CN105093939B - Building control system design and commissioning device and method - Google Patents

Building control system design and commissioning device and method Download PDF

Info

Publication number
CN105093939B
CN105093939B CN201510110618.8A CN201510110618A CN105093939B CN 105093939 B CN105093939 B CN 105093939B CN 201510110618 A CN201510110618 A CN 201510110618A CN 105093939 B CN105093939 B CN 105093939B
Authority
CN
China
Prior art keywords
design
control system
data
building control
wiring diagram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510110618.8A
Other languages
Chinese (zh)
Other versions
CN105093939A (en
Inventor
李光磊
谢春华
钟童
张桂芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honeywell Environmental and Combustion Controls Tianjin Co Ltd
Original Assignee
Honeywell Environmental and Combustion Controls Tianjin Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honeywell Environmental and Combustion Controls Tianjin Co Ltd filed Critical Honeywell Environmental and Combustion Controls Tianjin Co Ltd
Priority to CN201510110618.8A priority Critical patent/CN105093939B/en
Publication of CN105093939A publication Critical patent/CN105093939A/en
Application granted granted Critical
Publication of CN105093939B publication Critical patent/CN105093939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Programmable Controllers (AREA)

Abstract

The invention proposes a kind of design of building control system and commissioning device and methods, the equipment includes: design and inspection unit, can automatically generate design and system configuration document and bin wiring diagram based on the design data of importing to implement the deployment and debugging of subsequent building control system;Auxiliary unit is debugged, auxiliary can execute the field adjustable for being directed to designed building control system after disposing the building control system according to the design and system configuration document and bin wiring diagram.Building control system design disclosed in this invention and commissioning device and method enable to design process not easy to make mistakes and can guarantee the global consistency of system and can be improved fielded system debugging efficiency.

Description

Building control system design and commissioning device and method
Technical field
The present invention relates to system design and commissioning device and methods, design and adjust more particularly, to building control system Try device and method.
Background technique
Currently, the scale and complexity with building control system increasingly improve, large buildings are effectively designed and debugged Control system becomes more and more important.
In existing technical solution, the designer of building control system usually completes building control system as follows The design of system: obtaining the architectural composition figure of target building according to demand, artificially selects to be directed to based on the architectural composition figure therewith The field controller of each building equipment, and according to selected field controller artificially determine or write and is corresponding using journey Sequence and logic and the wiring diagram for designing each bin then carry out the installation and debugging of field device based on the wiring diagram, such as Technical solution described in patent document US20050119767A1.
However, there are the following problems for above-mentioned existing technical solution: (1) due to needing according to specific architectural composition figure people Site organisation's field device and design wiring diagram, therefore design process is easy to malfunction and it is difficult to ensure that the entirety of system is consistent Property;(2) due to needing complete artificially field adjustable each unit equipment and system configuration, therefore the efficiency of system debug is lower.
Accordingly, there exist following demands: providing the entirety for enabling to design process not easy to make mistakes and can guaranteeing system Consistency and the building control system design and commissioning device and method that can be improved fielded system debugging efficiency.
Summary of the invention
In order to solve the problems existing in the prior art scheme, the invention proposes enable to design process to be not easy It malfunctions and can guarantee the global consistency of system and can be improved the building control system of fielded system debugging efficiency to set Meter and commissioning device and method.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of design of building control system and commissioning device, the building control system design and commissioning device include:
Design and inspection unit, the design and inspection unit can automatically generate design based on the design data of importing And system configuration document and bin wiring diagram are to implement the deployment and debugging of subsequent building control system;
Auxiliary unit is debugged, the debugging auxiliary unit can connect according to the design and system configuration document and bin Auxiliary executes the field adjustable for being directed to designed building control system after line chart disposes the building control system.
In scheme disclosed above, it is preferable that the design data includes the side by filling in design parameter template The first design data that formula imports and/or by user provided by the design and inspection unit 1 on user interface directly The second design data that the mode of input data imports.
In scheme disclosed above, it is preferable that the design parameter template can be right based on scheduled first rule The reasonability and logical validity of the design data of user's filling are checked in real time, to prompt and ensure that user's input meets The design data of first rule, wherein the reasonableness check includes the data format and data of the data to being inputted The inspection of content.
In scheme disclosed above, it is preferable that the design and inspection unit can analyze the design data, and And abnormal examination is carried out to analysis result data, and institute is automatically generated based on the analysis result data after abnormal examination therewith State design and system configuration document and bin wiring diagram.
In scheme disclosed above, it is preferable that the design and inspection unit analyze the design as follows Data: classifying the design data according to the data field classified index for presetting and storing, and according to presetting Rule basic operations are carried out to each data classification, to obtain categorized and operation analysis result data.
In scheme disclosed above, it is preferable that the design and inspection unit are as follows to analysis number of results According to progress abnormal examination: based on scheduled Second Rule to the analysis result data as caused by the first design data imported Reasonability and logical validity checked in real time, and when noting abnormalities to user report exception information;For straight by user Analysis result data caused by second design data of input is connect, converges when it is entered and has imported or already present Whole design datas simultaneously carry out reasonability and logical validity inspection based on the scheduled Second Rule to it in real time, and Exception information is momentarily prompted the user with when noting abnormalities.
In scheme disclosed above, it is preferable that the Second Rule covers first rule, and the exception Information is classified as two class of first kind exception information and the second class exception information, and the first kind exception information instruction does not allow phase The data of pass use in subsequent design process, the second class exception information indicate relevant data be it is unconventional and Although being allowed to continue in subsequent design process using may lead to the problem of.
In scheme disclosed above, it is preferable that the design and inspection unit automatically generate set as follows Meter and system configuration document and bin wiring diagram: converge the analysis result on inspection as caused by the first design data imported Analysis result data caused by data and second design data directly inputted as user on inspection, based on scheduled Design matching rule selects suitable field unit device controller and application associated logic from database To generate design and system configuration document, and bin is automatically generated based on selected field unit device controller therewith and is connect Line chart, wherein reported when noting abnormalities during generating design and system configuration document and bin wiring diagram to user Accuse exception information.
In scheme disclosed above, it is preferable that in the design and system configuration document and bin wiring diagram quilt After generation, it is described design and inspection unit by it is described design and system configuration document be deployed on fielded system control station so as to User disposes and debugs the building control system according to the bin wiring diagram.
In scheme disclosed above, it is preferable that when disposing and debugging the building control system, the debugging is auxiliary It helps unit to initiate and executes assisted modulation operation, the assisted modulation operation includes: initiation and executes for the fielded system The detection operation of the type and legitimacy of control station, if the type and legitimacy of the fielded system control station and design are not Symbol, then prompt user exceptions, the exception information includes abnormal cause.
In scheme disclosed above, it is preferable that when disposing and debugging the building control system, the debugging is auxiliary It helps unit to initiate and executes assisted modulation operation, the assisted modulation operation further comprises: (1) based on the bin wiring diagram Check the correctness of field wiring;(2) consistency of field device mount message and system configuration information and design documentation is checked, And be presented inconsistent information to user, the inconsistent information include inconsistent field unit device controller information and The information of inconsistent equipment.
In scheme disclosed above, it is preferable that the debugging auxiliary unit checks that field device is pacified as follows It fills the consistency of information and system configuration information and offline design document: offline design element is generated based on the design documentation Table, the offline design list of elements include basic key element and element to be compared;Based on from on-site test and setting of being collected into Standby installation and configuration information generate field deployment element information table, and format is identical as the offline design list of elements;With basis Key element be index by the element to be compared in the offline design list of elements and the field deployment element information table according to Priority compares one by one, to form uniformity comparison report.
In scheme disclosed above, it is preferable that the assisted modulation operation further comprises: if it is determined that scene is set Standby mount message and system configuration information and design documentation are inconsistent, then correct the design documentation online or prompt user is existing The installation of field corrigendum equipment and configuration, so that the two is consistent.
In scheme disclosed above, it is preferable that after the completion of building control system is disposed and is debugged, the debugging is auxiliary Unit is helped to be capable of the operating status of monitoring field equipment in real time.
The purpose of the present invention can also be achieved through the following technical solutions:
A kind of design of building control system and adjustment method, the building control system design and adjustment method include following Step:
(A1) design data based on importing automatically generates design and system configuration document and bin wiring diagram to implement The deployment and debugging of subsequent building control system;
(A2) building control system is disposed according to the design and system configuration document and bin wiring diagram, and be based on The design and system configuration document and bin wiring diagram auxiliary field adjustable personnel execute and control system for designed building The field adjustable of system.
Building control system design disclosed in this invention and commissioning device and method have the advantage that (1) due to not It needs artificially to organize field device and design wiring diagram according to specific architectural composition figure, so that design process is more acurrate With it is convenient and be easy to guarantee the global consistency of system;(2) since live tune can be more effectively carried out by auxiliary unit Examination, therefore the efficiency of system debug can be improved significantly, to reduce the cost that system installs and deploys.
Detailed description of the invention
In conjunction with attached drawing, technical characteristic of the invention and advantage will be more fully understood by those skilled in the art, in which:
Fig. 1 is the building control system design of embodiment according to the present invention and the schematic diagram of commissioning device;
Fig. 2 is the flow chart of the building control system design and adjustment method of embodiment according to the present invention.
Specific embodiment
Fig. 1 is the building control system design of embodiment according to the present invention and the schematic diagram of commissioning device.Such as Shown in Fig. 1, building control system design disclosed in this invention and commissioning device include design and inspection unit 1 and debugging auxiliary Unit 2.The design and inspection unit 1 can be automatically generated based on the design data of importing design and system configuration document and Bin wiring diagram is to implement the deployment and debugging of subsequent building control system.The debugging auxiliary unit 2 can be according to institute State design and system configuration document and bin wiring diagram dispose the building control system after auxiliary execute for designed building The field adjustable of space control system.
Preferably, in building control system disclosed in this invention design and commissioning device, the design data includes The first design data for being imported in a manner of filling in design parameter template (such as by point table of excel form) and/or Second imported in such a way that user directly inputs data on the user interface provided by the design and inspection unit 1 sets It counts.
Preferably, in building control system disclosed in this invention design and commissioning device, the design parameter template Can based on it is scheduled first rule to user filling design data reasonability and logical validity (for example, a network 2200 equipment points etc. cannot be comprised more than not across multiple buildings, a building control system) it is checked in real time, To prompt and ensure that user's input meets the design data of first rule, wherein the reasonableness check includes to institute The inspection of the data formats of the data of input and data content is (for example, the range of certain cell data must be certain in 0-50 Cell must be number etc.).Illustratively, first rule is realized in the form of embedded macro application,
Preferably, in building control system disclosed in this invention design and commissioning device, design and 1 energy of inspection unit The design data is enough analyzed, and abnormal examination is carried out to analysis result data, and therewith based on point after abnormal examination Analysis result data automatically generates the design and system configuration document and bin wiring diagram.
Preferably, in building control system disclosed in this invention design and commissioning device, the design and checklist Member 1 analyzes the design data as follows: according to the data field classified index for presetting and storing by the design number According to being classified (for example, each of which column is split to each data in the form of a unit by certain a line in table In class), and basic operations are carried out (for example, calculating on each unit to each data classification according to preset rules AO(analog output) quantity), to obtain categorized and operation analysis result data.
Preferably, in building control system disclosed in this invention design and commissioning device, the design and checklist Member 1 carries out abnormal examination to analysis result data as follows: based on scheduled Second Rule to the first design by importing The reasonability and logical validity of analysis result data caused by data checked in real time, and when noting abnormalities to user Report exception information;For analysis result data caused by second design data directly inputted as user, in its quilt Converge when input and has imported or already present whole design data and it has been carried out in real time based on the scheduled Second Rule Reasonability and logical validity inspection, and exception information is momentarily prompted the user with when noting abnormalities.
Preferably, in building control system disclosed in this invention design and commissioning device, the Second Rule is covered Described first regular (it may thereby be ensured that double safety of reasonability and logical validity inspection), and the exception information It is classified as two class of first kind exception information and the second class exception information, the first kind exception information instruction does not allow relevant Data use in subsequent design process, although the second class exception information indicate relevant data be it is unconventional and It is allowed to continue in subsequent design process using but may leading to the problem of.
Preferably, in building control system disclosed in this invention design and commissioning device, the design and checklist Member 1 automatically generates design and system configuration document and bin wiring diagram as follows: converging the first design number by importing Through examining caused by second design data directly inputted according to generated analysis result data on inspection and as user The analysis result data looked into selects suitable field unit equipment to control based on scheduled design matching rule from database Device (model and port numbers including field unit device controller) and application associated logic are to generate design And system configuration document, and bin wiring diagram is automatically generated based on selected field unit device controller therewith, wherein When noting abnormalities during generating design and system configuration document and bin wiring diagram to user report exception information.
Preferably, in building control system disclosed in this invention design and commissioning device, in the design and system After configuration documentation and bin wiring diagram are generated, it is described design and inspection unit 1 by it is described design and system configuration document It is deployed on fielded system control station and disposes and debug institute according to the bin wiring diagram so as to user (such as field engineer) State building control system.
Preferably, in building control system disclosed in this invention design and commissioning device, described in deployment and debugging When building control system, assisted modulation operation is initiated and executed to the debugging auxiliary unit 2, and the assisted modulation operation includes: It initiates and executes type (such as its model) and legitimacy for the fielded system control station (for example whether effectively being awarded Power) detection operation, if the type and legitimacy and different design of the fielded system control station, prompt user to believe extremely Breath, the exception information includes abnormal cause.
Preferably, in building control system disclosed in this invention design and commissioning device, described in deployment and debugging When building control system, assisted modulation operation is initiated and executed to the debugging auxiliary unit 2, and the assisted modulation operation is further It include: the correctness that (1) checks field wiring based on the bin wiring diagram;(2) field device mount message and system are checked The consistency of configuration information and design documentation, and inconsistent information is presented (for example, field unit device controller quilt to user It is linked into wrong network, input point type configuration mistake etc.), the inconsistent information includes inconsistent field unit equipment The information of the information of controller and inconsistent equipment.
Preferably, in building control system disclosed in this invention design and commissioning device, the debugging auxiliary unit 2 The consistency of field device mount message and system configuration information and offline design document is checked as follows: being set based on described The document structure tree offline design list of elements is counted, the offline design list of elements includes basic key element and element to be compared;It is based on Field deployment element information table is generated from on-site test and the equipment being collected into installation and configuration information, format and described offline Design element table is identical;It is that index will be described offline with basic key element (such as identifier of field unit device controller) Design element table is compared with the element to be compared in the field deployment element information table according to priority one by one, consistent to be formed Property compare report.
Preferably, in building control system disclosed in this invention design and commissioning device, the assisted modulation operation Further comprise: if it is determined that field device mount message and system configuration information and design documentation are inconsistent, then online corrigendum The design documentation or the installation of prompt user scene corrigendum equipment and configuration, so that the two is consistent.
Preferably, in building control system disclosed in this invention design and commissioning device, in building control system portion After the completion of administration and debugging, the debugging auxiliary unit 2 is capable of the operating status of monitoring field equipment in real time.
Therefore building control system disclosed in this invention design and commissioning device have the advantage that (1) due to It does not need artificially to organize field device and design wiring diagram according to specific architectural composition figure, so that design process is more quasi- True and global consistency that is convenient and being easy to guarantee system;(2) due to that can be more effectively carried out by debugging auxiliary unit Field adjustable, therefore the efficiency of system debug can be improved significantly, to reduce the cost that system installs and deploys.
Fig. 2 is the flow chart of the building control system design and adjustment method of embodiment according to the present invention.Such as Fig. 2 institute Show, building control system design and adjustment method disclosed in this invention include the following steps: the design number of (A1) based on importing According to automatically generating design and system configuration document and bin wiring diagram to implement deployment and the tune of subsequent building control system Examination;(A2) building control system is disposed according to the design and system configuration document and bin wiring diagram, and based on described Design and system configuration document and bin wiring diagram auxiliary field adjustable personnel execute for designed building control system Field adjustable.
Preferably, in building control system disclosed in this invention design and adjustment method, the design data includes The first design data for being imported in a manner of filling in design parameter template (such as by point table of excel form) and/or Second imported in such a way that user directly inputs data on the user interface provided by the design and inspection unit 1 sets It counts.
Preferably, in building control system disclosed in this invention design and adjustment method, the design parameter template Can based on it is scheduled first rule to user filling design data reasonability and logical validity (for example, a network 2200 equipment points etc. cannot be comprised more than not across multiple buildings, a building control system) it is checked in real time, To prompt and ensure that user's input meets the design data of first rule, wherein the reasonableness check includes to institute The inspection of the data formats of the data of input and data content is (for example, the range of certain cell data must be certain in 0-50 Cell must be number etc.).Illustratively, first rule is realized in the form of embedded macro application,
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one Step includes: the analysis design data, and carries out abnormal examination to analysis result data, and therewith based on after abnormal examination Analysis result data automatically generate the design and system configuration document and bin wiring diagram.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one Step includes analyzing the design data as follows: according to the data field classified index for presetting and storing by the design Data are classified (for example, each of which column is split to each number in the form of a unit by certain a line in table According in class), and basic operations are carried out (for example, calculating each unit to each data classification according to preset rules On AO(analog output) quantity), to obtain categorized and operation analysis result data.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one Step includes carrying out abnormal examination to analysis result data as follows: being set based on scheduled Second Rule to first by importing The reasonability and logical validity of analysis result data caused by counting checked in real time, and when noting abnormalities to Report exception information in family;For analysis result data caused by second design data directly inputted as user, at it Converge when being entered imported or already present whole design data and based on the scheduled Second Rule in real time to its into Row reasonability and logical validity inspection, and exception information is momentarily prompted the user with when noting abnormalities.
Preferably, in building control system disclosed in this invention design and adjustment method, the Second Rule is covered Described first regular (it may thereby be ensured that double safety of reasonability and logical validity inspection), and the exception information It is classified as two class of first kind exception information and the second class exception information, the first kind exception information instruction does not allow relevant Data use in subsequent design process, although the second class exception information indicate relevant data be it is unconventional and It is allowed to continue in subsequent design process using but may leading to the problem of.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one Step includes automatically generating design and system configuration document and bin wiring diagram as follows: converging the first design by importing It is passed through caused by analysis result data caused by data on inspection and second design data directly inputted as user The analysis result data of inspection selects suitable field unit equipment control based on scheduled design matching rule from database Device (model and port numbers including field unit device controller) processed and application associated logic are set with generating Meter and system configuration document, and bin wiring diagram is automatically generated based on selected field unit device controller therewith, In, believe extremely when noting abnormalities during generating design and system configuration document and bin wiring diagram to user report Breath.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A1) is into one Step includes: after the design and system configuration document and bin wiring diagram are generated, by the design and system configuration Document, which is deployed on fielded system control station, to be disposed and adjusts according to the bin wiring diagram so as to user (such as field engineer) Try the building control system.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one Step includes: to initiate and execute assisted modulation operation, the assisted modulation operation when disposing and debugging the building control system Include: initiation and execute for the fielded system control station type (such as its model) and legitimacy (for example whether by Effectively authorization) detection operation, if the type and legitimacy and different design of the fielded system control station, prompt user Exception information, the exception information include abnormal cause.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one Step includes: to initiate and execute assisted modulation operation, the assisted modulation operation when disposing and debugging the building control system Further comprise: (1) checking the correctness of field wiring based on the bin wiring diagram;(2) field device mount message is checked With the consistency of system configuration information and design documentation, and inconsistent information is presented (for example, field unit equipment control to user Device processed is linked into wrong network, input point type configuration mistake etc.), the inconsistent information includes that inconsistent scene is single The information of the information of element device controller and inconsistent equipment.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one Step includes checking the consistency of field device mount message and system configuration information and offline design document as follows: being based on The design documentation generates the offline design list of elements, and the offline design list of elements includes basic key element and member to be compared Element;Based on from on-site test and be collected into equipment installation and configuration information generate field deployment element information table, format with The offline design list of elements is identical;It is that index will with basic key element (such as identifier of field unit device controller) The offline design list of elements is compared with the element to be compared in the field deployment element information table according to priority one by one, with Form uniformity comparison report.
Preferably, in building control system disclosed in this invention design and adjustment method, the assisted modulation operation Further comprise: if it is determined that field device mount message and system configuration information and design documentation are inconsistent, then online corrigendum The design documentation or the installation of prompt user scene corrigendum equipment and configuration, so that the two is consistent.
Preferably, in building control system disclosed in this invention design and adjustment method, the step (A2) is into one Step includes: the operating status of the monitoring field equipment in real time after the completion of building control system is disposed and is debugged.
Therefore building control system disclosed in this invention design and adjustment method have the advantage that (1) due to It does not need artificially to organize field device and design wiring diagram according to specific architectural composition figure, so that design process is more quasi- True and global consistency that is convenient and being easy to guarantee system;(2) since scene can be more effectively carried out by auxiliary unit Debugging, therefore the efficiency of system debug can be improved significantly, to reduce the cost that system installs and deploys.
Although the present invention is described by above-mentioned preferred embodiment, way of realization is not limited to Above-mentioned embodiment.It will be appreciated that in the case where not departing from spirit and scope of the present invention, those skilled in the art can be with Different change and modification are made to the present invention.

Claims (14)

1. a kind of building control system design and commissioning device, the building control system design and commissioning device include:
Design and inspection unit, the design and inspection unit can be automatically generated design based on the design data of importing and be System configuration documentation and bin wiring diagram are to implement the deployment and debugging of subsequent building control system;With
Auxiliary unit is debugged, the debugging auxiliary unit can be according to the design and system configuration document and bin wiring diagram It is executed based on the design and system configuration document and bin wiring diagram auxiliary for set after disposing the building control system The field adjustable of the building control system of meter;
Wherein, the design data includes the first design data imported by way of filling in design parameter template and passes through use Family directly inputs the second design data that the mode of data imports on the user interface provided by the design and inspection unit;
Wherein, the design and inspection unit automatically generate design and system configuration document and bin wiring as follows Figure: converging the analysis result data as caused by the first design data imported on inspection and described in being directly inputted as user Analysis result data caused by second design data on inspection is selected from database based on scheduled design matching rule Suitable field unit device controller and application associated logic to generate design and system configuration document, and And bin wiring diagram is automatically generated based on selected field unit device controller therewith.
2. building control system design according to claim 1 and commissioning device, which is characterized in that the design parameter mould Plate can based on it is scheduled first rule to user filling design data reasonability and logical validity be checked in real time, To prompt and ensure that user's input meets the design data of first rule, wherein the reasonableness check includes to institute The data format of the data of input and the inspection of data content.
3. building control system design according to claim 2 and commissioning device, which is characterized in that the design and inspection Unit can analyze the design data, and carry out abnormal examination to analysis result data, and be based on abnormal examination therewith Analysis result data afterwards automatically generates the design and system configuration document and bin wiring diagram.
4. building control system design according to claim 3 and commissioning device, which is characterized in that the design and inspection Unit analyzes the design data as follows: according to the data field classified index for presetting and storing by the design number Basic operations are carried out to each data classification according to classifying, and according to preset rules, to obtain categorized and operation Analysis result data.
5. building control system design according to claim 4 and commissioning device, which is characterized in that the design and inspection Unit carries out abnormal examination to analysis result data as follows: based on scheduled Second Rule to the first design by importing The reasonability and logical validity of analysis result data caused by data checked in real time, and when noting abnormalities to user Report exception information;For analysis result data caused by second design data directly inputted as user, in its quilt Converge when input and has imported or already present whole design data and it has been carried out in real time based on the scheduled Second Rule Reasonability and logical validity inspection, and exception information is momentarily prompted the user with when noting abnormalities.
6. building control system design according to claim 5 and commissioning device, which is characterized in that the Second Rule is contained First rule is covered, and the exception information is classified as two class of first kind exception information and the second class exception information, institute Stating the instruction of first kind exception information does not allow relevant data to use in subsequent design process, the second class exception information Although indicating that relevant data are unconventional and are allowed to continue in subsequent design process using may It leads to the problem of.
7. building control system design according to claim 1 and commissioning device, which is characterized in that the design and inspection Unit further automatically generates design and system configuration document and bin wiring diagram as follows: when generate design and be To user report exception information when noting abnormalities during system configuration documentation and bin wiring diagram.
8. building control system design according to claim 1 and commissioning device, which is characterized in that in the design and be System configuration documentation and after bin wiring diagram is generated, the design and inspection unit are by the design and system configuration document It is deployed on fielded system control station so that user disposes and debug the building control system according to the bin wiring diagram.
9. building control system design according to claim 8 and commissioning device, which is characterized in that disposing and debugging institute When stating building control system, assisted modulation operation is initiated and executed to the debugging auxiliary unit, and the assisted modulation operation includes: The detection operation for initiating and executing the type and legitimacy for the fielded system control station, if the fielded system controls The type and legitimacy and different design stood, then prompt user exceptions, and the exception information includes abnormal cause.
10. building control system design according to claim 9 and commissioning device, which is characterized in that disposing and debugging When the building control system, the debugging auxiliary unit initiate and execute assisted modulation operation, the assisted modulation operate into One step includes: the correctness that (1) checks field wiring based on the bin wiring diagram;(2) check field device mount message and The consistency of system configuration information and offline design document, and inconsistent information is presented to user.
11. building control system design according to claim 10 and commissioning device, which is characterized in that the debugging auxiliary Unit checks the consistency of field device mount message and system configuration information and offline design document as follows: being based on institute It states design documentation and generates the offline design list of elements, the offline design list of elements includes basic key element and element to be compared; Based on from on-site test and be collected into equipment installation and configuration information generate field deployment element information table, format with it is described The offline design list of elements is identical;It is to index the offline design list of elements and the field deployment element with basic key element Element to be compared in information table compares one by one according to priority, to form uniformity comparison report.
12. building control system design according to claim 10 and commissioning device, which is characterized in that the assisted modulation Operation further comprises: if it is determined that field device mount message and system configuration information and offline design document are inconsistent, then The offline design document or the installation of prompt user scene corrigendum equipment and configuration are corrected online, so that the two is consistent.
13. building control system design according to claim 1 and commissioning device, which is characterized in that control system in building After the completion of system deployment and debugging, the debugging auxiliary unit is capable of the operating status of monitoring field equipment in real time.
14. a kind of building control system design and adjustment method, the building control system design and adjustment method include following Step:
(A1) design data based on importing automatically generates design and system configuration document and bin wiring diagram is subsequent to implement Building control system deployment and debugging, wherein the design data includes being led by way of filling in design parameter template The first design data for entering and data are directly inputted on the user interface provided by the design and inspection unit by user The second design data for importing of mode;
(A2) building control system is disposed according to the design and system configuration document and bin wiring diagram, and based on described Design and system configuration document and bin wiring diagram auxiliary field adjustable personnel execute for designed building control system Field adjustable;And
In the step (A1), converge analysis result data as caused by the first design data imported on inspection and by Analysis result data caused by second design data that user directly inputs on inspection is matched based on scheduled design Rule selects suitable field unit device controller and application associated logic to set to generate from database Meter and system configuration document, and bin wiring diagram is automatically generated based on selected field unit device controller therewith.
CN201510110618.8A 2015-03-13 2015-03-13 Building control system design and commissioning device and method Active CN105093939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510110618.8A CN105093939B (en) 2015-03-13 2015-03-13 Building control system design and commissioning device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510110618.8A CN105093939B (en) 2015-03-13 2015-03-13 Building control system design and commissioning device and method

Publications (2)

Publication Number Publication Date
CN105093939A CN105093939A (en) 2015-11-25
CN105093939B true CN105093939B (en) 2018-12-14

Family

ID=54574645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510110618.8A Active CN105093939B (en) 2015-03-13 2015-03-13 Building control system design and commissioning device and method

Country Status (1)

Country Link
CN (1) CN105093939B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111831494A (en) * 2020-06-08 2020-10-27 珠海格力电器股份有限公司 Debugging system of building equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4885694A (en) * 1987-04-29 1989-12-05 Honeywell Inc. Automated building control design system
CN101311864A (en) * 2007-05-18 2008-11-26 西门子建筑技术公司 Arrangement and method for accessing data of a building automation system component
CN101460928A (en) * 2006-04-11 2009-06-17 因文西斯系统公司 Method and supporting configuration user interfaces for streamlining installing replacement field devices
CN103048959A (en) * 2011-10-13 2013-04-17 Abb股份公司 Method for configuring a control device
CN104081298A (en) * 2012-02-10 2014-10-01 Abb技术有限公司 System and method for automated handling of a workflow in an automation and/or electrical engineering project

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050119767A1 (en) * 2003-12-01 2005-06-02 Gary Kiwimagi Configuration application for building automation
US20070232288A1 (en) * 2006-03-30 2007-10-04 Mcfarland Norman R Service tool for wireless automation systems
CA2785327A1 (en) * 2009-12-23 2011-06-30 AEA Integration System and method for automated building services design

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4885694A (en) * 1987-04-29 1989-12-05 Honeywell Inc. Automated building control design system
CN101460928A (en) * 2006-04-11 2009-06-17 因文西斯系统公司 Method and supporting configuration user interfaces for streamlining installing replacement field devices
CN101311864A (en) * 2007-05-18 2008-11-26 西门子建筑技术公司 Arrangement and method for accessing data of a building automation system component
CN103048959A (en) * 2011-10-13 2013-04-17 Abb股份公司 Method for configuring a control device
CN104081298A (en) * 2012-02-10 2014-10-01 Abb技术有限公司 System and method for automated handling of a workflow in an automation and/or electrical engineering project

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于Lonworks技术的楼宇控制系统设计;刘志京;《北京印刷学院学报》;20091231;第17卷(第06期);58-61 *

Also Published As

Publication number Publication date
CN105093939A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN106257367B (en) A kind of nuclear power DCS platform test device and test method based on analogue system
CN104390657B (en) A kind of Generator Unit Operating Parameters measurement sensor fault diagnosis method and system
CN103439658B (en) The method for diagnosing faults of a kind of current transformer and system
CN104483842B (en) One kind regulation and control one automation main website comparison method
CN104536436B (en) A kind of Auto-Test System of industrial processes control logic and method
CN103869801A (en) Test method of nuclear power plant instrumentation control logic function block and system
CN106708730B (en) One kind being directed to embedded real-time operating system formalization verification method
CN104319891B (en) Maintenance O&M device and method for transformer station process layer
CN101458973A (en) Safety monitoring system for nucleus electromotor unit
CN104615928B (en) Measurement and examination method, verification system and server
CN105069587A (en) Mobile Internet-based relay protection verification device
CN105589837A (en) Automatic electronic document checking method
EP2913762A1 (en) Methods for producing customer configurable technical manuals
CN105093939B (en) Building control system design and commissioning device and method
CN109683923A (en) A kind of check method and system of electrical power distribution automatization system configuration file version
Ubayashi et al. Context-dependent product line practice for constructing reliable embedded systems
CN105823940A (en) Relay protection testing system and method
CN106547236A (en) A kind of nuclear power plant digitizes the method for designing of accident program elements
CN104714203A (en) Calibration method for power quality monitoring device
CN106022580A (en) Secondary system data control method covering whole process of intelligent substation
US7698245B2 (en) Applying rules to validating data for a machine arrangement
CN103064883B (en) The data auto-generation method of railway signal maintenance system
CN104266731A (en) System for verifying electromagnetic flowmeter
CN114064911A (en) Modeling method and system for expert knowledge base of intelligent diagnostic system of nuclear power plant
Yuan et al. The design of Matlab-DSP development environment for control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant