CN105089194A - Ceiling conversion layer self-prolonged hanging device and construction method thereof - Google Patents

Ceiling conversion layer self-prolonged hanging device and construction method thereof Download PDF

Info

Publication number
CN105089194A
CN105089194A CN201510390739.2A CN201510390739A CN105089194A CN 105089194 A CN105089194 A CN 105089194A CN 201510390739 A CN201510390739 A CN 201510390739A CN 105089194 A CN105089194 A CN 105089194A
Authority
CN
China
Prior art keywords
steel
furred ceiling
purlin
conversion layer
plain sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510390739.2A
Other languages
Chinese (zh)
Other versions
CN105089194B (en
Inventor
陈继云
赵向东
徐飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd filed Critical Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority to CN201510390739.2A priority Critical patent/CN105089194B/en
Publication of CN105089194A publication Critical patent/CN105089194A/en
Application granted granted Critical
Publication of CN105089194B publication Critical patent/CN105089194B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a ceiling conversion layer self-prolonged hanging device and a construction method thereof. The device comprises an angle steel transverse support frame, wherein the angle steel transverse support frame is fixedly connected with a galvanized C-shaped steel ceiling purline, and is supported with an angle steel lifting rod; the top end of the angle steel lifting rod is fixedly connected with a roof H-shaped steel purline through a hoop device; and the construction method comprises machining of ceiling fittings and installation of the ceiling fittings. The ceiling conversion layer self-prolonged hanging device and the construction method thereof have the following beneficial effects: the ceiling conversion layer self-prolonged hanging device has no need to build a scaffold; and the construction method is simple, saves both time and labor, can realize the construction of large large-space ceilings, can guarantee the whole construction quality and the decoration effect, and can effectively save the construction cost.

Description

A kind of furred ceiling conversion layer is from prolonging formula erecting by overhang and construction method thereof
method field
The present invention relates to construction techniques field, being specifically related to a kind of furred ceiling conversion layer from prolonging formula erecting by overhang and construction method thereof.
background method
The Building decorating and repairs engineering furred ceiling touched in daily life is normally made up of surface layer and erecting by overhang two parts, in the furred ceiling engineering construction of present stage architectural decoration, usually steel conversion layer, zinc-plated harness cord suspension rod and supporting surface layer suspension member three incorporating aspects is adopted to be the erecting by overhang of furred ceiling.
In construction, to common erecting by overhang, first suspension rod is installed, then carries out primary and secondary skeletal frame leveling accurately, supporting suspension member and the surface layer furred ceiling of surface layer is finally installed again.When constructing to large-scale large space furred ceiling, often needing to set up scaffold, causing working procedure loaded down with trivial details, time-consumingly to take a lot of work, and common erecting by overhang has been difficult to the construction of large space arc furred ceiling, integral construction quality and finishing effect cannot be ensured, undesirably increased construction cost simultaneously.
Therefore, need a kind of furred ceiling conversion layer for large space of design badly from prolonging formula erecting by overhang and construction method thereof, to solve the problems referred to above that existing method exists.
Summary of the invention
The object of this invention is to provide a kind of furred ceiling conversion layer from prolonging formula erecting by overhang and construction method thereof, to overcome current existing method above shortcomings.
The object of the invention is scheme by the following method to realize:
A kind of furred ceiling conversion layer is from prolonging formula erecting by overhang, comprise angle steel cross binding frame, described angle steel cross binding frame is fixedly connected with zinc-plated C-type steel furred ceiling purlin, described angle steel cross binding frame is supported with angle steel suspension rod, and the top of described angle steel suspension rod is fixedly connected with roofing H profile steel purlin by anchor ear device.
Further, described anchor ear device comprises symmetrically arranged two galvanized steel plain sheet fasteners, described galvanized steel plain sheet fastener is provided with the draw-in groove matched with roofing H profile steel purlin bottom flange, described galvanized steel plain sheet fastener is connected to described roofing H profile steel purlin bottom flange by described draw-in groove symmetry, be fixed with anchor ear connector inside described galvanized steel plain sheet fastener, be bolted to connection between described anchor ear connector.
Further, be bolted to connection between described angle steel cross binding frame and angle steel suspension rod.
Furred ceiling conversion layer, from a construction method of prolonging formula erecting by overhang, comprises following concrete steps:
1) furred ceiling component and fitting processing: on-the-spot component and fitting adopts punch press processing, according to design drawing processing galvanized steel plain sheet fastener, the galvanized steel plain sheet fastener of arc section is supporting with the angle of roofing H profile steel purlin, according to on-the-spot roofing H profile steel purlin absolute altitude determination angle steel length of boom, utilize punch press to block perforating, zinc-plated C-type steel furred ceiling purlin is according to the punching of design hoisting point position size;
2) installation of furred ceiling component and fitting: first assemble on ground after described galvanized steel plain sheet fastener and angle steel suspension rod process, operating personnel by setting up scaffold floor and ladder on scaffold, fixed pulley is fixed in advance on roofing H profile steel purlin, ground staff moves the galvanized steel plain sheet fastener assembled and angle steel suspension rod to installed height mark by fixed pulley, galvanized steel plain sheet fastener snaps on roofing H profile steel purlin by upper operating personnel, and zinc-plated C-type steel furred ceiling purlin and angle steel suspension rod fix by bottom personnel;
3), after installing a part of galvanized steel plain sheet fastener and zinc-plated C-type steel furred ceiling purlin, scaffold floor and ladder being extended and carry out next region installation, repeat step 2) installation of furred ceiling component and fitting is until be in place the zinc-plated C-type steel furred ceiling purlin of all beginning sections.
Further, the component and fitting processed all carries out grey paint spraying.
Further, described zinc-plated C-type steel furred ceiling purlin is all fixedly connected with by M12 bolt with between angle steel suspension rod and between galvanized steel plain sheet fastener with roofing H profile steel purlin.
Further, described ladder is triangular steel cat ladder, and described ladder and steel work bottom flange adopt ladder edge of a wing special fixture to fix.
Beneficial effect of the present invention is: furred ceiling conversion layer of the present invention does not need to set up scaffold from prolonging formula erecting by overhang; Its construction method is simple, time saving and energy saving, can realize constructing to large-scale large space furred ceiling, and can ensure integral construction quality and finishing effect; Effectively can save construction cost.
Accompanying drawing explanation
Below in order to be illustrated more clearly in the method scheme in the embodiment of the present invention or existing method, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only some embodiments of the application, for this area commonsense method personnel, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is that the furred ceiling conversion layer according to the embodiment of the present invention prolongs formula erecting by overhang construction schematic diagram certainly;
Fig. 2 is that large space furred ceiling conversion layer according to the embodiment of the present invention is from the structural representation prolonging formula erecting by overhang;
Fig. 3 is A portion enlarged drawing in Fig. 2;
Fig. 4 is the edge-on figure of the scaffold according to the embodiment of the present invention;
Fig. 5 is the upright figure of the scaffold according to the embodiment of the present invention;
Fig. 6 is the overhead furred ceiling profile schematic diagram according to the embodiment of the present invention;
Fig. 7 is the conversion layer arrangement schematic diagram according to the embodiment of the present invention.
In figure:
1, angle steel cross binding frame; 2, zinc-plated C-type steel furred ceiling purlin; 3, angle steel suspension rod; 4, galvanized steel plain sheet fastener; 5, roofing H profile steel purlin; 6, bolt; 7, scaffold floor; 8, ladder; 9, fixed pulley; 10, pulley stay cord; 11, safety steel cable; 12, structural steel beam; 13, scaffold; 14, screw mandrel; 15, clip fastening keel; 16, aluminum strip plate; 17, anchor ear device; 18, draw-in groove; 19, anchor ear connector.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the method scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, the every other embodiment that this area commonsense method personnel obtain, all belongs to the scope of protection of the invention.
As shown in figs. 1-7, a kind of furred ceiling conversion layer according to the embodiment of the present invention is from prolonging formula erecting by overhang, comprise angle steel cross binding frame 1(40*40*4), described angle steel cross binding frame 1 is fixedly connected with zinc-plated C-type steel furred ceiling purlin 2(100*50*15*2.5), described angle steel cross binding frame 1 is supported with angle steel suspension rod 3(40*40*4), the top of described angle steel suspension rod 3 is fixedly connected with roofing H profile steel purlin 5 by anchor ear device.
In a specific embodiment, it is thick that described anchor ear device 17 comprises symmetrically arranged two galvanized steel plain sheet fastener 4(6mm), described galvanized steel plain sheet fastener 4 is provided with the draw-in groove 18 matched with roofing H profile steel purlin 5 bottom flange, described galvanized steel plain sheet fastener 4 is connected to described roofing H profile steel purlin 5 bottom flange by described draw-in groove 18 symmetry, be fixed with anchor ear connector 19 inside described galvanized steel plain sheet fastener 4, be fixedly connected with by bolt 6 between described anchor ear connector 19.
In a specific embodiment, described angle steel cross binding frame 1 is fixedly connected with by bolt 6 with between angle steel suspension rod 3.
During concrete installation, 1, furred ceiling component and fitting processing: on-the-spot component and fitting adopts punch press processing, according to the thick galvanized steel plain sheet fastener 4 of design drawing processing 6mm, the processing dimension of galvanized steel plain sheet fastener 4 and punch-out openings etc. will conform to drawing, and the galvanized steel plain sheet fastener 4 of arc section is supporting with the angle of on-the-spot roofing H profile steel purlin 5; Angle steel suspension rod 3 adopts 40*40*4 Zinc-coated angle steel to make, and according to on-the-spot steel work purlin absolute altitude determination angle steel suspension rod 3 length, utilizes punch press to block perforating; Zinc-plated C-type steel furred ceiling purlin 2 is according to the punching of design hoisting point position size, and the component and fitting processed all carries out grey paint spraying.
2, furred ceiling component and fitting is installed: first assemble on ground after galvanized steel plain sheet fastener 4 and angle steel suspension rod 3 process, operating personnel by taking scaffold floor 7 and ladder 8 on scaffold 13, fixed pulley 9 is fixed in advance on steel work purlin, ground staff moves the angle steel suspension rod 3 assembled and galvanized steel plain sheet fastener 4 to installed height mark by fixed pulley 9, galvanized steel plain sheet fastener 4 snaps on roofing H profile steel purlin 5 by upper operating personnel, by bolt 6, galvanized steel plain sheet fastener 4 and roofing H profile steel purlin 5 are locked, zinc-plated C-type steel furred ceiling purlin 2 is tightened fixing with angle steel suspension rod 3 by M12 bolt 6 by bottom personnel, after having operated, ladder 8 is moved to down one keel installation position, the zinc-plated C-type steel furred ceiling purlin 2 of all beginning sections is all in place by repetition said process, and (ladder 8 and steel work bottom flange adopt ladder edge of a wing special fixture to fix.After installing a part of anchor ear device 17 and zinc-plated C-type steel furred ceiling purlin 2, scaffold floor 7 and triangle cat ladder are extended and carries out next region conversion keel installation.Push ahead in this approach, realize the object that conversion layer oneself extends, ceiling board is installed.)
Method effect of the present invention:
In the South Railway Station of Ningbo, by the ingenious roofing H profile steel purlin 5 that utilizes as the hitch point of conversion layer angle steel suspension rod 3, utilize the triangle climbing ladder apparatus of new research and development, creatively develop conversion layer oneself and extend mounting method, solve the great method in engineering and economic headache, not only save a large sum of scaffold measure cost, more saved the artificial of a large amount of preciousness and time, achieved good economic and social benefit; Satisfactorily complete the task that Party A pays, ensure that the use that is formally open to traffic at station, obtain the consistent favorable comment of various circles of society, the development & application of this method plays vital effect in the construction at southern station, Ningbo.
In sum, by means of method scheme of the present invention, furred ceiling conversion layer of the present invention does not need to set up scaffold from prolonging formula erecting by overhang; Its construction method is simple, time saving and energy saving, can realize constructing to large-scale large space furred ceiling, and can ensure integral construction quality and finishing effect; Effectively can save construction cost.
The present invention is not limited to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present invention; no matter but any change is done in its shape or structure; every have identical with the application or akin method scheme, all drops within protection scope of the present invention.

Claims (7)

1. a furred ceiling conversion layer is from prolonging formula erecting by overhang, it is characterized in that, comprise angle steel cross binding frame (1), described angle steel cross binding frame (1) is fixedly connected with zinc-plated C-type steel furred ceiling purlin (2), described angle steel cross binding frame (1) is supported with angle steel suspension rod (3), and the top of described angle steel suspension rod (3) is fixedly connected with roofing H profile steel purlin (5) by anchor ear device (17).
2. furred ceiling conversion layer according to claim 1 is from prolonging formula erecting by overhang, it is characterized in that, described anchor ear device (17) comprises symmetrically arranged two galvanized steel plain sheet fasteners (4), described galvanized steel plain sheet fastener (4) is provided with the draw-in groove (18) matched with roofing H profile steel purlin (5) bottom flange, described galvanized steel plain sheet fastener (4) is connected to described roofing H profile steel purlin (5) bottom flange by described draw-in groove (18) symmetry, described galvanized steel plain sheet fastener (4) inner side is fixed with anchor ear connector (19), described anchor ear connector 19) between be fixedly connected with by bolt (6).
3. furred ceiling conversion layer according to claim 1 is from prolonging formula erecting by overhang, it is characterized in that, described angle steel cross binding frame (1) is fixedly connected with by bolt (6) with between angle steel suspension rod (3).
4. furred ceiling conversion layer is from a construction method of prolonging formula erecting by overhang, it is characterized in that, comprises following concrete steps:
1) furred ceiling component and fitting processing: on-the-spot component and fitting adopts punch press processing, according to design drawing processing galvanized steel plain sheet fastener (4), the galvanized steel plain sheet fastener (4) of arc section is supporting with the angle of roofing H profile steel purlin (5), according to on-the-spot roofing H profile steel purlin (5) absolute altitude determination angle steel suspension rod (3) length, utilize punch press to block perforating, zinc-plated C-type steel furred ceiling purlin (2) is according to the punching of design hoisting point position size;
2) installation of furred ceiling component and fitting: first assemble on ground after described galvanized steel plain sheet fastener (4) and angle steel suspension rod (3) process, operating personnel by setting up scaffold floor (7) and ladder (8) on scaffold (13), in advance at the upper fixing fixed pulley (9) of roofing H profile steel purlin (5), ground staff moves the galvanized steel plain sheet fastener (4) assembled and angle steel suspension rod (3) to installed height mark by fixed pulley (9), galvanized steel plain sheet fastener (4) snaps on roofing H profile steel purlin (5) by upper operating personnel, zinc-plated C-type steel furred ceiling purlin (2) and angle steel suspension rod (3) fix by bottom personnel,
3) after installing a part of galvanized steel plain sheet fastener (4) and zinc-plated C-type steel furred ceiling purlin (2), scaffold floor (7) and ladder (8) being extended and carry out next region installation, repeat step 2) installation of furred ceiling component and fitting is until be in place the zinc-plated C-type steel furred ceiling purlin (2) of all beginning sections.
5. furred ceiling conversion layer according to claim 4 is from the construction method of prolonging formula erecting by overhang, and it is characterized in that, the component and fitting processed all carries out grey paint spraying.
6. furred ceiling conversion layer according to claim 5 is from the construction method of prolonging formula erecting by overhang, it is characterized in that, described zinc-plated C-type steel furred ceiling purlin (2) is all fixedly connected with by M12 bolt (6) with between angle steel suspension rod (3) and between galvanized steel plain sheet fastener (4) with roofing H profile steel purlin (5).
7. furred ceiling conversion layer according to claim 5 is from the construction method of prolonging formula erecting by overhang, and it is characterized in that, described ladder (8) is triangular steel cat ladder, and described ladder (8) and steel work bottom flange adopt ladder edge of a wing special fixture to fix.
CN201510390739.2A 2015-07-06 2015-07-06 A kind of furred ceiling conversion layer prolongs the construction method of formula erecting by overhang certainly Active CN105089194B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510390739.2A CN105089194B (en) 2015-07-06 2015-07-06 A kind of furred ceiling conversion layer prolongs the construction method of formula erecting by overhang certainly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510390739.2A CN105089194B (en) 2015-07-06 2015-07-06 A kind of furred ceiling conversion layer prolongs the construction method of formula erecting by overhang certainly

Publications (2)

Publication Number Publication Date
CN105089194A true CN105089194A (en) 2015-11-25
CN105089194B CN105089194B (en) 2017-12-19

Family

ID=54570449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510390739.2A Active CN105089194B (en) 2015-07-06 2015-07-06 A kind of furred ceiling conversion layer prolongs the construction method of formula erecting by overhang certainly

Country Status (1)

Country Link
CN (1) CN105089194B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067976A (en) * 2019-05-06 2019-07-30 中建八局装饰工程有限公司 A kind of installation system and installation method of matrix form system art pendent lamp

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008063873A (en) * 2006-09-08 2008-03-21 Shimizu Corp Transfer mechanism of ceiling and execution method
CN101871261A (en) * 2010-06-30 2010-10-27 中国五冶集团有限公司 Quick mounting platform for inverted color steel tiles and mounting method thereof
CN203878845U (en) * 2014-06-11 2014-10-15 苏州苏明装饰股份有限公司 Conversion layer hung ceiling structure
WO2014207145A1 (en) * 2013-06-27 2014-12-31 Uniqem Bvba Suspension unit for attaching a construction element

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008063873A (en) * 2006-09-08 2008-03-21 Shimizu Corp Transfer mechanism of ceiling and execution method
CN101871261A (en) * 2010-06-30 2010-10-27 中国五冶集团有限公司 Quick mounting platform for inverted color steel tiles and mounting method thereof
WO2014207145A1 (en) * 2013-06-27 2014-12-31 Uniqem Bvba Suspension unit for attaching a construction element
CN203878845U (en) * 2014-06-11 2014-10-15 苏州苏明装饰股份有限公司 Conversion layer hung ceiling structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
武利平: "《铁路客站高大空间装饰吊顶施工技术研究》", 《建筑技术》 *
郑权: "《高大空间吊顶工程脚手架与移动式操作平台技术应用研究》", 《建筑技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067976A (en) * 2019-05-06 2019-07-30 中建八局装饰工程有限公司 A kind of installation system and installation method of matrix form system art pendent lamp

Also Published As

Publication number Publication date
CN105089194B (en) 2017-12-19

Similar Documents

Publication Publication Date Title
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN105804305B (en) Corrugated metal plate ceiling system and its installation method
CN204876268U (en) Light steel suspended ceiling keel that excels in
CN205296869U (en) Spatial grid structure thrustor that slides
CN105275203A (en) Telescopic beam, adjustable mold base system made by using same and mold base construction method
CN204728554U (en) The integral structure of channel and double-deck operation platform
CN104481075A (en) Hanging and connecting system for suspended ceiling
CN201003223Y (en) Triangle skeleton unit suitable for large space double curved surface suspended ceiling
CN203977672U (en) A kind of roof suspended ceiling integrated member
CN105089194A (en) Ceiling conversion layer self-prolonged hanging device and construction method thereof
CN104234289A (en) Large-altitude-difference non-planar modeling suspended ceiling structure and construction method thereof
CN204850516U (en) A horizontal lifeline system for steel construction factory building
CN104088390A (en) Integral roof suspended ceiling component
CN208226933U (en) The special fixture of colored steel roof and photovoltaic bracket connection
CN204590640U (en) A kind of prefabricated concrete structure longitudinal reinforcement location adjustment jig
CN216713553U (en) Fireproof environment-friendly curtain box
CN204959995U (en) Modular structure of room roof beam
CN204299020U (en) A kind of mounting system of furred ceiling
CN205637282U (en) Wave metal sheet furred ceiling
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN202187455U (en) Suspended-ceiling suspension device below a floor support plate in a steel structure
CN210658449U (en) Remove aluminum alloy template structure
CN204983335U (en) Furred ceiling is staple bolt device for conversion layer
CN202899532U (en) Connecting component for low carbon plate adhesive clamping combination
CN209975890U (en) Hollow laser cutting aluminum plate skylight hanging clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant