CN105041014A - Method for manufacturing novel double-column side-pulling type parking shed - Google Patents

Method for manufacturing novel double-column side-pulling type parking shed Download PDF

Info

Publication number
CN105041014A
CN105041014A CN201510478325.5A CN201510478325A CN105041014A CN 105041014 A CN105041014 A CN 105041014A CN 201510478325 A CN201510478325 A CN 201510478325A CN 105041014 A CN105041014 A CN 105041014A
Authority
CN
China
Prior art keywords
column
frame
carport
pull
water pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510478325.5A
Other languages
Chinese (zh)
Other versions
CN105041014B (en
Inventor
李鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan grand decoration Mstar Technology Ltd
Original Assignee
李鹏飞
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李鹏飞 filed Critical 李鹏飞
Priority to CN201510478325.5A priority Critical patent/CN105041014B/en
Publication of CN105041014A publication Critical patent/CN105041014A/en
Application granted granted Critical
Publication of CN105041014B publication Critical patent/CN105041014B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The invention discloses a method for manufacturing a novel double-column side-pulling type parking shed. The method comprises following steps: (1) the parking shed employs novel double columns; (2) the parking shed employs a side-pulling type structure; (3) a main beam of the parking shed is additionally provided with a main beam steel lining; and (4) the parking shed employs a novel drainage system. The parking shed is characterized in that the double columns have cuboid structures and are internally provided with cavities; a column steel lining is additionally arranged on the inner wall of each cavity; a square steel plate and an aluminum alloy plate which are used for dispersing the force and enhancing the column strength are oppositely arranged on the upper and lower parts of each cavity; each column is provided with multiple reinforcement ribs; a frame and the columns are fixedly connected through frame and column corner connectors; the side-pulling type parking shed comprises pull bars on the two sides and fixedly connected to the double columns; the double pull bars are connected to the double columns and the frame; the steel lining is additionally arranged on the inner wall of the main beam; a sealing washer is arranged between a decontamination port sealing cap and a two-way band decontamination port bend of the drainage system; a drainage joint is internally provided with a sealing gasket; and the inner end of the connection of a transverse joint and a vertical joint of the two-way band decontamination port bend is tapered. According to the invention, the parking shed is high in wind and snow resistance, is firm in structure, is low in noise, has good drainage performance, and has a long service lifetime.

Description

A kind of method manufacturing the novel pair of pull-type carport of stud sides
Technical field
The present invention relates to a kind of manufacture method of carport, particularly a kind of method manufacturing the novel pair of pull-type carport of stud sides.
Background technology
The shed structure of prior art is generally: the slant-pull structure that the ceiling sheet material fixed by ceiling framework and girder and single column supporting structural, column are connected with ceiling, principle is, by diagonal member, whole ceiling weight is communicated to head tree, thus forms overall structure.
Said structure has buried potential safety hazard to the Long-Time Service of carport, and brings very large difficulty to maintenance process simulation from now on.
Specifically there is lower column defects in said structure:
1, the carport safety factor of prior art is low, not firm in a down-to-earth manner, poor, the anti-snow ability of wind loading rating, use material materials are too thin.
(1) carport ceiling both sides respectively have single column of an aluminum alloy material to be fixed to ground to take root, and weight to be communicated to above the column of the left and right sides by diagonal member by the weight of whole carport ceiling, column and diagonal member stressed very large.
Steel pipe steel lining is not added inside column, just the intensity of aluminium alloy single column own is stressed, Aluminum alloy column materials are thin, add long-time uneven stressed, can because column be stressed excessive, insufficient strength, there is flexural deformation, the situations such as fracture, bicycle shed all skeletons materials are thick not, unsturdy, the hardness of material own is also not high enough, wind-force will be vacillated now to the left, now to the right slightly greatly, as fruit product is contained in the large coastal cities of wind, avenge large the Northeast, that is just more dangerous, the probability of phenomenon of occurring collapsing is very large, safety factor is low, serious harm the people's lives and property safety.
2, easily roof leaking, unsightly air, ageing resistance are poor, and time rainy, noise is large.
(1) in prior art, not tightly beat because carport ceiling frame connects, connecting portion is by beating fluid sealant rain-tight, the long-time outdoor wind of carport blows, drench with rain, the sun shines, fluid sealant there will be aging very soon, rainwater flows down from surrounding sealing part, and aluminium shape surface can leave a lot of water stain marking, hinders attractive in appearance.
(2) before carport ceiling, the design of eaves place is unreasonable, and when raining in torrents, rainwater can be formed and pour in down a chimney, and eaves flows back to carport inside in the past.
(3) waterproof adhesive tape that the upper and lower press strip of carport ceiling force-bearing plate is worn is PVC material, outdoor use aging speed is fast, easily cause aging rear sealing bad, there is water leakage situation, because ceiling force-bearing plate does not adopt sound insulation and noise reduction technology, when raining, noise is comparatively large, makes carport lose sunshade, rain cover, handy original intention, and using to user makes troubles.
3, unreasonable structure, built on the sand, application life is short.
(1) in prior art, each single column in carport ceiling both sides bears the weight of whole bicycle shed, and long-term outdoor exposes to wind and rain, and column is very easily out of shape, fracture, produces security incident.
(2) carport ceiling frame section bar specification is too little, and wall thickness is too thin, and rigidity is inadequate, and wind resistance, anti-snow ability are too fragile, and wind is large, easily blown when avenging large and collapse, crush.
(3) carport ceiling frame, front eaves and rear tank connecting portion are unreasonable, and easily occurring falls apart comes off, and before ceiling, eaves design is unreasonable, and when raining in torrents, rainwater can be formed and pour in down a chimney, and eaves flows back to carport inside in the past.
(4) after carport ceiling, tank is too little, and when raining in torrents, tank water capacity is inadequate, and water can outwards overflow, and bottom of gullet is not flat, only has side to have leader, and rainwater stream is unclean, can ponding, water.
(5) the upper and lower press strip in carport bicycle shed top is narrow, not easily locks screw and fixes, also low to the pressure of force-bearing plate.
(6) parking car bicycle shed many places connecting portion structure is too simple, and bearing capacity is poor.
4, structure design is unreasonable, not firm in a down-to-earth manner, poor, the anti-snow ability of wind loading rating, use material materials are too thin, and application life is short.
(1) Aluminum alloy column and girder material materials thin, shaky, steel lining length laterally 0.32 meter, vertical 0.32 meter, steel lining adopts electroplating anticorrosion process, the anticorrosion time limit is short, antibiosis rust ability, steel lining vertically part is placed in column, the CARBURIZING FURNACE FOR STAINLESS FASTENER long with 4 M12*25MM is pinned, the CARBURIZING FURNACE FOR STAINLESS FASTENER that bicycle shed girder is penetrated rear use 4 M12*25MM long by steel lining lateral part is pinned, column and girder corner connection are only connected with a very short steel lining, column and other place of girder are without steel lining, the long-time outdoor use of bicycle shed, wind resistance, anti-snow ability, as high wind or heavy snow, being out of shape very easily appears in column and girder, fracture, collapse, safety factor is low, security incident is easily caused to occur.
(2) tank material materials are thin, shaky, in bicycle shed column, steel lining and tank are fixedly be connected by very thin stainless steel corner brace, corner brace one end snaps in bottom of gullet, and 2 self-tapping screws in one end are fixed on column steel lining, and tank outer side edges exceeds column outer side edges 8 centimetres, when raining heavily, water storage flume is too narrow, too little, the water capacity easily overfills, and is oblique after tank installs, water easy-storing, unsightly, be unfavorable for that bicycle shed townhouse is installed, fixing seal.
(3) ceiling frame section bar specification is too little, and wall thickness is too thin, and rigidity is inadequate, and wind resistance anti-snow ability is too fragile.
(4) the upper and lower press strip of ceiling is narrow, not easily locks screw and fixes, also low to the pressure of force-bearing plate.
5, utility function is unstable.The overboard drainage system ageing resistance of prior art is low, outdoor Long-Time Service, and after sealing glue is aging, soil cleaning port seal closure place easily leaks, and easily seeps water in each jointing junction, and infiltration situation is serious, poor practicability.
6, application life is short.The defect that overboard drainage system of the prior art exists due to self, for ensureing the normal use of drainage system, workman needs the seam crossing of periodic inspection gutter, regular frictioning, mends glue, causes certain loss, have a strong impact on the application life of drainage system.
7, energy consumption is high.Due to the high rhythm life of modern society, people wish that each product is practical, simple, performance is good, and the drainage system of prior art can not meet the requirement of people, not only using state instability (existing uncertain), and need often maintenance, maintenance, cause high energy consumption.
8, contaminated environment.The drainage system of prior art needs frictioning repeatedly, mends glue, can cause certain pollution, not environmentally to environment.
9, cost is high.Due to the defect that prior art exists, cause maintenance, maintenance cost high, be not suitable with the requirement of society to high-quality product.
Client needs practicality good, leakproof, and sturdy and durable, energy consumption is little, and noise is little, and overboard drainage system is good, the high-quality product of long service life.
Summary of the invention
The object of the invention is to the defect overcoming prior art, a kind of sturdy, wind resistance scientific and reasonable for structure, firm be provided, anti-snow ability is strong, security performance is high, noise is little, energy-conserving and environment-protective, overboard draining manufacture that is smooth and easy, long service life the novel pair of pull-type carport of stud sides method.
The object of the invention is to be achieved through the following technical solutions:
A kind of method manufacturing the novel pair of pull-type carport of stud sides, the structure of this side-pull type carport: comprise the ceiling be connected with two column by pull bar, the described ceiling being provided with front eaves is fixedly arranged in the frame with tank by Card trough and upper and lower press strip, tank and frame front end are provided with tank and frame capping, frame and front eaves port are provided with frame and front eaves capping
The method comprises the following steps:
(1) column of carport adopts novel pair of column;
(2) carport structure adopts side-pull type;
(3) main beam of parking shed sets up girder steel lining;
(4) carport adopts novel overboard drainage system;
The rectangular structure of cavity established by two column described in step (1) in being, cavity inner wall sets up column steel lining, and cavity is upper and lower to establishing for loose power and the cubic steel plate and the aluminium alloy plate that strengthen column strength, and is provided with several reinforcing ribs;
The reinforcing rib of step (1) central post be arranged in parallel;
Step (1) central post reinforcing rib is arranged in a crossed manner;
Column described in step (1) also comprises the groove beam and column capping of being located at column medial and lateral clamp on column body and column top, column square tube connector and column steel lining connector is provided with below column capping, column and pull bar junction are provided with column pull bar connector, and column bottom is provided with outer card plate base;
The frame of step (1) and column by frame and column corner brace affixed;
Side-pull type carport in step (2) comprises the bilateral pull bar be connected with two column;
Duplex pull rod one end in step (2) is connected with the two columns in step (1), and one end is connected with frame connecting pieces by the pull bar be provided with between pull bar with frame;
Girder inwall in step (3) sets up steel lining;
Girder steel lining in step (3) and girder isometric;
Frame in girder in step (3) and step (1) by girder and frame connecting pieces affixed;
The novel overboard drainage system of the carport in step (4), comprise the horizontally-arranged water pipe and tandem water pipe that are connected by two-way elbow, the front end of described horizontally-arranged water pipe is connected with two passband cleanup port elbows, the below of described two passband cleanup port elbows is provided with soil cleaning port seal closure, seal washer is provided with between soil cleaning port seal closure and two passband cleanup port elbows, drainage joint is provided with above two passband cleanup port elbows, establish sealing mat in drainage joint, two passband cleanup port elbow transverse joints and the inner, landing edge junction tapered;
The internal diameter of the external diameter of the transverse joint of two passband cleanup port elbows in step (4) and the landing edge of two passband cleanup port elbows matches;
Matching for the external diameter connecting port inner diameter that horizontally-arranged water pipe and the two-way elbow of tandem water pipe be connected with horizontally-arranged water pipe and horizontally-arranged water pipe in step (4), the external diameter of the port that this two-way elbow is connected with tandem water pipe and the internal diameter of tandem water pipe match.
Described in step (1) and step (2), (3), the material of carport column is aluminium alloys.
Frame in step (1) and the material of column corner brace are aluminium alloys.
The material of the girder in the frame in step (1) and step (3) is aluminium alloys.
Two passband cleanup port elbows in step (4) are 90 ° of two passband cleanup port elbow.
Be connected with another two-way elbow below tandem water pipe in step (4).
Two-way elbow in step (4) is 90 ° of two-way elbows.
In step (4), in soil cleaning port seal closure, seal washer material is silica gel.
Drainage joint in step (4) is T-shaped drainage joint.
After the present invention adopts technique scheme, following beneficial effect can be reached:
1, carport security and stability is high.The present invention is owing to adopting the two column (at least 0.57 meter wide) of ultra-wide, ensure that intensity and high wind resistance, the anti-snow performance of carport, the simultaneously steel liner structure in column indoor design, two columns can be fixed together firmly, simultaneously evenly load-bearing, stressed, avoid column load-bearing discontinuity, because column overall width adds several times (prior art carport head tree 0.16 meter is wide), the fixed point of the main frame of carport and main force's post is fixed by single-point short distance, become the long distance of multiple spot fixing, the security and stability of carport is high.
2, wind resistance anti-snow ability is high.The present invention is owing to adopting thick aluminium alloys material, and scientific structure design is reasonable, can resist 12 grades of strong wind, the accumulated snow that 50CM is thick, no matter is mounted in the many Hainan of typhoon, coastal cities or avenges large three provinces in the northeast of China all out of question, be suitable for the most area of China.
3, scientific structure design is firm, and product is durable, long service life.The present invention have employed high-strength aluminum alloy section (material 6005-T6 hardness 12-15 °) due to whole carport, all parts aluminium alloy extrusions all strengthen, thicken, split structure has been done and has more reasonably been designed, each portion combines closely, and main painstaking position is on column (inner side adds galvanizing steel lining) and diagonal member, overcome in prior art, the overall materials material of carport is poor, hardness is low, without steel lining inside column, section bar is too little, too thin, split unreasonable structure, wind resistance, anti-snow ability, the whole weight of carport ceiling is highly concentrated on single column stressed, and the potential safety hazard existed.Scientific structure of the present invention, firm, product is durable, extends the application life of carport, has wide market economy benefit.
4, sunshade, rainproof effect are good, and noise is little.The present invention owing to selecting the polycarbonate sheet of quality raw materials, and adds the two-sided UV layer of antiultraviolet, can hinder the ultraviolet of shelves 98% and the heat energy of 2/3rds.The structure design of science has been done to eaves, lower press strip, tank before bicycle shed, prevent because of lower large sudden and violent time the rainwater that occurs eaves, lower press strip, tank seep water in canopy in the past.The position that carport ceiling polycarbonate sheet contacts with bicycle shed frame is pasted with EVA high-elasticity foam, the noise reduction technique of particular design, and when can effectively prevent rainy, polycarbonate sheet directly contacts the noise of generation with bicycle shed frame, reduces noise, designs more humane.
5, scientific and reasonable for structure, in a down-to-earth manner firm.Aluminum alloy column of the present invention and girder material materials thick, column steel lining length and column isometric, girder length and girder isometric.Column needs the one section of column buried in concrete to make a call to the hole that four are worn screw rod, pin with nut after wearing screw rod, be convenient to column be welded and fixed and increase concrete adhesive power, increase several times than original bicycle shed intensity, solidness, increased substantially wind resistance, anti-snow ability and safety.
6, tank materials are thick, and more firmly sturdy, tank outer side edges flushes with column outer side edges and do not exceed column, and steel lining can penetrate by the T-slot of water trough design, and adjust arbitrarily and thicken corner brace link position, be fixed on column steel lining, intensity height wind resistance, anti-snow ability are strong.Tank can ensure when raining heavily after widening and strengthening process, and rainwater can not overfill tank, more attractive in appearance.
7, wind resistance, anti-snow ability are high.The present invention is owing to having superior materials, and scientific structure design is reasonable, can resist 12 grades of strong wind, the accumulated snow that 50CM is thick, no matter is mounted in the many Hainan of typhoon, coastal cities or avenges large three provinces in the northeast of China passable, be suitable for the most area of China.
8, scientific structure design is firm, and product is durable, long service life.The present invention have employed high-strength aluminum alloy section (material 6005-T6 hardness 12-15 °) due to whole bicycle shed, all sites aluminium alloy extrusions all strengthens thickening, split structure has been done and has more reasonably been designed, each position combines closely, and main painstaking point is all at aluminium extruded sections (the galvanizing steel lining that inner side installs additional), overcome the overall materials material of bicycle shed in prior art poor, hardness is low, inner without steel lining, too little, too thin, split unreasonable structure, wind resistance, anti-snow ability, with the whole weight of bicycle shed ceiling be highly concentrated in stressed on single column and exist potential safety hazard.
Scientific structure of the present invention is firm, and product is durable, extends the application life of bicycle shed, has wide market economy benefit.
9, sunshade, rainproof effect are good, noiselessness.The present invention owing to selecting the polycarbonate sheet of quality raw materials, and adds the two-sided UV layer of antiultraviolet, can hinder the ultraviolet of shelves 98% and the heat energy of 2/3rds.Done the structure design of science to eaves, lower press strip, tank before bicycle shed, eaves, lower press strip, tank seep water in canopy in the past to prevent the rainwater because occurring during lower torrential rain.The place that ceiling polycarbonate sheet contacts with bicycle shed frame is pasted with EVA high-elasticity foam, the noise reduction technique of particular design, when can effectively prevent rainy, polycarbonate sheet and bicycle shed frame directly contact the noise of generation, noise is obtained significantly reduce, adapt to the designing requirement that modern society's product is more humane.
10, easily draining.The present invention, owing to adopting AES engineering plastics switching device, closely cooperates with uvioresistant, aging-resistant pvc pipe, adds unique structure design, just can accomplish that a whole set of drainage system does not outwards seep water not beating fluid sealant regimen condition from technological layer.Overcome in prior art, not playing sealing glue will ooze water problem.
11, environmental protection; Maintaining is easy.Owing to all adopting high-strength aluminum alloy material, there is not problem of rustiness in the present invention, inner steel lining is all galvanizing steel, can ensure non-corrosive in 20 years.Bicycle shed all adopts composite assembly structure, is easy to dismounting, and it is convenient to install, and can reuse, environmental protection.
12, standardized production.The present invention, owing to adopting composite assembly structure, can realize factory normalization, modularization, production line balance; can produce in batches according to plan and make stock, Product Precision is high, can accomplish that the component often overlapping bicycle shed exchange; delivery is fast, and Assembling is convenient, can realize industrialization, large-scale development.
13, elegant in appearance.The present invention is elegant in appearance, and moulding is unique, while meeting vehicle sunshade rain-proof, has beautified parking ring Base-on-environment and Zhou Bianhuan Base-on-environment.
14, non-corrosive, non-maintaining in 20 years, environmental protection.The present invention is due to parts employing high-strength aluminum alloy material, and there is not problem of rustiness, inner steel lining is all galvanizing steel, can ensure non-corrosive in 20 years.Carport all adopts composite assembly structure, is easy to dismounting, recycling, environmental protection.
15, long product lifecycle.The AES material engineering resin that the present invention's overboard drainage system material all adopts outdoor uvioresistant to decompose, sealing mat selects the environment friendly foam cotton of SBR material, gutter adopts the pvc pipe adding uvioresistant composition, in soil cleaning port seal closure, seal washer adopts silica gel material, substantially prolongs the outdoor ageing resistance of overboard drainage system, extend the application life of product.
16, antiseep is effective.Each junction of the present invention all adopts the mode of close-fitting, fitting face tightly fit to together, just can accomplish that a whole set of drainage system all can not outwards seep water not beating fluid sealant regimen condition from technological layer, if stamp sealing glue more more can not outwards seep water, overcome in prior art and do not play sealing glue and will seep water, harmful situation is more gone through in sealing glue aging rear infiltration.
17, non-maintaining.The present invention is owing to solving infiltration, seepy question from technical pattern aspect, can guarantee that the water leak preventing structure of the close-fitting seepage-proof structure of each jointing, soil cleaning port seal closure, jointing all coordinate closely with the close-fitting seepage-proof structure of overboard gutter, guarantee whole overboard drainage system and the concordance of body of wall is installed.
18, creative.Two columns in the present invention are that applicant initiates, temporarily without the column finding this kind of structure in prior art, isometric steel lining set up by column and girder, also be that applicant initiates, in prior art, temporary without finding that the girder of this kind of structure is (after setting up isometric steel lining because of girder, deadweight can increase, column of the prior art is difficult to the carport supporting this structure, only have the novel pair of column adopting applicant to initiate just can overcome this defect) sink structure, do not find the sink structure in the present invention in the prior art temporarily.
Accompanying drawing explanation
Fig. 1 is stereogram of the present invention;
Fig. 2 is central post inside structure schematic diagram of the present invention;
Fig. 3 is central post outboard structure schematic diagram of the present invention;
Fig. 4 is central post internals schematic diagram of the present invention;
Fig. 5 is front view of the present invention;
Fig. 6 is left view of the present invention;
Fig. 7 is upward view of the present invention;
Fig. 8 is the sectional view of middle girder of the present invention;
Fig. 9 is the structural representation of overboard drainage system in the present invention.
Description of reference numerals
In FIG
1, clamp 8 inside clamp 2 outside column, tank and frame capping 3, Card trough 4, tank 5, PC force-bearing plate 6, frame and column corner brace 7, column, groove beam 9, column capping 10, pull bar 11, pull bar and frame connecting pieces 12, front eaves 13, frame and front eaves capping 14, column 15, outer card plate base 16, column;
In fig. 2
15, clamp outside clamp 1, column in outer card plate base 16, column 17, reinforcing rib 9, column capping 8, groove beam 7, column;
In figure 3
15, clamp outside outer card plate base 16, column 17, reinforcing rib 8, groove beam 9, column capping 1, column;
In the diagram
15, clamp 18, column steel lining 19, column steel lining connector 9, column capping 8, groove beam 20, column square tube connector 21, cubic steel plate 22, aluminium alloy plate 9, column capping 23, column pull bar connector 16, column 17, reinforcing rib inside clamp 16, column 7, column outside outer card plate base 1, column;
In Figure 5
16, column 25, secondary skeleton 12, front eaves 10, pull bar 4, tank 26, lower press strip 5, PC force-bearing plate 24, frame and column corner brace;
In figure 6
15, clamp 16, column 27, water slot cover 9, column capping 8, groove beam 28, pull bar serum cap 10, pull bar 11, pull bar connector 29, frame 13, front eaves capping outside outer card plate base 1, column;
In the figure 7
12, front eaves 5, PC force-bearing plate 25, secondary skeleton 26, lower press strip 4, tank 6, frame and column corner brace 10, pull bar 13, front eaves capping 2, water slot cover 24, frame and column corner brace;
In fig. 8
30, girder 31, girder steel lining;
In fig .9
32, the landing edge 37 of transverse joint 36, the two passband cleanup port elbow of sealing mat 33, T-shaped drainage joint 34, two passband cleanup port elbow 35, two passband cleanup port elbow, silica gel sealing packing ring 38, soil cleaning port seal closure 39, horizontally-arranged water pipe 40, two-way elbow 41, tandem water pipe 42, clamp seat 43, pipe clamp 44, two-way elbow.
Detailed description of the invention
Below in conjunction with drawings and the specific embodiments, the present invention is described in further detail:
See Fig. 1
Fig. 1 is stereogram of the present invention.In FIG, a kind of method manufacturing the novel pair of pull-type carport of stud sides, the method comprises the following steps:
(1) column of carport adopts novel pair of column;
(2) carport structure adopts side-pull type;
(3) main beam of parking shed sets up girder steel lining;
(4) carport adopts novel overboard drainage system;
The structure of the novel pair of pull-type carport of stud sides described in step (1): comprise the ceiling be connected with two column 14,16 by pull bar 10, the ceiling being provided with front eaves 12 is fixedly arranged in the frame 29 with tank 4 by Card trough 3 and upper and lower press strip 26, described tank 4 is provided with tank and frame capping 2 with frame 29 front end, frame 29 and front eaves 12 port are provided with frame and front eaves capping 13, are connected between pull bar 10 with frame 29 by pull bar with frame connecting pieces 11.
Described column 16,14 bottom is provided with outer card plate base 15.
Described column 16,14 top is provided with groove beam 8 and column capping 9.
Described frame 29 and column 16,14 are by frame and column corner brace 6,24 affixed.
Described ceiling is made up of PC force-bearing plate 5.
Side-pull type carport in step (2) comprises the bilateral pull bar 10 be connected with two column 16,14.
Duplex pull rod 10 one end in step (2) is connected with the two columns 16,14 in step (1), and one end is connected with frame connecting pieces 11 by the pull bar be provided with between pull bar 10 with frame 29.
See Fig. 2, see Fig. 3, see Fig. 4
Fig. 2 is central post inside structure schematic diagram of the present invention; Fig. 3 is the column outboard structure schematic diagram in the present invention; Fig. 4 is central post internals schematic diagram of the present invention.In Fig. 2, Fig. 3, Fig. 4, a kind of method manufacturing the novel pair of pull-type carport of stud sides, the rectangular structure of cavity established by column 16,14 in step (1) in being, cavity inner wall sets up column steel lining 18, cavity is upper and lower to establishing for loose power and the cubic steel plate 21 and the aluminium alloy plate 22 that strengthen column 16,14 intensity, and is provided with several reinforcing ribs 17.
