CN204151800U - A kind of bridge pier cofferdam equipment integrating - Google Patents

A kind of bridge pier cofferdam equipment integrating Download PDF

Info

Publication number
CN204151800U
CN204151800U CN201420573431.2U CN201420573431U CN204151800U CN 204151800 U CN204151800 U CN 204151800U CN 201420573431 U CN201420573431 U CN 201420573431U CN 204151800 U CN204151800 U CN 204151800U
Authority
CN
China
Prior art keywords
guide pile
bridge pier
cofferdam
pile
equipment integrating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420573431.2U
Other languages
Chinese (zh)
Inventor
杜东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420573431.2U priority Critical patent/CN204151800U/en
Application granted granted Critical
Publication of CN204151800U publication Critical patent/CN204151800U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of bridge pier cofferdam equipment integrating, it is characterized in that: comprise being installed by multiple water barrier device and the water plug interval identical with its layout quantity and connect to form cofferdam; Advantage of the present utility model is as follows: (1) this equipment volume is little, and quantity is few, is convenient to install and transport; (2) in installation and use procedure, can rapid-assembling, form cofferdam fast, reclaim fast, automaticity is high, and the whole like this work progress time shortens greatly; (3) this equipment can efficiently easily to division and the blocking-up in waters, and the removal process of equipment becomes facilitation simultaneously.

Description

A kind of bridge pier cofferdam equipment integrating
Technical field
The utility model belongs to technical field of bridge engineering, is specifically related to a kind of bridge pier cofferdam equipment integrating and construction method thereof.
Background technology
Cofferdam refers in hydraulic engineering construction, for building permanent water conservancy projects, and the provisional space enclosing structure of building.Its effect be prevent water and soil from entering building build position so that at cofferdam internal drainage, excavation pit, builds building.Generally be mainly used in hydraulic architecture, except the part as formal building, cofferdam is generally removed after being finished.Cofferdam height is higher than the peak level that may occur in the construction period.
Steel sheet-pile cofferdam is the most frequently used a kind of sheet pile cofferdam.Steel sheet pile is a kind of shaped steel with fore shaft, and there are straight plate shape, flute profile and Z-shaped etc. in its cross section, has full range of sizes and interlocking form.Common are and draw Ademilson formula, clarke Wan Nashi etc.Its advantage is: intensity is high, easily squeezes into hard soil layer; Can at dark subaqueous work, water resistance is good; The cofferdam of various profile can be formed on demand, and can repeatedly use, therefore, it of many uses.The cofferdam on open caisson top is usually used in, the cofferdam etc. of cylinder pile foundation, pile foundation and open cut foundation in bridge construction.Have vertical cross binding in these closed cofferdam of many employings single wall, cofferdam, adding bearing diagonal if desired becomes an inclosure.As the cylinder pile foundation of Nanjing of China the Changjiang river bridge, once used steel sheet pile circular cofferdam, its diameter 21.9 meters, long 36 meters of steel sheet pile, after underwater concrete back cover reaches requirement of strength, draw water and build cushion cap and pier shaft, projected depth of drawing water reaches 20 meters.In hydraulic architecture, general construction area is very large, then conventional to make structure body cofferdam.It is be made up of many monomers be connected to each other, and each monomer is made up of many steel sheet piles again, and monomer centre soil tamps.The scope that cofferdam is gone along with sb. to guard him is very large, and can not support weir wall with supporting, therefore each monomer can resist alone the drawing crack toppling, slide and prevent interlocking place.Conventional has the form such as circle and next door shape.
Steel sheet-pile cofferdam is applied more in China's construction, but its construction is extensive, and cost haggles over height, and also tamp with soil between steel sheet pile composition, such duration is longer, needs water pump ceaselessly to draw water in inside, cofferdam, and such operation is very trouble.
Secondly, if a patent No. is ZL201220322013.7, the applying date 2012. 07 .05, a kind of circular cofferdam is disclosed in the Chinese utility model patent of notification number CN202706045U, comprise the one group of steel sheet pile and cofferdam substrate that are enclosed in cushion cap periphery, it is characterized in that: described steel sheet pile is arranged to tubular cofferdam wall along cushion cap circumferential annular, the root of described steel sheet pile extends to below cofferdam substrate, and the top of steel sheet pile is higher than cushion cap; Be close to this group steel sheet pile inside wall be provided with cofferdam, described in enclose purlin along wall border, cofferdam from top to bottom successively interval be circular layout; Also be provided with the inner support be fixedly connected with cofferdam inwall in the disk at described first cofferdam and the 3rd cofferdam, road place respectively, described inner support is the rectangular frame that encloses of steel pipe and itself and cofferdam substrate are arranged in parallel.
And for example a patent No. is ZL201120427362.0, the applying date 2011. 11 .02, a kind of steel sheet pile cofferdam structure is disclosed in the Chinese utility model patent of notification number CN202359565U, be made up of steel sheet pile and weir, cofferdam body, it is characterized in that: described steel sheet pile is single, be arranged at body side near water, weir, cofferdam; Weir, described cofferdam body is filled by rock structure and forms.
Both cofferdam structures above-mentioned generally apply in construction at present, and its construction is extensive, and the time is long, and a large amount of bamboo pole is buried in inserting in operation waters of having; And a large amount of clothes is hung up above, cloth fixed point on bamboo pole with resistance effect is many, and operation is slow; After operation completes, the recovery for bamboo pole and cloth too bothers, especially when cofferdam workload is large.
Summary of the invention
The utility model is for above shortcoming, and extensive based on the bridge pier cofferdam structure construction solving existing highway bridge bridge pier, particularly some canal water levels low, operation is slow, the slow-footed problem of rear material recovery of having constructed.Propose a kind of bridge cofferdam equipment integrating and construction method thereof.This equipment and construction method thereof make the installation and removal time in bridge pier cofferdam greatly shorten by rational structure design, improve efficiency of construction.
For realizing the purpose of this utility model, the technical solution adopted in the utility model is:
A kind of bridge pier cofferdam equipment integrating, is characterized in that: comprise being installed by multiple water barrier device and the water plug interval identical with its layout quantity and connect to form cofferdam;
It is hollow-core construction that described water barrier device comprises inner, and edge is arranged with triangle open mouth, and bottom is the guide pile one of taper pile crown; Its centre of guide pile one is provided with dividing plate, and axis of rolling symmetry is arranged on dividing plate both sides, and above it, volume has rubberized fabric; The vertical edges of described rubberized fabric is along being connected with the fan-shaped long strip block being stuck in triangle open mouth place;
Described water plug comprise inner for hollow-core construction, bottom be taper pile crown guide pile two, described guide pile two edge is provided with the clamping structure fixing fan-shaped long strip block; Suction pump is arranged in the middle of guide pile two, and be connected with above it and lead to outside outlet conduit, below is connected with inlet channel; Multiple water inlet is laid with, wherein: water inlet is positioned at bottom guide pile two bottom above described inlet channel.
Above-mentioned guide pile one and guide pile two shape are circular or square.
Preferentially, described rubberized fabric top is positioned at guide pile one top, and bottom extends to guide pile one bottom, and its thickness is 3-5mm, and bottom is also uniform is connected with inserted sheet, and rubberized fabric is not easily torn by foreign matter partition under mud so during insertion.
Preferentially, described axis of rolling top is also connected with PLC and controls motor, and Electric Machine Control button is arranged on guide pile one top end face, can be reclaimed fast by the rubberized fabric run out fast like this.
Preferentially, in order to prevent foreign material from entering inlet channel, water inlet place of described water inlet has also been provided with screen pack.
Preferentially, described guide pile two inside is laid with the bracing member of fixed water inlet pipe road, outlet conduit and suction pump from top to bottom.
Preferentially, clamping structure is fan groove or spring clip, wherein: adopt fan groove corresponding with the shape of fan-shaped long strip block, can penetrate and make two connections; Adopt spring clip to be fixed by round steel and bracing member, so first pulled open by spring clip and occur opening, long strip block be placed in opening, trip spring folder makes its automatic rebounding clamp, and makes two connections.
Preferentially, described rubberized fabric bottom sides is along being 50-70cm apart from guide pile one taper pile crown distance, and such stake at least will squeeze into 50cm in mud, adds that rubberized fabric submerges 10-20cm in mud, is thoroughly stablized for such two.
In addition, based on the said equipment, the utility model additionally provides a kind of bridge pier cofferdam equipment integrating construction method, comprises the following steps,
(1) by equipment delivery to treating place, cofferdam, measure and determine spacing between guide pile two and guide pile one and fixed point;
(2) long strip block above guide pile one to be extracted out and to be fixed on the clamping structure of guide pile two inner, surround bridge pier;
(3) guide pile two and guide pile one that surround bridge pier are squeezed in fixed point water, both bottom pyramidal pile crowns are submerged in mud completely and guarantees that rubberized fabric bottom margin submerges 10-20cm in mud, makes guide pile two and guide pile one fix;
(4) the Electric Machine Control button above crawl guide pile one, is slowly recovered to the axis of rolling by unnecessary rubberized fabric, makes thoroughly to strain between guide pile two and guide pile one, and now cofferdam has been arranged;
(5) suction pump started in guide pile two starts to draw water in cofferdam, checks with or without bottom water leakage situation, and take corresponding measures of preventing water in pump process according to water level fluctuation situation in cofferdam;
(6) after having drawn water, utilize earth to banket to cofferdam inner bottom part surrounding, make thoroughly to seal bottom cofferdam and start to overhaul bridge pier;
(7) after having overhauled, first long strip block is separated with clamping structure, pulls up guide pile one and guide pile two, and by the Electric Machine Control button above guide pile one by above quick for the rubberized fabric of outside backrush to the axis of rolling, complete construction.
Compared with prior art, advantage of the present utility model is as follows: (1) this equipment volume is little, and quantity is few, is convenient to install and transport; (2) in installation and use procedure, can rapid-assembling, form cofferdam fast, reclaim fast, automaticity is high, and the whole like this work progress time shortens greatly; (3) this equipment can efficiently easily to division and the blocking-up in waters, and the removal process of equipment becomes facilitation simultaneously.
Accompanying drawing explanation
The following accompanying drawing by means of embodiment carries out brief description to the utility model now.In accompanying drawing:
Fig. 1 shows schematic diagram when the utility model bridge cofferdam equipment integrating is constructed;
Fig. 2 shows the schematic diagram that the utility model water barrier device pulls open state;
Fig. 3 shows the top view of the utility model water barrier device;
Fig. 4 shows the utility model water barrier device and pulls open state top view;
Fig. 5 shows the structural configuration schematic diagram of the utility model water plug;
Fig. 6 shows the utility model water barrier device and is connected the first clamping mode with water plug;
Fig. 7 shows the utility model water barrier device and is connected the second with water plug and clamps mode.
In figure: 100, water barrier device, 101, guide pile one, 102, rubberized fabric, 103, long strip block, 104, the axis of rolling, 106, dividing plate, 107, Electric Machine Control button, 108, inserted sheet, 200, water plug, 201, guide pile two, 202, bracing member, 203, suction pump, 204, water inlet, 205, screen pack, 206, inlet channel, 207, outlet conduit, 209, clamping structure, 2091, spring clip, 2092, fan groove, 211, electrical wire interface, 300, cofferdam.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in detail.Following examples will contribute to those skilled in the art and understand the utility model further, but not limit the utility model in any form.It should be pointed out that to those skilled in the art, without departing from the concept of the premise utility, some distortion and improvement can also be made.These all belong to protection domain of the present utility model.
Embodiment 1
This kind of structure based on the depth of water in the bridge pier operation at 5-7 rice.
A kind of bridge pier cofferdam equipment integrating, comprises being installed by multiple water barrier device 100 and water plug 200 interval identical with its layout quantity and connects to form cofferdam 300, and distance is 0.7 meter between the two.
Please consult Fig. 2, Fig. 3 and Fig. 4 by emphasis, it is hollow-core construction that water barrier device 100 comprises inner, and edge is arranged with triangle open mouth, and bottom is the circular guide pile 1 of taper pile crown; Its centre of guide pile 1 is provided with dividing plate 106, and the axis of rolling 104 symmetry is arranged on dividing plate 106 both sides, and above it, volume has rubberized fabric 102; The vertical edges of described rubberized fabric 102 is along being connected with the fan-shaped long strip block 103 being stuck in triangle open mouth place.
Rubberized fabric 102 top is positioned at guide pile 1 top, and bottom extends to guide pile 1 bottom, and its thickness is 5mm, and bottom is also uniform is connected with inserted sheet 108, and rubberized fabric 102 is not easily torn by foreign matter partition under mud so during insertion.Rubberized fabric 102 bottom sides is 70cm along distance guide pile 1 taper pile crown distance.
In addition, the axis of rolling 104 top is also connected with PLC and controls motor (not shown), and Electric Machine Control button 107 is arranged on guide pile 1 top end face, can be reclaimed fast by the rubberized fabric 102 run out fast like this;
Please consult Fig. 5 and Fig. 7 by emphasis, water plug 200 comprises the circular guide pile 2 201 that inside is hollow-core construction, bottom is taper pile crown, and described guide pile 2 201 edge is provided with the clamping structure 209 fixing fan-shaped long strip block 103; Clamping structure 209 is fan groove 2092, adopts fan groove 2092 corresponding with the shape of fan-shaped long strip block 103, can penetrate and make two connections.
Suction pump 203 is arranged in the middle of guide pile 2 201, and be connected with above it and lead to outside outlet conduit 207, below is connected with inlet channel 206; Electrical wire interface 211 is located at guide pile 2 201 end face connection external power source and powers to suction pump 203.Described inlet channel 206 is laid with multiple water inlet 204 above, and its water inlet place is also provided with screen pack 205, wherein: water inlet is positioned at bottom guide pile 2 201 bottom.
Guide pile 2 201 inside is laid with the bracing member 202 of fixed water inlet pipe road 206, outlet conduit 207 and suction pump 203 from top to bottom.
Based on the said equipment, its construction method comprises the following steps,
(1) by equipment delivery to treating place, cofferdam, measure and determine spacing between guide pile 2 201 and guide pile 1 and fixed point;
(2) long strip block 103 above guide pile 1 to be extracted out and to be fixed on the clamping structure 209 of guide pile 2 201 inner, surround bridge pier;
(3) guide pile 2 201 and guide pile 1 that surround bridge pier are squeezed in fixed point water, both bottom pyramidal pile crowns are submerged in mud completely and guarantees that rubberized fabric 102 bottom margin submerges 20cm in mud, makes guide pile 2 201 and guide pile 1 fix;
(4) the Electric Machine Control button 107 above crawl guide pile 1, is slowly recovered to the axis of rolling 104 by unnecessary rubberized fabric 102, and make thoroughly to strain between guide pile 2 201 and guide pile 1, now cofferdam has been arranged;
(5) suction pump 203 started in guide pile 2 201 starts to draw water in cofferdam, checks with or without bottom water leakage situation, and take corresponding measures of preventing water in pump process according to water level fluctuation situation in cofferdam;
(6) after having drawn water, utilize earth to banket to cofferdam inner bottom part surrounding, make thoroughly to seal bottom cofferdam and start that maintenance is carried out to bridge pier and reinforce; And surely make regular check on and leak with or without occurring;
(7) after having overhauled, first long strip block 103 is separated with clamping structure 209, pull up guide pile 1 and guide pile 2 201, and by the Electric Machine Control button 107 above guide pile 1 by above the rubberized fabric 102 of outside fast backrush to the axis of rolling 104, complete construction.
Embodiment 2
This kind of structure based on the depth of water in the bridge pier operation at 3-5 rice.
A kind of bridge pier cofferdam equipment integrating, comprises being installed by multiple water barrier device 100 and water plug 200 interval identical with its layout quantity and connects to form cofferdam 300, and distance is 1 meter between the two
Please consult Fig. 2, Fig. 3 and Fig. 4 by emphasis, it is hollow-core construction that water barrier device 100 comprises inner, and edge is arranged with triangle open mouth, and bottom is the circular guide pile 1 of taper pile crown; Its centre of guide pile 1 is provided with dividing plate 106, and the axis of rolling 104 symmetry is arranged on dividing plate 106 both sides, and above it, volume has rubberized fabric 102; The vertical edges of described rubberized fabric 102 is along being connected with the fan-shaped long strip block 103 being stuck in triangle open mouth place.
Rubberized fabric 102 top is positioned at guide pile 1 top, and bottom extends to guide pile 1 bottom, and its thickness is 5mm, and bottom is also uniform is connected with inserted sheet 108, and rubberized fabric 102 is not easily torn by foreign matter partition under mud so during insertion.Rubberized fabric 102 bottom sides is 70cm along distance guide pile 1 taper pile crown distance.
In addition, the axis of rolling 104 top is also connected with PLC and controls motor (not shown), and Electric Machine Control button 107 is arranged on guide pile 1 top end face, can be reclaimed fast by the rubberized fabric 102 run out fast like this;
Please consult Fig. 5 and Fig. 6 by emphasis, water plug 200 comprises the circular guide pile 2 201 that inside is hollow-core construction, bottom is taper pile crown, and described guide pile 2 201 edge is provided with the clamping structure 209 fixing fan-shaped long strip block 103; Clamping structure 209 is spring clip 2091, and spring clip 2091 is fixed by round steel and bracing member 202, is so first pulled open by spring clip 2091 and occurs opening, be placed in opening by long strip block 103, and trip spring folder 2091 makes its automatic rebounding clamp, and makes two connections.
Suction pump 203 is arranged in the middle of guide pile 2 201, and be connected with above it and lead to outside outlet conduit 207, below is connected with inlet channel 206; Electrical wire interface 211 is located at guide pile 2 201 end face connection external power source and powers to suction pump 203.Described inlet channel 206 is laid with multiple water inlet 204 above, and its water inlet place is also provided with screen pack 205, wherein: water inlet is positioned at bottom guide pile 2 201 bottom.
Guide pile 2 201 inside is laid with the bracing member 202 of fixed water inlet pipe road 206, outlet conduit 207 and suction pump 203 from top to bottom.
Based on the said equipment, its construction method comprises the following steps,
(1) by equipment delivery to treating place, cofferdam, measure and determine spacing between guide pile 2 201 and guide pile 1 and fixed point;
(2) long strip block 103 above guide pile 1 to be extracted out and to be fixed on the clamping structure 209 of guide pile 2 201 inner, surround bridge pier;
(3) guide pile 2 201 and guide pile 1 that surround bridge pier are squeezed in fixed point water, both bottom pyramidal pile crowns are submerged in mud completely and guarantees that rubberized fabric 102 bottom margin submerges 20cm in mud, makes guide pile 2 201 and guide pile 1 fix;
(4) the Electric Machine Control button 107 above crawl guide pile 1, is slowly recovered to the axis of rolling 104 by unnecessary rubberized fabric 102, and make thoroughly to strain between guide pile 2 201 and guide pile 1, now cofferdam has been arranged;
(5) suction pump 203 started in guide pile 2 201 starts to draw water in cofferdam, checks with or without bottom water leakage situation, and take corresponding measures of preventing water in pump process according to water level fluctuation situation in cofferdam;
(6) after having drawn water, utilize earth to banket to cofferdam inner bottom part surrounding, make thoroughly to seal bottom cofferdam and start that maintenance is carried out to bridge pier and reinforce; And surely make regular check on and leak with or without occurring;
(7) after having overhauled, first long strip block 103 is separated with clamping structure 209, pull up guide pile 1 and guide pile 2 201, and by the Electric Machine Control button 107 above guide pile 1 by above the rubberized fabric 102 of outside fast backrush to the axis of rolling 104, complete construction.

Claims (8)

1. a bridge pier cofferdam equipment integrating, is characterized in that: comprise being installed by multiple water barrier device (100) and water plug (200) interval identical with its layout quantity and connect to form cofferdam (300);
It is hollow-core construction that described water barrier device (100) comprises inner, and edge is arranged with triangle open mouth, and bottom is the guide pile one (101) of taper pile crown; Its centre of guide pile one (101) is provided with dividing plate (106), and the axis of rolling (104) symmetry is arranged on dividing plate (106) both sides, and above it, volume has rubberized fabric (102); The vertical edges of described rubberized fabric (102) is along being connected with the fan-shaped long strip block (103) being stuck in triangle open mouth place;
Described water plug (200) comprise inner for hollow-core construction, bottom be taper pile crown guide pile two (201), described guide pile two (201) edge is provided with the clamping structure (209) fixing fan-shaped long strip block (103); Suction pump (203) is arranged in the middle of guide pile two (201), and be connected with above it and lead to outside outlet conduit (207), below is connected with inlet channel (206); Described inlet channel (206) is laid with multiple water inlet (204) above, wherein: water inlet is positioned at guide pile two (201) bottom bottom.
2. bridge pier cofferdam according to claim 1 equipment integrating, is characterized in that, described rubberized fabric (102) top is positioned at guide pile one (101) top, and bottom extends to guide pile one (101) bottom.
3. bridge pier cofferdam according to claim 1 and 2 equipment integrating, it is characterized in that, the described axis of rolling (104) top is also connected with PLC and controls motor, and Electric Machine Control button (107) is arranged on guide pile one (101) top end face.
4. bridge pier cofferdam according to claim 1 and 2 equipment integrating, is characterized in that, described rubberized fabric (102), and thickness is 3-5mm, and bottom is also uniform is connected with inserted sheet (108).
5. bridge pier cofferdam according to claim 1 equipment integrating, is characterized in that, described water inlet (204) water inlet place is also provided with screen pack (205).
6. bridge pier cofferdam according to claim 1 equipment integrating, is characterized in that, described clamping structure (209) is fan groove (2092) or spring clip (2091).
7. bridge pier cofferdam according to claim 1 equipment integrating, it is characterized in that, described guide pile two (201) inside is laid with the bracing member (202) of fixed water inlet pipe road (206), outlet conduit (207) and suction pump (203) from top to bottom.
8. bridge pier cofferdam according to claim 1 equipment integrating, is characterized in that, described rubberized fabric (102) bottom sides is 30-50cm along distance guide pile one (101) taper pile crown distance.
CN201420573431.2U 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating Withdrawn - After Issue CN204151800U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420573431.2U CN204151800U (en) 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420573431.2U CN204151800U (en) 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating

Publications (1)

Publication Number Publication Date
CN204151800U true CN204151800U (en) 2015-02-11

Family

ID=52509928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420573431.2U Withdrawn - After Issue CN204151800U (en) 2014-10-01 2014-10-01 A kind of bridge pier cofferdam equipment integrating

Country Status (1)

Country Link
CN (1) CN204151800U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213569A (en) * 2014-10-01 2014-12-17 杜东升 Bridge pier cofferdam integrated equipment and construction method thereof
CN114673135A (en) * 2022-05-05 2022-06-28 连云港徐圩城建工程有限公司 Shallow soft soil foundation curing structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213569A (en) * 2014-10-01 2014-12-17 杜东升 Bridge pier cofferdam integrated equipment and construction method thereof
CN104213569B (en) * 2014-10-01 2016-02-24 中交第一公路工程局有限公司 A kind of bridge pier cofferdam equipment integrating and construction method thereof
CN114673135A (en) * 2022-05-05 2022-06-28 连云港徐圩城建工程有限公司 Shallow soft soil foundation curing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN104213569B (en) A kind of bridge pier cofferdam equipment integrating and construction method thereof
CN208088310U (en) A kind of deep pit support watch box
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN204151800U (en) A kind of bridge pier cofferdam equipment integrating
CN104234064B (en) The construction method of a kind of bridge pier cofferdam ruggedized construction
CN103967015B (en) A kind of water seal for deep foundation pit excavation method and structure thereof
CN205975646U (en) Shallow water territory steel pipe pile holder fortifield village weir structure
CN203904971U (en) Reinforcement cage protective device capable of controlling necking, bar leakage and mud inclusion of underground diaphragm wall
CN206052744U (en) A kind of highway bridge construction cofferdam device
CN204590049U (en) Bridge construction cofferdam device
CN210049262U (en) Directional location slip casting curtain between stake
CN110685291A (en) Supporting device for concrete cofferdam in deep water area and construction process thereof
CN205035780U (en) Wet tailing of piling accelerates drainage consolidation device and tailing storehouse drainage system step by step
CN204570714U (en) A kind of sectional construction cofferdam device
CN213233574U (en) A embedded structure that is used for subway station to prevent basement infiltration
CN211143097U (en) Supporting device for concrete cofferdam in deep water area
CN203891045U (en) Leakage blocking and grouting device between deep foundation pit fender posts
CN207919560U (en) The grouting behind shaft or drift lining cast-in-situ concrete thin-wall of reserved grouting pipeline
CN114250744A (en) Novel ecological combined river slope retaining wall revetment
CN203939019U (en) A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure
CN112627231A (en) Construction device for deep guide wall of soft soil
CN204151806U (en) A kind of bridge pier cofferdam ruggedized construction
CN204875806U (en) Shoring of trench on water construction steel pipe channel -section steel framed bent
CN204435396U (en) A kind of bridge construction cofferdam device
CN105002870A (en) Stage-by-stage wet stacking tailing drainage acceleration and consolidation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150211

Effective date of abandoning: 20160224

C25 Abandonment of patent right or utility model to avoid double patenting