CN105066219A - Total flue gas waste heat recovery system and method for gas boiler or direct-fired machine - Google Patents

Total flue gas waste heat recovery system and method for gas boiler or direct-fired machine Download PDF

Info

Publication number
CN105066219A
CN105066219A CN201510469706.7A CN201510469706A CN105066219A CN 105066219 A CN105066219 A CN 105066219A CN 201510469706 A CN201510469706 A CN 201510469706A CN 105066219 A CN105066219 A CN 105066219A
Authority
CN
China
Prior art keywords
heat
hot water
flue gas
heat exchanger
heat pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510469706.7A
Other languages
Chinese (zh)
Inventor
卓志红
陈鹰
骆国建
余健
杨卫红
戴子光
朱立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Is All Energy-Conservation Science And Technology Ltd
Original Assignee
Hunan Is All Energy-Conservation Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Is All Energy-Conservation Science And Technology Ltd filed Critical Hunan Is All Energy-Conservation Science And Technology Ltd
Priority to CN201510469706.7A priority Critical patent/CN105066219A/en
Publication of CN105066219A publication Critical patent/CN105066219A/en
Pending legal-status Critical Current

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The invention discloses a total flue gas waste heat recovery system and method for a gas boiler or a direct-fired machine. The total flue gas waste heat recovery system comprises the gas boiler or the direct-fired machine, one or more heat exchangers, an induced draft fan, one or more condensers and a heat pump. A high-temperature flue gas channel of the gas boiler or the direct-fired machine is connected with the heat exchangers, the induced draft fan and the condensers in sequence. The flue gas output end of each condenser is connected with the outdoor place. Hot water connection of the flue gas waste heat recovery system includes a parallel connection manner and/or a series connection manner. The parallel connection manner is characterized in that a hot water return pipe is divided into two ways to be connected with the heat exchangers and the heat pump respectively, and the output of the heat exchangers and the output of the heat pump are connected with a heating system. The series connection manner is characterized in that the hot water return pipe is connected with the heat pump, outlet water of the heat pump is connected with the heat exchangers, and the output of the heat exchangers is connected with the heating system. By means of the total flue gas waste heat recovery system, the flue gas waste heat of the gas boiler or the direct-fired machine is totally recycled and used for heating, sanitary water heating, replenished water heating and other kinds of technological application, and the aims of saving energy, reducing consumption and reducing emission are achieved.

Description

A kind of gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery system and method
Technical field
The invention belongs to energy-saving environmental protection device technical field, be specifically related to a kind of gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery system and method.
Background technology
At present, gas fired-boiler or Central Air-Conditioner have quite a few heat energy to waste with fume emission.And the exhaust gas temperature of the flue gas waste heat recovery technology that waste heat recovery field is released and condensing boiler is also more than 40 DEG C, a large amount of waste heats is still had to be difficult to recycle.Therefore, current so-called residual activity recovery technology, just by part recovery of latent heat, the inreal total heat recovery realizing natural gas heat energy yet.
Summary of the invention
Technical problem to be solved by this invention is: solve above-mentioned prior art Problems existing, and a kind of gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery system and method are provided, gas fired-boiler or Central Air-Conditioner fume afterheat are all recycled, supply water for heating, final exhaust gas temperature reduces to normal temperature, the multipurpose reaching energy-conservation, lower consumption, reduce discharging.
The technical solution used in the present invention is:
A kind of gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery system, comprise gas fired-boiler or Central Air-Conditioner, one or more heat exchanger, air-introduced machine, one or more condenser, heat pump, gas fired-boiler or Central Air-Conditioner high temp. flue connect one or more heat exchanger flue gas input, the flue gas output of one or more heat exchanger connects the flue gas input of one or more condenser by air-introduced machine, the flue gas output of one or more condenser leads to outdoor by pipeline, the circulating water pipe of one or more condenser connects the evaporimeter of heat pump; The hot-water heating system of flue gas waste heat recovery connects and is divided into parallel connection and/or series connection two kinds of modes, parallel way is: hot water return pipe divides two-way to connect one or more heat exchanger and heat pump respectively, and one or more heat exchanger is connected heating system with hot water backwater's efferent duct of heat pump; Series system is: hot water return pipe connects heat pump, and the hot water delivery pipe of heat pump is connected to one or more heat exchanger, and hot water backwater's efferent duct of one or more heat exchanger connects heating system.
A kind of gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery method, hot water return pipe divides two-way, one tunnel connects one or more heat exchanger, another road connects heat pump, gas fired-boiler or Central Air-Conditioner are discharged high-temperature flue gas and are entered one or more heat exchanger, carry out heat exchange with hot water backwater, flue-gas temperature reduces, and hot water backwater's temperature raises; The flue gas of being discharged by one or more heat exchanger enters one or more condenser under air-introduced machine water conservancy diversion, and carry out heat exchange with the recirculated water to heat pump, flue-gas temperature is reduced to normal temperature further, and discharges; Heat exchange and the circulating water flow backheat pump after heating up in one or more condenser, heat pump reclaims recirculated water heat, and hot water backwater's temperature that heat pump exports raises; Hot water backwater to heat pump and the hot water backwater come to one or more heat exchanger heat exchange intensification mix, and entering heating system becomes heating water supply, for heating system provides heat.
Another kind of gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery method, hot water backwater is via after heat pump heat temperature raising, enter one or more heat exchanger, heat exchange and secondary temperature elevation is carried out with high-temperature flue gas in one or more heat exchanger, enter hot water pipe net via one or more heat exchanger output and become heating water supply, for heating system provides heat; Gas fired-boiler or Central Air-Conditioner are discharged high-temperature flue gas and are entered one or more heat exchanger, carry out heat exchange with hot water backwater, and flue-gas temperature reduces; The flue gas of being discharged by one or more heat exchanger enters one or more condenser under air-introduced machine water conservancy diversion, and carry out heat exchange with the recirculated water to heat pump, flue-gas temperature is reduced to normal temperature further, and discharges; Heat exchange and the circulating water flow backheat pump after heating up in one or more condenser, drive heat pump to carry out heat temperature raising to hot water backwater.
The fume afterheat of gas fired-boiler or Central Air-Conditioner can all be recycled by the present invention, and supply water for heating, final exhaust gas temperature reduces to normal temperature, the multipurpose reaching energy-conservation, lower consumption, reduce discharging.
Accompanying drawing explanation
Fig. 1 is hot water backwater's parallel way structure principle chart of the present invention;
Fig. 2 is hot water backwater's series system structure principle chart of the present invention.
1-high-temperature flue gas inputs, 2-gas fired-boiler or Central Air-Conditioner, 3-heat exchanger, 4-hot water return pipe, 5-air-introduced machine, 6-condenser, and 7-flue gas exports, and 8-recirculated water goes out, and 9-recirculated water enters, 10-heat pump, 11-hot water delivery pipe.
Detailed description of the invention
See Fig. 1, Fig. 2 two example structure schematic diagrams of the present invention, gas fired-boiler of the present invention or Central Air-Conditioner fume afterheat total heat recovery system, comprise gas fired-boiler or Central Air-Conditioner, one or more heat exchanger, air-introduced machine, one or more condenser, heat pump, gas fired-boiler or Central Air-Conditioner high temp. flue connect one or more heat exchanger flue gas input, the flue gas output of one or more heat exchanger connects the flue gas input of one or more condenser by air-introduced machine, the flue gas output of one or more condenser leads to outdoor by pipeline, the circulating water pipe of one or more condenser connects the evaporimeter of heat pump, the hot-water heating system of flue gas waste heat recovery connects and is divided into parallel connection and/or series connection two kinds of modes, parallel way is: hot water return pipe divides two-way to connect one or more heat exchanger and heat pump respectively, and one or more heat exchanger is connected heating system with hot water backwater's efferent duct of heat pump, series system is: hot water return pipe connects heat pump, and the hot water delivery pipe of heat pump is connected to one or more heat exchanger, and hot water backwater's efferent duct of one or more heat exchanger connects heating system.
Gas fired-boiler of the present invention or Central Air-Conditioner fume afterheat total heat recovery method, hot water return pipe divides two-way, one tunnel connects one or more heat exchanger, another road connects heat pump, gas fired-boiler or Central Air-Conditioner are discharged high-temperature flue gas and are entered one or more heat exchanger, carry out heat exchange with hot water backwater, flue-gas temperature reduces, and hot water backwater's temperature raises.The flue gas of being discharged by one or more heat exchanger enters one or more condenser under air-introduced machine water conservancy diversion, and carry out heat exchange with the recirculated water to heat pump, flue-gas temperature is reduced to normal temperature further, and discharges.Heat exchange and the circulating water flow backheat pump after heating up in one or more condenser, heat pump reclaims recirculated water heat, and hot water backwater's temperature that heat pump exports raises; Hot water backwater to heat pump and the hot water backwater come to one or more heat exchanger heat exchange intensification mix, and entering heating system becomes heating water supply, for heating system provides heat.
Another kind of gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery method, hot water backwater is via after heat pump heat temperature raising, enter one or more heat exchanger, heat exchange and secondary temperature elevation is carried out with high-temperature flue gas in one or more heat exchanger, enter hot water pipe net via one or more heat exchanger output and become heating water supply, for heating system provides heat; Gas fired-boiler or Central Air-Conditioner are discharged high-temperature flue gas and are entered one or more heat exchanger, carry out heat exchange with hot water backwater, and flue-gas temperature reduces; The flue gas of being discharged by one or more heat exchanger enters one or more condenser under air-introduced machine water conservancy diversion, and carry out heat exchange with the recirculated water to heat pump, flue-gas temperature is reduced to normal temperature further, and discharges; Heat exchange and the circulating water flow backheat pump after heating up in one or more condenser, drive heat pump to carry out heat temperature raising to hot water backwater.

Claims (3)

1. a gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery system, it is characterized in that, comprise gas fired-boiler or Central Air-Conditioner, one or more heat exchanger, air-introduced machine, one or more condenser, heat pump, gas fired-boiler or Central Air-Conditioner high temp. flue connect one or more heat exchanger flue gas input, the flue gas output of one or more heat exchanger connects the flue gas input of one or more condenser by air-introduced machine, the flue gas output of one or more condenser leads to outdoor by pipeline, the circulating water pipe of one or more condenser connects the evaporimeter of heat pump, the hot-water heating system of flue gas waste heat recovery connects and is divided into parallel connection and/or series connection two kinds of modes, parallel way is: hot water return pipe divides two-way to connect one or more heat exchanger and heat pump respectively, and one or more heat exchanger is connected heating system with hot water backwater's efferent duct of heat pump, series system is: hot water return pipe connects heat pump, and the hot water delivery pipe of heat pump is connected to one or more heat exchanger, and hot water backwater's efferent duct of one or more heat exchanger connects heating system.
2. a gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery method, it is characterized in that, hot water return pipe divides two-way, one tunnel connects one or more heat exchanger, another road connects heat pump, and gas fired-boiler or Central Air-Conditioner are discharged high-temperature flue gas and entered one or more heat exchanger, carry out heat exchange with hot water backwater, flue-gas temperature reduces, and hot water backwater's temperature raises; The flue gas of being discharged by one or more heat exchanger enters one or more condenser under air-introduced machine water conservancy diversion, and carry out heat exchange with the recirculated water to heat pump, flue-gas temperature is reduced to normal temperature further, and discharges; Heat exchange and the circulating water flow backheat pump after heating up in one or more condenser, heat pump reclaims recirculated water heat, and hot water backwater's temperature that heat pump exports raises; Hot water backwater to heat pump and the hot water backwater come to one or more heat exchanger heat exchange intensification mix, and entering heating system becomes heating water supply, for heating system provides heat.
3. a gas fired-boiler or Central Air-Conditioner fume afterheat total heat recovery method, it is characterized in that, hot water backwater is via after heat pump heat temperature raising, enter one or more heat exchanger, heat exchange and secondary temperature elevation is carried out with high-temperature flue gas in one or more heat exchanger, enter hot water pipe net via one or more heat exchanger output and become heating water supply, for heating system provides heat; Gas fired-boiler or Central Air-Conditioner are discharged high-temperature flue gas and are entered one or more heat exchanger, carry out heat exchange with hot water backwater, and flue-gas temperature reduces; The flue gas of being discharged by one or more heat exchanger enters one or more condenser under air-introduced machine water conservancy diversion, and carry out heat exchange with the recirculated water to heat pump, flue-gas temperature is reduced to normal temperature further, and discharges; Heat exchange and the circulating water flow backheat pump after heating up in one or more condenser, heat pump carries out heat temperature raising to hot water backwater.
CN201510469706.7A 2015-08-04 2015-08-04 Total flue gas waste heat recovery system and method for gas boiler or direct-fired machine Pending CN105066219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510469706.7A CN105066219A (en) 2015-08-04 2015-08-04 Total flue gas waste heat recovery system and method for gas boiler or direct-fired machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510469706.7A CN105066219A (en) 2015-08-04 2015-08-04 Total flue gas waste heat recovery system and method for gas boiler or direct-fired machine

Publications (1)

Publication Number Publication Date
CN105066219A true CN105066219A (en) 2015-11-18

Family

ID=54495653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510469706.7A Pending CN105066219A (en) 2015-08-04 2015-08-04 Total flue gas waste heat recovery system and method for gas boiler or direct-fired machine

Country Status (1)

Country Link
CN (1) CN105066219A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110108033A (en) * 2019-03-12 2019-08-09 北京北燃供热有限公司 It is a kind of for heating medium-sized gas fired-boiler flue gas waste heat recovery apparatus
CN111059563A (en) * 2020-01-19 2020-04-24 新疆和融热力有限公司 Flue gas waste heat degree of depth recovery economizer system based on gas boiler

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20014741U1 (en) * 2000-09-12 2001-04-19 Wolter Gerhard Condensing heating systems consisting of low and low temperature boilers / heat pumps
CN1415901A (en) * 2001-10-31 2003-05-07 清华大学 Heating system with electric heat pump by use of recycling latent heat in flue gas of gas fired boiler and oil burning boiler
CN101769594A (en) * 2008-12-29 2010-07-07 苏桐梅 Flue gas total-heat recovery device of gas boiler
JP2010243012A (en) * 2009-04-02 2010-10-28 Miura Co Ltd Exhaust gas heat recovery device
CN202002390U (en) * 2011-01-12 2011-10-05 李正春 Boiler system with tail gas heat energy recycling function
CN202149478U (en) * 2011-07-01 2012-02-22 广东汇嵘节能服务有限公司 System for recycling waste heat of boiler
KR20120112902A (en) * 2011-04-04 2012-10-12 한국에너지기술연구원 Boiler flue gas heat recovery system using heat pump
CN203336678U (en) * 2013-05-21 2013-12-11 青岛宏宇环保空调设备有限公司 Boiler smoke discharge and waste heat recovery heat pump heating system
CN103438575A (en) * 2013-08-30 2013-12-11 北京金房暖通节能技术股份有限公司 System for deep utilization of low-temperature discharged smoke from gas-fired boiler and control method thereof
CN103954039A (en) * 2014-04-02 2014-07-30 华电电力科学研究院 Device and method for recycling smoke condensate heat energy of gas boiler in heat pumping mode
CN204214166U (en) * 2014-09-26 2015-03-18 北京金房暖通节能技术股份有限公司 Water source heat pump units and flue gas waste heat recovery apparatus combined operation system
CN204285583U (en) * 2014-11-27 2015-04-22 大连圣鼎工业装备有限公司 The heat pump heat distribution system of high efficient gas boiler flue gas waste heat recovery
CN204901904U (en) * 2015-08-04 2015-12-23 湖南同为节能科技有限公司 Gas boiler or full heat recovery system of direct combustion machine flue gas waste heat

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20014741U1 (en) * 2000-09-12 2001-04-19 Wolter Gerhard Condensing heating systems consisting of low and low temperature boilers / heat pumps
CN1415901A (en) * 2001-10-31 2003-05-07 清华大学 Heating system with electric heat pump by use of recycling latent heat in flue gas of gas fired boiler and oil burning boiler
CN101769594A (en) * 2008-12-29 2010-07-07 苏桐梅 Flue gas total-heat recovery device of gas boiler
JP2010243012A (en) * 2009-04-02 2010-10-28 Miura Co Ltd Exhaust gas heat recovery device
CN202002390U (en) * 2011-01-12 2011-10-05 李正春 Boiler system with tail gas heat energy recycling function
KR20120112902A (en) * 2011-04-04 2012-10-12 한국에너지기술연구원 Boiler flue gas heat recovery system using heat pump
CN202149478U (en) * 2011-07-01 2012-02-22 广东汇嵘节能服务有限公司 System for recycling waste heat of boiler
CN203336678U (en) * 2013-05-21 2013-12-11 青岛宏宇环保空调设备有限公司 Boiler smoke discharge and waste heat recovery heat pump heating system
CN103438575A (en) * 2013-08-30 2013-12-11 北京金房暖通节能技术股份有限公司 System for deep utilization of low-temperature discharged smoke from gas-fired boiler and control method thereof
CN103954039A (en) * 2014-04-02 2014-07-30 华电电力科学研究院 Device and method for recycling smoke condensate heat energy of gas boiler in heat pumping mode
CN204214166U (en) * 2014-09-26 2015-03-18 北京金房暖通节能技术股份有限公司 Water source heat pump units and flue gas waste heat recovery apparatus combined operation system
CN204285583U (en) * 2014-11-27 2015-04-22 大连圣鼎工业装备有限公司 The heat pump heat distribution system of high efficient gas boiler flue gas waste heat recovery
CN204901904U (en) * 2015-08-04 2015-12-23 湖南同为节能科技有限公司 Gas boiler or full heat recovery system of direct combustion machine flue gas waste heat

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110108033A (en) * 2019-03-12 2019-08-09 北京北燃供热有限公司 It is a kind of for heating medium-sized gas fired-boiler flue gas waste heat recovery apparatus
CN111059563A (en) * 2020-01-19 2020-04-24 新疆和融热力有限公司 Flue gas waste heat degree of depth recovery economizer system based on gas boiler

Similar Documents

Publication Publication Date Title
CN102252339B (en) System for reducing discharge smoke temperature of power station boiler
CN103244944B (en) Air preheating system and method performing steam extraction by utilizing steam turbine
CN102401369B (en) Method for improving quality of recyclable exhaust waste heat in power plant boiler and progressively utilizing exhaust waste heat
CN104006401B (en) The degree of depth of boiler of power plant fume afterheat is recycled and emission-reducing system
CN203823787U (en) Comprehensive smoke waste heat utilization system
CN104534439A (en) System and method for indirectly heating air heater through extracted low-level steam in waste heat cascade utilization mode
CN203249228U (en) Air pre-heating system extracting steam through steam turbine
CN203323218U (en) Boiler flue gas waste heat heating system
CN203796339U (en) Waste heat recovery device of direct air cooling unit
CN104653241A (en) Waste heat recovery device for indirect air-cooling unit
CN105066219A (en) Total flue gas waste heat recovery system and method for gas boiler or direct-fired machine
CN204901904U (en) Gas boiler or full heat recovery system of direct combustion machine flue gas waste heat
CN105258518A (en) Heat recovery process and system of flue gas
CN104896735A (en) Smoke waste heat utilization self-boosting heat pump system and method of direct-fired machine
CN209688872U (en) A kind of step recycles the energy conserving system of low-temperature flue gas waste heat
CN204756887U (en) High -efficient hot media water system of circulating fluidized bed boiler
CN204665333U (en) Smoke waste heat utilization system
CN102581945B (en) Exhaust steam afterheat recycling device for aerated brick field
CN202733874U (en) Device utilizing waste heat of low-grade flue gas
CN204901735U (en) Heat exchanger boiler waste heat utilization economizer
CN204438069U (en) The low-lying level of exhaust heat stepped utilization is drawn gas indirect steam air heater system
CN210197339U (en) Combined system for effectively relieving blockage of ammonium bisulfate of air preheater
CN104235827A (en) Boiler smoke waste heat utilization system
CN202410960U (en) Exhaust gas residual heat utilization device
CN205424887U (en) Fan heater cyclic utilization system is united to low -level (stack -gas) economizer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151118