CN105040716B - Bridge and bridge pier cofferdam integral equipment and construction method for same - Google Patents

Bridge and bridge pier cofferdam integral equipment and construction method for same Download PDF

Info

Publication number
CN105040716B
CN105040716B CN201510576932.5A CN201510576932A CN105040716B CN 105040716 B CN105040716 B CN 105040716B CN 201510576932 A CN201510576932 A CN 201510576932A CN 105040716 B CN105040716 B CN 105040716B
Authority
CN
China
Prior art keywords
guide pile
cofferdam
water
pile
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510576932.5A
Other languages
Chinese (zh)
Other versions
CN105040716A (en
Inventor
徐伟青
李涛
陈正寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang road traffic construction supervision Consulting Co. Ltd.
Original Assignee
Zhejiang Road Traffic Construction Supervision Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Road Traffic Construction Supervision Consulting Co Ltd filed Critical Zhejiang Road Traffic Construction Supervision Consulting Co Ltd
Priority to CN201510576932.5A priority Critical patent/CN105040716B/en
Publication of CN105040716A publication Critical patent/CN105040716A/en
Application granted granted Critical
Publication of CN105040716B publication Critical patent/CN105040716B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses bridge and bridge pier cofferdam integral equipment and a construction method for the same. The bridge and bridge pier cofferdam integral equipment is characterized by comprising a plurality of water blocking devices and water pumping devices having the same numbers as the water blocking devices. The water blocking devices and the water pumping devices are connected at intervals to form the cofferdam. The bridge and bridge pier cofferdam integral equipment is advantaged by small equipment size, number reduction, easy installation and transportation, quick assembling, cofferdam formation, and quick recovery, and also possessing high automation degree; construction period can be greatly shortened; water areas can be divided and blocked with high efficiency; and apparatus recovery can be facilitated.

Description

A kind of bridge pier cofferdam equipment integrating and construction method thereof
Technical field
The invention belongs to technical field of bridge engineering, be specifically related to a kind of bridge cofferdam equipment integrating and construction method thereof.
Background technology
Cofferdam refers in hydraulic engineering construction, for building permanent water conservancy projects, the provisional building enclosure built.Its Effect is to prevent what water and soil from entering building to build position, in order at cofferdam internal drainage, and excavation pit builds building.One As be mainly used in waterwork, in addition to the part as formal building, cofferdam typically after being finished remove.Cofferdam height Higher than the peak level being likely to occur in the construction time.
Steel sheet-pile cofferdam is the most frequently used a kind of sheet-pile cofferdam.Steel sheet pile is a kind of shaped steel with fore shaft, and its cross section has Straight plate shape, flute profile and Z-shaped etc., have full range of sizes and interlocking form.Common are Ademilson formula of drawing, clarke Wan Nashi etc..Its Advantage is: intensity is high, easily squeezes into hard soil layer;Can be at deep subaqueous work, water resistance is good;Various profile can be formed on demand Cofferdam, and can repeatedly use, therefore, it of many uses.The cofferdam on open caisson top, tubing string it is usually used in bridge construction Basis, pile foundation and the cofferdam etc. of open cut foundation.Have in these closed cofferdam of many employings single wall, cofferdam and vertically and horizontally support, necessary Time add bearing diagonal and become an inclosure.Such as the tube caisson foudations of Nanjing of China the Changjiang river bridge, once used steel sheet pile circular cofferdam, its diameter 21.9 meters, steel sheet pile length 36 meters, after underwater concrete back cover reaches requirement of strength, draw water and build cushion cap and pier shaft, design of drawing water The degree of depth reaches 20 meters.In waterwork, general construction area is very big, then conventional to make structure body cofferdam.It is mutual by many The monomer connected is constituted, and each monomer is made up of many steel sheet piles again, tamps with soil in the middle of monomer.The scope that cofferdam is gone along with sb. to guard him The biggest, it is impossible to supporting weir wall with supporting, the most each monomer can resist alone the drawing crack toppled, slide and prevent at interlocking. Conventional has the form such as circle and next door shape.
Steel sheet-pile cofferdam is applied more in China constructs, but its construction is extensive, and cost haggles over height, between steel sheet pile composition Also tamping with soil, such duration is longer, needs water pump ceaselessly to draw water inside cofferdam, and such operation is very trouble.
Secondly, such as Patent No. ZL201220322013.7, the applying date 2012. 07 .05, notification number The Chinese utility model patent of CN202706045U discloses a kind of circular cofferdam, including the one group of steel being enclosed in cushion cap periphery Sheet pile and cofferdam substrate, it is characterised in that: described steel sheet pile is arranged to tubular cofferdam wall, described steel sheet pile along cushion cap circumferential annular Root extend to below cofferdam substrate, the top of steel sheet pile be higher than cushion cap;The medial wall being close to this group steel sheet pile is provided with and encloses Weir, described in enclose purlin and be spaced the most successively along wall border, cofferdam and be circular layout;Described first cofferdam and the 3rd cofferdam, road are divided Being additionally provided with in the disk at other place and fix the inner support being connected with cofferdam inwall, described inner support is the square that steel pipe encloses Shape framework and its be arranged in parallel with cofferdam substrate.
And for example Patent No. ZL201120427362.0, the applying date 2011. 11 .02, notification number CN202359565U Chinese utility model patent in disclose a kind of steel sheet pile cofferdam structure, be made up of steel sheet pile and weir, cofferdam body, its feature exists In: described steel sheet pile is single, is arranged at body side near water, weir, cofferdam;Weir, described cofferdam body is filled by rock structure and forms.
Both cofferdam structures above-mentioned are commonly used in construction at present, and its construction is extensive, and the time is long, have in operation waters Insert and bury a large amount of bamboo pole;And substantial amounts of cloth is hung up above, cloth fixing point on bamboo pole with resistance effect is many, and operation is delayed Slowly;After operation completes, the recovery for bamboo pole and cloth excessively bothers, especially in the case of cofferdam workload is big.
Summary of the invention
The present invention is directed to disadvantage mentioned above, based on solving existing highway bridge bridge pier, the bridge pier that particularly some canal water levels are low Cofferdam structure construction is extensive, and operation is slow, the slow-footed problem of rear material recovery of having constructed.Propose a kind of bridge cofferdam one Body equipment and construction method thereof.This equipment and construction method thereof make installation and the dismounting in bridge pier cofferdam by the design of rational structure Time is greatly shortened, and improves efficiency of construction.
For realizing the purpose of the present invention, the technical solution used in the present invention is:
A kind of bridge pier cofferdam equipment integrating, is characterized in that: include arranging quantity phase by multiple water barrier devices with it Same water plug interval is installed and is connected composition cofferdam;
Described water barrier device includes that internal is hollow-core construction, and edge is arranged with triangle open mouth, and bottom is taper pile crown Guide pile one;Guide pile one is provided with dividing plate in the middle of it, and the axis of rolling is symmetrically mounted on dividing plate both sides, and on it, roll has rubber Cloth;The vertical edges of described rubberized fabric has, along connection, the fan-shaped long strip block being stuck at triangle open mouth;
Described water plug includes that internal is taper pile crown guide pile two for hollow-core construction, bottom, described guide pile two limit Edge is provided with the clamping structure fixing fan-shaped long strip block;Suction pump is arranged in the middle of guide pile two, and it is connected above leading to outward The outlet conduit in portion, lower section connects inlet channel;Multiple water inlet it is laid with, wherein: under above described inlet channel End water inlet is positioned at bottom guide pile two.
Above-mentioned guide pile one and guide pile two are generally circular in shape or square.
Preferentially, described rubberized fabric top is positioned at guide pile one top, and bottom extends to guide pile one bottom, and its thickness is 3-5mm, the most uniform connection in bottom has inserted sheet, and rubberized fabric is difficult to be cut off by foreign body under mud tear the most during insertion.
Preferentially, described axis of rolling top is also associated with PLC and controls motor, and motor control knob is arranged on guide pile one top End surface, so can quickly quickly reclaim the rubberized fabric run out.
Preferentially, in order to prevent foreign material from entering inlet channel, at described water inlet water inlet, it is additionally provided with drainage screen.
Preferentially, described guide pile two is internal is laid with fixed water inlet pipe road, outlet conduit and suction pump from top to bottom Bracing member.
Preferentially, clamping structure is fan groove or alligator clamp, wherein: use fan groove relative with the shape of fan-shaped long strip block Should, can penetrate and make two connections;Use alligator clamp to be fixed with bracing member by round steel, the most first alligator clamp is pulled open appearance Opening, is placed on long strip block in opening, and trip spring folder makes its automatic rebounding clamp, and makes two connections.
Preferentially, described rubberized fabric bottom sides is along being 50-70cm away from guide pile one taper pile crown distance, and such stake is at least wanted Squeeze into 50cm in mud, add that rubberized fabric submerges 10-20cm in mud, such two by thoroughly stable.
It addition, based on the said equipment, present invention also offers a kind of bridge pier cofferdam equipment integrating construction method, including Following steps,
(1) by equipment delivery to treating place, cofferdam, measure the spacing determining between guide pile two and guide pile one and fix Point;
(2) long strip block above guide pile one is extracted out and is fixed on inside the clamping structure of guide pile two, surround bridge pier;
(3) guide pile two and guide pile one that surround bridge pier are squeezed in fixing point water, make both bottom pyramidal pile crowns complete Entirely submerge in mud and guarantee that rubberized fabric bottom margin submerges 10-20cm in mud, makes guide pile two and guide pile one fix;
(4) crawl guide pile one motor control knob above, is slowly recovered to the axis of rolling by unnecessary rubberized fabric, and it is fixed to make Thoroughly straining between position stake two and guide pile one, now cofferdam has been arranged;
(5) suction pump started in guide pile two starts to draw water in cofferdam, according to water surface ripple in cofferdam in pump process Emotionally condition checks for bottom water leakage situation, and takes corresponding measures of preventing water;
(6), after having drawn water, utilize earth that cofferdam inner bottom part surrounding is banketed, make bottom cofferdam thoroughly to seal and Start bridge pier is overhauled;
(7) after having overhauled, first long strip block is separated with clamping structure, pull up guide pile one and guide pile two, and lead to Cross guide pile one motor control knob above quickly to be wrapped back to above the axis of rolling by outside rubberized fabric, complete construction.
Compared with prior art, advantages of the present invention is as follows: (1) this equipment volume is little, and quantity is few, it is simple to installs and transports Defeated;(2) during installing and using, can quickly assemble, quickly form cofferdam, quickly reclaim, automaticity is high, so The whole work progress time is greatly shortened;(3) this equipment can division and blocking-up to waters the most easily, simultaneously the returning of equipment Receipts process becomes facilitation.
Accompanying drawing explanation
The most next the accompanying drawing by means of embodiment carries out brief description to the present invention.In accompanying drawing:
Fig. 1 shows schematic diagram when bridge cofferdam equipment integrating of the present invention is constructed;
Fig. 2 shows that water barrier device of the present invention pulls open the schematic diagram of state;
Fig. 3 shows the top view of water barrier device of the present invention;
Fig. 4 shows that water barrier device of the present invention pulls open state top view;
Fig. 5 shows that the structure of water plug of the present invention arranges schematic diagram;
Fig. 6 shows that water barrier device of the present invention is connected the first clamping mode with water plug;
Fig. 7 shows that water barrier device of the present invention is connected the second clamping mode with water plug.
In figure: 100, water barrier device, 101, guide pile one, 102, rubberized fabric, 103, long strip block, 104, the axis of rolling, 106, Dividing plate, 107, motor control knob, 108, inserted sheet, 200, water plug, 201, guide pile two, 202, bracing member, 203, take out Water pump, 204, water inlet, 205, drainage screen, 206, inlet channel, 207, outlet conduit, 209, clamping structure, 2091, spring Folder, 2092, fan groove, 211, electrical wire interface, 300, cofferdam.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following example will assist in the technology of this area Personnel are further appreciated by the present invention, but limit the present invention the most in any form.It should be pointed out that, the ordinary skill to this area For personnel, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement.These broadly fall into the present invention Protection domain.
Embodiment 1
This kind of structure based on the depth of water in the bridge pier operation at 5-7 rice.
A kind of bridge pier cofferdam equipment integrating, including by multiple water barrier devices 100 with arrange identical the taking out of quantity with it Water device 200 interval is installed and is connected composition cofferdam 300, between the two away from for 0.7 meter.
Please refer to Fig. 2, Fig. 3 and Fig. 4 by emphasis, water barrier device 100 includes that internal is hollow-core construction, and edge is arranged with triangle Shape opening, bottom is the circular guide pile 1 of taper pile crown;Guide pile 1 is provided with dividing plate 106, the axis of rolling in the middle of it 104 are symmetrically mounted on dividing plate 106 both sides, and on it, roll has rubberized fabric 102;The vertical edges of described rubberized fabric 102 has card along connection Fan-shaped long strip block 103 at triangle open mouth.
Rubberized fabric 102 top is positioned at guide pile 1 top, and bottom extends to guide pile 1 bottom, and its thickness is 5mm, the most uniform connection in bottom has inserted sheet 108, and rubberized fabric 102 is difficult to be cut off by foreign body under mud tear the most during insertion. Rubberized fabric 102 bottom sides edge is 70cm away from guide pile 1 taper pile crown distance.
It addition, the axis of rolling 104 top is also associated with PLC controls motor (not shown), motor control knob 107 is installed At guide pile 1 top end face, so can quickly the rubberized fabric 102 run out quickly be reclaimed;
Please emphasis refering to Fig. 5 and Fig. 7, water plug 200 includes internal for circle that hollow-core construction, bottom are taper pile crown Guide pile 2 201, described guide pile 2 201 edge is provided with the clamping structure 209 fixing fan-shaped long strip block 103;Clamping structure 209 is fan groove 2092, uses fan groove 2092 corresponding with the shape of fan-shaped long strip block 103, can penetrate and make two connections.
Suction pump 203 is arranged in the middle of guide pile 2 201, and it is connected above leading to outside outlet conduit 207, lower section Connect and have inlet channel 206;Electrical wire interface 211 is located at guide pile 2 201 end face connection external power source and powers suction pump 203. It is laid with multiple water inlet 204 above described inlet channel 206, is additionally provided with drainage screen 205 at its water inlet, wherein: bottom Water inlet is positioned at bottom guide pile 2 201.
Guide pile 2 201 is internal is laid with fixed water inlet pipe road 206, outlet conduit 207 and suction pump 203 from top to bottom Bracing member 202.
Based on the said equipment, its construction method comprises the following steps,
(1) by equipment delivery to treating place, cofferdam, measure and determine the spacing between guide pile 2 201 and guide pile 1 And fixing point;
(2) long strip block 103 above guide pile 1 is extracted out and is fixed in the clamping structure 209 of guide pile 2 201 Portion, surrounds bridge pier;
(3) guide pile 2 201 and guide pile 1 that surround bridge pier are squeezed in fixing point water, make both bottom pyramidal Pile crown submerges in mud completely and guarantees that rubberized fabric 102 bottom margin submerges 20cm in mud, makes guide pile 2 201 and guide pile one 101 fix;
(4) crawl guide pile 1 motor control knob 107 above, is slowly recovered to rolling by unnecessary rubberized fabric 102 Moving axis 104, makes thoroughly to strain between guide pile 2 201 and guide pile 1, and now cofferdam has been arranged;
(5) suction pump 203 started in guide pile 2 201 starts to draw water in cofferdam, according in cofferdam in pump process Water level fluctuation situation checks for bottom water leakage situation, and takes corresponding measures of preventing water;
(6), after having drawn water, utilize earth that cofferdam inner bottom part surrounding is banketed, make bottom cofferdam thoroughly to seal and Start that bridge pier carries out maintenance to reinforce;And surely make regular check on or without occurring leaking;
(7) after having overhauled, first long strip block 103 is separated with clamping structure 209, pull up guide pile 1 and location Stake 2 201, and quickly wrap back to roll by outside rubberized fabric 102 by guide pile 1 motor control knob 107 above Above axle 104, complete construction.
Embodiment 2
This kind of structure based on the depth of water in the bridge pier operation at 3-5 rice.
A kind of bridge pier cofferdam equipment integrating, including by multiple water barrier devices 100 with arrange identical the taking out of quantity with it Water device 200 interval is installed and is connected composition cofferdam 300, between the two away from for 1 meter
Please refer to Fig. 2, Fig. 3 and Fig. 4 by emphasis, water barrier device 100 includes that internal is hollow-core construction, and edge is arranged with triangle Shape opening, bottom is the circular guide pile 1 of taper pile crown;Guide pile 1 is provided with dividing plate 106, the axis of rolling in the middle of it 104 are symmetrically mounted on dividing plate 106 both sides, and on it, roll has rubberized fabric 102;The vertical edges of described rubberized fabric 102 has card along connection Fan-shaped long strip block 103 at triangle open mouth.
Rubberized fabric 102 top is positioned at guide pile 1 top, and bottom extends to guide pile 1 bottom, and its thickness is 5mm, the most uniform connection in bottom has inserted sheet 108, and rubberized fabric 102 is difficult to be cut off by foreign body under mud tear the most during insertion. Rubberized fabric 102 bottom sides edge is 70cm away from guide pile 1 taper pile crown distance.
It addition, the axis of rolling 104 top is also associated with PLC controls motor (not shown), motor control knob 107 is installed At guide pile 1 top end face, so can quickly the rubberized fabric 102 run out quickly be reclaimed;
Please emphasis refering to Fig. 5 and Fig. 6, water plug 200 includes internal for circle that hollow-core construction, bottom are taper pile crown Guide pile 2 201, described guide pile 2 201 edge is provided with the clamping structure 209 fixing fan-shaped long strip block 103;Clamping structure 209 is alligator clamp 2091, and alligator clamp 2091 is fixed with bracing member 202 by round steel, is the most first pulled open out by alligator clamp 2091 Existing opening, is placed on long strip block 103 in opening, and trip spring folder 2091 makes its automatic rebounding clamp, and makes two connections.
Suction pump 203 is arranged in the middle of guide pile 2 201, and it is connected above leading to outside outlet conduit 207, lower section Connect and have inlet channel 206;Electrical wire interface 211 is located at guide pile 2 201 end face connection external power source and powers suction pump 203. It is laid with multiple water inlet 204 above described inlet channel 206, is additionally provided with drainage screen 205 at its water inlet, wherein: bottom Water inlet is positioned at bottom guide pile 2 201.
Guide pile 2 201 is internal is laid with fixed water inlet pipe road 206, outlet conduit 207 and suction pump 203 from top to bottom Bracing member 202.
Based on the said equipment, its construction method comprises the following steps,
(1) by equipment delivery to treating place, cofferdam, measure and determine the spacing between guide pile 2 201 and guide pile 1 And fixing point;
(2) long strip block 103 above guide pile 1 is extracted out and is fixed in the clamping structure 209 of guide pile 2 201 Portion, surrounds bridge pier;
(3) guide pile 2 201 and guide pile 1 that surround bridge pier are squeezed in fixing point water, make both bottom pyramidal Pile crown submerges in mud completely and guarantees that rubberized fabric 102 bottom margin submerges 20cm in mud, makes guide pile 2 201 and guide pile one 101 fix;
(4) crawl guide pile 1 motor control knob 107 above, is slowly recovered to rolling by unnecessary rubberized fabric 102 Moving axis 104, makes thoroughly to strain between guide pile 2 201 and guide pile 1, and now cofferdam has been arranged;
(5) suction pump 203 started in guide pile 2 201 starts to draw water in cofferdam, according in cofferdam in pump process Water level fluctuation situation checks for bottom water leakage situation, and takes corresponding measures of preventing water;
(6), after having drawn water, utilize earth that cofferdam inner bottom part surrounding is banketed, make bottom cofferdam thoroughly to seal and Start that bridge pier carries out maintenance to reinforce;And surely make regular check on or without occurring leaking;
(7) after having overhauled, first long strip block 103 is separated with clamping structure 209, pull up guide pile 1 and location Stake 2 201, and quickly wrap back to roll by outside rubberized fabric 102 by guide pile 1 motor control knob 107 above Above axle 104, complete construction.

Claims (1)

1. a bridge pier cofferdam equipment integrating, including by multiple water barrier devices (100) with arrange identical the taking out of quantity with it Water device (200) interval is installed and is connected composition cofferdam (300);
Described water barrier device (100) includes that internal is hollow-core construction, and edge is arranged with triangle open mouth, and bottom is taper pile crown Guide pile one (101);Guide pile one (101) is provided with dividing plate (106) in the middle of it, and the axis of rolling (104) is symmetrically mounted on dividing plate (106) both sides, on it, roll has rubberized fabric (102);The vertical edges of described rubberized fabric (102) is stuck in triangle open mouth along connection The fan-shaped long strip block (103) at place;
Described water plug (200) includes that internal is taper pile crown guide pile two (201) for hollow-core construction, bottom, described location Stake two (201) edges are provided with the clamping structure (209) fixing fan-shaped long strip block (103);Suction pump (203) is arranged on guide pile In the middle of two (201), it is connected above leading to outside outlet conduit (207), and lower section connects inlet channel (206);Described Multiple water inlet (204) it is laid with, wherein: bottom water inlet is positioned at guide pile two (201) end above inlet channel (206) Portion;It is characterized in that: construction method, comprise the following steps,
(1) by equipment delivery to treating place, cofferdam, measure and determine the spacing between guide pile two (201) and guide pile one (101) And fixing point;
(2) the above long strip block (103) of guide pile one (101) is extracted out and is fixed on the clamping structure of guide pile two (201) (209) internal, surround bridge pier;
(3) guide pile two (201) and guide pile one (101) that surround bridge pier are squeezed in fixing point water, make both bottom pyramidal Pile crown submerges in mud completely and guarantees that rubberized fabric (102) bottom margin submerges 10-20cm in mud, makes guide pile two (201) and fixed Position stake one (101) is fixed;
(4) crawl guide pile one (101) motor control knob (107) above, is slowly recovered to unnecessary rubberized fabric (102) The axis of rolling (104), makes thoroughly to strain between guide pile two (201) and guide pile one (101), and now cofferdam has been arranged;
(5) suction pump (203) started in guide pile two (201) starts to draw water in cofferdam, according in cofferdam in pump process Water level fluctuation situation checks for bottom water leakage situation, and takes corresponding measures of preventing water;
(6) after having drawn water, utilize earth that cofferdam inner bottom part surrounding is banketed, make thoroughly to seal bottom cofferdam and start Bridge pier is overhauled;And make regular check on or without occurring leaking;
(7) after having overhauled, first long strip block (103) is separated with clamping structure (209), pull up guide pile one (101) and determine Position stake two (201), and by guide pile one (101) motor control knob (107) above, outside rubberized fabric (102) is quick Wrap back to the axis of rolling (104) above, complete construction.
CN201510576932.5A 2014-10-01 2014-10-01 Bridge and bridge pier cofferdam integral equipment and construction method for same Expired - Fee Related CN105040716B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510576932.5A CN105040716B (en) 2014-10-01 2014-10-01 Bridge and bridge pier cofferdam integral equipment and construction method for same

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510576932.5A CN105040716B (en) 2014-10-01 2014-10-01 Bridge and bridge pier cofferdam integral equipment and construction method for same
CN201410519802.3A CN104213569B (en) 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating and construction method thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410519802.3A Division CN104213569B (en) 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating and construction method thereof

Publications (2)

Publication Number Publication Date
CN105040716A CN105040716A (en) 2015-11-11
CN105040716B true CN105040716B (en) 2017-01-11

Family

ID=52095452

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410519802.3A Active CN104213569B (en) 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating and construction method thereof
CN201510576932.5A Expired - Fee Related CN105040716B (en) 2014-10-01 2014-10-01 Bridge and bridge pier cofferdam integral equipment and construction method for same

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410519802.3A Active CN104213569B (en) 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating and construction method thereof

Country Status (1)

Country Link
CN (2) CN104213569B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104506632B (en) * 2014-12-25 2018-05-04 中国科学院电子学研究所 One kind is based on distributed polycentric resource sharing system and method
CN107806021B (en) * 2017-11-29 2019-06-18 宁波衡华园林建设有限公司 Subaqueous construction of bridge pier method
CN111764416B (en) * 2019-04-02 2022-05-10 广西长长路桥建设有限公司 Highway bridge construction cofferdam device
CN112031005B (en) * 2020-08-11 2022-03-01 南昌航空大学 Cofferdam assembly system of underwater pile foundation

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3020896B2 (en) * 1997-06-23 2000-03-15 株式会社鴻池組 Temporary deadline method and assembly / sinking device for deadline members
JPH11256587A (en) * 1998-03-09 1999-09-21 Kajima Corp Cofferdam construction method for reinforcing bridge pier
CN100547178C (en) * 2008-01-04 2009-10-07 贵州省桥梁工程总公司 Bridge foundation construction method in the water
US20100232878A1 (en) * 2009-03-10 2010-09-16 Vitaly Boris Feygin Universal Framed Cofferdam
CN101649621A (en) * 2009-07-16 2010-02-17 招商局重庆交通科研设计院有限公司 Technology for constructing anti-collision bridge pier by steel cofferdam
CN101781894B (en) * 2009-12-23 2012-05-09 中铁大桥局集团第一工程有限公司 Steel pipe pile locking notch structure and water-stopping method of steel pipe pile cofferdam
CN102644290A (en) * 2012-05-14 2012-08-22 中国十九冶集团有限公司 Steel cofferdam construction method suitable for deep silt-layer bridge construction in shallow sea area
CN102877420A (en) * 2012-11-06 2013-01-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform
CN103726501B (en) * 2014-01-02 2015-08-12 中铁大桥局集团有限公司 Construction method is transferred in a kind of large-scale cofferdam
CN204151800U (en) * 2014-10-01 2015-02-11 杜东升 A kind of bridge pier cofferdam equipment integrating
CN204435396U (en) * 2014-12-26 2015-07-01 广西华南建设集团有限公司 A kind of bridge construction cofferdam device

Also Published As

Publication number Publication date
CN104213569A (en) 2014-12-17
CN104213569B (en) 2016-02-24
CN105040716A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105040716B (en) Bridge and bridge pier cofferdam integral equipment and construction method for same
CN104846836B (en) Water feeding and draining device and construction method based on this water feeding and draining device for deep basal pit
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN204151800U (en) A kind of bridge pier cofferdam equipment integrating
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN206052744U (en) A kind of highway bridge construction cofferdam device
CN204590049U (en) Bridge construction cofferdam device
CN104294806A (en) Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit
CN107794925A (en) The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline
CN101709582B (en) Protection method for reducing soil extrusion in construction of prefabricated piles
CN203891045U (en) Leakage blocking and grouting device between deep foundation pit fender posts
CN103669333B (en) It is easy to the friction pile of vacuum-dewatering
CN209368854U (en) Foundation pit side-wall infiltration current-collecting device
CN106948388A (en) A kind of magnet ring type test excavation of foundation pit causes the device and method that ground swells
CN206015695U (en) Buried pipe
CN115012422B (en) Supporting structure convenient to assemble and used for foundation pit construction and operation method
CN208009457U (en) A kind of novel evacuated well sealing device
CN105672328B (en) Slip casting ductule resists the H profile steel foundation pit support device of earth lateral pressure
CN207314371U (en) Use the foundation trench structure of cylinder caisson
CN218466564U (en) Plugging device for treating sudden gushing of foundation pit
CN104863168A (en) Hydrophobic device on lower part of basic baseplate and usage method of same
CN205475283U (en) Deep well dewatering well mouth blocking device in underground garage foundation pit
CN218322828U (en) Hidden type external drainage precipitation well
CN203654265U (en) Antiskid pile facilitating vacuum water reduction
CN204435396U (en) A kind of bridge construction cofferdam device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Xu Weiqing

Inventor after: Li Tao

Inventor after: Chen Zhengshou

Inventor before: Du Dongsheng

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160704

Address after: 1306, room 2, 324003 Central Business Plaza, 39 Baiyun Central Road, Zhejiang, Quzhou

Applicant after: Zhejiang road traffic construction supervision Consulting Co. Ltd.

Address before: 223800 Suqian City, Jiangsu province Tu Yuan Xiang Sheng he Cun, Sucheng District Hu Wei Group No. 9

Applicant before: Du Dongsheng

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20171001