Prior art keywords
place
tour
inspection
puts
open switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510435374.0A
Other languages
Chinese (zh)
Inventor
邵鹏
孙治国
杜吉超
宋俊峰
郑仁岩
仇善军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Wang Rushan Shandong Province City Electric Co
Original Assignee
Guo Wang Rushan Shandong Province City Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guo Wang Rushan Shandong Province City Electric Co filed Critical Guo Wang Rushan Shandong Province City Electric Co
Priority to CN201510435374.0A priority Critical patent/CN105072164A/en
Publication of CN105072164A publication Critical patent/CN105072164A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • H04L67/125Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/20Checking timed patrols, e.g. of watchman

Abstract

A transformer substation in-place inspection monitoring device comprises a plurality of in-place confirmation devices respectively arranged on each transformer substation. The in-place confirmation device comprises an in-place inspection normally-opened switch arranged outside a transformer substation inspection point. The in-place inspection normally-opened switch is connected with a remote signaling terminal board through a control cable. The remote signaling terminal board is connected with a communication management computer. The communication management computer is connected with an automatic main station through a communication line. According to the above scheme, the in-place inspection normally-opened switches are arranged outside the transformer substations needing inspection, the in-place inspection normally-opened switches need to be triggered in an inspection process of inspection personnel, and trigger signals are transmitted in a remote-signaling deflection mode to the automatic main station; in addition, the automatic main station draws an inspection planar graph corresponding to the transformer substations, so that the conditions of inspected positions are clear at a glance, the monitoring efficiency is substantially improved, the in-place inspection of a transformer substation operator on duty is ensured, and the normal operation of important transformer substation equipment is ensured.

Description

A kind of substation inspection puts in place monitoring arrangement and supervision method thereof
Technical field:
The present invention relates to a kind of substation inspection to put in place monitoring arrangement and supervision method thereof.
Background technology:
At present, for transformer station's normally unattended operation, equipment-patrolling personnel need make an inspection tour administered equipment according to the rules, to ensure that substation safety runs.At present, the tour regulatory measure the one whether situation of putting in place adopts for substation inspection personnel be adopt at substation field, tour minute book is set, two be by being arranged on transformer station video monitoring apparatus timing tour personnel are supervised.Adopt first kind of way, because supervisor cannot check every day, therefore operator on duty sometimes exists to fill in advance and makes an inspection tour minute book or afterwards mend the situation of filling out, and does not have the effect of supervision; Adopt the second way, the video monitoring apparatus being arranged on transformer station is easily subject to the impact of equipment fault and weather conditions, causes puzzlement, simultaneously to the supervision of supervisor, supervisor needs to check one by one the picture captured by video monitoring apparatus when making an inspection tour, and efficiency is lower.
Summary of the invention:
The present invention is in order to make up the deficiencies in the prior art, provide a kind of substation inspection to put in place monitoring arrangement and supervision method thereof, reasonable in design, arrange tour needing the place of transformer station that carries out making an inspection tour to put in place normal open switch, operator on duty is when making an inspection tour, need to trigger tour to put in place normal open switch, namely triggering signal the form of remote signalling displacement can be sent to automation main website; The tour plane graph corresponding with transformer station simultaneously by drawing in automation main website, supervisor can learn the tour situation of operator on duty by making an inspection tour plane graph, realize real-time monitoring, substantially increase supervisory efficiency, ensure that transformer station operator on duty makes an inspection tour to put in place, ensure the normal operation of important substation equipment, solve problems of the prior art.
The present invention for solving the problems of the technologies described above adopted technical scheme is:
A kind of substation inspection puts in place monitoring arrangement, comprise several and be arranged on the confirmation device that puts in place in each transformer station, described putting in place confirms that device comprises the tour being arranged on substation inspection point place and to put in place normal open switch, the tour normal open switch that puts in place is connected with remote signalling terminal board by control cables, and remote signalling terminal board is connected with communication manager; Communication manager is connected with automation main website by communication line, described communication line comprises the front end optical transmission device be connected with communication manager by cable and the rear end optical transmission device be connected with automation main website by cable, is connected between front end optical transmission device and rear end optical transmission device by optical fiber; Described automation main website comprises the terminal server be connected with rear end optical transmission device by cable, also comprises the traffic control site server be connected with terminal server, SCADA server, history server and WEB server.
Outdoor protector is provided with in put in place the outside of normal open switch of the tour at inspection point provided place disposed in the outdoor.
Substation inspection puts in place the supervision method of monitoring arrangement, and its step is as follows:
(1) installation of normal open switch of putting in place is maked an inspection tour: tour is set at the inspection point provided place of each transformer station and puts in place normal open switch;
(2) drafting of plane graph is maked an inspection tour: to draw in automation main website make an inspection tour plane graph according to put in place the installation site of normal open switch of the scale of each transformer station, internal structure and tour;
(3) make an inspection tour plane graph and confirm the data correlation of device with putting in place: the tour at each substation inspection point place normal open switch that puts in place is connected to automation main website by communication manager, sets up data cube computation with the tour plane graph drawn in automation main website;
(4) supervision that puts in place is maked an inspection tour: the personnel that make an inspection tour are when making an inspection tour each transformer station, the tour normal open switch that puts in place is triggered, the trigger message making an inspection tour the normal open switch that puts in place is sent to automation main website by communication manager and communication line, shows by making an inspection tour plane graph.
In step (1), make an inspection tour the normal open switch that puts in place for several, be distributed in the diverse location of its place transformer station.
In step (2), described tour plane graph comprises transformer station inner each structural representation figure, patrol route and several confirmation symbols that puts in place.
In step (3), the tour at each substation inspection point place normal open switch that puts in place is connected to automation main website by communication manager, and putting in place with each in the tour plane graph drawn in automation main website confirms that symbol sets up data cube computation.
Also comprising step (5) can use multiple terminal to check information received by automation main website and the historical information that stores by WEB server within the scope of local area network (LAN)
The present invention adopts such scheme, arranges tour to put in place normal open switch needing the place of transformer station that carries out making an inspection tour, and operator on duty, when making an inspection tour, needs to trigger tour and to put in place normal open switch, and namely triggering signal the form of remote signalling displacement can be sent to automation main website; Simultaneously by drawing the tour plane graph corresponding with transformer station in automation main website, very clear to the situation of making an inspection tour place, supervisor can learn the tour situation of operator on duty by making an inspection tour plane graph, realize real-time monitoring, simultaneously, the tour information of putting in place can be stored in automation main website, can within the scope of local area network (LAN), multiple terminal be used to check historical information by the WEB server in automation main website, substantially increase supervisory efficiency, ensure that transformer station operator on duty makes an inspection tour to put in place, ensured the normal operation of important substation equipment.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present invention.
Fig. 2 is tour plane graph of the present invention.
In figure, 1, put in place confirmation device, 2, communication line, 3, automation main website, 4, make an inspection tour the normal open switch that puts in place, 5, put in place confirmation symbol, 6, hyperbaric chamber.
Embodiment:
For clearly demonstrating the technical characterstic of this programme, below by embodiment, and in conjunction with its accompanying drawing, the present invention will be described in detail.
As shown in Figure 1, a kind of substation inspection puts in place monitoring arrangement, comprise several be arranged in each transformer station putting in place confirm device 1, described putting in place confirms that device 1 comprises the tour being arranged on substation inspection point place and to put in place normal open switch 4, the tour normal open switch 4 that puts in place is connected with remote signalling terminal board by control cables, and remote signalling terminal board is connected with communication manager; Communication manager is connected with automation main website 3 by communication line, described communication line comprises the front end optical transmission device be connected with communication manager by cable and the rear end optical transmission device be connected with automation main website 3 by cable, is connected between front end optical transmission device and rear end optical transmission device by optical fiber; Described automation main website 3 comprises the terminal server be connected with rear end optical transmission device by cable, also comprises the traffic control site server be connected with terminal server, SCADA server, history server and WEB server.
When tour puts normal open switch triggering in place, its triggering signal is sent to remote signalling terminal board, then automation main website is sent to remote signalling displacement form by communication manager, SCADA server in automation main website can control the remote signalling information received and monitoring, history server can store the data collected, and can be realized in whole local area network (LAN) the access of automation main website and inquiry by WEB server.
Outdoor protector is provided with in put in place the outside of normal open switch 4 of the tour at inspection point provided place disposed in the outdoor.Rainproof effect can be played, avoid rainwater to cause corrosion and damage to it.
Substation inspection puts in place the supervision method of monitoring arrangement, and its step is as follows:
(1) installation of normal open switch 4 of putting in place is maked an inspection tour: tour is set at the inspection point provided place of each transformer station and puts in place normal open switch 4;
(2) drafting of plane graph is maked an inspection tour: to draw in automation main website make an inspection tour plane graph according to put in place the installation site of normal open switch 4 of the scale of each transformer station, internal structure and tour;
(3) make an inspection tour plane graph and confirm the data correlation of device with putting in place: the tour at each substation inspection point place normal open switch 4 that puts in place is connected to automation main website 3 by communication manager, sets up data cube computation with the tour plane graph drawn in automation main website 3;
(4) supervision that puts in place is maked an inspection tour: the personnel that make an inspection tour are when making an inspection tour each transformer station, the tour normal open switch 4 that puts in place is triggered, the trigger message making an inspection tour the normal open switch 4 that puts in place is sent to automation main website 3 by communication manager and communication line, shows by making an inspection tour plane graph.
In step (1), make an inspection tour the normal open switch 4 that puts in place for several, be distributed in the diverse location of its place transformer station.
In step (2), described tour plane graph comprises the inner each structural representation figure of transformer station, patrol route and several confirmation symbols 5 that puts in place.
In step (3), the tour at each substation inspection point place normal open switch 4 that puts in place is connected to automation main website by communication manager, and putting in place with each in the tour plane graph drawn in automation main website 3 confirms that symbol 5 sets up data cube computation.
As shown in Figure 2, in the tour plane graph in the hyperbaric chamber in certain transformer station, draw the switch cubicle having this hyperbaric chamber, four confirmations put in place normal open switch symbol 5 and patrol route, when operator on duty according to patrol and examine route this hyperbaric chamber is maked an inspection tour time, trigger the tour being arranged on corner, hyperbaric chamber successively to put in place normal open switch 4, when triggering one, this confirms that triggering signal is sent to automation main website 3 by the form that remote signalling conjugates by the normal open switch 4 that puts in place, it is red that putting in place in the tour plane graph that in automation main website 3, hyperbaric chamber is corresponding therewith confirms that namely symbol 5 is conjugated by green, illustrate that operator on duty makes an inspection tour this inspection point provided.By making an inspection tour putting in place in plane graph, supervisor confirms that the color of symbol 5 can distinguish whether operator on duty makes an inspection tour.
Also comprising step (5) can use multiple terminal to check information received by automation main website and the historical information that stores by WEB server within the scope of local area network (LAN).Whether supervisor can also be inquired about the information in automation main website 3 by any computer in local area network (LAN) or other-end, can not only supervise operator on duty in real time and make an inspection tour, can also check the history situation of making an inspection tour.
Substation inspection of the present invention is adopted to put in place monitoring arrangement and supervision method thereof, arrange tour needing the place of transformer station that carries out making an inspection tour to put in place normal open switch, operator on duty is when making an inspection tour, need to trigger tour to put in place normal open switch, namely triggering signal the form of remote signalling displacement can be sent to automation main website; Simultaneously by drawing the tour plane graph corresponding with transformer station in automation main website, very clear to the situation of making an inspection tour place, supervisor can learn the tour situation of operator on duty by making an inspection tour plane graph, realize real-time monitoring, simultaneously, the tour information of putting in place can be stored in automation main website, can within the scope of local area network (LAN), multiple terminal be used to check historical information by the WEB server in automation main website, substantially increase supervisory efficiency, ensure that transformer station operator on duty makes an inspection tour to put in place, ensured the normal operation of important substation equipment.
The present invention does not describe part in detail, is the known technology of those skilled in the art of the present technique.

Claims (7)

1. a substation inspection puts in place monitoring arrangement, it is characterized in that: comprise several and be arranged on the confirmation device that puts in place in each transformer station, described putting in place confirms that device comprises the tour being arranged on substation inspection point place and to put in place normal open switch, the tour normal open switch that puts in place is connected with remote signalling terminal board by control cables, and remote signalling terminal board is connected with communication manager; Communication manager is connected with automation main website by communication line, described communication line comprises the front end optical transmission device be connected with communication manager by cable and the rear end optical transmission device be connected with automation main website by cable, is connected between front end optical transmission device and rear end optical transmission device by optical fiber; Described automation main website comprises the terminal server be connected with rear end optical transmission device by cable, also comprises the traffic control site server be connected with terminal server, SCADA server, history server and WEB server.
2. a kind of substation inspection according to claim 1 puts in place monitoring arrangement, it is characterized in that: be provided with outdoor protector in put in place the outside of normal open switch of the tour at inspection point provided place disposed in the outdoor.
3. substation inspection as claimed in claim 1 puts in place a supervision method for monitoring arrangement, it is characterized in that: its step is as follows:
(1) installation of normal open switch of putting in place is maked an inspection tour: tour is set at the inspection point provided place of each transformer station and puts in place normal open switch;
(2) drafting of plane graph is maked an inspection tour: to draw in automation main website make an inspection tour plane graph according to put in place the installation site of normal open switch of the scale of each transformer station, internal structure and tour;
(3) make an inspection tour plane graph and confirm the data correlation of device with putting in place: the tour at each substation inspection point place normal open switch that puts in place is connected to automation main website by communication manager, sets up data cube computation with the tour plane graph drawn in automation main website;
(4) supervision that puts in place is maked an inspection tour: the personnel that make an inspection tour are when making an inspection tour each transformer station, the tour normal open switch that puts in place is triggered, the trigger message making an inspection tour the normal open switch that puts in place is sent to automation main website by communication manager and communication line, shows by making an inspection tour plane graph.
4. a kind of substation inspection according to claim 3 puts in place the supervision method of monitoring arrangement, it is characterized in that: in step (1), makes an inspection tour the normal open switch that puts in place for several, is distributed in the diverse location of its place transformer station.
5. a kind of substation inspection according to claim 3 puts in place the supervision method of monitoring arrangement, it is characterized in that: in step (2), described tour plane graph comprises transformer station inner each structural representation figure, patrol route and several confirmation symbols that puts in place.
6. a kind of substation inspection according to claim 5 puts in place the supervision method of monitoring arrangement, it is characterized in that: in step (3), the tour at each substation inspection point place normal open switch that puts in place is connected to automation main website by communication manager, and putting in place with each in the tour plane graph drawn in automation main website confirms that symbol sets up data cube computation.
7. a kind of substation inspection according to claim 3 puts in place the supervision method of monitoring arrangement, it is characterized in that: also comprise step (5) and multiple terminal can be used within the scope of local area network (LAN) to check information received by automation main website and the historical information that stores by WEB server.
CN201510435374.0A 2015-07-22 2015-07-22 Transformer substation in-place inspection monitoring device and monitoring method thereof Pending CN105072164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510435374.0A CN105072164A (en) 2015-07-22 2015-07-22 Transformer substation in-place inspection monitoring device and monitoring method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510435374.0A CN105072164A (en) 2015-07-22 2015-07-22 Transformer substation in-place inspection monitoring device and monitoring method thereof

Publications (1)

Publication Number Publication Date
CN105072164A true CN105072164A (en) 2015-11-18

Family

ID=54501443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510435374.0A Pending CN105072164A (en) 2015-07-22 2015-07-22 Transformer substation in-place inspection monitoring device and monitoring method thereof

Country Status (1)

Country Link
CN (1) CN105072164A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090252087A1 (en) * 2008-04-03 2009-10-08 National Taiwan University Wireless-linked remote ecological environment monitoring system
CN102801216A (en) * 2012-09-06 2012-11-28 上海欣影电力科技发展有限公司 Intelligent substation inspection system
CN103280000A (en) * 2013-04-11 2013-09-04 魏大伦 Visualization inspection system based on internet of things and inspection method therefor
CN203398873U (en) * 2013-06-20 2014-01-15 国家电网公司 Transformer station tour inspection automatic recording system
CN103871119A (en) * 2014-03-18 2014-06-18 山西奥得健荣科技有限公司 Electronic inspection system for troubleshooting safety production hidden danger
CN104091482A (en) * 2014-07-17 2014-10-08 国家电网公司 Operation and maintenance simulating training system of smart distribution grid
CN104777824A (en) * 2013-11-21 2015-07-15 国家电网公司 Substation computer monitoring remote diagnosis system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090252087A1 (en) * 2008-04-03 2009-10-08 National Taiwan University Wireless-linked remote ecological environment monitoring system
CN102801216A (en) * 2012-09-06 2012-11-28 上海欣影电力科技发展有限公司 Intelligent substation inspection system
CN103280000A (en) * 2013-04-11 2013-09-04 魏大伦 Visualization inspection system based on internet of things and inspection method therefor
CN203398873U (en) * 2013-06-20 2014-01-15 国家电网公司 Transformer station tour inspection automatic recording system
CN104777824A (en) * 2013-11-21 2015-07-15 国家电网公司 Substation computer monitoring remote diagnosis system
CN103871119A (en) * 2014-03-18 2014-06-18 山西奥得健荣科技有限公司 Electronic inspection system for troubleshooting safety production hidden danger
CN104091482A (en) * 2014-07-17 2014-10-08 国家电网公司 Operation and maintenance simulating training system of smart distribution grid

Similar Documents

Publication Publication Date Title
CN202513670U (en) Auxiliary control system of intelligent transformer substation
CN111614913B (en) One-key sequential control double-confirmation system and method based on intelligent isolation switch position identification
CN103679559A (en) Visual grid system and fault identification method thereof
CN107702818B (en) Submarine cable temperature monitoring system
CN202167063U (en) Onsite operation safety control system
CN205407823U (en) Optical cable fibre core intelligent monitoring system
CN205453696U (en) Real -time on -line monitoring system of optical cable based on GIS
CN104460598A (en) Substation intelligent auxiliary information monitoring system serving operation and maintenance staff
CN103401312A (en) Redundancy warning system and control method for goose network communication of intelligent transformer station
CN202013401U (en) Line fault detection system and node fault detection device
CN203287469U (en) Distribution network cable line fault locating on-line monitoring device
CN203338610U (en) Practical training device for entrance guard and surrounding warning system
CN104778541A (en) Management control system for underground electric power pipe network
CN105703479B (en) Main website, the method for substation automation equipment linkage from top to bottom are realized in passage extension
CN107046439A (en) Big Dipper distribution automation system
CN105072164A (en) Transformer substation in-place inspection monitoring device and monitoring method thereof
CN103208859A (en) Comprehensive anti-misoperation system of intelligent transformer station
CN106443344A (en) System and method for judging online short-circuit fault section of high-voltage cable
CN105656193A (en) High-voltage cabinet protection monitoring system for unattended substation
CN202856454U (en) Five prevention system capable of positioning working personnel and temporary grounding wire
CN109412684A (en) A kind of city power optical fiber communication network on-line monitoring and automatic checkout system
CN205265113U (en) Ground system of transformer substation
CN204231025U (en) A kind of unattended operation transformer station high-voltage board protecting, monitoring system
CN203773701U (en) Water leakage prevention monitoring device
CN104009543B (en) The supervision method of transformer station's secondary equipment running status

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151118