CN105060796A - Slurry for slurry shield sand stratum tunneling and preparation method thereof - Google Patents

Slurry for slurry shield sand stratum tunneling and preparation method thereof Download PDF

Info

Publication number
CN105060796A
CN105060796A CN201510533168.3A CN201510533168A CN105060796A CN 105060796 A CN105060796 A CN 105060796A CN 201510533168 A CN201510533168 A CN 201510533168A CN 105060796 A CN105060796 A CN 105060796A
Authority
CN
China
Prior art keywords
slurry
shield
mud
flooding
tackifier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510533168.3A
Other languages
Chinese (zh)
Other versions
CN105060796B (en
Inventor
闵凡路
张亚洲
张宁
陈喜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201510533168.3A priority Critical patent/CN105060796B/en
Publication of CN105060796A publication Critical patent/CN105060796A/en
Application granted granted Critical
Publication of CN105060796B publication Critical patent/CN105060796B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses slurry for slurry shield sand stratum tunneling. The slurry comprises 1000-1250 parts by weight of abandoned slurry; 0-300 parts by weight of clear water, 0-50 parts by weight of bentonite and 0.5-3 parts by weight of tackifier. A preparation method is that when a shield penetrates a clay stratum at the earlier stage, generated abandoned slurry is carried and stored near a slurry mixing tank; when the slurry shield tunnels fine sand or a gravelly sand stratum, the abandoned slurry is pumped into the slurry mixing tank to be adjusted, one or more of clear water, bentonite and tackifier are led into the abandoned slurry, and a product which meets the quality index requirements of the slurry for slurry shield sand stratum tunneling is obtained. Compared with an existing slurrying technology, the abandoned slurry is fully utilized, resources can be effectively saved, the cost can be effectively reduced, the environmental pollution is reduced, and the excellent slurry which can meet the requirements for density, adhesiveness, separation rate and physical and chemical stability and the like can be obtained.

Description

A kind of slurry shield Flooding in Borehole driving mud and compound method thereof
Technical field
The present invention relates to a kind of slurry shield Flooding in Borehole driving mud and compound method thereof, adopt discarded slurry preparation slurry shield Flooding in Borehole driving mud; Be applicable to pass through the slurry shield tunnel engineerings such as rivers.
Background technology
In recent years, along with the fast development of social economy and urbanization process, slurry shield tunnel technology has become gordian technique indispensable in the infrastructure constructions such as China's major motor vehicle.Slurry shield starting well and early stage tunneling construction will produce a large amount of discarded slurry, in engineering, the general groove tank car that uses carries out outward transport process to discarded slurry, so not only cause the huge wasting of resources, also may affect the appearance of the city because leakage is spilt in transportation, and the subsequent disposal of discarded slurry is also very difficult.And rivers and subbottom tunnel often pass through long distance Flooding in Borehole in construction process in mid-term excessively, need to consume a large amount of mud for shield driving, these mud are generally configured by wilkinite, tackifier and clear water in special slurrying pond, need at substantial pulping material.
Due to the difference of geologic condition of front and back driving and the time difference of the upper of tunneling sequence, the useless slurry of a large amount of high clay content produced when making shield structure in earlier stage pass through clay stratum is provided with the feasibility of recycling.But, also there is no this kind of technical scheme in current industry, need exploitation badly.
Summary of the invention
For solving the deficiencies in the prior art, the object of the present invention is to provide a kind of slurry shield Flooding in Borehole driving mud and compound method thereof, taking full advantage of a large amount of discarded slurries produced when shield structure passes through cohesive soil stratum in earlier stage.
In order to realize above-mentioned target, the present invention adopts following technical scheme:
A kind of slurry shield Flooding in Borehole driving mud, comprise each component of following weight part: discarded slurry 1000-1250 weight part, clear water 0-300 weight part, wilkinite 0-50 weight part and tackifier 0.5-3 weight part, described discarded slurry is that shield structure produces when passing through cohesive soil stratum early stage, this makes it possible to the discarded slurry making full use of the generation in early stage of shield structure, there is the many merits such as environmental protection and energy saving.
Particularly, the clay content of aforementioned discarded slurry is 20%-50%, and density is 1.10g/cm 3-1.45g/cm 3, Soviet Union's formula funnel viscosity is 20s-75s.
Preferably, foregoing tackifiers is Xylo-Mucine, and Xylo-Mucine is called for short CMC, it is a kind of ether of cellulose of synthetic, belong to water-soluble salt, there is excellent water-retentivity and viscosifying action, in the engineerings such as petroleum drilling and muddy water adding pressure type shield structure, can be used to the viscosity regulating mud.
Further, the quality index requirement of driving mud of the present invention is: clay content is 20%-35%, and density is 1.15g/cm 3-1.25g/cm 3, Soviet Union's formula funnel viscosity is 25-35s.
In addition, the invention also discloses the compound method of aforesaid slurry shield Flooding in Borehole driving mud, be specially: when shield structure passes through cohesive soil stratum in earlier stage, the carrying of the discarded slurry of generation is deposited near size-mixing tank, when slurry shield tunnels Extra-fine sand or gravelly sand stratum, discarded slurry being pumped into size-mixing tank regulate, one or more by adding in clear water, wilkinite and tackifier wherein, adjusting the product meeting slurry shield Flooding in Borehole driving quality of mud fluid index request.The excessive clear water that then adds of mud density, viscosity is with dilution, and the too small wilkinite that then adds of mud density is to regulate, and the too small tackifier that then add of mud viscosity are to regulate.
Usefulness of the present invention is: compared with existing pulping technique, the present invention takes full advantage of discarded slurry, prepare every cubic metre of slurry shield Flooding in Borehole driving mud and can save wilkinite 100-250kg, clear water 850-950kg, tackifier 2-5kg, can effectively economize on resources, cost, reduce environmental pollution, and can modulate and meet density, viscosity, isolation rate, the premium mud that physical and chemical stability etc. require, this mud can form fine and close mud film in Flooding in Borehole excavation face, effective maintenance excavation face is stablized, be a kind of tally with the national condition efficient, environmental protection, energy-conservation slurry shield driving Slurry confection method.
Embodiment
Below in conjunction with specific embodiment, concrete introduction is done to the present invention.
embodiment 1
Prepare every cubic metre of slurry shield Flooding in Borehole driving mud and comprise following starting material: discarded slurry 1140kg (density 1.14g/cm 3, Su Shi funnel viscosity 21s, clay content 22%), wilkinite 30kg, tackifier 0.5kg, above-mentioned raw materials is placed in size-mixing tank and mixes stand-by.
The quality index of the slurry shield Flooding in Borehole driving mud of the present embodiment preparation is: density 1.17g/cm 3, viscosity 28s, clay content 29%, meet engineering construction requirement.
embodiment 2
Prepare every cubic metre of construction mud and comprise following starting material: discarded slurry 1000kg (density 1.31g/cm 3, Su Shi funnel viscosity 44s, clay content 41%), clear water 237kg, above-mentioned raw materials is placed in size-mixing tank and mixes stand-by.
The quality index of the slurry shield Flooding in Borehole driving mud of the present embodiment preparation is: density 1.24g/cm 3, Su Shi funnel viscosity 33s, clay content 32%, meet engineering construction requirement.
Confirm through construction, the mud that embodiment 1 and embodiment 2 are prepared also has the advantage that isolation rate is little, physical and chemical stability is good, density, viscosity are larger, clay content is higher, be suitable for gravelly sand stratum tunneling construction, this mud construction effect is better, forms fine and close mud film at thin silt, excavation face stability can be maintained well, there is the value applied.
More than show and describe ultimate principle of the present invention, principal character and advantage.The technician of the industry should understand, and above-described embodiment does not limit the present invention in any form, the technical scheme that the mode that all employings are equal to replacement or equivalent transformation obtains, and all drops in protection scope of the present invention.

Claims (6)

1. a slurry shield Flooding in Borehole driving mud, it is characterized in that, comprise each component of following weight part: discarded slurry 1000-1250 weight part, clear water 0-300 weight part, wilkinite 0-50 weight part and tackifier 0.5-3 weight part, described discarded slurry is that shield structure produces when passing through cohesive soil stratum early stage.
2. a kind of slurry shield Flooding in Borehole driving mud according to claim 1, it is characterized in that, the clay content of described discarded slurry is 20%-50%, and density is 1.10g/cm 3-1.45g/cm 3, Soviet Union's formula funnel viscosity is 20s-75s.
3. a kind of slurry shield Flooding in Borehole driving mud according to claim 1, it is characterized in that, described tackifier are Xylo-Mucines.
4. a kind of slurry shield Flooding in Borehole driving mud according to claim 1, it is characterized in that, the clay content of this driving mud is 20%-35%, and density is 1.15g/cm 3-1.25g/cm 3, Soviet Union's formula funnel viscosity is 25-35s.
5. the compound method of a kind of slurry shield Flooding in Borehole driving mud as described in any one of claim 1-4, it is characterized in that, concrete grammar is: when shield structure passes through cohesive soil stratum in earlier stage, the carrying of the discarded slurry of generation is deposited near size-mixing tank, when slurry shield tunnels Extra-fine sand or gravelly sand stratum, discarded slurry is pumped into size-mixing tank regulate, one or more by adding in clear water, wilkinite and tackifier wherein, adjust the product meeting slurry shield Flooding in Borehole driving quality of mud fluid index request.
6. the compound method of a kind of slurry shield Flooding in Borehole driving mud according to claim 5, it is characterized in that, the excessive clear water that then adds of mud density, viscosity is with dilution, and the too small wilkinite that then adds of mud density is to regulate, and the too small tackifier that then add of mud viscosity are to regulate.
CN201510533168.3A 2015-08-27 2015-08-27 A kind of slurry shield Flooding in Borehole driving mud and its compound method Active CN105060796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510533168.3A CN105060796B (en) 2015-08-27 2015-08-27 A kind of slurry shield Flooding in Borehole driving mud and its compound method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510533168.3A CN105060796B (en) 2015-08-27 2015-08-27 A kind of slurry shield Flooding in Borehole driving mud and its compound method

Publications (2)

Publication Number Publication Date
CN105060796A true CN105060796A (en) 2015-11-18
CN105060796B CN105060796B (en) 2017-07-21

Family

ID=54490379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510533168.3A Active CN105060796B (en) 2015-08-27 2015-08-27 A kind of slurry shield Flooding in Borehole driving mud and its compound method

Country Status (1)

Country Link
CN (1) CN105060796B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106699105A (en) * 2016-12-08 2017-05-24 中铁十四局集团隧道工程有限公司 Mud for slurry shield gravel-cobble stratum tunneling and preparation method thereof
CN106948827A (en) * 2017-04-10 2017-07-14 中铁十四局集团有限公司 A kind of slurry shield mends slurry circulation technology method and device with emergent
CN107188463A (en) * 2017-05-26 2017-09-22 中冶天工集团有限公司 A kind of bentonite adhesive and its construction method for external wall waterproof layer protection board
CN107344830A (en) * 2017-08-09 2017-11-14 中铁隧道集团二处有限公司 A kind of method that shield grouting is prepared using discarded slurry
CN108086908A (en) * 2017-12-13 2018-05-29 中国二冶集团有限公司 The application method of mud in the construction of directional drilling crossing river
CN108358491A (en) * 2018-02-02 2018-08-03 中南大学 A kind of integrated conduct method and mixing feeding device of shield discarded slurry
CN110436836A (en) * 2019-08-21 2019-11-12 河海大学 SCAP formula earth pressure balanced shield, EPBS opens the cabin with mud and its preparation method
CN111170685A (en) * 2020-01-21 2020-05-19 中南大学 Green slurry for water-rich fractured formation slurry shield construction and preparation method thereof
CN113790057A (en) * 2021-09-07 2021-12-14 中建八局轨道交通建设有限公司 Slurry shield filter-pressing mud cake re-slurrying construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104177008A (en) * 2014-08-12 2014-12-03 上海三瑞高分子材料有限公司 Formula of high-dispersion slurry for slurry shield

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104177008A (en) * 2014-08-12 2014-12-03 上海三瑞高分子材料有限公司 Formula of high-dispersion slurry for slurry shield

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
姜腾等: "废弃黏土在泥水盾构泥浆配制中的再利用研究", 《隧道建设》 *
王道远主编: "《隧道施工技术》", 31 January 2014, 中国水利水电出版社 *
闵凡路等: "泥水盾构带压开舱时泥浆配制及泥膜形成实验研究", 《隧道建设》 *
魏代伟等: "砂土地层泥水盾构泥膜形成时间及泥浆压力转化率的试验研究", 《岩土力学》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106699105A (en) * 2016-12-08 2017-05-24 中铁十四局集团隧道工程有限公司 Mud for slurry shield gravel-cobble stratum tunneling and preparation method thereof
CN106948827A (en) * 2017-04-10 2017-07-14 中铁十四局集团有限公司 A kind of slurry shield mends slurry circulation technology method and device with emergent
CN107188463A (en) * 2017-05-26 2017-09-22 中冶天工集团有限公司 A kind of bentonite adhesive and its construction method for external wall waterproof layer protection board
CN107344830A (en) * 2017-08-09 2017-11-14 中铁隧道集团二处有限公司 A kind of method that shield grouting is prepared using discarded slurry
CN108086908A (en) * 2017-12-13 2018-05-29 中国二冶集团有限公司 The application method of mud in the construction of directional drilling crossing river
CN108086908B (en) * 2017-12-13 2020-02-11 中国二冶集团有限公司 Method for using slurry in river channel crossing construction by directional drilling
CN108358491A (en) * 2018-02-02 2018-08-03 中南大学 A kind of integrated conduct method and mixing feeding device of shield discarded slurry
CN108358491B (en) * 2018-02-02 2023-09-12 湖南垚森信息科技有限公司 Comprehensive treatment method for shield waste slurry and mixed feeding device
CN110436836A (en) * 2019-08-21 2019-11-12 河海大学 SCAP formula earth pressure balanced shield, EPBS opens the cabin with mud and its preparation method
CN110436836B (en) * 2019-08-21 2021-10-15 河海大学 Slurry for SCAP type earth pressure balance shield cabin opening and preparation method thereof
CN111170685A (en) * 2020-01-21 2020-05-19 中南大学 Green slurry for water-rich fractured formation slurry shield construction and preparation method thereof
CN113790057A (en) * 2021-09-07 2021-12-14 中建八局轨道交通建设有限公司 Slurry shield filter-pressing mud cake re-slurrying construction method

Also Published As

Publication number Publication date
CN105060796B (en) 2017-07-21

Similar Documents

Publication Publication Date Title
CN105060796A (en) Slurry for slurry shield sand stratum tunneling and preparation method thereof
CN103525383B (en) Filming drilling fluid being applicable to coal bed gas well and preparation method thereof
CN107365574A (en) A kind of viscosity reduction oil displacement agent for common heavy oil reservoir and preparation method thereof
CN107698226A (en) A kind of cement-silicate injecting paste material
CN101684648A (en) Compound reinforcing method capable of rapidly falling-silt, promoting-seepage, prepressing, reinforcing and blow filling soft clay
CN102604625A (en) Water-based fracturing fluid used for continental face shale gas fracturing and preparation method thereof
CN102352225B (en) Powder for plugging air leaking crack
CN105925254A (en) Well-cementation working fluid system prepared from waste drilling fluid and drill cuttings
CN107344830A (en) A kind of method that shield grouting is prepared using discarded slurry
CN104446296A (en) Filling material prepared from all industrial solid wastes and preparation method of filling material
CN111663948B (en) Water-rich sand-gravel stratum shield muck improvement additive and preparation method thereof
CN106947446A (en) A kind of anti-corrosion low-density well cementing cement mortar system and preparation method thereof
CN110066661B (en) Retaining wall slurry for underground continuous wall of deep and large foundation pit in gravel stratum and preparation method of retaining wall slurry
CN103244135A (en) Construction method for manufacturing mud film in high-permeability stratum
CN106699105A (en) Mud for slurry shield gravel-cobble stratum tunneling and preparation method thereof
CN106285524B (en) To drilling macromolecular mud dreg removing system, method and macromolecular mud under coal mine
CN108166983B (en) Novel shield tail wall back grouting liquid capable of preventing loss
CN112723809A (en) Method for preparing road base material by curing hard rock shield muck
CN107082604A (en) A kind of coarse aggregate phosphorus ore cemented filling material defeated applied to big times of spool
CN103541683A (en) Method for leaking stoppage by pre-arranging plugging gel and tightly adding cement paste
CN100556842C (en) A kind of preparation method of cement additire
CN102604608A (en) Water shutoff agent for extra-low permeability oil reservoir
CN103352722B (en) Cemented filling close to back processing technology for goaf at barren rock filling background
CN203891831U (en) Double-pipe aggregate pouring device with orifice
CN102515640A (en) Retarded cement grout for sealing water of ultra-deep freezing-hole solid pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant