CN105091595B - 一种工业炉的炉衬安装工艺 - Google Patents

一种工业炉的炉衬安装工艺 Download PDF

Info

Publication number
CN105091595B
CN105091595B CN201510558445.6A CN201510558445A CN105091595B CN 105091595 B CN105091595 B CN 105091595B CN 201510558445 A CN201510558445 A CN 201510558445A CN 105091595 B CN105091595 B CN 105091595B
Authority
CN
China
Prior art keywords
jack
furnace
cotton
cotton block
cotton blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510558445.6A
Other languages
English (en)
Other versions
CN105091595A (zh
Inventor
李明科
李振元
王振广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Tianli thermal equipment Limited by Share Ltd
Original Assignee
Tian Li Industrial Furnace Co Ltd Of Henan Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tian Li Industrial Furnace Co Ltd Of Henan Province filed Critical Tian Li Industrial Furnace Co Ltd Of Henan Province
Priority to CN201510558445.6A priority Critical patent/CN105091595B/zh
Publication of CN105091595A publication Critical patent/CN105091595A/zh
Application granted granted Critical
Publication of CN105091595B publication Critical patent/CN105091595B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

一种工业炉的炉衬安装工艺,它包括以下步骤,①将成立方体的棉块靠近炉壁内侧进行摆放,每层大概间隔5‑7个棉块时,插入一个千斤顶;②将炉壁内侧紧靠炉壁的一圈按照步骤一的排布方式排好棉块,启动千斤顶,千斤顶的两端分别挤压两侧的棉块;③将顶紧位置的千斤顶依次取出,在空隙位置依次放入棉块,再启动相邻的千斤顶继续挤压,依次将各个空隙位置的棉块填入,最后一个空隙位置使用挤压的方式,将棉块在空隙中塞紧即可。本发明结构安装法在于工序简单明了,易学好操作,安装成本低;本发明的安装法使棉块中无金属固件,也不用螺栓固定,不会造成导电,安全性可靠。

Description

一种工业炉的炉衬安装工艺
技术领域:
本发明涉及工业炉的加工,特别是工业炉的炉衬安装工艺。
背景技术:
工业炉的炉衬安装是该领域较为常见的加工工序,现在的各式井式炉、立窑和烟囱内壁棉衬保温隔热的施工正是该领域的加工中最为常见的施工。现在的传动加工工艺为:用带锚固件的棉块戴到焊在炉壁内侧的不锈钢螺栓上,将螺帽拧紧,缺点是:购买带锚固件的棉块成本高,用工具多,效率低,操作繁琐,工序多,捶击次数多,震荡粉尘多,装棉密度低,隔热效果差,客户不满意,施工人员操作环境差,影响身体健康。
发明内容:
本发明的目的是提供一种工艺合理、加工工序较为方便的工业炉的炉衬安装工艺。
本发明的技术方案是,一种工业炉的炉衬安装工艺,它包括以下步骤,其特征在于:①将成立方体的棉块靠近炉壁内侧进行摆放,每层大概间隔5-7个棉块时,插入一个千斤顶;②将炉壁内侧紧靠炉壁的一圈按照步骤一的排布方式排好棉块,启动千斤顶,千斤顶的两端分别挤压两侧的棉块;③将顶紧位置的千斤顶依次取出,在空隙位置依次放入棉块,再启动相邻的千斤顶继续挤压,依次将各个空隙位置的棉块填入,最后一个空隙位置使用挤压的方式,将棉块在空隙中塞紧即可。所述的千斤顶为菱形千斤顶。各个菱形千斤顶均通过钢丝拉绳与手持环连接。
本发明结构安装法在于工序简单明了,易学好操作,本发明的安装法一改传统工艺,不再锤打棉管,去棉块,不损坏棉块纤维组织,不反复折腾,不起粉尘,不降低其原有性能,不影响员工健康;本发明不用电,不焊接,不计算分线;本发明无需再次对间隙,内孔等填补棉;本发明的工具单一,着力可控,装棉密度有保证;本发明能节省工时一半,工序简化,方便操作,工人一组一天可装100块以上,本发明成本低;本发明的安装法使棉块中无金属固件,也不用螺栓固定,不会造成导电,安全性可靠。
附图说明:
图1是本发明的安装结构示意图。
具体实施方式:
结合附图详细描述实施例,
实施例1
一种工业炉的炉衬安装工艺,它包括以下步骤,①将成立方体的棉块1靠近炉壁内侧2进行摆放,每层大概间隔五个棉块时,插入一个千斤顶3;②将炉壁内侧紧靠炉壁的一圈按照步骤一的排布方式排好棉块,启动千斤顶,千斤顶的两端分别挤压两侧的棉块;③将顶紧位置的千斤顶依次取出,在空隙位置依次放入棉块,再启动相邻的千斤顶继续挤压,依次将各个空隙位置的棉块填入,最后一个空隙位置使用挤压的方式,将棉块从空隙中塞紧即可,也可以使用辅助工具,如压板,讲棉块塞紧压入,还可以使用切刀,对棉块进行切割,便于使用;所述的千斤顶为菱形千斤顶;各个菱形千斤顶均通过钢丝拉绳4与手持环5连接。
实施例2
一种工业炉的炉衬安装工艺,它包括以下步骤,①将成立方体的棉块靠近炉壁进行摆放,每层大概间隔七个棉块时,插入一个千斤顶;②将炉壁内侧紧靠炉壁的一圈按照步骤一的排布方式排好棉块,启动千斤顶,千斤顶的两端分别挤压两侧的棉块;③将顶紧位置的千斤顶依次取出,在空隙位置依次放入棉块,再启动相邻的千斤顶继续挤压,依次将各个空隙位置的棉块填入,最后一个空隙位置使用挤压的方式,将棉块从空隙中塞紧即可,也可以使用辅助工具,如压板,讲棉块塞紧压入,还可以使用切刀,对棉块进行切割,便于使用;所述的千斤顶为菱形千斤顶;各个菱形千斤顶均通过钢丝拉绳与手持环连接。
上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举,而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之内。

Claims (3)

1.一种工业炉的炉衬安装工艺,它包括以下步骤,其特征在于:①将成立方体的棉块靠近炉壁内侧进行摆放,每层大概间隔5-7个棉块时,插入一个千斤顶;②将炉壁内侧紧靠炉壁的一圈按照步骤一的排布方式排好棉块,启动千斤顶,千斤顶的两端分别挤压两侧的棉块;③将顶紧位置的千斤顶依次取出,在空隙位置依次放入棉块,再启动相邻的千斤顶继续挤压,依次将各个空隙位置的棉块填入,最后一个空隙位置使用挤压的方式,将棉块在空隙中塞紧即可。
2.根据权利要求1所述的一种工业炉的炉衬安装工艺,其特征在于:所述的千斤顶为菱形千斤顶。
3.根据权利要求1所述的一种工业炉的炉衬安装工艺,其特征在于:各个千斤顶均通过钢丝拉绳与手持环连接。
CN201510558445.6A 2015-09-06 2015-09-06 一种工业炉的炉衬安装工艺 Active CN105091595B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510558445.6A CN105091595B (zh) 2015-09-06 2015-09-06 一种工业炉的炉衬安装工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510558445.6A CN105091595B (zh) 2015-09-06 2015-09-06 一种工业炉的炉衬安装工艺

Publications (2)

Publication Number Publication Date
CN105091595A CN105091595A (zh) 2015-11-25
CN105091595B true CN105091595B (zh) 2017-05-10

Family

ID=54572564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510558445.6A Active CN105091595B (zh) 2015-09-06 2015-09-06 一种工业炉的炉衬安装工艺

Country Status (1)