Described reinforcing rib 17 can be arranged in parallel; Also can be arranged in a crossed manner.Parallel and intersection mixing setting can also be adopted as required.
Described column 16,14 also comprises the groove beam 8 and column capping 9 of being located at column medial and lateral clamp 7,1 on column 16,14 body and column 16,14 top, column square tube connector 20 and column steel lining connector 19 is provided with below column capping 9, column 16,14 and pull bar 10 junction are provided with column pull bar connector 23, are provided with outer card plate base 15 bottom column 16,14.
The column steel lining 18 be connected with column 16,14 by column steel lining connector 19 is established in column 16,14 cuboid cavity.
Between described pull bar 10 and frame 29 by pull bar and frame connecting pieces 11 affixed.
Described frame 29 and column 16,14 are by frame and column corner brace 6,24 affixed.
See Fig. 5
Fig. 5 is front view of the present invention.In Figure 5, a kind of method manufacturing the novel pair of pull-type carport of stud sides, column 16,14 in cuboid in step (1) is by the pull bar 10 in step (2) and frame and column corner brace 6,24 affixed, the PC force-bearing plate 5 of ceiling, lower press strip 26 and secondary skeleton 25 are by fastening for PC force-bearing plate 5, and carport ceiling is provided with front eaves 12 and the tank 4 for draining.
See Fig. 6
Fig. 6 is left view of the present invention.In figure 6, a kind of method manufacturing the novel pair of pull-type carport of stud sides, column 16,14 in step (1) is connected with the pull bar 10 in step (3) and frame 29 with frame connecting pieces 11 by pull bar, the front end of described frame 29 is provided with front eaves capping 13, frame 29 rear end is provided with water slot cover 27, column 16 has groove beam 8 and column capping 9, and column 16 has outer card plate base 15, and column 16 has clamp 1 outside column.
The structure of column 14 is identical with column 16, and column 14 and carport each parts annexation are also identical with carport each parts annexation with column 16.
See Fig. 7
Fig. 7 is upward view of the present invention.In the figure 7, a kind of method manufacturing the novel pair of pull-type carport of stud sides, the PC force-bearing plate 5 of the ceiling of the bicycle shed in step (1) is fixedly arranged in frame 29 by Card trough 3 and lower press strip 26 and secondary skeleton 25, the tank 4 with water slot cover 2 is provided with outside frame 29, column 16,14 and frame 29 by the pull bar 10 in step (3) and column and frame corner brace 6 affixed, front eaves 12 port being located at ceiling front portion is provided with front eaves capping 13.
Column and frame corner brace 6,24 material can adopt aluminium alloys.
See Fig. 8
Fig. 8 is the sectional view of middle girder of the present invention.In fig. 8, a kind of method manufacturing the novel pair of pull-type carport of stud sides, in step (3), girder 30 inwall is provided with girder steel lining 31, and girder steel lining 31 is isometric with girder 30.
After girder steel lining 31 is set, add the integrally-built intensity of carport.
See Fig. 9
Fig. 9 is the structural representation of overboard drainage system in the present invention.In fig .9, a kind of method manufacturing the novel pair of pull-type carport of stud sides, novel overboard drainage system in step (4), comprise the horizontally-arranged water pipe 39 and tandem water pipe 41 that are connected by two-way elbow 40, the front end of described horizontally-arranged water pipe 39 is connected with two passband cleanup port elbows 34, the below of described two passband cleanup port elbows 34 is provided with soil cleaning port seal closure 38, silica gel sealing packing ring 37 is provided with between soil cleaning port seal closure 38 and two passband cleanup port elbows 34, drainage joint 33 is provided with above two passband cleanup port elbows 38, sealing mat 32 is established in drainage joint 33, the transverse joint 35 of two passband cleanup port elbows and the inner, landing edge 36 junction of two passband cleanup port elbows tapered.
Be connected with another two-way elbow 44 below tandem water pipe 41, the novel overboard drainage system of carport can be fixedly connected with by clamp seat 42 and with the pipe clamp 43 that clamp seat 42 matches with infield, arranges several clamp seat 42 and pipe clamp 43 according to actual needs.
The internal diameter of the external diameter of the transverse joint 35 of two passband cleanup port elbows and the landing edge 36 of two passband cleanup port elbows matches.
External diameter for connecting port inner diameter that horizontally-arranged water pipe 39 and the two-way elbow 40 of tandem water pipe 41 be connected with horizontally-arranged water pipe 39 and horizontally-arranged water pipe 39 matches, and the external diameter of the port that this two-way elbow 40 is connected with tandem water pipe 41 and the internal diameter of tandem water pipe 41 match.
Be connected with another two-way elbow 44 below tandem water pipe 41; Two-way elbow 40,44 can adopt 90 ° of two-way elbows.
Two passband cleanup port elbows 34 can adopt 90 ° of two passband cleanup port elbow; 90 ° of two passband cleanup port elbow 34 fitting face is tapered.
Drainage joint 33 can adopt T-shaped drainage joint.
In drainage joint 33, sealing mat 32 can adopt the environment friendly foam cotton of SBR material.
In soil cleaning port seal closure 38, the material of seal washer 37 can adopt silica gel.
Overboard drainage system in the present invention can be fixedly arranged on the low side of carport, so that the excretion of carport current.
After the present invention adopts said structure, the close-fitting mode fitting face of each junction tightly fit to together, structure, just accomplishing that a whole set of drainage system is not when playing sealing glue, can not outwards seep water, accomplishing to install, safeguard, maintain simple and direct.
The present invention adopts standardized production, and each parts all adopts standard component, produce, transport easily, after arriving job site, each parts are connected with screw with connector and fastening bolt, fixing, and install, dismantle convenient, maintaining is easy, change component efficient, succinctly.
Critical piece in the present invention can customize according to suitable environment, blast and the large place of crushing by snow, reinforcing rib in column can be set up several, and meanwhile, each connector also can adopt reinforced, to strengthen Wind-Pressure Resistance, crushing by snow ability, the environment of general blast, then without the need to adding reinforcing rib especially, by standard configuration, mobility strong, designs more humane.
Other technologies of the present invention can adopt prior art.
Most preferred embodiment of the present invention is illustrated, and the further expansion that those skilled in the art makes according to the present invention all falls into protection scope of the present invention.

Claims (9)

1. one kind manufactures the method for the novel pair of pull-type carport of stud sides, the structure of this side-pull type carport: comprise the ceiling be connected with two column by pull bar, the described ceiling being provided with front eaves is fixedly arranged in the frame with tank by Card trough and upper and lower press strip, tank and frame front end are provided with tank and frame capping, frame and front eaves port are provided with frame and front eaves capping, it is characterized in that:
The method comprises the following steps:
(1) column of carport adopts novel pair of column;
(2) carport structure adopts side-pull type;
(3) main beam of parking shed sets up girder steel lining;
(4) carport adopts novel overboard drainage system;
The rectangular structure of cavity established by two column described in step (1) in being, cavity inner wall sets up column steel lining, and cavity is upper and lower to establishing for loose power and the cubic steel plate and the aluminium alloy plate that strengthen column strength, and is provided with several reinforcing ribs;
The reinforcing rib of step (1) central post be arranged in parallel;
Step (1) central post reinforcing rib is arranged in a crossed manner;
Column described in step (1) also comprises the groove beam and column capping of being located at column medial and lateral clamp on column body and column top, column square tube connector and column steel lining connector is provided with below column capping, column and pull bar junction are provided with column pull bar connector, and column bottom is provided with outer card plate base;
The frame of step (1) and column by frame and column corner brace affixed;
Side-pull type carport in step (2) comprises the bilateral pull bar be connected with two column;
Duplex pull rod one end in step (2) is connected with the two columns in step (1), and one end is connected with frame connecting pieces by the pull bar be provided with between pull bar with frame;
Girder inwall in step (3) sets up steel lining;
Girder steel lining in step (3) and girder isometric;
Frame in girder in step (3) and step (1) by girder and frame connecting pieces affixed;
The novel overboard drainage system of the carport in step (4), comprise the horizontally-arranged water pipe and tandem water pipe that are connected by two-way elbow, the front end of described horizontally-arranged water pipe is connected with two passband cleanup port elbows, the below of described two passband cleanup port elbows is provided with soil cleaning port seal closure, seal washer is provided with between soil cleaning port seal closure and two passband cleanup port elbows, drainage joint is provided with above two passband cleanup port elbows, establish sealing mat in drainage joint, two passband cleanup port elbow transverse joints and the inner, landing edge junction tapered;
The internal diameter of the external diameter of the transverse joint of two passband cleanup port elbows in step (4) and the landing edge of two passband cleanup port elbows matches;
Matching for the external diameter connecting port inner diameter that horizontally-arranged water pipe and the two-way elbow of tandem water pipe be connected with horizontally-arranged water pipe and horizontally-arranged water pipe in step (4), the external diameter of the port that this two-way elbow is connected with tandem water pipe and the internal diameter of tandem water pipe match.
2. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: described in described step (1) and step (2), (3), the material of carport column is aluminium alloys.
3. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: the frame in described step (1) and the material of column corner brace are aluminium alloys.
4. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: the material of the girder in the frame in described step (1) and step (3) is aluminium alloys.
5. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: two passband cleanup port elbows in described step (4) are 90 ° of two passband cleanup port elbow.
6. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: be connected with another two-way elbow below the tandem water pipe in described step (4).
7. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: the two-way elbow in described step (4) is 90 ° of two-way elbows.
8. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: in described step (4), in soil cleaning port seal closure, seal washer material is silica gel.
9. a kind of method manufacturing the novel pair of pull-type carport of stud sides according to claim 1, is characterized in that: the drainage joint in described step (4) is T-shaped drainage joint.
CN201510478325.5A 2015-08-06 2015-08-06 A kind of method for manufacturing double column side-pull type carports Active CN105041014B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510478325.5A CN105041014B (en) 2015-08-06 2015-08-06 A kind of method for manufacturing double column side-pull type carports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510478325.5A CN105041014B (en) 2015-08-06 2015-08-06 A kind of method for manufacturing double column side-pull type carports

Publications (2)

Publication Number Publication Date
CN105041014A true CN105041014A (en) 2015-11-11
CN105041014B CN105041014B (en) 2018-02-13

Family

ID=54447954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510478325.5A Active CN105041014B (en) 2015-08-06 2015-08-06 A kind of method for manufacturing double column side-pull type carports

Country Status (1)

Country Link
CN (1) CN105041014B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07310452A (en) * 1994-05-17 1995-11-28 Ykk Architect Prod Kk Column attachment of carport
CN2685431Y (en) * 2004-03-08 2005-03-16 民夏铝业(常熟)有限公司 Assembling down pipe
JP2005105714A (en) * 2003-09-30 2005-04-21 Shikoku Chem Corp Simple car shed
CN2811436Y (en) * 2005-06-29 2006-08-30 连云港杰瑞模具技术有限公司 Wood-plastic patterned-porch stand post
CN201610648U (en) * 2009-11-06 2010-10-20 深圳市新天光电科技有限公司 Solar energy parking shed capable of charging automobiles
CN202450803U (en) * 2012-02-23 2012-09-26 鲁海波 Canopy

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07310452A (en) * 1994-05-17 1995-11-28 Ykk Architect Prod Kk Column attachment of carport
JP2005105714A (en) * 2003-09-30 2005-04-21 Shikoku Chem Corp Simple car shed
CN2685431Y (en) * 2004-03-08 2005-03-16 民夏铝业(常熟)有限公司 Assembling down pipe
CN2811436Y (en) * 2005-06-29 2006-08-30 连云港杰瑞模具技术有限公司 Wood-plastic patterned-porch stand post
CN201610648U (en) * 2009-11-06 2010-10-20 深圳市新天光电科技有限公司 Solar energy parking shed capable of charging automobiles
CN202450803U (en) * 2012-02-23 2012-09-26 鲁海波 Canopy

Also Published As

Publication number Publication date
CN105041014B (en) 2018-02-13

Similar Documents

Publication Publication Date Title
CN207176920U (en) A kind of steel frame SIP plank frame modular houses
CN201649374U (en) Framework type curtain wall with decorative strip keels
CN201952948U (en) Novel panel
CN201486057U (en) Node mechanism for self-water drainage flashing edge-closing plate
CN203701307U (en) Deformation joint structure of ramp roof of automobile
CN101787775B (en) Solar roof with concrete structure
CN206091112U (en) Novel sunshade rainshelter
CN209339019U (en) A kind of anti-wind and snow Lang Peng of steel and concrete structure
CN204940957U (en) A kind of novel pair of pull-type carport of stud sides
CN105041014A (en) Method for manufacturing novel double-column side-pulling type parking shed
CN209907619U (en) Novel building outer wall
CN215105162U (en) Totally-enclosed transparent shed tunnel for flood discharge atomization area of power station
CN205153244U (en) Metal roof waterproof people pore structure
CN213086855U (en) Prestressing force transversely divides and adds vertical even pin-connected panel pipe gallery
CN204920328U (en) Add parking shed of steel lining structure
CN204676927U (en) Module intelligence anti-seismic heat-preservation one splicing structure house
CN201663834U (en) Light planting container device used for tridimensional virescence
CN206487186U (en) A kind of novel assembled high intensity is solar vehicle-shed
CN2611461Y (en) Glass fibre reinforced plastic movable dwellings
CN111593839A (en) Single-slope drainage lateral lighting large-span sloping roof system of industrial factory building in cold region
CN202401642U (en) Integrated roof structure used for railroad platform
CN205637277U (en) A roofing connecting device and abat -vent for installing oblique roofing of abat -vent
CN206385641U (en) A kind of aluminum alloy sunlight house rain-proof splices roof
CN201598730U (en) Roof waterproof structure for container type connected movable house
CN204299048U (en) Sheet material connects and waterproof construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170921

Address after: 528225, Guangdong, Nanhai District, Foshan province lion town Shishan office Liu Runwen village factory (phase 1) factory building

Applicant after: Foshan grand decoration Mstar Technology Ltd

Address before: 466600 Xihua County, Henan City, the former town of the first section of the village in front of the village of the town of Zhoukou, No. 061

Applicant before: Li Pengfei

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant