CN105046589A - 一种获取超高层建筑供电网络的经济性指标方法 - Google Patents
一种获取超高层建筑供电网络的经济性指标方法 Download PDFInfo
- Publication number
- CN105046589A CN105046589A CN201510512076.7A CN201510512076A CN105046589A CN 105046589 A CN105046589 A CN 105046589A CN 201510512076 A CN201510512076 A CN 201510512076A CN 105046589 A CN105046589 A CN 105046589A
- Authority
- CN
- China
- Prior art keywords
- supply network
- rise building
- analyzed
- building supply
- super
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种获取超高层建筑供电网络的经济性指标方法,包括以下步骤:1)根据待分析超高层建筑供电网络的运行情况计算待分析超高层建筑供电网络的年电量不足期望值EENS,然后根据待分析超高层建筑供电网络的年电量不足期望值EENS得待分析超高层建筑供电网络的总停电损失费;2)获取待分析超高层建筑供电网络的投资成本,再将所述待分析超高层建筑供电网络的投资成本及总停电损失费折算成年值后相加,得待分析超高层建筑供电网络的年总可比费用;3)根据步骤2)得到的待分析超高层建筑供电网络的年总可比费用通过灵敏度分析法得超高层建筑供电网络的经济性指标。本发明能够准确、有效的获取超高层建筑供电网络的经济性指标。
Description
技术领域
本发明属于配电网规划领域,涉及一种获取超高层建筑供电网络的经济性指标方法。
背景技术
实际工程中所说的经济性指标是指经济资源得到最充分的利用,获得最大的产出效益,同时产生负效应最小,主要关注的是资源投入和使用过程中成本节约的水平和程度及资源使用的合理性。配电系统的经济性指的是:在一定可靠性和一定质量的电能供应前提下,配电系统的电力资源得到最充分的利用,系统供电能力的效用得到最大程度的发挥,设备成本和损耗得到很好控制,同时对生态环境、社会等的负面效应最小,经济性评价,是减少和避免项目决策失误并提高项目经济效益的重要手段。
现有的超高层建筑一般采用10kV电缆专线供电的网络结构。该结构可靠性相对较差,单、双环网的网络结构可靠性较高,但是更换超高层建筑供电的网络结构,不仅需要考虑结构的可靠性,还要比较其经济性,但现有的技术中没有给出计算超高层建筑供电电网的经济性指标的分析方法。
发明内容
本发明的目的在于克服上述现有技术的缺点,提供了一种获取超高层建筑供电网络的经济性指标方法,该方法能够准确、有效的获取超高层建筑供电网络的经济性指标。
为达到上述目的,本发明所述的获取超高层建筑供电网络的经济性指标方法包括以下步骤:
1)根据待分析超高层建筑供电网络的运行情况计算待分析超高层建筑供电网络的年电量不足期望值EENS,然后根据待分析超高层建筑供电网络的年电量不足期望值EENS得待分析超高层建筑供电网络的总停电损失费;
2)获取待分析超高层建筑供电网络的投资成本,再将所述待分析超高层建筑供电网络的投资成本及总停电损失费折算成年值后相加,得待分析超高层建筑供电网络的年总可比费用;
3)根据步骤2)得到的待分析超高层建筑供电网络的年总可比费用通过灵敏度分析法得超高层建筑供电网络的经济性指标。
步骤1)中待分析超高层建筑供电网络的年电量不足期望值EENS的表达式为:
其中,λi为待分析超高层建筑供电网络的故障率,Li为待分析超高层建筑供电网络的负荷,ri为待分析超高层建筑供电网络的停运时间。
待分析超高层建筑供电网络的总停电损失费等于待分析超高层建筑供电网络的年电量不足期望值EENS乘以单位电量停电损失费用。
将待分析超高层建筑供电网络的投资成本折算成年值的结果记作minAC,其中,
其中,Ct为待分析超高层建筑供电网络在第t年的运行费用,Kt为待分析超高层建筑供电网络在第t年的投资成本,a为贴现率,n为待分析超高层建筑供电网络的使用年限,(P/F,i,a)为一次支付贴现系数,(A/P,i,n)为资金回收系数;
设Ct=0,t=1,2,3,...,n,且待分析超高层建筑供电网络的投资只发生在第一年,即
则有minAC=K0(A/P,i,n)。
本发明具有以下有益效果:
本发明所述的获取超高层建筑供电网络的经济性指标方法在具体操作时,将将所述待分析超高层建筑供电网络的投资成本及总停电损失费折算成年值后相加,得待分析超高层建筑供电网络的年总可比费用,然后通过灵敏度分析法准确得到超高层建筑供电网络的经济性指标,在实际应用时,本发明通过将待分析超高层建筑供电网络的投资成本及总停电损失费折算成年值统一了获取经济性指标的参数,从而使获取的待分析超高层建筑供电网络的经济性指标准确有效,具有较强的实用性。
附图说明
图1为超高层建筑供电单环网结构示意图;
图2为超高层建筑供电双环网结构示意图。
具体实施方式
下面结合附图对本发明做进一步详细描述:
本发明所述的获取超高层建筑供电网络的经济性指标方法包括以下步骤:
1)根据待分析超高层建筑供电网络的运行情况计算待分析超高层建筑供电网络的年电量不足期望值EENS,然后根据待分析超高层建筑供电网络的年电量不足期望值EENS得待分析超高层建筑供电网络的总停电损失费;
2)获取待分析超高层建筑供电网络的投资成本,再将所述待分析超高层建筑供电网络的投资成本及总停电损失费折算成年值后相加,得待分析超高层建筑供电网络的年总可比费用;
3)根据步骤2)得到的待分析超高层建筑供电网络的年总可比费用通过灵敏度分析法得超高层建筑供电网络的经济性指标。
步骤1)中待分析超高层建筑供电网络的年电量不足期望值EENS的表达式为:
其中,λi为待分析超高层建筑供电网络的故障率,Li为待分析超高层建筑供电网络的负荷,ri为待分析超高层建筑供电网络的停运时间。
待分析超高层建筑供电网络的总停电损失费等于待分析超高层建筑供电网络的年电量不足期望值EENS乘以单位电量停电损失费用。
将待分析超高层建筑供电网络的投资成本折算成年值的结果记作minAC,其中,
其中,Ct为待分析超高层建筑供电网络在第t年的运行费用,Kt为待分析超高层建筑供电网络在第t年的投资成本,a为贴现率,n为待分析超高层建筑供电网络的使用年限,(P/F,i,a)为一次支付贴现系数,(A/P,i,n)为资金回收系数;
设Ct=0,t=1,2,3,...,n,且待分析超高层建筑供电网络的投资只发生在第一年,即
则有minAC=K0(A/P,i,n)。
单位电量停电损失费用对待分析超高层建筑供电网络的经济性指标判断起到重要的作用,单位电量停电损失费用直接影响了待分析超高层建筑供电网络的总停电损失费。贴现率a是反映投资增值的增值系数,资金的价值与时间有密切的关系,工程项目在不同时刻投入的资金及获得的效益,其价值是不同的。为了取得经济上的正确评价,应该把不同时刻的金额折算为同一时刻的金额,然后在相同的时间基础上进行比较,方案规划者根据对未来经济形势的估计,在实际应用时,可以设定不同的贴现率,计算对应的经济性指标,得到不同贴现率下的方案经济性对比。
Claims (5)
1.一种获取超高层建筑供电网络的经济性指标方法,其特征在于,包括以下步骤:
1)根据待分析超高层建筑供电网络的运行情况计算待分析超高层建筑供电网络的年电量不足期望值EENS,然后根据待分析超高层建筑供电网络的年电量不足期望值EENS得待分析超高层建筑供电网络的总停电损失费;
2)获取待分析超高层建筑供电网络的投资成本,再将所述待分析超高层建筑供电网络的投资成本及总停电损失费折算成年值后相加,得待分析超高层建筑供电网络的年总可比费用;
3)根据步骤2)得到的待分析超高层建筑供电网络的年总可比费用通过灵敏度分析法得超高层建筑供电网络的经济性指标。
2.根据权利要求1所述的获取超高层建筑供电网络的经济性指标方法,其特征在于,步骤1)中待分析超高层建筑供电网络的年电量不足期望值EENS的表达式为:
其中,λi为待分析超高层建筑供电网络的故障率,Li为待分析超高层建筑供电网络的负荷,ri为待分析超高层建筑供电网络的停运时间。
3.根据权利要求1所述的获取超高层建筑供电网络的经济性指标方法,其特征在于,待分析超高层建筑供电网络的总停电损失费等于待分析超高层建筑供电网络的年电量不足期望值EENS乘以单位电量停电损失费用。
4.根据权利要求1所述的获取超高层建筑供电网络的经济性指标方法,其特征在于,将待分析超高层建筑供电网络的投资成本折算成年值的结果记作minAC,其中,
其中,Ct为待分析超高层建筑供电网络在第t年的运行费用,Kt为待分析超高层建筑供电网络在第t年的投资成本,a为贴现率,n为待分析超高层建筑供电网络的使用年限,(P/F,i,a)为一次支付贴现系数,(A/P,i,n)为资金回收系数。
5.根据权利要求4所述的获取超高层建筑供电网络的经济性指标方法,其特征在于,设Ct=0,t=1,2,3,…,n,且待分析超高层建筑供电网络的投资只发生在第一年,即
则有minAC=K0(A/P,i,n)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510512076.7A CN105046589A (zh) | 2015-08-19 | 2015-08-19 | 一种获取超高层建筑供电网络的经济性指标方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510512076.7A CN105046589A (zh) | 2015-08-19 | 2015-08-19 | 一种获取超高层建筑供电网络的经济性指标方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105046589A true CN105046589A (zh) | 2015-11-11 |
Family
ID=54453112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510512076.7A Pending CN105046589A (zh) | 2015-08-19 | 2015-08-19 | 一种获取超高层建筑供电网络的经济性指标方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105046589A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106327081A (zh) * | 2016-08-24 | 2017-01-11 | 湖北省电力勘测设计院 | 基于全寿命周期的配网项目可靠性效益评估方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102882214A (zh) * | 2012-09-29 | 2013-01-16 | 江西省电力公司电力经济技术研究院 | 农村地区高压配电网电压等级组合选择方法 |
CN104217369A (zh) * | 2013-06-05 | 2014-12-17 | 国家电网公司 | 一种大电网建设经济性评价方法 |
CN104504613A (zh) * | 2014-12-15 | 2015-04-08 | 国家电网公司 | 一种计及多种影响因素的停电损失评估方法 |
CN104700323A (zh) * | 2015-03-27 | 2015-06-10 | 国网上海市电力公司 | 考虑不同主体经济效益指标的储能电站综合评估方法 |
CN104732349A (zh) * | 2015-03-30 | 2015-06-24 | 国家电网公司 | 一种电网规划方法 |
-
2015
- 2015-08-19 CN CN201510512076.7A patent/CN105046589A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102882214A (zh) * | 2012-09-29 | 2013-01-16 | 江西省电力公司电力经济技术研究院 | 农村地区高压配电网电压等级组合选择方法 |
CN104217369A (zh) * | 2013-06-05 | 2014-12-17 | 国家电网公司 | 一种大电网建设经济性评价方法 |
CN104504613A (zh) * | 2014-12-15 | 2015-04-08 | 国家电网公司 | 一种计及多种影响因素的停电损失评估方法 |
CN104700323A (zh) * | 2015-03-27 | 2015-06-10 | 国网上海市电力公司 | 考虑不同主体经济效益指标的储能电站综合评估方法 |
CN104732349A (zh) * | 2015-03-30 | 2015-06-24 | 国家电网公司 | 一种电网规划方法 |
Non-Patent Citations (1)
Title |
---|
苏卫华 等: "全寿命周期成本电网规划的灵敏度分析模型", 《中国电力》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106327081A (zh) * | 2016-08-24 | 2017-01-11 | 湖北省电力勘测设计院 | 基于全寿命周期的配网项目可靠性效益评估方法 |
CN106327081B (zh) * | 2016-08-24 | 2021-10-15 | 湖北省电力勘测设计院有限公司 | 基于全寿命周期的配网项目可靠性效益评估方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106874630B (zh) | 基于电量消纳的区域电网新能源开发潜力评估方法 | |
CN103106314B (zh) | 太阳能光伏电源输出功率的时序概率建模方法 | |
Adinolfi et al. | Pseudo-measurements modeling using neural network and Fourier decomposition for distribution state estimation | |
CN103678931B (zh) | 基于精确量测负荷数据的变电站覆盖区域能效评估方法 | |
CN111738498B (zh) | 一种综合能源系统鲁棒规划方法及系统 | |
CN103996147A (zh) | 配电网综合评估方法 | |
Tande et al. | Operational implications of wind power in a hydro based power system | |
CN103679282A (zh) | 风电功率爬坡的预测方法 | |
CN107257130A (zh) | 基于区域量测解耦的低压配电网损耗计算方法 | |
CN104868468B (zh) | 基于全寿命周期成本的upfc优化配置方法 | |
CN110489856A (zh) | 一种基于cps的微电网可靠建模方法和系统 | |
CN110429591A (zh) | 一种基于电力系统时序耦合性的输电网利用率评估方法 | |
CN104283208B (zh) | 大型电网概率性可用输电能力的分解协调计算方法 | |
CN103956827B (zh) | 一种基于多电源微电网的谐波监测控制系统 | |
CN105046589A (zh) | 一种获取超高层建筑供电网络的经济性指标方法 | |
CN106971255A (zh) | 一种配网自动化方案综合评估系统 | |
CN116797245A (zh) | 一种用电侧碳排放系数分摊方法及系统 | |
CN104022501B (zh) | 基于模糊理论的配电网状态估计方法 | |
CN104331748A (zh) | 一种预测规划目标年风电场群持续功率曲线的方法 | |
CN103944159B (zh) | 含风电的电力系统规划中检修备用容量确定方法 | |
CN104573313A (zh) | 峰谷分时电价下的用户响应模型的获取方法及系统 | |
CN201886479U (zh) | 风能实时监测与评估系统 | |
CN104063812B (zh) | 一种风光互补发电系统低电压穿越性能评估方法 | |
CN109066791B (zh) | 一种风电模拟弃风序列的确定方法和装置 | |
CN105303056A (zh) | 一种风速实时变化速率刻画方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151111 |
|
RJ01 | Rejection of invention patent application after publication |