CN105069269B - A kind of tunnel excavation Whole Process Simulation method - Google Patents

A kind of tunnel excavation Whole Process Simulation method Download PDF

Info

Publication number
CN105069269B
CN105069269B CN201510600424.6A CN201510600424A CN105069269B CN 105069269 B CN105069269 B CN 105069269B CN 201510600424 A CN201510600424 A CN 201510600424A CN 105069269 B CN105069269 B CN 105069269B
Authority
CN
China
Prior art keywords
creep
msub
time
mrow
msup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510600424.6A
Other languages
Chinese (zh)
Other versions
CN105069269A (en
Inventor
任松
姜德义
吴建勋
陈结
邓高岭
李振元
欧阳讯
蒲文明
崔遥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201510600424.6A priority Critical patent/CN105069269B/en
Publication of CN105069269A publication Critical patent/CN105069269A/en
Application granted granted Critical
Publication of CN105069269B publication Critical patent/CN105069269B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of tunnel excavation Whole Process Simulation method, it is characterized in that country rock body in constructing tunnel is regarded to be a kind of with time correlation structure, therefore the method that simulation creep can be used, the dynamic change of the country rock under the different construction stages is simulated, and then simulates the purpose of whole tunnel excavation process.Step is as follows:1)Tested by creep of rock and obtain Rock Creep rule;2)Creep Equation parameter is fitted based on creep experiments;3)Creep Equation is embedded in finite element software, by setting control time length, simulation tunnel excavates overall process.

Description

A kind of tunnel excavation Whole Process Simulation method
Technical field
The present invention relates to a kind of tunnel excavation Whole Process Simulation method.
Background technology
Existing tunnels mimic method, one kind are to regard country rock with lining cutting as elasticoplastic body, are simulated by the life and death of cell Tunnel excavation and supporting, kill after excavating unit, directly activate lining element.This method can only obtain the knot of end-state Fruit, can not simulate from excavate to closing stage tunnel change, can not embody country rock with just lining interact common eigenvector this One process.Another kind is according to load-structure design model, and country rock and lining cutting interaction relationship are simulated using spring unit. This method is not inconsistent with the New Austrian Tunneling Method in practice of construction, and can not consider third principal stress.
The content of the invention
For above shortcomings in the prior art, the invention provides a kind of tunnel excavation Whole Process Simulation method. This method regards country rock body in constructing tunnel to be a kind of with time correlation structure, therefore the method that can use simulation creep, The dynamic change of the country rock under the different construction stages is simulated, and then simulates the purpose of whole tunnel excavation process;This method Comprise the following steps:
1) creep of rock is tested:To the tunnel surrounding coring to be simulated, the high 100mm of diameter 50mm cylindrical type is processed into Test specimen, traditional uniaxial static creep test is carried out, obtained under axially different stress state, test specimen creep strain changes over time rule Rule;
2) following Creep Equation is selected, creep results are fitted:
Wherein, εcrFor rock equivalent creep strain, t is the time, and σ is rock equivalent stress, and e is natural constant, and T is temperature Degree,For the rock parameter obtained by experimental fit;The parameter c when not considering temperature effect4And c7It is zero, the equation Creep starting stage and secondary creep stage can be simulated;
3) Creep Equation is embedded in ANSYS, control time length is set, simulation tunnel excavates overall process:
3.1) tunnel excavation model, and grid division are established;To include preliminary bracing and two linings in model;
3.2) country rock material passes through experimental fit rock parameter by tb, creep orders, imparting;
3.3) simulated ground stress:Apply initial field stress, by time orders, the time is set to 1e-8;Time very little herein, It is the influence in order to ignore creep effect to crustal stress;
3.4) before excavation simulation is completed to preliminary bracing:Kill and excavate unit, but do not activate preliminary bracing, ordered by time Order, time are set to t1, and t1 is the time of stage consumption used in practice of construction;
3.5) before simulation preliminary bracing is completed to two linings:Preliminary bracing is activated, by time orders, the time is set to t2, t2- T1 is by the stage consumes in practice of construction time;
3.6) the simulation tunnel operation phase:The lining of activation two, by time orders, the time is set to t3, and t3-t2 is the operation in tunnel Time.
The beneficial effects of the invention are as follows:Can simulation tunnel excavate overall process in each construction stage Change in surrounding rocks situation, Analog result can instruct actual tunnel to construct.
Embodiment
A kind of tunnel excavation Whole Process Simulation method, this method comprise the following steps:
1) tested by creep of rock and obtain Rock Creep rule:To the tunnel surrounding coring to be simulated, it is processed into straight The high 100mm of footpath 50mm cylindrical type test specimen, carries out traditional uniaxial static creep test, obtains under axially different stress state, test specimen Creep strain changes over time rule.
2) the implicit Creep Equations of ANASYS are selected, creep results are fitted:
Wherein, εcrFor rock equivalent creep strain, t is the time, and σ is rock equivalent stress, and e is natural constant, and T is temperature Degree,For equation parameter (rock parameter obtained by experimental fit);
The parameter c when not considering temperature effect4And c7It is zero, the equation can simulate creep starting stage and secondary creep Stage.
3) implicit Creep Equation is embedded in ANSYS, control time length is set, simulation tunnel excavates overall process:
3.1) tunnel excavation model, and grid division are established;To include preliminary bracing and two linings in model;
3.2) country rock material creep orders (i.e. material properties), is assigned creep material parameter and (intended by testing by tb Close obtained rock parameter);
3.3) simulated ground stress:Apply initial field stress, by time orders, the time is set to 1e-8;Time very little herein, It is the influence in order to ignore creep effect to crustal stress;
3.4) before excavation simulation is completed to preliminary bracing:Kill and excavate unit, but do not activate preliminary bracing, ordered by time Order, time are set to t1, and t1 is the time of stage consumption used in practice of construction;
3.5) before simulation preliminary bracing is completed to two linings:Preliminary bracing is activated, by time orders, the time is set to t2, t2- T1 is by the stage consumes in practice of construction time;
3.6) the simulation tunnel operation phase:The lining of activation two, by time orders, the time is set to t3, and t3-t2 is the operation in tunnel Time.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this Among the right of invention.

Claims (1)

  1. A kind of 1. tunnel excavation Whole Process Simulation method, it is characterised in that country rock body is regarded as a kind of and time correlation structure, Using Creep Equation, country rock dynamic change under the different construction stages is simulated, and then simulation tunnel excavates the purpose of overall process; This method specifically comprises the following steps:
    1) creep of rock is tested:To the tunnel surrounding coring to be simulated, the cylindrical type for being processed into the long 100mm of diameter 50mm tries Part, traditional uniaxial static creep test is carried out, obtained under axially different stress state, test specimen creep strain changes over time rule;
    2) creep results are fitted, obtain Creep Equation parameter, Creep Equation is as follows:
    <mrow> <msub> <mi>&amp;epsiv;</mi> <mrow> <mi>c</mi> <mi>r</mi> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <msub> <mi>c</mi> <mn>1</mn> </msub> <msup> <mi>&amp;sigma;</mi> <msub> <mi>c</mi> <mn>2</mn> </msub> </msup> <msup> <mi>t</mi> <mrow> <msub> <mi>c</mi> <mn>3</mn> </msub> <mo>+</mo> <mn>1</mn> </mrow> </msup> <msup> <mi>e</mi> <mrow> <mo>-</mo> <mfrac> <msub> <mi>c</mi> <mn>4</mn> </msub> <mi>T</mi> </mfrac> </mrow> </msup> </mrow> <mrow> <msub> <mi>c</mi> <mn>3</mn> </msub> <mo>+</mo> <mn>1</mn> </mrow> </mfrac> <mo>+</mo> <msub> <mi>c</mi> <mn>5</mn> </msub> <msup> <mi>&amp;sigma;</mi> <msub> <mi>c</mi> <mn>6</mn> </msub> </msup> <msup> <mi>te</mi> <mrow> <mo>-</mo> <mfrac> <msub> <mi>c</mi> <mn>7</mn> </msub> <mi>T</mi> </mfrac> </mrow> </msup> </mrow>
    Wherein, εcrFor rock equivalent creep strain, t is the time, and σ is rock equivalent stress, and e is natural constant, and T is temperature,For the rock parameter obtained by experimental fit;The parameter c when not considering temperature effect4And c7It is zero, the equation can Simulate creep starting stage and secondary creep stage;
    3) Creep Equation is embedded in ANSYS finite element softwares, control time length is set, simulation tunnel excavates overall process:
    3.1) tunnel excavation model, and grid division are established;To include preliminary bracing and two linings in model;
    3.2) country rock material creep orders, assigns the rock parameter obtained by experimental fit by tb;
    3.3) simulated ground stress:Apply initial field stress, by time orders, the time is set to 1e-8;Time very little herein, be for Ignore influence of the creep effect to crustal stress;
    3.4) before excavation simulation is completed to preliminary bracing:Kill and excavate unit, but do not activate preliminary bracing, by time orders, Time is set to t1, and t1 is the time of stage consumption used in practice of construction;
    3.5) before simulation preliminary bracing is completed to two linings:Preliminary bracing is activated, by time orders, the time is set to t2, and t2-t1 is The time that the stage is consumed in practice of construction;
    3.6) the simulation tunnel operation phase:The lining of activation two, by time orders, the time is set to t3, when t3-t2 is the operation in tunnel Between.
CN201510600424.6A 2015-09-18 2015-09-18 A kind of tunnel excavation Whole Process Simulation method Expired - Fee Related CN105069269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510600424.6A CN105069269B (en) 2015-09-18 2015-09-18 A kind of tunnel excavation Whole Process Simulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510600424.6A CN105069269B (en) 2015-09-18 2015-09-18 A kind of tunnel excavation Whole Process Simulation method

Publications (2)

Publication Number Publication Date
CN105069269A CN105069269A (en) 2015-11-18
CN105069269B true CN105069269B (en) 2017-12-26

Family

ID=54498635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510600424.6A Expired - Fee Related CN105069269B (en) 2015-09-18 2015-09-18 A kind of tunnel excavation Whole Process Simulation method

Country Status (1)

Country Link
CN (1) CN105069269B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106198208B (en) * 2016-06-21 2018-09-25 中电建路桥集团有限公司 A kind of interbedding of soft and hard rocks surrounding rock tunnel method for analog construction considering stratification effect
CN106354972B (en) * 2016-09-18 2019-06-28 重庆大学 Nearly horizontal interbedding of soft and hard rocks surrounding rock tunnel optimization of construction technology method
CN111460703B (en) * 2020-03-10 2023-05-05 西安科技大学 Simulation calculation method for freezing and sinking process of coal mine vertical shaft

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061091A (en) * 2003-08-14 2005-03-10 Seisuke Okubo Finite element analysis method using increment type constitution relational expression following creep model
CN104598296A (en) * 2015-01-23 2015-05-06 陈建永 Numerical simulation analysis method for deformation of soft soil deep foundation pit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061091A (en) * 2003-08-14 2005-03-10 Seisuke Okubo Finite element analysis method using increment type constitution relational expression following creep model
CN104598296A (en) * 2015-01-23 2015-05-06 陈建永 Numerical simulation analysis method for deformation of soft soil deep foundation pit

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
A Constitutive Model and Numerical Simulation for;Ning Jianguo;《IEEE Conference Publications》;4271 - 4274;20111231;第1-4页 *
Creep model for Zonal disintegration of deep rock mass;Li Haitao;《National Natural Science Foudation of China》;20111231;第1-5页 *
Study on the Creep Characteristic and Model of;Haiping Yuan;《IEEE Conference Publications》;20111231;第1-5页 *
岩石内变量蠕变模型研究;乔丽苹;《岩土力学》;20121210;第33卷(第12期);第1-10页 *

Also Published As

Publication number Publication date
CN105069269A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105069269B (en) A kind of tunnel excavation Whole Process Simulation method
Sun et al. Impacts of bedding directions of shale gas reservoirs on hydraulically induced crack propagation
CN105181927B (en) The hypotonic coal seam hydraulic fracture simulation experiment method of multi- scenarios method
Chen et al. Experimental study on low‐strength similar‐material proportioning and properties for coal mining
CN104792966B (en) A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum
Ma et al. Experimental study on damage failure mechanical characteristics and crack evolution of water-bearing surrounding rock
Ozturk et al. The estimation of uniaxial compressive strength conversion factor of trona and interbeds from point load tests and numerical modeling
CN104314538A (en) Device and method for simulating large-sized acid-etched earthworm hole
CN109187237A (en) A kind of tunnels and underground engineering Blasting Excavation model assay systems and test method
Wang et al. Numerical simulation of coal floor fault activation influenced by mining
Zhang et al. Experimental simulation and a reliable calibration method of rockfill microscopic parameters by considering flexible boundary
Kamdem et al. New description of the mechanical creep response of rocks by fractional derivative theory
Sainoki et al. Numerical simulation of rock mass vibrations induced by nearby production blast
Desai et al. Numerical methods and constitutive modelling in geomechanics
Zhou et al. Numerical analysis of dynamic responses of rock containing parallel cracks under combined dynamic and static loading
Haeri et al. Experimental and numerical investigation of the effect of sample shapes on point load index
Xu et al. The weakening effect of hydrostatic pressure on rock mass of different lithology
White et al. Modeling the dynamic flow resistance across the fracture network of EGS Collab Experiment 1
Li et al. Numerical simulation of creep characteristic for composite rock mass with weak interlayer
Spreafico et al. Effects of poroelasticity and stress corrosion on large rock slope instability using damage-based time-dependent numerical modelling
Huang et al. The Impacts of Increased Ductility in Organic-Rich Shale on Fracture Network Growth by Hydraulic Fracturing
Bilotta et al. A cohesive zone model to simulate fatigue crack propagation under high pressure gaseous hydrogen
Li et al. Numerical Test Research on Loading Rate Effect of Rock Mass with Transfixion Sawtooth Structural Plane
Ru et al. Numerical modeling of hydraulic fracture propagation using extended finite element method
Neupane et al. Developing EGS Collab Site Geologic Framework Models at the Sanford Underground Research Facility, Lead, South Dakota

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20180918