checked in real time, and when noting abnormalities to user report exception information;For straight by user
Analysis result data caused by second design data of input is connect, converges when it is entered and has imported or already present
Whole design datas simultaneously carry out reasonability and logical validity inspection based on the scheduled Second Rule to it in real time, and
Exception information is momentarily prompted the user with when noting abnormalities.
In scheme disclosed above, it is preferable that the Second Rule covers first rule, and the exception
Information is classified as two class of first kind exception information and the second class exception information, and the first kind exception information instruction does not allow phase
The data of pass use in subsequent design process, the second class exception information indicate relevant data be it is unconventional and
Although being allowed to continue in subsequent design process using may lead to the problem of.
In scheme disclosed above, it is preferable that the design and inspection unit automatically generate set as follows
Meter and system configuration document and bin wiring diagram: converge the analysis result on inspection as caused by the first design data imported
Analysis result data caused by data and second design data directly inputted as user on inspection, based on scheduled
Design matching rule selects suitable field unit device controller and application associated logic from database
To generate design and system configuration document, and bin is automatically generated based on selected field unit device controller therewith and is connect
Line chart, wherein reported when noting abnormalities during generating design and system configuration document and bin wiring diagram to user
Accuse exception information.
In scheme disclosed above, it is preferable that in the design and system configuration document and bin wiring diagram quilt
After generation, it is described design and inspection unit by it is described design and system configuration document be deployed on fielded system control station so as to
User disposes and debugs the building control system according to the bin wiring diagram.
In scheme disclosed above, it is preferable that when disposing and debugging the building control system, the debugging is auxiliary
It helps unit to initiate and executes assisted modulation operation, the assisted modulation operation includes: initiation and executes for the fielded system
The detection operation of the type and legitimacy of control station, if the type and legitimacy of the fielded system control station and design are not
Symbol, then prompt user exceptions, the exception information includes abnormal cause.
In scheme disclosed above, it is preferable that when disposing and debugging the building control system, the debugging is auxiliary
It helps unit to initiate and executes assisted modulation operation, the assisted modulation operation further comprises: (1) based on the bin wiring diagram
Check the correctness of field wiring;(2) consistency of field device mount message and system configuration information and design documentation is checked,
And be presented inconsistent information to user, the inconsistent information include inconsistent field unit device controller information and
The information of inconsistent equipment.
In scheme disclosed above, it is preferable that the debugging auxiliary unit checks that field device is pacified as follows
It fills the consistency of information and system configuration information and offline design document: offline design element is generated based on the design documentation
Table, the offline design list of elements include basic key element and element to be compared;Based on from on-site test and setting of being collected into
Standby installation and configuration information generate field deployment element information table, and format is identical as the offline design list of elements;With basis
Key element be index by the element to be compared in the offline design list of elements and the field deployment element information table according to
Priority compares one by one, to form uniformity comparison report.
In scheme disclosed above, it is preferable that the assisted modulation operation further comprises: if it is determined that scene is set
Standby mount message and system configuration information and design documentation are inconsistent, then correct the design documentation online or prompt user is existing
The installation of field corrigendum equipment and configuration, so that the two is consistent.
In scheme disclosed above, it is preferable that after the completion of building control system is disposed and is debugged, the debugging is auxiliary
Unit is helped to be capable of the operating status of monitoring field equipment in real time.
The purpose of the present invention can also be achieved through the following technical solutions:
A kind of design of building control system and adjustment method, the building control system design and adjustment method include following
Step:
(A1) design data based on importing automatically generates design and system configuration document and bin wiring diagram to implement
The deployment and debugging of subsequent building control system;
(A2) building control system is disposed according to the design and system configuration document and bin wiring diagram, and be based on
The design and system configuration document and bin wiring diagram auxiliary field adjustable personnel execute and control system for designed building
The field adjustable of system.
Building control system design disclosed in this invention and commissioning device and method have the advantage that (1) due to not
It needs artificially to organize field device and design wiring diagram according to specific architectural composition figure, so that design process is more acurrate
With it is convenient and be easy to guarantee the global consistency of system;(2) since live tune can be more effectively carried out by auxiliary unit
Examination, therefore the efficiency of system debug can be improved significantly, to reduce the cost that system installs and deploys.
Detailed description of the invention
In conjunction with attached drawing, technical characteristic of the invention and advantage will be more fully understood by those skilled in the art, in which:
Fig. 1 is the building control system design of embodiment according to the present invention and the schematic diagram of commissioning device;
Fig. 2 is the flow chart of the building control system design and adjustment method of embodiment according to the present invention.
Specific embodiment
Fig. 1 is the building control system design of embodiment according to the present invention and the schematic diagram of commissioning device.Such as
Shown in Fig. 1, building control system design disclosed in this invention and commissioning device include design and inspection unit 1 and debugging auxiliary
Unit 2.The design and inspection unit 1 can be automatically generated based on the design data of importing design and system configuration document and
Bin wiring diagram is to implement the deployment and debugging of subsequent building control system.The debugging auxiliary unit 2 can be according to institute
State design and system configuration document and bin wiring diagram dispose the building control system after auxiliary execute for designed building
The field adjustable of space control system.
Preferably, in building control system disclosed in this invention design and commissioning device, the design data includes
The first design data for being imported in a manner of filling in design parameter template (such as by point table of excel form) and/or
Second imported in such a way that user directly inputs data on the user interface provided by the design and inspection unit 1 sets
It counts.
Preferably, in building control system disclosed in this invention design and commissioning device, the design parameter template
Can based on it is scheduled first rule to user filling design data reasonability and logical validity (for example, a network
2200 equipment points etc. cannot be comprised more than not across multiple buildings, a building control system) it is checked in real time,
To prompt and ensure that user's input meets the design data of first rule, wherein the reasonableness check includes to institute
The inspection of the data formats of the data of input and data content is (for example, the range of certain cell data must be certain in 0-50
Cell must be number etc.).Illustratively, first rule is realized in the form of embedded macro application,
Preferably, in building control system disclosed in this invention design and commissioning device, design and 1 energy of inspection unit
The design data is enough analyzed, and abnormal examination is carried out to analysis result data, and therewith based on point after abnormal examination
Analysis result data automatically generates the design and system configuration document and bin wiring diagram.
Preferably, in building control system disclosed in this invention design and commissioning device, the design and checklist
Member 1 analyzes the design data as follows: according to the data field classified index for presetting and storing by the design number
According to being classified (for example, each of which column is split to each data in the form of a unit by certain a line in table
In class), and basic operations are carried out (for example, calculating on each unit to each data classification according to preset rules
AO(analog output) quantity), to obtain categorized and operation analysis result data.
Preferably, in building control system disclosed in this invention design and commissioning device, the design and checklist
Member 1 carries out abnormal examination to analysis result data as follows: based on scheduled Second Rule to the first design by importing
The reasonability and logical validity of analysis result data caused by data checked in real time, and when noting abnormalities to user
Report exception information;For analysis result data caused by second design data directly inputted as user, in its quilt
Converge when input and has imported or already present whole design data and it has been carried out in real time based on the scheduled Second Rule
Reasonability and logical validity inspection, and exception information is momentarily prompted the user with when noting abnormalities.
Preferably, in building control system disclosed in this invention design and commissioning device, the Second Rule is covered
Described first regular (it may thereby be ensured that double safety of reasonability and logical validity inspection), and the exception information
It is classified as two class of first kind exception information and the second class exception information, the first kind exception information instruction does not allow relevant
Data use in subsequent design process, although the second class exception information indicate relevant data be it is unconventional and
It is allowed to continue in subsequent design process using but may leading to the problem of.
Preferably, in building control system disclosed in this invention design and commissioning device, the design and checklist
Member 1 automatically generates design and system configuration document and bin wiring diagram as follows: converging the first design number by importing
Through examining caused by second design data directly inputted according to generated analysis result data on inspection and as user
The analysis result data looked into selects suitable field unit equipment to control based on scheduled design matching rule from database
Device (model and port numbers including field unit device controller) and application associated logic are to generate design
And system configuration document, and bin wiring diagram is automatically generated based on selected field unit device controller therewith, wherein
When noting abnormalities during generating design and system configuration document and bin wiring diagram to user report exception information.
Preferably, in building control system disclosed in this invention design and commissioning device, in the design and system
After configuration documentation and bin wiring diagram are generated, it is described design and inspection unit 1 by it is described design and system configuration document
It is deployed on fielded system control station and disposes and debug institute according to the bin wiring diagram so as to user (such as field engineer)
State building control system.
Preferably, in building control system disclosed in this invention design and commissioning device, described in deployment and debugging
When building control system, assisted modulation operation is initiated and executed to the debugging auxiliary unit 2, and the assisted modulation operation includes:
It initiates and executes type (such as its model) and legitimacy for the fielded system control station (for example whether effectively being awarded
Power) detection operation, if the type and legitimacy and different design of the fielded system control station, prompt user to believe extremely
Breath, the exception information includes abnormal cause.
Preferably, in building control system disclosed in this invention design and commissioning device, described in deployment and debugging
When building control system, assisted modulation operation is initiated and executed to the debugging auxiliary unit 2, and the assisted modulation operation is further
It include: the correctness that (1) checks field wiring based on the bin wiring diagram;(2) field device mount message and system are checked
The consistency of configuration information and design documentation, and inconsistent information is presented (for example, field unit device controller quilt to user
It is linked into wrong network, input point type configuration mistake etc.), the inconsistent information includes inconsistent field unit equipment
The information of the information of controller and inconsistent equipment.
Preferably, in building control system disclosed in this invention design and commissioning device, the debugging auxiliary unit 2
The consistency of field device mount message and system configuration information and offline design document is checked as follows: being set based on described
The document structure tree offline design list of elements is counted, the offline design list of elements includes basic key element and element to be compared;It is based on
Field deployment element information table is generated from on-site test and the equipment being collected into installation and configuration information, format and described offline
Design element table is identical;It is that index will be described offline with basic key element (such as identifier of field unit device controller)
Design element table is compared with the element to be compared in the field deployment element information table according to priority one by one, consistent to be formed
Property compare report.
Preferably, in building control system disclosed in this invention design and commissioning device, the assisted modulation operation
Further comprise: if it is determined that field device mount message and system configuration information and design documentation are inconsistent, then online corrigendum
The design documentation or the installation of prompt user scene corrigendum equipment and configuration, so that the two is consistent.
Preferably, in building control system disclosed in this invention design and commissioning device, in building control system portion
After the completion of administration and debugging, the debugging auxiliary unit 2 is capable of the operating status of monitoring field equipment in real time.
Therefore building control system disclosed in this invention design and commissioning device have the advantage that (1) due to
It does not need artificially to organize field device and design wiring diagram according to specific architectural composition figure, so that design process is more quasi-
True and global consistency that is convenient and being easy to guarantee system;(2) due to that can be more effectively carried out by debugging auxiliary unit
Field adjustable, therefore the efficiency of system debug can be improved significantly, to reduce the cost that system installs and deploys.
Fig. 2 is the flow chart of the building control system design and adjustment method of embodiment according to the present invention.Such as Fig. 2 institute
Show, building control system design and adjustment method disclosed in this invention include the following steps: the design number of (A1) based on importing
According to automatically generating design and system configuration document and bin wiring diagram to implement deployment and the tune of subsequent building control system
Examination;(A2) building control system is disposed according to the design and system configuration document and bin wiring diagram, and based on described
Design and system configuration document and bin wiring diagram auxiliary field adjustable personnel execute for designed building control system
Field adjustable.
Preferably, in building control system disclosed in this invention design and adjustment method, the design data includes
The first design data for being imported in a manner of filling in design parameter template (such as by point table of excel form) and/or
Second imported in such a way that user directly inputs data on the user interface provided by the design and inspection unit 1 sets
It counts.
Preferably, in building control system disclosed in this invention design and adjustment method, the design parameter template
Can based on it is scheduled first rule to user filling design data reasonability and logical validity (for example, a network
2200 equipment points etc. cannot be comprised more than not across multiple buildings, a building control system) it is checked in real time,
To prompt and ensure that user's input meets the design data of first rule, wherein the reasonableness check includes to institute
The inspection of the data formats of the data of input and data content is (for example, the range of certain cell data must be certain in 0-50
Cell must be number etc.).Illustratively, first rule is realized in the form of embedded macro application,
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one
Step includes: the analysis design data, and carries out abnormal examination to analysis result data, and therewith based on after abnormal examination
Analysis result data automatically generate the design and system configuration document and bin wiring diagram.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one
Step includes analyzing the design data as follows: according to the data field classified index for presetting and storing by the design
Data are classified (for example, each of which column is split to each number in the form of a unit by certain a line in table
According in class), and basic operations are carried out (for example, calculating each unit to each data classification according to preset rules
On AO(analog output) quantity), to obtain categorized and operation analysis result data.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one
Step includes carrying out abnormal examination to analysis result data as follows: being set based on scheduled Second Rule to first by importing
The reasonability and logical validity of analysis result data caused by counting checked in real time, and when noting abnormalities to
Report exception information in family;For analysis result data caused by second design data directly inputted as user, at it
Converge when being entered imported or already present whole design data and based on the scheduled Second Rule in real time to its into
Row reasonability and logical validity inspection, and exception information is momentarily prompted the user with when noting abnormalities.
Preferably, in building control system disclosed in this invention design and adjustment method, the Second Rule is covered
Described first regular (it may thereby be ensured that double safety of reasonability and logical validity inspection), and the exception information
It is classified as two class of first kind exception information and the second class exception information, the first kind exception information instruction does not allow relevant
Data use in subsequent design process, although the second class exception information indicate relevant data be it is unconventional and
It is allowed to continue in subsequent design process using but may leading to the problem of.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one
Step includes automatically generating design and system configuration document and bin wiring diagram as follows: converging the first design by importing
It is passed through caused by analysis result data caused by data on inspection and second design data directly inputted as user
The analysis result data of inspection selects suitable field unit equipment control based on scheduled design matching rule from database
Device (model and port numbers including field unit device controller) processed and application associated logic are set with generating
Meter and system configuration document, and bin wiring diagram is automatically generated based on selected field unit device controller therewith,
In, believe extremely when noting abnormalities during generating design and system configuration document and bin wiring diagram to user report
Breath.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one
Step includes: after the design and system configuration document and bin wiring diagram are generated, by the design and system configuration
Document, which is deployed on fielded system control station, to be disposed and adjusts according to the bin wiring diagram so as to user (such as field engineer)
Try the building control system.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one
Step includes: to initiate and execute assisted modulation operation, the assisted modulation operation when disposing and debugging the building control system
Include: initiation and execute for the fielded system control station type (such as its model) and legitimacy (for example whether by
Effectively authorization) detection operation, if the type and legitimacy and different design of the fielded system control station, prompt user
Exception information, the exception information include abnormal cause.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one
Step includes: to initiate and execute assisted modulation operation, the assisted modulation operation when disposing and debugging the building control system
Further comprise: (1) checking the correctness of field wiring based on the bin wiring diagram;(2) field device mount message is checked
With the consistency of system configuration information and design documentation, and inconsistent information is presented (for example, field unit equipment control to user
Device processed is linked into wrong network, input point type configuration mistake etc.), the inconsistent information includes that inconsistent scene is single
The information of the information of element device controller and inconsistent equipment.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one
Step includes checking the consistency of field device mount message and system configuration information and offline design document as follows: being based on
The design documentation generates the offline design list of elements, and the offline design list of elements includes basic key element and member to be compared
Element;Based on from on-site test and be collected into equipment installation and configuration information generate field deployment element information table, format with
The offline design list of elements is identical;It is that index will with basic key element (such as identifier of field unit device controller)
The offline design list of elements is compared with the element to be compared in the field deployment element information table according to priority one by one, with
Form uniformity comparison report.
Preferably, in building control system disclosed in this invention design and adjustment method, the assisted modulation operation
Further comprise: if it is determined that field device mount message and system configuration information and design documentation are inconsistent, then online corrigendum
The design documentation or the installation of prompt user scene corrigendum equipment and configuration, so that the two is consistent.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one
Step includes: the operating status of the monitoring field equipment in real time after the completion of building control system is disposed and is debugged.
Therefore building control system disclosed in this invention design and adjustment method have the advantage that (1) due to
It does not need artificially to organize field device and design wiring diagram according to specific architectural composition figure, so that design process is more quasi-
True and global consistency that is convenient and being easy to guarantee system;(2) since scene can be more effectively carried out by auxiliary unit
Debugging, therefore the efficiency of system debug can be improved significantly, to reduce the cost that system installs and deploys.
Although the present invention is described by above-mentioned preferred embodiment, way of realization is not limited to
Above-mentioned embodiment.It will be appreciated that in the case where not departing from spirit and scope of the present invention, those skilled in the art can be with
Different change and modification are made to the present invention.
Claims (14)
1. a kind of building control system design and commissioning device, the building control system design and commissioning device include:
Design and inspection unit, the design and inspection unit can be automatically generated design based on the design data of importing and be
System configuration documentation and bin wiring diagram are to implement the deployment and debugging of subsequent building control system;With
Auxiliary unit is debugged, the debugging auxiliary unit can be according to the design and system configuration document and bin wiring diagram
It is executed based on the design and system configuration document and bin wiring diagram auxiliary for set after disposing the building control system
The field adjustable of the building control system of meter;
Wherein, the design data includes the first design data imported by way of filling in design parameter template and passes through use
Family directly inputs the second design data that the mode of data imports on the user interface provided by the design and inspection unit;
Wherein, the design and inspection unit automatically generate design and system configuration document and bin wiring as follows
Figure: converging the analysis result data as caused by the first design data imported on inspection and described in being directly inputted as user
Analysis result data caused by second design data on inspection is selected from database based on scheduled design matching rule
Suitable field unit device controller and application associated logic to generate design and system configuration document, and
And bin wiring diagram is automatically generated based on selected field unit device controller therewith.
2. building control system design according to claim 1 and commissioning device, which is characterized in that the design parameter mould
Plate can based on it is scheduled first rule to user filling design data reasonability and logical validity be checked in real time,
To prompt and ensure that user's input meets the design data of first rule, wherein the reasonableness check includes to institute
The data format of the data of input and the inspection of data content.
3. building control system design according to claim 2 and commissioning device, which is characterized in that the design and inspection
Unit can analyze the design data, and carry out abnormal examination to analysis result data, and be based on abnormal examination therewith
Analysis result data afterwards automatically generates the design and system configuration document and bin wiring diagram.
4. building control system design according to claim 3 and commissioning device, which is characterized in that the design and inspection
Unit analyzes the design data as follows: according to the data field classified index for presetting and storing by the design number
Basic operations are carried out to each data classification according to classifying, and according to preset rules, to obtain categorized and operation
Analysis result data.
5. building control system design according to claim 4 and commissioning device, which is characterized in that the design and inspection
Unit carries out abnormal examination to analysis result data as follows: based on scheduled Second Rule to the first design by importing
The reasonability and logical validity of analysis result data caused by data checked in real time, and when noting abnormalities to user
Report exception information;For analysis result data caused by second design data directly inputted as user, in its quilt
Converge when input and has imported or already present whole design data and it has been carried out in real time based on the scheduled Second Rule
Reasonability and logical validity inspection, and exception information is momentarily prompted the user with when noting abnormalities.
6. building control system design according to claim 5 and commissioning device, which is characterized in that the Second Rule is contained
First rule is covered, and the exception information is classified as two class of first kind exception information and the second class exception information, institute
Stating the instruction of first kind exception information does not allow relevant data to use in subsequent design process, the second class exception information
Although indicating that relevant data are unconventional and are allowed to continue in subsequent design process using may
It leads to the problem of.
7. building control system design according to claim 1 and commissioning device, which is characterized in that the design and inspection
Unit further automatically generates design and system configuration document and bin wiring diagram as follows: when generate design and be
To user report exception information when noting abnormalities during system configuration documentation and bin wiring diagram.
8. building control system design according to claim 1 and commissioning device, which is characterized in that in the design and be
System configuration documentation and after bin wiring diagram is generated, the design and inspection unit are by the design and system configuration document
It is deployed on fielded system control station so that user disposes and debug the building control system according to the bin wiring diagram.
9. building control system design according to claim 8 and commissioning device, which is characterized in that disposing and debugging institute
When stating building control system, assisted modulation operation is initiated and executed to the debugging auxiliary unit, and the assisted modulation operation includes:
The detection operation for initiating and executing the type and legitimacy for the fielded system control station, if the fielded system controls
The type and legitimacy and different design stood, then prompt user exceptions, and the exception information includes abnormal cause.
10. building control system design according to claim 9 and commissioning device, which is characterized in that disposing and debugging
When the building control system, the debugging auxiliary unit initiate and execute assisted modulation operation, the assisted modulation operate into
One step includes: the correctness that (1) checks field wiring based on the bin wiring diagram;(2) check field device mount message and
The consistency of system configuration information and offline design document, and inconsistent information is presented to user.
11. building control system design according to claim 10 and commissioning device, which is characterized in that the debugging auxiliary
Unit checks the consistency of field device mount message and system configuration information and offline design document as follows: being based on institute
It states design documentation and generates the offline design list of elements, the offline design list of elements includes basic key element and element to be compared;
Based on from on-site test and be collected into equipment installation and configuration information generate field deployment element information table, format with it is described
The offline design list of elements is identical;It is to index the offline design list of elements and the field deployment element with basic key element
Element to be compared in information table compares one by one according to priority, to form uniformity comparison report.
12. building control system design according to claim 10 and commissioning device, which is characterized in that the assisted modulation
Operation further comprises: if it is determined that field device mount message and system configuration information and offline design document are inconsistent, then
The offline design document or the installation of prompt user scene corrigendum equipment and configuration are corrected online, so that the two is consistent.
13. building control system design according to claim 1 and commissioning device, which is characterized in that control system in building
After the completion of system deployment and debugging, the debugging auxiliary unit is capable of the operating status of monitoring field equipment in real time.
14. a kind of building control system design and adjustment method, the building control system design and adjustment method include following
Step:
(A1) design data based on importing automatically generates design and system configuration document and bin wiring diagram is subsequent to implement
Building control system deployment and debugging, wherein the design data includes being led by way of filling in design parameter template
The first design data for entering and data are directly inputted on the user interface provided by the design and inspection unit by user
The second design data for importing of mode;
(A2) building control system is disposed according to the design and system configuration document and bin wiring diagram, and based on described
Design and system configuration document and bin wiring diagram auxiliary field adjustable personnel execute for designed building control system
Field adjustable;And
In the step (A1), converge analysis result data as caused by the first design data imported on inspection and by
Analysis result data caused by second design data that user directly inputs on inspection is matched based on scheduled design
Rule selects suitable field unit device controller and application associated logic to set to generate from database
Meter and system configuration document, and bin wiring diagram is automatically generated based on selected field unit device controller therewith.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510110618.8A CN105093939B (en) | 2015-03-13 | 2015-03-13 | Building control system design and commissioning device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510110618.8A CN105093939B (en) | 2015-03-13 | 2015-03-13 | Building control system design and commissioning device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105093939A CN105093939A (en) | 2015-11-25 |
CN105093939B true CN105093939B (en) | 2018-12-14 |
Family
ID=54574645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510110618.8A Active CN105093939B (en) | 2015-03-13 | 2015-03-13 | Building control system design and commissioning device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105093939B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111831494A (en) * | 2020-06-08 | 2020-10-27 | 珠海格力电器股份有限公司 | Debugging system of building equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4885694A (en) * | 1987-04-29 | 1989-12-05 | Honeywell Inc. | Automated building control design system |
CN101311864A (en) * | 2007-05-18 | 2008-11-26 | 西门子建筑技术公司 | Arrangement and method for accessing data of a building automation system component |
CN101460928A (en) * | 2006-04-11 | 2009-06-17 | 因文西斯系统公司 | Method and supporting configuration user interfaces for streamlining installing replacement field devices |
CN103048959A (en) * | 2011-10-13 | 2013-04-17 | Abb股份公司 | Method for configuring a control device |
CN104081298A (en) * | 2012-02-10 | 2014-10-01 | Abb技术有限公司 | System and method for automated handling of a workflow in an automation and/or electrical engineering project |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050119767A1 (en) * | 2003-12-01 | 2005-06-02 | Gary Kiwimagi | Configuration application for building automation |
US20070232288A1 (en) * | 2006-03-30 | 2007-10-04 | Mcfarland Norman R | Service tool for wireless automation systems |
CA2785327A1 (en) * | 2009-12-23 | 2011-06-30 | AEA Integration | System and method for automated building services design |
-
2015
- 2015-03-13 CN CN201510110618.8A patent/CN105093939B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4885694A (en) * | 1987-04-29 | 1989-12-05 | Honeywell Inc. | Automated building control design system |
CN101460928A (en) * | 2006-04-11 | 2009-06-17 | 因文西斯系统公司 | Method and supporting configuration user interfaces for streamlining installing replacement field devices |
CN101311864A (en) * | 2007-05-18 | 2008-11-26 | 西门子建筑技术公司 | Arrangement and method for accessing data of a building automation system component |
CN103048959A (en) * | 2011-10-13 | 2013-04-17 | Abb股份公司 | Method for configuring a control device |
CN104081298A (en) * | 2012-02-10 | 2014-10-01 | Abb技术有限公司 | System and method for automated handling of a workflow in an automation and/or electrical engineering project |
Non-Patent Citations (1)
Title |
---|
基于Lonworks技术的楼宇控制系统设计;刘志京;《北京印刷学院学报》;20091231;第17卷(第06期);58-61 * |
Also Published As
Publication number | Publication date |
---|---|
CN105093939A (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106257367B (en) | A kind of nuclear power DCS platform test device and test method based on analogue system | |
CN104390657B (en) | A kind of Generator Unit Operating Parameters measurement sensor fault diagnosis method and system | |
CN103439658B (en) | The method for diagnosing faults of a kind of current transformer and system | |
CN104483842B (en) | One kind regulation and control one automation main website comparison method | |
CN104536436B (en) | A kind of Auto-Test System of industrial processes control logic and method | |
CN103869801A (en) | Test method of nuclear power plant instrumentation control logic function block and system | |
CN105158718B (en) | A kind of fault detector integrated test facility and test system | |
CN104319891B (en) | Maintenance O&M device and method for transformer station process layer | |
CN105070321B (en) | The quick test circuit and method of memory device | |
CN106708730A (en) | Formal verification method capable of aiming at embedded real-time operating system | |
CN101458973A (en) | Safety monitoring system for nucleus electromotor unit | |
CN104615928B (en) | Measurement and examination method, verification system and server | |
CN105069587A (en) | Mobile Internet-based relay protection verification device | |
CN105589837A (en) | Automatic electronic document checking method | |
EP2913762A1 (en) | Methods for producing customer configurable technical manuals | |
CN105093939B (en) | Building control system design and commissioning device and method | |
CN109683923A (en) | A kind of check method and system of electrical power distribution automatization system configuration file version | |
CN105823940A (en) | Relay protection testing system and method | |
CN106547236A (en) | A kind of nuclear power plant digitizes the method for designing of accident program elements | |
CN104714203A (en) | Calibration method for power quality monitoring device | |
CN106022580A (en) | Secondary system data control method covering whole process of intelligent substation | |
US7698245B2 (en) | Applying rules to validating data for a machine arrangement | |
Wu et al. | Development, verification and validation of an FPGA-based core heat removal protection system for a PWR | |
Zhao et al. | Incorporation TACOM and SPAR-H into the operating procedure of nuclear power plants | |
CN103064883B (en) | The data auto-generation method of railway signal maintenance system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |