CN105064067A - Large-area rainshade canvas structure and manufacturing method thereof - Google Patents

Large-area rainshade canvas structure and manufacturing method thereof Download PDF

Info

Publication number
CN105064067A
CN105064067A CN201510490107.3A CN201510490107A CN105064067A CN 105064067 A CN105064067 A CN 105064067A CN 201510490107 A CN201510490107 A CN 201510490107A CN 105064067 A CN105064067 A CN 105064067A
Authority
CN
China
Prior art keywords
canvas
cover
large area
awning
canvas structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510490107.3A
Other languages
Chinese (zh)
Other versions
CN105064067B (en
Inventor
陈世明
朱成
赵青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU WENCHUAN HEAVY INDUSTRY Co Ltd
Guangzhou Wenchong Shipyard Co Ltd
Original Assignee
GUANGZHOU WENCHUAN HEAVY INDUSTRY Co Ltd
Guangzhou Wenchong Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU WENCHUAN HEAVY INDUSTRY Co Ltd, Guangzhou Wenchong Shipyard Co Ltd filed Critical GUANGZHOU WENCHUAN HEAVY INDUSTRY Co Ltd
Priority to CN201510490107.3A priority Critical patent/CN105064067B/en
Publication of CN105064067A publication Critical patent/CN105064067A/en
Application granted granted Critical
Publication of CN105064067B publication Critical patent/CN105064067B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a sheltering device and discloses a large-area rainshade canvas structure and a manufacturing method thereof. The rainshade canvas structure comprises a support framework and a canopy hood located below the support framework, wherein the support framework comprises multiple parallel horizontal ribs, and multiple rows of connecting buckles are longitudinally arranged at the top of the canopy hood at intervals and connected with the horizontal ribs through binding bands; the canopy hood is made of canvas. The horizontal ribs and the multiple rows of longitudinal connecting buckles are arranged, the connecting buckles are connected with the horizontal ribs through the binding bands, so that when any one point of a grid structure on the upper layer of the rainshade canvas structure is drawn during coverage of a storage yard, the canvas can be pulled and moved in point-to-line and line-to-surface manners, and the canopy hood of the rainshade canvas structure is easy to pull, can be pulled by special pulling and moving equipment and is not likely to be pulled apart.

Description

Large area rain cover canvas structure and preparation method thereof
Technical field
The present invention relates to a kind of radical occlusion device, particularly relate to a kind of large area rain cover canvas structure and preparation method thereof.
Background technology
Present stage, outdoor goods yard hides goods all to be needed with manually hiding.The awning cover of radical occlusion device generally adopts canvas.
Large-scale stockyard needs multiple manpower to adopt polylith canvas overlap to hide when hiding, canvas scale is only difficult to pull by manpower too greatly.If adopt machinery to draw to move, common large-area canvas is easy to again by drawing crack.
Summary of the invention
The present invention is to solve the awning cover manpower of large area rain cover canvas structure is difficult to pull and adopt equipment easily by the technical problem of drawing crack.
In order to realize above-mentioned technical problem, the invention provides a kind of large area rain cover canvas structure, it comprises support frame and is positioned at the awning cover below described support frame, described support frame is made up of the horizontal muscles and bones that many be arranged in parallel, the head clearance of described awning cover is provided with arranges junction button more, the described junction button of many rows is longitudinally arranged, and described junction button is connected with described horizontal muscles and bones by bandage; Described canopy cover is made up of canvas.
Preferably, described awning cover is spliced by polylith splicing block.
Preferably, the canvas that described splicing block has Waterproof glue line by surface is made.
Preferably, the inner side of described awning cover is provided with flexible reinforcement, and the two ends of described reinforcement protrude from the edge of described awning cover.
Preferably, described reinforcement is collodion silk rope.
Preferably, the spacing laterally between adjacent two junction buttons is 2-4m.
In order to solve same technical problem, the present invention also provides a kind of large area rain cover canvas structure preparation method, and it comprises the following steps:
At the surface of canvas coating marine glue to form splicing block, polylith splicing block is spliced to form awning cover;
Build the many horizontal muscles and bones be arranged in parallel;
Awning cover is carried out flanging, and arranges multiple junction button at flanging place;
By bandage, junction button is connected with horizontal muscles and bones.
Preferably, after polylith splicing block is spliced to form awning cover, sews up collodion silk rope in the bottom of awning cover as reinforcement, and make WATER REPELLENT TREATMENT at the suture of collodion silk rope, in the process sewing up collodion silk rope, the two ends of collodion silk rope are made to protrude from the edge of awning cover.
Preferably, the step of the WATER REPELLENT TREATMENT of the suture of described collodion silk rope is comprised:
Have the canvas strips of Waterproof glue line at the both sides adhesive surface of the suture of collodion silk rope, the hot-blast spray nozzle of Hot gluing machine is avoided the surrounding position of suture to suture and is carried out heat seal.
Preferably, described awning cover carries out a flanging every the distance of 2-4m.
A kind of large area rain cover canvas structure provided by the present invention and preparation method thereof, horizontal muscles and bones and the longitudinal junction button of many rows are set, junction button is connected with horizontal muscles and bones by bandage, when hiding stockyard, affect arbitrarily a point of the network on rain cover canvas structure upper strata, both can with a band line, by line, drawing of face have moved canvas, the awning cover of rain cover canvas structure of the present invention is easily pulled, and can also bear specially draw the pulling of moving device and be not easy by drawing crack.
Accompanying drawing explanation
Fig. 1 is the structural representation of the large area rain cover canvas structure of the embodiment of the present invention.
Wherein, 1, awning cover; 2, horizontal muscles and bones; 3, junction button; 4, bandage.
Detailed description of the invention
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is described in further detail.Following examples for illustration of the present invention, but are not used for limiting the scope of the invention.
As shown in Figure 1, a kind of large area rain cover canvas structure of the preferred embodiment of the present invention, it comprises support frame and is positioned at the awning cover 1 below this support frame, and awning cover 1 is made up of canvas.Support frame is made up of the horizontal muscles and bones 2 that many be arranged in parallel, the head clearance of awning cover 1 is provided with many row's junction buttons 3, this many rows junction button 3 is longitudinally arranged, junction button 3 is connected with horizontal muscles and bones 2 by bandage 4, form chi structure in length and breadth thus, this rain cover canvas structure can be divided into upper and lower double-layer structure, downside is awning cover 1 structure, upper strata is the network affecting awning cover 1, upper and lower double-layer structure again compact siro spinning technology becomes as a whole, thus, when hiding stockyard, affect arbitrarily a point of the network on rain cover canvas structure upper strata, both can with a band line, by line, drawing of face moves canvas, the awning cover 1 of rain cover canvas structure of the present invention is easily pulled, and be not easy by drawing crack.
Awning cover 1 is spliced by polylith splicing block, and the joining method by gluing together, the performance at glued seam place should be guaranteed to be not less than company standard, ensures its sealing, does not allow to leak.Bandage 4 can be nylon bandage.
In addition, also be provided with flexible reinforcement in the inner side of awning cover 1, and the two ends of this reinforcement are particularly positioned at the edge certain distance that longitudinal direction should protrude from awning cover 1, are strained and fixed to facilitate awning cover 1, the end of reinforcement should protrude from the edge 1.5-3m of awning cover 1, is preferably 2.5m.Reinforcement can be collodion silk rope or nylon rope etc. and has flexible nonmetallic materials, makes the toughness of awning cover 1 and tension ability all be greatly improved using collodion silk rope as reinforcement.
The size dimension of whole awning cover 1 and thickness can be arbitrary dimension, and size can be 52m × 40m (longitudinal length × transverse width), and the thickness of awning cover 1 can be 0.5mm ± 0.02mm, and overall weight is about 0.6Kg/m 2, the aperture of junction button 3 can be 10-25mm, is preferably 17mm.Spacing laterally between adjacent two junction buttons 3 can be 2-4m, is preferably 3m.
The present invention also provides a kind of preparation method of aforesaid large area rain cover canvas structure, and it comprises the following steps:
At the surface of canvas coating marine glue to form splicing block, adopt the mode of gummed to be spliced to form awning cover 1 polylith splicing block, and carry out waterproof sealing process at glued seam place, make the performance of this interface be not less than company standard, ensure its sealing, do not allow drainage occurs;
Build the many horizontal muscles and bones 2 be arranged in parallel to form support frame; Wherein, the manufacturing process of awning cover 1 and support frame can be carried out or sequencing carries out simultaneously;
Awning cover 1 is carried out flanging, and arranges multiple junction button 3 at flanging place; Be connected with horizontal muscles and bones 2 by junction button 3 by bandage 4, bandage 4 adopts the mode be connected with horizontal muscles and bones 2 longitudinally through junction button 3.
After polylith splicing block is spliced to form awning cover 1, sews up collodion silk rope in the bottom of awning cover 1 as reinforcement, and make WATER REPELLENT TREATMENT at the suture of collodion silk rope, leak to prevent suture; In the process sewing up collodion silk rope, the two ends of collodion silk rope are made to protrude from the edge of awning cover 1, so that tension awning cover 1.
The step of the WATER REPELLENT TREATMENT of the suture of collodion silk rope is comprised: the canvas strips at the both sides adhesive surface of the suture of collodion silk rope with Waterproof glue line, the hot-blast spray nozzle of Hot gluing machine is avoided the surrounding position of suture to suture and is carried out heat seal, and it is avoid suture temperature distortion to split that hot-blast spray nozzle avoids suture.
In order to ensure the ductility of awning cover 1, awning cover 1 carries out a flanging every the distance of 2-4m, after guaranteeing that awning cover 1 is connected with horizontal muscles and bones 2, awning cover 1 is in the state of naturally drooping, and punches at each flanging place and overlap metal collar to form junction button 3.
Large area rain cover canvas structure provided by the present invention and preparation method thereof, can realize large-scale awning cover and to make and awning cover after completing can draw arbitrarily and moves and be not easy to be damaged; Can be equipped with and specially draw moving device, its operating efficiency is high, danger coefficient is low, can save a large amount of manpower and materials; Especially in harbour open depot, both this rain cover canvas structure can have been drawn in the short time and move to hide stockyard; The basic lastblock of large area rain cover canvas structure of the present invention just can realize the covering in a medium-sized stockyard, and the phenomenon of multiple common compact rain cover canvas structure overlapping lap-joint water inlet can be avoided to occur.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the technology of the present invention principle; can also make some improvement and replacement, these improve and replace and also should be considered as protection scope of the present invention.

Claims (10)

1. a large area rain cover canvas structure, it is characterized in that, comprise support frame and be positioned at the awning cover below described support frame, described support frame is made up of the horizontal muscles and bones that many be arranged in parallel, the head clearance of described awning cover is provided with arranges junction button more, the described junction button of many rows is longitudinally arranged, and described junction button is connected with described horizontal muscles and bones by bandage; Described canopy cover is made up of canvas.
2. large area rain cover canvas structure as claimed in claim 1, it is characterized in that, described awning cover is spliced by polylith splicing block.
3. large area rain cover canvas structure as claimed in claim 2, it is characterized in that, the canvas that described splicing block has Waterproof glue line by surface is made.
4. the large area rain cover canvas structure as described in any one of claim 1-3, it is characterized in that, the inner side of described awning cover is provided with flexible reinforcement, the two ends of described reinforcement protrude from the edge of described awning cover.
5. large area rain cover canvas structure as claimed in claim 4, it is characterized in that, described reinforcement is collodion silk rope.
6. the large area rain cover canvas structure as described in any one of claim 1-3, is characterized in that, the spacing laterally between adjacent two junction buttons is 2-4m.
7. a large area rain cover canvas structure preparation method, is characterized in that, comprise the following steps:
At the surface of canvas coating marine glue to form splicing block, polylith splicing block is spliced to form awning cover;
Build the many horizontal muscles and bones be arranged in parallel;
Awning cover is carried out flanging, and arranges multiple junction button at flanging place;
By bandage, junction button is connected with horizontal muscles and bones.
8. large area rain cover canvas structure preparation method as claimed in claim 7, it is characterized in that, after polylith splicing block is spliced to form awning cover, collodion silk rope is sewed up as reinforcement in the bottom of awning cover, and make WATER REPELLENT TREATMENT at the suture of collodion silk rope, in the process sewing up collodion silk rope, the two ends of collodion silk rope are made to protrude from the edge of awning cover.
9. large area rain cover canvas structure preparation method as claimed in claim 7, is characterized in that, comprise the step of the WATER REPELLENT TREATMENT of the suture of described collodion silk rope:
Have the canvas strips of Waterproof glue line at the both sides adhesive surface of the suture of collodion silk rope, the hot-blast spray nozzle of Hot gluing machine is avoided the surrounding position of suture to suture and is carried out heat seal.
10. large area rain cover canvas structure preparation method as claimed in claim 7, is characterized in that, described awning cover carries out a flanging every the distance of 2-4m.
CN201510490107.3A 2015-08-11 2015-08-11 Large-area rainshade canvas structure and manufacturing method thereof Active CN105064067B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510490107.3A CN105064067B (en) 2015-08-11 2015-08-11 Large-area rainshade canvas structure and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510490107.3A CN105064067B (en) 2015-08-11 2015-08-11 Large-area rainshade canvas structure and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN105064067A true CN105064067A (en) 2015-11-18
CN105064067B CN105064067B (en) 2017-04-26

Family

ID=54493555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510490107.3A Active CN105064067B (en) 2015-08-11 2015-08-11 Large-area rainshade canvas structure and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN105064067B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0815762B1 (en) * 1996-07-03 2001-06-13 Aplix Société Anonyme Process for manufacturing a layered product comprising a layer provided with loops, and layered product comprising a layer provided with loops
CN201808434U (en) * 2010-10-13 2011-04-27 中国建筑第七工程局有限公司 Sun-block anti-theft rainproof car hood

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0815762B1 (en) * 1996-07-03 2001-06-13 Aplix Société Anonyme Process for manufacturing a layered product comprising a layer provided with loops, and layered product comprising a layer provided with loops
CN201808434U (en) * 2010-10-13 2011-04-27 中国建筑第七工程局有限公司 Sun-block anti-theft rainproof car hood

Also Published As

Publication number Publication date
CN105064067B (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN204466416U (en) Agricultural planting booth
CN206347356U (en) LED light wire kludge
CN206078329U (en) Solar protection devices in greenhouse
CN103598034B (en) Greenhouse and application thereof
CN105064067A (en) Large-area rainshade canvas structure and manufacturing method thereof
CN204898417U (en) Large tracts of land hides rain canvas structure
CN206333077U (en) A kind of seedling growth greenhouse card film device
CN210695195U (en) Modularization exhibition room greenhouse
CN203985284U (en) A kind of green house of vegetables puggaree jack
CN112616506A (en) Modern agriculture big-arch shelter tomato growth binding apparatus
CN207597288U (en) A kind of reinforcement curtain guides protection network
CN203279613U (en) Portable pollination bag
US20220235573A1 (en) Deployable and retractable cover
CN204664649U (en) A kind of automatic contractive aircraft earth surface air-conditioning air supplying hose
EP2910110B1 (en) Cover for plant cultures arranged in rows
CN217217637U (en) Afforestation plant winter protection shelters from device
CN105587158A (en) Combined type tent and installing method thereof
CN104847976B (en) A kind of automatic contractive aircraft earth surface air-conditioning air supplying hose and preparation method thereof
CN206978171U (en) A kind of greenhouse film
CN2547121Y (en) Greenhouse forcing-frame without film-pressing line
CN214046853U (en) Equipment convenient to seedling growing shed membrane is laid
CN205356254U (en) Solar assembly frames
CN219826246U (en) Dust net connecting device
CN203654870U (en) Extensible tent
CN105475046A (en) Ventilation window for preventing water accumulation of greenhouse and installation method of ventilation window

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant