CN105042608B CN201510228076.4A CN201510228076A CN105042608B CN 105042608 B CN105042608 B CN 105042608B CN 201510228076 A CN201510228076 A CN 201510228076A CN 105042608 B CN105042608 B CN 105042608B
Authority
CN
China
Prior art keywords
air
introduced machine
absorbing tower
desulfuration absorbing
deduster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510228076.4A
Other languages
Chinese (zh)
Other versions
CN105042608A (en
Inventor
杨劲
范旭
潘灏
李伟科
马雪松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201510228076.4A priority Critical patent/CN105042608B/en
Publication of CN105042608A publication Critical patent/CN105042608A/en
Application granted granted Critical
Publication of CN105042608B publication Critical patent/CN105042608B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrostatic Separation (AREA)
  • Treating Waste Gases (AREA)

Abstract

The present invention relates to the rear air and gas system combination layout structures that power plant's deduster six exports, including six house outlets, air-introduced machine structure, desulfuration absorbing tower, wet electrical dust precipitator structure and chimney, air-introduced machine structure is by two draft mechanisms at biserial air-introduced machine structure, every three house outlets connect the air inlet of an air-introduced machine, and the air outlet of two air-introduced machines respectively connects an air inlet of desulfuration absorbing tower;Wet electrical dust precipitator structure is made of four wet electrical dust precipitators;Desulfuration absorbing tower is set there are one air inlet and four air outlets;Air-introduced machine structure and six house outlets are arranged between desulfuration absorbing tower and chimney, air-introduced machine structure is located at the lower section of six house outlets, wet electrical dust precipitator structure is located at the top of six house outlets, wet electrical dust precipitator structure is located at the surface of air-introduced machine, six house outlets are in being horizontally disposed with, and the air inlet of air-introduced machine structure is vertical setting, air outlet is in horizontally disposed.The present invention is at low cost, takes up an area less, operational effect is good.

Description

The rear air and gas system combination layout structure that power plant's deduster six exports
Technical field
The present invention relates to the rear air and gas system combination layout structures that a kind of power plant deduster six exports, and belong to power plant's smoke evacuation And ventilation equipment technical field.
Background technology
In coal-fired station's project the distance of boiler the first organ timbering to chimney center line be important land requisition index it One, after flue gas system most equipment is all disposed within stove, and boiler room frame, preceding flue and deduster arrangement are relatively solid It is fixed, after being concentrated mainly on deduster to the optimization arranged after stove.It is main both at home and abroad to arrange pattern to the arrangement form after deduster It is substantially using each equipment in-line arrangement, deduster 1-1 arranges air-introduced machine 1-2 later, arranges that desulfurization absorbs after air-introduced machine 1-2 Tower 1-3, wet electrical dust precipitator 1-4 and chimney 1-5.As shown in Figure 1, each equipment uses in-line arrangement, air-introduced machine after deduster 1-1 1-2 is arranged between deduster 1-1 and desulfuration absorbing tower 1-3, and the outlet of biserial air-introduced machine only enters towards desulfuration absorbing tower 1-3 Mouthful, it is to be staggeredly arranged with desulfuration absorbing tower 1-3 center lines, wet electrical dust precipitator 1-4 and air-introduced machine 1-2 positions are farther out.
Flue arrangement after traditional deduster has widened house outlet to the fore-and-aft distance of chimney center line, increases and accounts for The material consumption of ground area and flue;And rectangular flue is used to arrange, the resistance and material consumption of flue will further increase, So that auxiliary power consumption increases, and there are 90 ° of elbows of level before desulfuration absorbing tower entrance, Flow Field Distribution is uneven, influences to enter desulfurization suction Receive flue gas uniformity in tower.
It, can be due to no matter air-introduced machine is laterally or longitudinally to arrange it can be seen that after traditional deduster in arrangement The fore-and-aft distance between deduster and desulfuration absorbing tower is pulled open, and generates the arrangement after deduster and takes up an area big, flue length, flue resistance The problems such as power is big, but also increase flue resistance and flue consumption of materials.Virtually increase coal-fired station's occupation of land Area and flue cost increase initial cost cost, increase as well as the resistance of flue, also directly affect the fortune in power plant Row economy.
Invention content
The purpose of the present invention is taken up an area to solve the arrangement of equipment after existing coal-fired station's deduster The technical problems such as greatly, flue is long, flue resistance is big provide a kind of rear air and gas system combined layout that power plant's deduster six exports Structure.
The purpose of the present invention can be achieved through the following technical solutions:
The rear air and gas system combination layout structure that power plant's deduster six exports, including six house outlets, air-introduced machines Structure, desulfuration absorbing tower, wet electrical dust precipitator structure and chimney, air-introduced machine structure is by two draft mechanisms at biserial air-introduced machine knot Structure, every three house outlets connect the air inlet of an air-introduced machine, and the air outlet connection desulfurization of two air-introduced machines absorbs One air inlet of tower;Wet electrical dust precipitator structure is made of four wet electrical dust precipitators;Desulfuration absorbing tower is entered the wind there are one setting Mouth and four air outlets, four air outlets of desulfuration absorbing tower respectively connect the air inlet of a wet electrical dust precipitator, four wet types The air inlet of the air outlet collecting pipe connection chimney of electric precipitator;Desulfuration absorbing tower is vertical structure, the air inlet of desulfuration absorbing tower Mouth setting is arranged in lower sidewall, air outlet at top;Air-introduced machine structure and six house outlets are arranged in desulfuration absorbing tower Between chimney, air-introduced machine structure is located at the lower section of six house outlets, and wet electrical dust precipitator structure is located at six dedusters The top of outlet, wet electrical dust precipitator structure are located at right over air-introduced machine structure, and six house outlets are in be horizontally disposed with, The air inlet of air-introduced machine structure is vertical setting, air outlet is in horizontally disposed;Form the outlet of deduster six and biserial air-introduced machine The three-dimensional combination layout structure of the longitudinal and transverse of air and gas system, vertical three-dimensional after deduster.
The purpose of the present invention can be also achieved through the following technical solutions:
Further, wet electrical dust precipitator structure is mounted on the flue of connection desulfuration absorbing tower and chimney, the air inducing For the air-introduced machine of machine structure on the vertical center line between desulfuration absorbing tower and chimney, the air-introduced machine is mounted on wet type side by side Immediately below electrostatic precipitator structure, the air inlet of the air outlet face desulfuration absorbing tower of the air-introduced machine makes air-introduced machine be absorbed with desulfurization The flue of tower forms straight-through flue, and the house outlet is located at one side position of air-introduced machine, and every three house outlets pass through cigarette Road accesses an air-introduced machine.
Further, the arc-shaped buffering transition of flue that the air-introduced machine of the air-introduced machine structure is connect with desulfuration absorbing tower connects It connects, the flue of the air-introduced machine and desulfuration absorbing tower is made to form straight-through flue.
Further, maintenance distance, the air outlet of the air-introduced machine are remained between the air-introduced machine of the air-introduced machine structure Connected with the air inlet of desulfuration absorbing tower by flue arranged side by side.
Further, in six house outlets, every three house outlets pass through a three-in-one collecting pipe and one The air inlet of air-introduced machine connects.
Further, four air outlets of the desulfuration absorbing tower it is upper by double-deck arranged side by side four output flues access, Four output flues of the air inlet of the wet electrical dust precipitator of lower distribution, wet electrical dust precipitator structure are converged by a four-in-one Pipe accesses in chimney.
Further, the turning of each flue is using round slow turning head connection.
Further, the air-introduced machine entrance is equipped with the access head of 0-180 ° of corner.
Beneficial effects of the present invention:
1, wet electrical dust precipitator structure of the invention is made of four wet electrical dust precipitators;Desulfuration absorbing tower set there are one into Air port and four air outlets, four air outlets of desulfuration absorbing tower respectively connect the air inlet of a wet electrical dust precipitator, and four wet The air inlet of the air outlet collecting pipe connection chimney of formula electric precipitator;Desulfuration absorbing tower is vertical structure, desulfuration absorbing tower into Air port setting is arranged in lower sidewall, air outlet at top;Air-introduced machine structure and six house outlet settings are absorbed in desulfurization Between tower and chimney, air-introduced machine structure is located at the lower section of six house outlets, and wet electrical dust precipitator structure is located at six dedustings The top of device outlet, six house outlets are in horizontally disposed, and the air inlet of air-introduced machine structure is vertical setting, air outlet In horizontally disposed;It forms the outlet of deduster six and the longitudinal and transverse of air and gas system, vertical three-dimensional after the deduster of biserial air-introduced machine is three-dimensional Combination layout structure;Therefore the distance of house outlet and chimney center line can be shortened, there is the material that flue is greatly decreased Doses reduces flue gas system crushing, so that equipment is more efficiently run, reduce auxiliary power consumption, improving unit operation economy and account for Ground is small, flue material is few, resistance is small and flue gas flow field is uniform, reduces the advantageous effects such as initial cost cost.
2, the air outlet face desulfuration absorbing tower of air-introduced machine of the invention, and the flue that air-introduced machine is connect with desulfuration absorbing tower Arc-shaped buffering transition connection.The effective exhaust resistance for reducing air-introduced machine, keeps smoke distribution uniform, improves desulfuration efficiency, from And improve the performance driving economy in power plant.
3, house outlet of the invention can be distributed in the side of air-introduced machine, and arrangement various can be rationalized.And multiple dedustings Device outlet is connected by collecting pipe one with the air inlet of air-introduced machine, and six wet electrical dust precipitator air intake vents are led to by arranged side by side respectively Air hose connects with desulfuration absorbing tower, and air outlet is communicated by four-in-one collecting pipe with chimney air-out passage.Thus can effectively subtract The ventilation resistance of low pass wind pipeline improves the operational efficiency of air inducing equipment and flue.
4, the installation of vertical double-layer block form, the incoming end of wet electrical dust precipitator pass through wet electrical dust precipitator of the invention up and down Four bilayers access flue arranged side by side accesses desulfuration absorbing tower, and output end is exported by four bilayers output flue arranged side by side, defeated It is accessed in chimney and is discharged by a four-in-one collecting pipe when going out, thus reduce wet electrical dust precipitator area occupied, and make flue gas point Cloth more uniformly exports, and improves the discharge efficiency of flue.
Description of the drawings
Fig. 1 is the structural schematic diagram of the prior art of the present invention.
Fig. 2 is the structural schematic diagram of a specific embodiment of the invention.
Fig. 3 is the vertical view of Fig. 2.
Fig. 4 is the front view of Fig. 2.
Specific implementation mode
Below in conjunction with attached drawing, the present invention is described in further detail.
Embodiment 1:
The rear air and gas system combination layout structure that shown power plant deduster six exports referring to Figure 2 to Figure 4, including six removed Dirt device outlet 1, air-introduced machine structure 2, desulfuration absorbing tower 3, wet electrical dust precipitator structure 4 and chimney 5, air-introduced machine structure 2 is by two Draft mechanism connects the air inlet of an air-introduced machine, two air inducing at biserial air-introduced machine structure, every three house outlets 1 The air outlet of machine respectively connects an air inlet of desulfuration absorbing tower 3;Wet electrical dust precipitator structure 4 is by four wet electrical dust precipitator structures At;Desulfuration absorbing tower 3 is equipped with two air inlets and four air outlets, and respectively connection one is wet for four air outlets of desulfuration absorbing tower 3 The air inlet of formula electric precipitator, the air inlet of the air outlet collecting pipe connection chimney 5 of four wet electrical dust precipitators;Desulfuration absorbing tower 3 be vertical structure, and the air inlet setting of desulfuration absorbing tower 3 is arranged in lower sidewall, air outlet at top;2 He of air-introduced machine structure Six house outlets 1 are arranged between desulfuration absorbing tower 3 and chimney 5, and air-introduced machine structure 2 is located at six house outlets 1 Lower section, wet electrical dust precipitator structure 4 are located at the top of six house outlets 1, and six house outlets 1 are set in level It sets, the air inlet of air-introduced machine structure 2 is vertical setting, air outlet is in horizontally disposed;Form the outlet of deduster six and biserial air inducing The three-dimensional combination layout structure of the longitudinal and transverse of air and gas system, vertical three-dimensional after the deduster of machine.
In embodiment:
The wet electrical dust precipitator 4 is mounted on the flue of connection desulfuration absorbing tower 3 and chimney 5, the air-introduced machine knot The air-introduced machine and wet electrical dust precipitator 4 of structure 2 are located between desulfuration absorbing tower 3 and chimney 5, are located at desulfuration absorbing tower 3 and chimney 5 It on vertical center line, is distributed in vertical type, the air-introduced machine horizontal alignment of the air-introduced machine structure 2 is mounted on wet electrical dust precipitator 4 Underface, the installation of about 4 vertical double-layer block form of wet electrical dust precipitator, the fan out draft face desulfurization of air-introduced machine structure 2 The flue on absorption tower 3, the air-introduced machine for making air-introduced machine structure 2 and desulfuration absorbing tower 3 forms straight-through flue, the house outlet 1 It is located at one side position of air-introduced machine of air-introduced machine structure 2,1 air intake vent of every three house outlets accesses an air-introduced machine by flue The air-introduced machine of structure 2 forms equipment and flue combination layout structure after the deduster of the outlet of deduster six and biserial air-introduced machine.
The arc-shaped buffering transition connection of flue that the air-introduced machine 2 is connect with desulfuration absorbing tower 3.
Maintenance distance is remained between the air-introduced machine of two air-introduced machine structures 2, the air-introduced machine of air-introduced machine structure 2 goes out Air port is connected by flue arranged side by side with 3 air intake vent of desulfuration absorbing tower.Six house outlets 1, every three house outlets 1 Connected with the air inlet of an air-introduced machine 2 by a three-in-one collecting pipe 11, which is the applicant's application Patent of invention " cigarette air duct and its three-in-one collecting pipe (patent No.:ZL 2014 is 20211274.0) " technology.
The desulfuration absorbing tower 3 passes through double-deck four output flues arranged side by side wet-esp that access is distributed up and down side by side Four output flues of device 4, wet electrical dust precipitator 4 access discharge in chimney 5 by a four-in-one collecting pipe 41.The four-in-one is converged Flow tube 11 is patent of invention " cigarette air duct and its four-in-one collecting pipe (patent No. of the applicant's application:ZL ZL 2014 2 0211431.8 ") technology.
The turning of each flue is connected using round slow turning head 6.
Above-mentioned each equipment and flue can common support frame be fixed.
For conventional coal-fired station, main building mainly arranges three parts after point steam turbine building, boiler room and stove.Pot Behind boiler room (containing bunker bay) and stove, the relative position of wherein boiler and deduster is basic for stove and the equal centralized arrangement of air and gas system It is fixed.
In this combined layout scheme:Every three house outlets 1 enter an air-introduced machine by a three-in-one collecting pipe 11 The air-introduced machine entrance of structure 2, two air-introduced machines are horizontally-parallel to be arranged in juxtaposition between desulfuration absorbing tower and chimney, is located at wet type electricity 4 lower section of deduster, 3 entrance of the air-introduced machine exhaust pass face desulfuration absorbing tower connection of air-introduced machine structure 2, desulfuration absorbing tower 3 go out Mouth evenly distributes flue gas using four circular connecting pipe roads, is rotated into wet electrical dust precipitator 4 by the way that the slow turning head 6 of circle is slow, wet Formula electric precipitator 4 arranges that flue gas is further purified through wet electrical dust precipitator 4, is gone out in the surface of the air-introduced machine of air-introduced machine structure 2 Mouth enters chimney using the interflow of four-in-one collecting pipe 41.The air-introduced machine and wet type of the final air-introduced machine structure 2 of vertical distribution up and down The desulfuration absorbing tower 3 and chimney 5 that electric precipitator 4 is distributed with its both sides are arranged at linear type.
The air-introduced machine of the air-introduced machine structure 2 of upper joint arrangement is equipped with the access wind of 0-180 ° of corner by inlet Case, make air-introduced machine structure 2 air-introduced machine entrance can 0-180 ° of angle air inlet, 3 entrance of outlet face desulfuration absorbing tower so that desulfurization 3 inlet flue gas even flow field of absorption tower improves desulfuration efficiency;The air-introduced machine both sides of two air-introduced machine structures 2 respectively reserve not small In 5m wide maintenance apart from place, convenient for safeguarding;Flue turning is transferred by the slow turning head 6 of circle between each equipment, makes cigarette The smooth connection in road, flue resistance reduce.Each equipment and the arrangement of flue make full use of desulfuration absorbing tower 3 and chimney 5 after deduster Laterally and vertically space, the distance between house outlet 1 to 5 center line of chimney are greatly decreased within 27 meters.

Claims (8)

1. the rear air and gas system combination layout structure that power plant's deduster six exports, including six house outlets (1), air-introduced machines Structure (2), desulfuration absorbing tower (3), wet electrical dust precipitator structure (4) and chimney (5), it is characterised in that:Air-introduced machine structure (2) by For two draft mechanisms at biserial air-introduced machine structure, every three house outlets (1) connect the air inlet of an air-introduced machine, and described two The air outlet of platform air-introduced machine respectively connects an air inlet of desulfuration absorbing tower (3);Wet electrical dust precipitator structure (4) is by four wet types Electric precipitator is constituted;Desulfuration absorbing tower (3) is equipped with two air inlets and four air outlets, four outlet air of desulfuration absorbing tower (3) Mouth respectively connects the air inlet of a wet electrical dust precipitator, the air outlet collecting pipe connection chimney (5) of four wet electrical dust precipitators Air inlet;Desulfuration absorbing tower (3) is vertical structure, and the air inlet setting of desulfuration absorbing tower (3) is arranged in lower sidewall, air outlet At top;Air-introduced machine structure (2) and six house outlets (1) are arranged between desulfuration absorbing tower (3) and chimney (5), air inducing Machine structure (2) is located at the lower section of six house outlets (1), and wet electrical dust precipitator structure (4) is located at six house outlets (1) Top, wet electrical dust precipitator structure (4) is located at the surface of air-introduced machine structure (2), and six house outlets (1) are in water Flat setting, the air inlet of air-introduced machine structure (2) is vertical setting, air outlet is in horizontally disposed;The air-introduced machine of upper and lower vertical distribution The desulfuration absorbing tower (3) and chimney (5) that the air-introduced machine and wet electrical dust precipitator (4) of structure (2) are distributed with its both sides are at " one " word Shape is arranged;Form the outlet of deduster six and the longitudinal and transverse of air and gas system, the three-dimensional joint of vertical three-dimensional after the deduster of biserial air-introduced machine Arrangement.
2. the rear air and gas system combination layout structure that power plant according to claim 1 deduster six exports, feature exist In:Wet electrical dust precipitator structure (4) is mounted on the flue of connection desulfuration absorbing tower (3) and chimney (5), the air-introduced machine structure (2) air-introduced machine is located on the vertical center line between desulfuration absorbing tower (3) and chimney (5), and the air-introduced machine is mounted on side by side Immediately below wet electrical dust precipitator structure (4), the air inlet of the air outlet face desulfuration absorbing tower (3) of the air-introduced machine makes air-introduced machine Straight-through flue is formed with the flue of desulfuration absorbing tower (3), the house outlet (1) is located at the air-introduced machine of air-introduced machine structure (2) Side, every three house outlets (1) access the air-introduced machine of an air-introduced machine structure (2) by flue.
3. the rear air and gas system combination layout structure that power plant according to claim 1 or 2 deduster six exports, feature It is:The arc-shaped buffering transition connection of flue that the air-introduced machine of the air-introduced machine structure (2) is connect with desulfuration absorbing tower (3), makes The flue of the air-introduced machine and desulfuration absorbing tower (3) forms straight-through flue.
4. the rear air and gas system combination layout structure that power plant according to claim 1 or 2 deduster six exports, feature It is:Maintenance distance is remained between the air-introduced machine of the air-introduced machine structure (2), the air outlet of the air-introduced machine passes through cigarette arranged side by side Road connects with the air inlet of desulfuration absorbing tower (3).
5. the rear air and gas system combination layout structure that power plant according to claim 1 or 2 deduster six exports, feature It is:In six house outlets (1), every three house outlets (1) are drawn by a three-in-one collecting pipe (11) with one The air inlet of wind turbine connects.
6. the rear air and gas system combination layout structure that power plant according to claim 1 or 2 deduster six exports, feature It is:Four air outlets of the desulfuration absorbing tower (3) are accessed upper and lower distribution wet by double-deck four output flues arranged side by side Four output flues of the air inlet of formula electric precipitator, wet electrical dust precipitator structure (4) pass through a four-in-one collecting pipe (41) It accesses in chimney (5).
7. the rear air and gas system combination layout structure that power plant according to claim 1 or 2 deduster six exports, feature It is:The turning of each flue is connected using round slow turning head (6).
8. the rear air and gas system combination layout structure that power plant according to claim 1 deduster six exports, feature exist In:Air-introduced machine (2) entrance is equipped with the access head of 0-180 ° of corner.
CN201510228076.4A 2015-05-06 2015-05-06 The rear air and gas system combination layout structure that power plant's deduster six exports Active CN105042608B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510228076.4A CN105042608B (en) 2015-05-06 2015-05-06 The rear air and gas system combination layout structure that power plant's deduster six exports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510228076.4A CN105042608B (en) 2015-05-06 2015-05-06 The rear air and gas system combination layout structure that power plant's deduster six exports

Publications (2)

Publication Number Publication Date
CN105042608A CN105042608A (en) 2015-11-11
CN105042608B true CN105042608B (en) 2018-09-25

Family

ID=54449386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510228076.4A Active CN105042608B (en) 2015-05-06 2015-05-06 The rear air and gas system combination layout structure that power plant's deduster six exports

Country Status (1)

Country Link
CN (1) CN105042608B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105402762B (en) * 2015-12-02 2018-06-05 中国能源建设集团广东省电力设计研究院有限公司 Deduster six exports and flue gas system combination layout structure after biserial air-introduced machine

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60156563A (en) * 1984-01-26 1985-08-16 Mitsubishi Heavy Ind Ltd Waste gas treating apparatus
EP1182400A1 (en) * 1997-04-21 2002-02-27 Mitsubishi Heavy Industries, Ltd. Flue gas treating system and process
CN201715526U (en) * 2009-08-11 2011-01-19 浙江省电力设计院 Connecting device of front flue of dust collector of heat power plant
CN202066041U (en) * 2011-05-30 2011-12-07 内蒙古电力勘测设计院 Folding-type flue
CN202666644U (en) * 2012-07-20 2013-01-16 中电投远达环保工程有限公司 Water-saving and low-energy-consumption flue gas dry-wet compound dedusting and desulfurizing system
CN203560917U (en) * 2013-11-12 2014-04-23 中国电力工程顾问集团西南电力设计院 Compact furnace rear arrangement of 1000 MW ultra-supercritical unit
CN203718811U (en) * 2013-12-30 2014-07-16 上海克莱德贝尔格曼机械有限公司 Flue gas treatment device
CN103939928A (en) * 2014-04-28 2014-07-23 中国能源建设集团广东省电力设计研究院 Smoke duct and four-in-one collecting pipe
CN204704832U (en) * 2015-05-06 2015-10-14 中国能源建设集团广东省电力设计研究院有限公司 The rear air and gas system combination layout structure that power plant exports with deduster six

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60156563A (en) * 1984-01-26 1985-08-16 Mitsubishi Heavy Ind Ltd Waste gas treating apparatus
EP1182400A1 (en) * 1997-04-21 2002-02-27 Mitsubishi Heavy Industries, Ltd. Flue gas treating system and process
CN201715526U (en) * 2009-08-11 2011-01-19 浙江省电力设计院 Connecting device of front flue of dust collector of heat power plant
CN202066041U (en) * 2011-05-30 2011-12-07 内蒙古电力勘测设计院 Folding-type flue
CN202666644U (en) * 2012-07-20 2013-01-16 中电投远达环保工程有限公司 Water-saving and low-energy-consumption flue gas dry-wet compound dedusting and desulfurizing system
CN203560917U (en) * 2013-11-12 2014-04-23 中国电力工程顾问集团西南电力设计院 Compact furnace rear arrangement of 1000 MW ultra-supercritical unit
CN203718811U (en) * 2013-12-30 2014-07-16 上海克莱德贝尔格曼机械有限公司 Flue gas treatment device
CN103939928A (en) * 2014-04-28 2014-07-23 中国能源建设集团广东省电力设计研究院 Smoke duct and four-in-one collecting pipe
CN204704832U (en) * 2015-05-06 2015-10-14 中国能源建设集团广东省电力设计研究院有限公司 The rear air and gas system combination layout structure that power plant exports with deduster six

Also Published As

Publication number Publication date
CN105042608A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN101482303B (en) Energy-saving consumption-reducing air conditioning method and unit air conditioner of spinning factory
CN104879765B (en) Air and gas system combination layout structure after the six outlet biserials with flue gas waste heat recovery apparatus
CN104791821B (en) The power plant outlet of deduster four and the rear air and gas system combination layout structure of biserial air-introduced machine
CN105042608B (en) The rear air and gas system combination layout structure that power plant's deduster six exports
CN104832936A (en) Equipment arrangement structure provided with single-row induced draft fan behind dust catcher and flue gas system
CN204704830U (en) With air and gas system combination layout structure after four outlet biserials of flue gas waste heat recovery apparatus
CN204704832U (en) The rear air and gas system combination layout structure that power plant exports with deduster six
CN204704833U (en) With air and gas system combination layout structure after six outlet biserials of flue gas waste heat recovery apparatus
CN204704831U (en) Power plant's deduster four exports and the rear air and gas system combination layout structure of biserial air-introduced machine
CN104896491B (en) Air and gas system combination layout structure after the four outlet biserials with flue gas waste heat recovery apparatus
CN105920955A (en) Blowing-drawing-type dust removal system for underground space
CN205208617U (en) Flue gas system combined layout structure behind six exports of dust remover and biserial draught fan
CN206001502U (en) Flue gas system structure forward arranged by the single-row air-introduced machine of 600000 grades of coal unit
CN204187759U (en) Single blower fan based on rock-bed cold-storage indirect-direct double flash evaporation cooling air-conditioning
CN204665315U (en) Join the apparatus arrangement structure after the deduster of single-row air-introduced machine and flue gas system
CN205208594U (en) Flue gas system combined layout structure behind two exports of dust remover and biserial draught fan
CN205208593U (en) Six export back flue gas system arrangement structure of dust remover that join in marriage residual heat from flue gas device
CN206929791U (en) The improvement distributed architecture of Large-sized Coal-fired Power group house outlet flue and air-introduced machine
CN203215896U (en) Large-section direct evaporative cooling air-conditioning unit with air rectifier for subway
CN206073115U (en) Flue gas system arrangement after 600000 grades of coal units
CN204665316U (en) Join apparatus arrangement structure and flue gas system after the deduster of flue gas waste heat recovery apparatus
CN105402752B (en) Flue gas system arrangement after deduster six with flue gas waste heat recovery apparatus exports
CN204337949U (en) A kind of new type wet dust collector
CN205481105U (en) Flue gas system behind dust remover of desulfurization absorption tower and gas gas heater integration
CN206001501U (en) Flue gas system structure forward arranged by 600000 grades of coal unit biserial air-introduced machines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant