CN105040711B - Method for strengthening dry tailing storage yard by utilizing barren rocks - Google Patents

Method for strengthening dry tailing storage yard by utilizing barren rocks Download PDF

Info

Publication number
CN105040711B
CN105040711B CN201510354303.8A CN201510354303A CN105040711B CN 105040711 B CN105040711 B CN 105040711B CN 201510354303 A CN201510354303 A CN 201510354303A CN 105040711 B CN105040711 B CN 105040711B
Authority
CN
China
Prior art keywords
dam
barren rock
mine tailing
barren
branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510354303.8A
Other languages
Chinese (zh)
Other versions
CN105040711A (en
Inventor
汪斌
朱君星
汪良峰
杨胜强
秦柯
周玉新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Engineering Investigation & Design Institute Of Sinosteel Maanshan Co Ltd
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Investigation & Design Institute Of Sinosteel Maanshan Co Ltd, Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd, Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Engineering Investigation & Design Institute Of Sinosteel Maanshan Co Ltd
Priority to CN201510354303.8A priority Critical patent/CN105040711B/en
Publication of CN105040711A publication Critical patent/CN105040711A/en
Application granted granted Critical
Publication of CN105040711B publication Critical patent/CN105040711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a method for strengthening a dry tailing storage yard by utilizing barren rocks. A barren rock dam (3) is built at the inner periphery of a built dry tailing storage yard dam body (2); a barren rock middle partition dam (4) is built in the barren rock dam (3); at least two middle partition branch dams (4') are built at the two sides of the barren rock middle partition dam (4) respectively; a barren rock pile (5) is piled up in a gap among the barren rock dam (3), the barren rock middle partition dam (4) and the middle partition branch dams (4') by utilizing barren rocks in a rock disposal dump; and a space among the barren rock dam (3), the barren rock middle partition dam (4), the middle partition branch dams (4') and the barren rock pile (5) is a reservoir area for piled-up tailings (6), and is divided into a plurality of small areas which are communicated with one another. According to the method, by adopting a strengthening process technology of internal periphery strengthening, partitioning and area barren rock piling-up is adopted for the dry tailing storage yard, so that not only is the dry tailing storage yard strengthened, but also the piling-up problem of mineral barren rocks is solved, and therefore, land occupation by a project is saved.

Description

A kind of method that utilization barren rock reinforces mine tailing dry heaping yard
Technical field
The present invention relates to a kind of mine tailing stores up safely technology, and in particular to a kind of to store up safely mine tailing using the dry stockyard of barren rock Method, not only can reinforce mine tailing dry heaping yard, improve the security performance in dry stockyard, can also solve the stacking place of chats Problem, economizes the land resource.Suitable for the reinforcing of all kinds of mine tailing dry heaping yards, can be in the tailing heap of the industry such as black, coloured, chemical industry Extensively apply in.
Background technology
China is one of Tailings Dam quantity and the most countries of mine tailing amount of storage in the world, and past, most mines are logical Cross newly-built and enlarging ground Tailings Dam to solve the emission problem of mine tailing, Tailings Slurry concentration is low, water content is high, determines Tailings Dam Coefficient of stability it is low, especially in pluvial age and earthquake-prone region, easily there is dam-break accident;Containing a huge sum of money in mine tailing wastewater The polluters such as category ion, acid waste water, therefore Tailings Dam dam break not only results in casualties, property loss, can also be to ring Cause greatly destruction in border.In Tailings Dam run duration, the seepage of tailing water can also pollute surrounding enviroment.Tailings Dam is built, is needed Take a large amount of soils.Therefore by tailings discharging to Tailings Dam, increasingly it is not suitable with terms of economy, environment, policy and is sent out from now on The demand of exhibition, it is necessary to find new way and carry out effectively solving.
It is a kind of new Tailings Disposal method developed in recent years that tails dry is stored up, using dry piling technique shape Into stockyard equally exist potential safety hazard.
China's non-coal mine more than 86% is surface mine, and more than 1,000,000,000 tons, occupation of land exceedes annual discharge barren rock amount of peeling off 2000 hectares, be that genuine barren rock discharges the first big country.Mine tailing dry heaping yard is reinforced using barren rock, tail can have both been improved The safety in the dry stockyard of ore deposit, also helps the occupation of land for solving the problems, such as chats discharge.
《Scientific and technological Leader》2013,31(9)Describe in " tailing dry-heaping and dewatering process research application and the prospect " delivered Domestic and international various tailing dry-heapings and dewatering process, but be essentially all using Tailing thickening, filter pressing, ground, underground dry piling Technological approaches, the high cost of tailings impoundment, the mine tailing amount that mine tailing ground is stored up are limited.《Modern Mineral》July the 7th in 2013 In " design search in tailing dry-heaping storehouse " text that phase delivers, a kind of Gan Dui storehouses general design idea is disclosed, this article is by dry heap The reservoir area in storehouse is divided into production run area and safety buffer zone (pollution transition zone) two parts.Production run area is normal production period Between tailings impoundment place;Safety buffer zone (pollution transition zone) is then as risk control area, if the slopes in production run area are sent out Raw slumping, controllable slumping scope is in the region.Washed away by production run region the part CHARACTERISTICS OF TAILINGS SAND got off can be deposited on it is slow Rush periodic cleaning after area, rainy season, it is to avoid pollution downstream.But the design in the Gan Dui storehouses is still limited to the design of traditional tailing Thinking, has that floor space is big, security risk is big.
The content of the invention
Security risk that the purpose of the present invention is aiming at the presence of existing mine tailing dry heaping yard is big, floor space is big, operation The problems such as high cost, there is provided a kind of method that utilization barren rock reinforces mine tailing dry heaping yard, mine tailing dry heaping yard can not only can be reinforced The problem of banking up of effectively solving chats.
To realize the above-mentioned purpose of the present invention, a kind of utilization barren rock of the invention reinforces the method for mine tailing dry heaping yard using following Technical scheme:
Drain pipe is set in the bottom of mine tailing dry heaping yard, build barren rock is enclosed in the mine tailing dry heaping yard dam body for having constructed Dam, the barren rock dam built can both reinforce the mine tailing dry heaping yard dam body of periphery, while ensureing that mine tailing dry heaping yard stores up the storehouse of mine tailing Water in area is discharged by permeable barren rock dam, so as to reduce the water level of peripheral mine tailing dry heaping yard dam body.Build in barren rock dam Every dam in one barren rock, the both sides every dam in barren rock are built during quantity is at least two respectively every branch dam, on barren rock dam With in barren rock every dam, in recycle in space between branch dam refuse dump barren rock to bank up hillock, the quantity of hillock can Banked up according to how many treatment in accordance with local conditions of barren rock amount.With the discharge of tailings, hillock is not only oozed and is consolidated beneficial to the row of tailings Knot, and can prevent tailings liquefaction from improving anti-seismic performance and strengthening the stability in the large in stockyard.In barren rock dam and barren rock every dam, In space between branch dam, hillock be the reservoir area for storing up mine tailing, in barren rock dam and barren rock every dam, in every branch dam, useless The reservoir area for storing up mine tailing is separated into several cells being interconnected by clitter.
In in branch dam and barren rock between dam to be obliquely installed, in be folded to in again every branch every the end on branch dam The parallel direction in dam.Quantity every branch dam in every side on dam is built in barren rock is generally 2-4 seats.In every branch Ba Ba According to Gan Dui places area and barren rock amount, top width degree comprehensively determines that its grade of side slope must be according to the physical mechanicses of refuse dump barren rock Performance is determined Jing after stable calculation.
The design of this structure, can play a part of reinforce mine tailing dry heaping yard, and be conducive to mine tailing row ooze with Consolidation, so as to reduce in storehouse mine tailing to peripheral mine tailing dry heaping yard dam body(Earth dam)Pressure, reach the whole mine tailing dry heaping yard of raising Security performance.
The extravasation of water in the reservoir area of mine tailing is stored up for further reinforcing, be provided with row in the exterior bottom of mine tailing dry heaping yard dam body Water rib body.Drain pipe, drainage prism can be discharged to the tail water in reservoir area outside dam in time, can effectively reduce the infiltration of dam body Line.
The width at dam crest on described barren rock dam must be according to mine tailing dry heaping yard dam body(I.e. dry stockyard periphery dam body)Rise, The gradient and spoil amount specifically determining, generally mine tailing dry heaping yard dam body width at dam crest(1/4)~(1/2).Barren rock dam The outer slope gradient is consistent with the inner slope gradient of the mine tailing dry heaping yard dam body of periphery, physical mechanicses of its inner slope gradient according to barren rock Performance is determined Jing after stable calculation.
One layer of refuse dump barren rock row's infiltration layer is set in the bottom of the reservoir area for storing up mine tailing, its thickness is between 0.5~1m.
A kind of utilization barren rock of the present invention is reinforced the method for mine tailing dry heaping yard and takes mine tailing dry heaping yard " inside to enclose reinforcing, by stages Bank up every, interval barren rock " reinforcement process technology, not only Tailings Dam is reinforced, the heap of the refuse dump barren rock for also solving Problem is put, project occupation of land has been saved, the security performance of Tailings Dam is improve.Itself the specific beneficial effects are as follows:
(1)Piling tails not only can be used for, the stacking for solving the problems, such as chats is also helped;
(2)Mine tailing dry heaping yard is reinforced using barren rock, improve the safety and stablization of whole mine tailing dry heaping yard.
Description of the drawings
Fig. 1 is the dry stockyard horizontal layout schematic diagram of the method that a kind of utilization barren rock of the invention reinforces mine tailing dry heaping yard;
Fig. 2 is the dry stockyard generalized section of the method that a kind of utilization barren rock of the invention reinforces mine tailing dry heaping yard.
Reference is:1- mine tailing dry heaping yards;2- mine tailing dry heaping yard dam bodys;3- barren rocks dam;Every dam in 4- barren rocks;4 '-in Every branch dam;5- hillocks;6- mine tailings;7- drainage prisms;8- drain pipies;9- refuse dumps barren rock row's infiltration layer.
Specific embodiment
Preferably to describe the present invention, the side of mine tailing dry heaping yard is reinforced below in conjunction with the accompanying drawings to a kind of utilization barren rock of the invention Method is described in further detail.
A kind of utilization barren rock of invention as shown in Figure 1 reinforces the dry stockyard planar cloth of the method for mine tailing dry heaping yard Put schematic diagram and find out with reference to Fig. 2, the method that a kind of utilization barren rock of the invention reinforces mine tailing dry heaping yard, in mine tailing dry heaping yard 1 Bottom arranges drain pipe 8, is provided with drainage prism 7 in the exterior bottom of mine tailing dry heaping yard dam body 2.In the tailing dry-heaping for having constructed Build barren rock dam 3 is enclosed in the dam body 2 of field, is divided every dam 4, the both sides every dam 4 in barren rock during a barren rock is built in barren rock dam 3 Not Xiu Zhu in two every 4 ' of branch dam, in barren rock dam 3 and barren rock every dam 4, in profit again in space between 4 ' of branch dam Banked up with refuse dump barren rock treatment in accordance with local conditions hillock 5, in barren rock dam 3 and barren rock every dam 4, in every 4 ' of branch dam, hillock 5 it Between space be the reservoir area for storing up mine tailing 6, in barren rock dam 3 and barren rock every dam 4, in will store up mine tailing every 4 ' of branch dam, hillock 5 6 reservoir area is separated into the cell that several are interconnected.In in 4 ' of branch dam and barren rock between dam 4 to be obliquely installed, in It is folded to in again every the parallel directions of 4 ' of branch dam every the end of 4 ' of branch dam.The width at dam crest on described barren rock dam 3 is mine tailing Dry 2 width at dam crest of stockyard dam body(1/4)The scope of~(1/2).In the bottom of the reservoir area for storing up mine tailing 6, one layer of refuse dump is set Barren rock arranges infiltration layer 9, and its thickness can not be paved with whole stockyard between 0.5~1m.

Claims (4)

1. a kind of method that utilization barren rock reinforces mine tailing dry heaping yard, arranges drain pipe (8) in the bottom of mine tailing dry heaping yard (1), its It is characterised by:Build barren rock dam (3) is enclosed in the mine tailing dry heaping yard dam body (2) for having constructed, in barren rock dam (3) build one Every dam (4) in seat barren rock, the both sides every dam (4) in barren rock are built during quantity is at least two respectively every branch dam (4 '), In barren rock dam (3) and barren rock every dam (4), in recycle in space between branch dam (4 ') refuse dump barren rock to bank up barren rock Heap (5), in barren rock dam (3) and barren rock every dam (4), in space between branch dam (4 '), hillock (5) to store up mine tailing (6) in reservoir area, barren rock dam (3) and barren rock every dam (4), in the storehouse of mine tailing (6) will be stored up every branch dam (4 '), hillock (5) Differentiation is divided into several cells being interconnected;In in branch dam (4 ') and barren rock between dam (4) to be obliquely installed, in every The end on branch dam (4 ') is folded to in again every branch dam (4 ') parallel direction.
2. the method that a kind of utilization barren rock as claimed in claim 1 reinforces mine tailing dry heaping yard, it is characterised in that:Mine tailing dry heaping yard The exterior bottom of dam body (2) is provided with drainage prism (7).
3. the method that a kind of utilization barren rock as claimed in claim 1 or 2 reinforces mine tailing dry heaping yard, it is characterised in that:Described The width at dam crest on barren rock dam (3) is the scope of the 1/4~1/2 of mine tailing dry heaping yard dam body (2) width at dam crest.
4. the method that a kind of utilization barren rock as claimed in claim 3 reinforces mine tailing dry heaping yard, it is characterised in that:Storing up mine tailing (6) bottom of reservoir area arranges one layer of refuse dump barren rock row's infiltration layer (9), and its thickness is between 0.5~1m.
CN201510354303.8A 2015-06-25 2015-06-25 Method for strengthening dry tailing storage yard by utilizing barren rocks Active CN105040711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510354303.8A CN105040711B (en) 2015-06-25 2015-06-25 Method for strengthening dry tailing storage yard by utilizing barren rocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510354303.8A CN105040711B (en) 2015-06-25 2015-06-25 Method for strengthening dry tailing storage yard by utilizing barren rocks

Publications (2)

Publication Number Publication Date
CN105040711A CN105040711A (en) 2015-11-11
CN105040711B true CN105040711B (en) 2017-04-12

Family

ID=54447658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510354303.8A Active CN105040711B (en) 2015-06-25 2015-06-25 Method for strengthening dry tailing storage yard by utilizing barren rocks

Country Status (1)

Country Link
CN (1) CN105040711B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696518B (en) * 2016-01-28 2017-09-19 中钢集团马鞍山矿山研究院有限公司 A kind of fine tailings solidify dry heaping method
CN105952449B (en) * 2016-05-10 2018-04-10 中钢集团马鞍山矿山研究院有限公司 A kind of new method of Tailings dry type back production
CN106049509B (en) * 2016-07-24 2018-04-06 中国电建集团贵阳勘测设计研究院有限公司 Separation dam structure of tailing pond and construction process thereof
CN108787688A (en) * 2018-05-07 2018-11-13 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of metallurgy solid waste ecology stockyard building method
CN108941146B (en) * 2018-07-02 2021-05-04 北京科技大学 Waste rock and full tailings mixing and stacking method
CN109026152B (en) * 2018-08-27 2024-04-19 清华大学 Open pit coal mine underground reservoir containing core wall rock-fill retaining dam structure
CN110670546B (en) * 2019-10-18 2021-03-26 付文堂 Method for building dam by bidirectional permeation and reverse laying of seepage drainage arrises
CN114294056B (en) * 2021-12-14 2024-07-30 万宝矿产有限公司 Method for combined disposal of waste stone and dry tailings in open pit
CN115059025A (en) * 2022-06-22 2022-09-16 中国恩菲工程技术有限公司 Combined treatment system and method for tailings and waste rocks
CN115072400B (en) * 2022-08-18 2022-11-04 矿冶科技集团有限公司 Modified concentrated full-tailings piling method
CN115613594B (en) * 2022-09-01 2024-09-10 浙江省工程勘察设计院集团有限公司 Construction and recycling method of valley type weak slag soil digestion field

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6010010A (en) * 1983-06-25 1985-01-19 Takenaka Komuten Co Ltd Float for sludge dehydration work
CN2825748Y (en) * 2005-04-26 2006-10-11 贵阳铝镁设计研究院 Drainage device for dry-method red mud stack yard
CN100494629C (en) * 2006-04-17 2009-06-03 中国科学院力学研究所 Ribbed terrace method for wet type stack of fine tailings
CN103397645B (en) * 2013-07-22 2015-07-29 中钢集团马鞍山矿山研究院有限公司 A kind of dry heap arranges with wet the tailings pile discharge method combined

Also Published As

Publication number Publication date
CN105040711A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105040711B (en) Method for strengthening dry tailing storage yard by utilizing barren rocks
CN105350498B (en) A kind of tailings discharging method of water saving
CN103397645B (en) A kind of dry heap arranges with wet the tailings pile discharge method combined
CN111305210B (en) Ultra-fine grain tailing pond heightening and expanding heap-discharging structure adopting midline method for one-time dam building
CN108941146B (en) Waste rock and full tailings mixing and stacking method
CN103924576A (en) Intelligent control three-dimensional drainage vacuum preloading method for particle tailing ore reinforced fill dam
CN103243799B (en) Prevention and treatment method of water scour hazards of binding site of mine solid waste yard and mountain area
CN104405436A (en) Method for improving orebody rate of supporting pit roof
CN105926576A (en) Method for accelerating tailing pulp dewatering and consolidating in upstream method milltailing alluviation dam building
CN109630121B (en) Steering, developing and transporting system for strip mining area
CN1888391A (en) Fast spoil disposal slope protection and ecological recovery open-pit mining technology
CN106284205A (en) Method for building dam by hydraulic flushing of tailings of mold bag edge stems
CN111305211B (en) Method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method
CN104480949A (en) Strong draining and seepage-based upstream type tailings pond two-level dam structure and application thereof
CN103967496A (en) Novel method suitable for valley type tailings stacking dam slope tailings recovery
CN105780784B (en) A kind of method for being suitable to carry out fine tailings by level land or massif in dry heap
CN105040713A (en) Treatment method for slope sliding of strip mine
CN110616319B (en) Secondary copper sulfide ore inflation infiltration heap leaching method
RU2569100C1 (en) Method to stock granular wastes
CN110566207A (en) covering layer full-tailings piling method for open-air to underground non-bottom-pillar sublevel caving method
CN105672318A (en) Grading filling system for fine-grained tailing mould bags
CN201485845U (en) Tailing dam muddy foundation reinforcing device
CN106284373A (en) A kind of method of construction of Tailings Dam
CN105696518B (en) A kind of fine tailings solidify dry heaping method
CN214787547U (en) Tailing underground storage system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Co-patentee after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Co-patentee after: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH, ENGINEERING INVESTIGATION AND DESIGN Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Co-patentee before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.

Co-patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH, ENGINEERING INVESTIGATION AND DESIGN Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20221103

Address after: 243000 No. 666 Xitang Road, Ma'anshan Economic Development Zone, Anhui Province

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Patentee after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 243000 No. 666 Xitang Road, Ma'anshan Economic Development Zone, Anhui Province

Patentee before: MAANSHAN Mine Research Institute Co.,Ltd.

Patentee before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH, ENGINEERING INVESTIGATION AND DESIGN Co.,Ltd.

TR01 Transfer of patent right