CN105048393A - Method for laying cables in benzene hydrogenation engineering protection tube - Google Patents

Method for laying cables in benzene hydrogenation engineering protection tube Download PDF

Info

Publication number
CN105048393A
CN105048393A CN201510294434.1A CN201510294434A CN105048393A CN 105048393 A CN105048393 A CN 105048393A CN 201510294434 A CN201510294434 A CN 201510294434A CN 105048393 A CN105048393 A CN 105048393A
Authority
CN
China
Prior art keywords
protection tube
pipe
cable
benzene hydrogenation
laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510294434.1A
Other languages
Chinese (zh)
Inventor
冯娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Publication of CN105048393A publication Critical patent/CN105048393A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a method for laying cables in a benzene hydrogenation engineering protection tube. The method is characterized by comprising the following steps that a) the protection tube exposed out of the ground is shortened or lengthened; b) cable heads are fastened by a non-corrosive lubricant, iron wire or steel wire; and c) after the cables penetrate the protection tube and are laid, an opening of the protection tube is closed plugged. The method for laying the cables in the benzene hydrogenation engineering protection tube is reasonable in design, simple in operation, safe and reliable in engineering, excellent in electrical performance and lower in engineering cost.

Description

The method that benzene hydrogenation engineering protection tube inner cable lays
Technical field
The present invention relates to a kind of cable laying method of electric equipment, specifically, is a kind of method that benzene hydrogenation engineering protection tube inner cable lays.
Background technology
The technique of benzol hydro refining unit is more special, its system complex, and equipment is many, and the pressure of system own, temperature are higher, and pumping unit does not allow idle running.Benzene hydrogenation engineering be mainly divided into central control room and electric substation, refining plant, water supply and sewage work, air compression station, storage and handling facility (tank field and pump house), full factory powers and the illumination of full factory, torch and engineering affiliated facility, in the electrical install of these facilities, have lightning protection, fire prevention, explosion-proof particular/special requirement, wherein laying of cable is important step in whole electrical system.Current domestic built or be still in the stage lack of standardization the laying of cable of building benzene hydrogenation engineering equipment, there is a lot of not science, irrational place, manufacturing process is numerous and diverse, manufacturing cost is high.
Therefore the method that known benzene hydrogenation engineering protection tube inner cable lays also exists above-mentioned all inconvenience and problem.
Summary of the invention
Object of the present invention, is the method that a kind of safe and reliable benzene hydrogenation engineering protection tube inner cable of proposition lays.
For achieving the above object, technical solution of the present invention is:
The method that benzene hydrogenation engineering protection tube inner cable lays, is characterized in that comprising the following steps:
A, first the protection tube basseted to be drawn on the strong points to offset the weaknesses, not affect the handling of equipment; The mouth of pipe height of protection tube arranged side by side needs consistent, smoothly protect wedge angle, the burr of mouth of pipe inner circle with file process, then with iron wire or steel wire bind cotton yarn, rag drags back and forth in protection tube, to remove foreign object in pipe or ponding;
B, pinion cable end with non-corrosive lubricant or with iron wire, steel wire, and trailing cable is through protection tube;
C, cable are through protection tube and after having laid, tightly the mouth of pipe is protected in shutoff.
The method that benzene hydrogenation engineering protection tube inner cable of the present invention lays can also be further achieved by the following technical measures.
Aforesaid method, wherein said cable protection pipe is the welded still pipe of zinc-plated low-pressure fluid conveying.
After adopting technique scheme, the method that benzene hydrogenation engineering protection tube inner cable of the present invention lays has the following advantages:
1, making step is reasonable in design, simple to operate;
2, safe and reliable, the excellent electric properties of project quality;
3, engineering cost is reduced.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
The method that benzene hydrogenation engineering protection tube inner cable lays, is characterized in that comprising the following steps:
A, the method for laying at protection tube inner cable specify by GB50397-2007 " metallurgical electric equipment project installation acceptance specification " 24.1.3, forbids surface insulated conductor, first be drawn on the strong points to offset the weaknesses by the protection tube basseted, not affect the handling of equipment; The mouth of pipe height of protection tube arranged side by side needs consistent, smoothly protect wedge angle, the burr of mouth of pipe inner circle with file process, then with iron wire or steel wire bind cotton yarn, rag drags back and forth in protection tube, to remove foreign object in pipe or ponding; Described cable protection pipe is the welded still pipe of zinc-plated low-pressure fluid conveying;
B, pinion cable end with non-corrosive lubricant or with iron wire, steel wire, and trailing cable is through protection tube;
After c, cable have laid through protection tube, the tightly shutoff protection mouth of pipe.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.

Claims (2)

1. a benzene hydrogenation engineering protection tube inner cable method of laying, is characterized in that comprising the following steps:
A, first the protection tube basseted to be drawn on the strong points to offset the weaknesses, not affect the handling of equipment; The mouth of pipe height of protection tube arranged side by side needs consistent, smoothly protect wedge angle, the burr of mouth of pipe inner circle with file process, then with iron wire or steel wire bind cotton yarn, rag drags back and forth in protection tube, to remove foreign object in pipe or ponding;
B, pinion cable end with non-corrosive lubricant or with iron wire, steel wire, and trailing cable is through protection tube;
C, cable are through protection tube and after having laid, tightly the mouth of pipe is protected in shutoff.
2. the benzene hydrogenation engineering protection tube inner cable as claimed in claim 1 method of laying, it is characterized in that, described cable protection pipe is the welded still pipe of zinc-plated low-pressure fluid conveying.
CN201510294434.1A 2010-08-12 2010-08-12 Method for laying cables in benzene hydrogenation engineering protection tube Pending CN105048393A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102516581A CN102377125A (en) 2010-08-12 2010-08-12 Laying method of cable on benzene hydrogenation engineering cable rack

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN2010102516581A Division CN102377125A (en) 2010-08-12 2010-08-12 Laying method of cable on benzene hydrogenation engineering cable rack

Publications (1)

Publication Number Publication Date
CN105048393A true CN105048393A (en) 2015-11-11

Family

ID=45795317

Family Applications (3)

Application Number Title Priority Date Filing Date
CN2010102516581A Pending CN102377125A (en) 2010-08-12 2010-08-12 Laying method of cable on benzene hydrogenation engineering cable rack
CN201510294571.5A Pending CN105006795A (en) 2010-08-12 2010-08-12 Method for laying benzene hydrogenation engineering direct-buried cable
CN201510294434.1A Pending CN105048393A (en) 2010-08-12 2010-08-12 Method for laying cables in benzene hydrogenation engineering protection tube

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN2010102516581A Pending CN102377125A (en) 2010-08-12 2010-08-12 Laying method of cable on benzene hydrogenation engineering cable rack
CN201510294571.5A Pending CN105006795A (en) 2010-08-12 2010-08-12 Method for laying benzene hydrogenation engineering direct-buried cable

Country Status (1)

Country Link
CN (3) CN102377125A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106356771A (en) * 2015-07-17 2017-01-25 上海宝冶集团有限公司 Threading-free hard pipeline connection method
CN107938673A (en) * 2017-12-12 2018-04-20 储茂松 A kind of buried 35KV cross-linked polrvinyl chlorides insulated power cable automatic mounting machine
CN111682495B (en) * 2020-06-24 2021-08-27 南京东瑞水电工程有限公司 Cable pulling pipe structure and installation method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000184570A (en) * 1998-12-18 2000-06-30 Kurimoto Ltd Structure of underground conduit, protecting tube therefor, and method for inserting cable thereinto
CN101364718A (en) * 2007-08-08 2009-02-11 上海宝冶建设有限公司 Heavy cable laying system and laying method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101494361A (en) * 2008-01-25 2009-07-29 上海船厂船舶有限公司 Method for laying high-voltage cable

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000184570A (en) * 1998-12-18 2000-06-30 Kurimoto Ltd Structure of underground conduit, protecting tube therefor, and method for inserting cable thereinto
CN101364718A (en) * 2007-08-08 2009-02-11 上海宝冶建设有限公司 Heavy cable laying system and laying method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国电力出版社: "《电力建设施工、验收及质量验评标准汇编(下册)》", 31 May 2006 *

Also Published As

Publication number Publication date
CN102377125A (en) 2012-03-14
CN105006795A (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN201868124U (en) Novel water-leakage detection cable
CN106400882B (en) Device for protecting water hammer of long-distance pump water supply system
CN105048393A (en) Method for laying cables in benzene hydrogenation engineering protection tube
CN102468629A (en) Electric piping and in-pipe threading installation method for benzene hydrogenation engineering
CN202503231U (en) Junction box with built-in terminal
CN202707475U (en) Novel vertical type water pump inlet and outlet complete device
CN201884294U (en) Combined type mobile pump station
CN204984706U (en) Power generation system
CN204590155U (en) A kind of large discharge remote automatic-taking-water system
CN205412006U (en) Construction fire prevention device
CN204491799U (en) Transformer station's self-draining arrangement
CN202696074U (en) Cable bent corner part protecting tube
CN205701204U (en) A kind of landscape pond anticorrosive wood Os Draconis automatic painting device
CN207073184U (en) A kind of cable duct of substation drainage system
CN208835559U (en) A kind of transformer device structure of box-type substation
CN202099830U (en) Automatic water supply system for construction water
CN105477814A (en) Intensive fire pump room capable of being overall carried
CN207407056U (en) A kind of integrated oil pump station of thin-oil sealed gas tank
CN105162100A (en) Novel alternating-current electric drainage
CN206553629U (en) The antisepsis protector of submarine cable cast-iron socket
CN204962112U (en) Gas is registered one's residence pipe insulation and is cuted and subside compensation arrangement
CN204921399U (en) Valve is closed to direction changing variable sectional type of protection motor
CN204983113U (en) Cover for manhole
CN203808207U (en) Automatic water drainage system arranged on bottom of cable duct
CN203337873U (en) Cable down lead bushing plugging material protecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151111