CN105064379B - H-shaped steel foundation pit supporting device and method - Google Patents

H-shaped steel foundation pit supporting device and method Download PDF

Info

Publication number
CN105064379B
CN105064379B CN201510538913.3A CN201510538913A CN105064379B CN 105064379 B CN105064379 B CN 105064379B CN 201510538913 A CN201510538913 A CN 201510538913A CN 105064379 B CN105064379 B CN 105064379B
Authority
CN
China
Prior art keywords
pile
sheet pile
steel sheet
foundation pit
merogenesis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510538913.3A
Other languages
Chinese (zh)
Other versions
CN105064379A (en
Inventor
程超
张伟
彭宝安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou LIANLI ground air Construction Technology Co., Ltd
Original Assignee
Qingdao Lantian Chuangxian Technology Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Lantian Chuangxian Technology Services Ltd filed Critical Qingdao Lantian Chuangxian Technology Services Ltd
Priority to CN201510538913.3A priority Critical patent/CN105064379B/en
Publication of CN105064379A publication Critical patent/CN105064379A/en
Application granted granted Critical
Publication of CN105064379B publication Critical patent/CN105064379B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides an H-shaped steel foundation pit supporting device and method, and belongs to the field of building engineering construction. The device and method are mainly used for supporting of building construction deep foundation pit excavation. The device integrates the advantages of section-steel piles and steel plate piles, is large in supporting depth, short in construction cycle and capable of being repeatedly used, and has a water stop function. According to the H-shaped steel foundation pit supporting device and method, a plurality of H-shaped steel piles are driven or pressed from the ground to an underground designed elevation one by one through a pile driver or a pile pressing-in machine according to a design requirement; sectional steel plate piles are pressed between the pile bodies of every two H-shaped steel piles through a press pile device, and therefore a first section foundation pit support is formed; earthwork in a first depth is dug in the first section foundation pit support, and second sectional steel plate piles continue to be pressed between the pile bodies of every two piles, and earthwork in a second depth continues to be dug; construction is conducted in this way circularly till foundation pit supporting is completed; and the second sectional steel plate piles and pulling-out piles are sequentially pulled out, and thus a supporting system is disassembled.

Description

A kind of H profile steel foundation pit support device and method
Technical field
Present invention is mainly used for construction deep pit digging supporting uses, belong to building engineering construction field.
Background technology
Steel sheet pile and Section-steel Piles respectively have its pluses and minuses as existing multiple material handling method of deep foundation pit, although steel sheet pile has sealing work( Can, short construction period, but run into boulder or cobble interlayer then cannot be squeezed into, applicable stratum is limited, and driving depth is limited;Shaped steel Stake is easily squeezed into, and can penetrate cobble interlayer, and driving depth is big, repeats and utilizes, short construction period, but does not have water stopping function.
Content of the invention
Instant invention overcomes the shortcoming of above two method for supporting deep foundation pit, it combines the excellent of Section-steel Piles and steel sheet pile Point, supporting depth is big, short construction period, repeats and utilizes, and low cost has water stopping function again.It is by piling machine or pile press machine Multiple H profile steel stakes of the present invention are squeezed into from ground one by one by design requirement or is pressed into subterranean designation absolute altitude, then respectively every It is pressed into merogenesis steel sheet pile with pile compacting equipment between the pile body of two H profile steel stakes, form first paragraph pattern foundation pit supporting structure, merogenesis steel sheet pile General 5 to 6 meters of length, can meet the requirement of general pile press machine piling ability, excavate first paragraph deep in first paragraph pattern foundation pit supporting structure The earthwork of degree, continues to be pressed into second section merogenesis steel sheet pile between the pile body of each two stake, continues to excavate the second segment earthwork, so Circulation construction is until complete pattern foundation pit supporting structure;Extract merogenesis steel sheet pile successively, extract stake, support system is removed and completed.
The present invention is mainly made up of H profile steel stake, merogenesis steel sheet pile, baffle plate, Squeezing Soil Pile;Baffle plate is welded on the abdomen of H profile steel stake On plate, be all related plate and coattail board in the left and right two ends of merogenesis steel sheet pile, and there is U-lag the upper end of merogenesis steel sheet pile, and Squeezing Soil Pile has Pile crown;The contact plate of merogenesis steel sheet pile and coattail board insert between the adjacent lower flange of H profile steel stake and baffle plate respectively, Squeezing Soil Pile In space between the lower flange of press-in H profile steel stake and baffle plate, U-lag is built with sealing rod, the lower end of upper section merogenesis steel sheet pile In the U-lag of insertion lower section merogenesis steel sheet pile.Need explanation:It is designed with junction button, by merogenesis steel up and down between section merogenesis steel sheet pile Sheet pile is contacted, and lower section merogenesis steel sheet pile can be driven to extract by upper section merogenesis steel sheet pile during pile pulling.
Brief description
Description of reference numerals:1-H Section-steel Piles, 2- merogenesis steel sheet pile, 3- baffle plate, 4- Squeezing Soil Pile, 5- contact plate, 6- swallow Tailgate, 7-U shape groove, 8- sealing rod, 9- pile crown, the soil layer of 10- gear soil.
Fig. 1 is the horizontal sectional drawing of one supporting unit of the present invention.
Fig. 2 is the horizontal sectional drawing of two supporting units of the present invention.
Fig. 3 is that H profile steel stake of the present invention is connected drawing with merogenesis steel sheet pile.
Fig. 4 is the socket joint drawing up and down of merogenesis steel sheet pile of the present invention.
Fig. 5 is the vertical cross section drawing of the pile crown of Squeezing Soil Pile of the present invention.
Specific embodiment
The specific embodiment of the present invention is described below in conjunction with the accompanying drawings
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, first squeeze into one by one by deep basal pit layout design sideline on smooth place Or it is pressed into H profile steel stake 1 of the present invention to designed elevation, such as hard boulder, when H profile steel stake 1 is difficult to squeeze into, boulder can be avoided and beat Enter, then by the contact plate 5 at the left and right two ends of first segment merogenesis steel sheet pile 2 and dovetail between the pile body of each two H profile steel stake 1 Plate 6 inserts between the adjacent lower flange of H profile steel stake 1 and baffle plate 3 respectively, is pressed into first segment merogenesis steel sheet pile 2 with pile compacting equipment, Form first paragraph pattern foundation pit supporting structure, need explanation:If certain two H profile steel stake 1 changes due to running into boulder spacing, this punishment need to be adjusted The width of section steel sheet pile 2;Excavate in the range of first paragraph pattern foundation pit supporting structure and complete the earthwork of first construction section, general 5 to 6 meters Depth is a construction section, and the pile body of H profile steel stake 1 and first paragraph merogenesis steel sheet pile 2 expose outside soil layer in first construction section, Sealing rod 8 is installed in the U-lag 7 of first segment merogenesis steel sheet pile 2, first segment is inserted in the lower end of second section merogenesis steel sheet pile 2 In the U-lag 7 of merogenesis steel sheet pile 2, simultaneously by the contact plate 5 at second section merogenesis steel sheet pile 2 about two ends and coattail board 6 difference Insert between the adjacent lower flange of H profile steel stake 1 and baffle plate 3, be pressed into second section merogenesis steel sheet pile 2 with pile compacting equipment, form the Two-stage nitration pattern foundation pit supporting structure, then excavate second section soil layer, so circulation completes remaining each section pattern foundation pit supporting structure, and support system is substantially complete Become;Due to all there is clipping room between the contact plate 5 of merogenesis steel sheet pile 2 and the lower flange of coattail board 6 and H profile steel stake 1 and baffle plate 3 Gap, although have natural soil during piling, but if groundwater pressure is very in the space between the lower flange of H profile steel stake 1 and baffle plate 3 Height, subsurface pressure water can flow out along the gap between the lower flange of contact plate 5 and coattail board 6 and H profile steel stake 1 and baffle plate 3, this When need Squeezing Soil Pile 4 is pressed in the space between the lower flange of H profile steel stake 1 and baffle plate 3, by the lower flange of H profile steel stake 1 and gear Natural soil dense extrusion between plate 3, between blocking between the lower flange contacting plate 5 and coattail board 6 and H profile steel stake 1 and baffle plate 3 Gap, prevent subsoil water flow out, if with this can't solve problem, Squeezing Soil Pile 4 is extracted, pours in the cavity extracted Cementing material, is pressed again by Squeezing Soil Pile 4, and this process can be repeated, till not having subsoil water to flow out.Support system is removed When, first extract merogenesis steel sheet pile 2 successively with conventional method, then extract H profile steel stake 1 successively, complete support system and remove.Certainly on Junction button can be designed between lower section merogenesis steel sheet pile 2, merogenesis steel sheet pile 2 is contacted, can be carried by upper section merogenesis steel sheet pile 2 during pile pulling Dynamic lower section merogenesis steel sheet pile 2 is extracted.
Need explanation:
1st, the present invention is to transmit lower pressure section merogenesis steel sheet pile 2 by upper section merogenesis steel sheet pile 2, and soil layer is also that excavation section by section divides Section supporting, the therefore pile compacting equipment of merogenesis steel sheet pile 2 only need to overcome the end resistance of next section merogenesis steel sheet pile 2 and remaining is each The frictional force in the native face of gear of section merogenesis steel sheet pile 2, general pile compacting equipment can meet requirement.2nd, first segment merogenesis steel sheet pile 2 All retain 200 to 500 millimeter high soil layer when excavating every time not excavate, temporary leaking water effect can be played well.3、 When merogenesis steel sheet pile 2 runs into boulder or cobble interlayer can not be pressed into, stop pushing, when excavating soil layer, dig out boulder or cobble It is pressed into merogenesis steel sheet pile 2 after interlayer again, this addresses the problem that conventional steel sheet stake runs into boulder or cobble interlayer is difficult to be pressed into asks Topic.4th, the contact plate 5 of merogenesis steel sheet pile 2 has certain width, can adjust interval error when two H profile steel stakes 1 are squeezed into;Swallow Tailgate 6 then can stop merogenesis steel sheet pile 2 from disengaging between the lower flange of H profile steel stake 1 and baffle plate 3.5th, if necessary, the present invention Need to coordinate horizontal shore system or other prevents H profile steel stake 1 to needing displacement or the method for supporting toppling inside the foundation ditch of supporting. 6th, the H profile steel stake 1 of the present invention can use steel plate splicing.

Claims (2)

1. a kind of H profile steel foundation pit support device, is characterized in that:It is mainly by H profile steel stake(1), merogenesis steel sheet pile (2), baffle plate (3), Squeezing Soil Pile(4)Composition;Baffle plate(3)It is welded on H profile steel stake(1)Web on, the left and right two ends of merogenesis steel sheet pile (2) all have Contact plate(5)And coattail board(6), there is U-lag the upper end of merogenesis steel sheet pile (2)(7), Squeezing Soil Pile(4)There is pile crown(9);Merogenesis steel The contact plate of sheet pile (2)(5)And coattail board(6)Insert adjacent H profile steel stake respectively(1)Lower flange and baffle plate(3)Between, squeeze Native stake(4)Press-in H profile steel stake(1)Lower flange and baffle plate(3)Between space in, U-lag(7)Built with sealing rod(8), on The lower U-lag saving merogenesis steel sheet pile (2) of lower end insertion of section merogenesis steel sheet pile (2)(7)Interior.
2. a kind of H profile steel foundation pit support device according to claim 1, it is characterized in that described merogenesis steel sheet pile (2) its It is designed with junction button between section merogenesis steel sheet pile (2) up and down, merogenesis steel sheet pile (2) is contacted, can be by upper section merogenesis steel during pile pulling Sheet pile (2) drives lower section merogenesis steel sheet pile (2) to extract.
CN201510538913.3A 2015-08-29 2015-08-29 H-shaped steel foundation pit supporting device and method Active CN105064379B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510538913.3A CN105064379B (en) 2015-08-29 2015-08-29 H-shaped steel foundation pit supporting device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510538913.3A CN105064379B (en) 2015-08-29 2015-08-29 H-shaped steel foundation pit supporting device and method

Publications (2)

Publication Number Publication Date
CN105064379A CN105064379A (en) 2015-11-18
CN105064379B true CN105064379B (en) 2017-02-22

Family

ID=54493866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510538913.3A Active CN105064379B (en) 2015-08-29 2015-08-29 H-shaped steel foundation pit supporting device and method

Country Status (1)

Country Link
CN (1) CN105064379B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696601A (en) * 2016-02-27 2016-06-22 武汉市创先专利技术服务有限公司 Reusable foundation pit supporting device with water stopping function and construction method
CN105672328B (en) * 2016-02-28 2017-07-04 青岛蓝天创先科技服务有限公司 Slip casting ductule resists the H profile steel foundation pit support device of earth lateral pressure
CN105804078B (en) * 2016-03-07 2017-09-15 青岛蓝天创先科技服务有限公司 A kind of merogenesis steel sheet pile press-in of H profile steel foundation pit support device and extraction equipment
CN110629765B (en) * 2019-09-29 2021-03-30 河南乾坤路桥工程有限公司 Safety protection device and protection method for H-shaped steel foundation pit
CN114855824B (en) * 2022-06-08 2024-06-21 浙江国进建设有限公司 Construction method of Larson steel sheet pile of foundation pit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202530441U (en) * 2012-04-25 2012-11-14 上海智平基础工程有限公司 U-shaped connector steel sheet pile
CN203200762U (en) * 2013-01-11 2013-09-18 东南大学 HSW construction method pile foundation pit supporting structure
CN204023549U (en) * 2014-03-14 2014-12-17 江苏东合南岩土工程技术研究有限公司 A kind of SE combined steel plate pile
CN104285010A (en) * 2012-05-16 2015-01-14 杰富意钢铁株式会社 Combined steel wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202530441U (en) * 2012-04-25 2012-11-14 上海智平基础工程有限公司 U-shaped connector steel sheet pile
CN104285010A (en) * 2012-05-16 2015-01-14 杰富意钢铁株式会社 Combined steel wall
CN203200762U (en) * 2013-01-11 2013-09-18 东南大学 HSW construction method pile foundation pit supporting structure
CN204023549U (en) * 2014-03-14 2014-12-17 江苏东合南岩土工程技术研究有限公司 A kind of SE combined steel plate pile

Also Published As

Publication number Publication date
CN105064379A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105064379B (en) H-shaped steel foundation pit supporting device and method
CN102124163B (en) Method for constructing a chair-type, self-supported earth retaining wall
CN101597904B (en) Waterproof sheet pile cofferdam and construction method thereof
CN104120710B (en) A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN103290848B (en) Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof
CN202559375U (en) H-shaped steel underground diaphragm wall base pit support structure
CN202559363U (en) Foundation pit supporting structure for underground diaphragm wall with steel structure
CN206204967U (en) A kind of double perfusion pile cofferdam
CN105604065A (en) Foundation fit support and peat-soil deep-foundation-pit-support high-pressure jet grouting anchoring method
CN107326896A (en) One kind combination steel construction support pile and construction method
JP5351125B2 (en) Open shield machine start method of open shield method
CN207331746U (en) A kind of underground pipe gallery
CN207159990U (en) One kind combination steel construction support pile
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN105696701A (en) Along-slope shear wall building development platform and construction method thereof
CN103410155B (en) A kind of recyclable preposition assembling braced cuts structure and application process thereof
CN202610808U (en) Press-anchor-restrict method foundation pit retaining structure
CN105696601A (en) Reusable foundation pit supporting device with water stopping function and construction method
CN105672328A (en) H-shaped steel foundation pit supporting device with small grouting ducts resisting lateral earth pressure
CN209799980U (en) Integral advance support board canopy
CN107059839B (en) A kind of construction method of armored concrete waveform sheet pile underground structure
CN110130958A (en) A kind of control method of gob side entry retaining pucking

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160803

Address after: 430064, Wuhan, Hubei province Hongshan District lion mountain street, school 84, 73, 7, 2 room

Applicant after: WUHAN CHUANGXIAN PATENT TECHNOLOGY SERVICE CO., LTD.

Address before: 430064 Wuhan Institute of education, Hongshan 712 District, Hubei, China

Applicant before: Peng Baoan

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161013

Address after: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China

Applicant after: Qingdao Lantian Chuangxian Technology Services Limited

Address before: 430064, Wuhan, Hubei province Hongshan District lion mountain street, school 84, 73, 7, 2 room

Applicant before: WUHAN CHUANGXIAN PATENT TECHNOLOGY SERVICE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191101

Address after: 311200 zizikong community, Linpu Town, Xiaoshan District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou LIANLI ground air Construction Technology Co., Ltd

Address before: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China

Patentee before: Qingdao Lantian Chuangxian Technology Services Limited

TR01 Transfer of patent right