Country Link
CN (1) CN105091595B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108885060A (zh) * 2015-12-30 2018-11-23 丹尼利克里斯有限公司 竖炉构造方法及组件

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1404274A (en) * 1972-03-20 1975-08-28 Rheinstahl Ag Method of lining a metallurgical furnace
JPH07224316A (ja) * 1994-02-08 1995-08-22 Tokyo Yogyo Co Ltd Aod炉コーン部内張りれんが構造及びその施工方法
US5817198A (en) * 1993-11-19 1998-10-06 Viertola; Raimo Lining method and system for high temperature spaces
JP2007263447A (ja) * 2006-03-28 2007-10-11 Kurosaki Harima Corp 溶融金属炉の炉壁内張り施工方法とそれに使用する耐火物ブロック
CN102425949A (zh) * 2011-11-25 2012-04-25 中国一冶集团有限公司 大面积耐火纤维模块安装方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1404274A (en) * 1972-03-20 1975-08-28 Rheinstahl Ag Method of lining a metallurgical furnace
US5817198A (en) * 1993-11-19 1998-10-06 Viertola; Raimo Lining method and system for high temperature spaces
JPH07224316A (ja) * 1994-02-08 1995-08-22 Tokyo Yogyo Co Ltd Aod炉コーン部内張りれんが構造及びその施工方法
JP2007263447A (ja) * 2006-03-28 2007-10-11 Kurosaki Harima Corp 溶融金属炉の炉壁内張り施工方法とそれに使用する耐火物ブロック
CN102425949A (zh) * 2011-11-25 2012-04-25 中国一冶集团有限公司 大面积耐火纤维模块安装方法

Also Published As

Publication number Publication date
CN105091595A (zh) 2015-11-25

Similar Documents

Publication Publication Date Title
CN105091595B (zh) 一种工业炉的炉衬安装工艺
CN203783486U (zh) 防螺纹粘扣钻杆接头
CN204923879U (zh) 一种工业炉的炉衬安装工具
CN103822045B (zh) 管道可拆卸封堵器
CN104110078A (zh) 保温墙体
CN204475822U (zh) 一种脚手架的便携连墙件
CN203036151U (zh) 便于拆卸的管道接头
CN201686745U (zh) 井场快速安装式套管手镯阳极组套
CN203547725U (zh) 一种多用途井下监测管柱
CN204456666U (zh) 一种建筑工程用续接器结构
CN110907263B (zh) 一种划分循环应力响应曲线的方法和应用
CN204113148U (zh) 一种钻杆吊钳牙板
CN205478787U (zh) 双金属自攻水泥锚栓
CN205136255U (zh) 一种不锈钢管连接组件
CN211084101U (zh) 一种燃烧废气设备的保温钉内藏式结构
CN205135579U (zh) 水平井外套式复合射孔用锁紧降阻扶正装置
CN204266950U (zh) 快速卸套管短接专用工具
CN205342986U (zh) 活塞环撑开器
CN219675063U (zh) 快插式齿型对称度检测用具
CN204413949U (zh) 一种新型快抓管钳
CN207426629U (zh) 一种新型防振锤
CN211855117U (zh) 一种检测治具
Bao et al. Abstract of: Sensitivity Study on Climate Induced Internal Pressure within Cylindrical Curved IGUs
CN204403560U (zh) 一种环形可变直径顶铁垫片
CN205120260U (zh) 即热式反映铂铑热电偶

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 453200, Henan County, Xinxiang County, Yanjin Province industrial agglomeration area north 307 lines

Patentee after: Henan Tianli thermal equipment Limited by Share Ltd

Address before: Zuo Yanjin County of Xinxiang City, Henan province 453200 urban and rural areas in eastern Henan province Tianli Industrial Furnace Co. Ltd

Patentee before: Tian Li industrial furnace Co., Ltd of Henan Province

CP03 Change of name, title or address