CN105040682A - 一种组合桩一次成型设备的实施方法 - Google Patents

一种组合桩一次成型设备的实施方法 Download PDF

Info

Publication number
CN105040682A
CN105040682A CN201510300199.4A CN201510300199A CN105040682A CN 105040682 A CN105040682 A CN 105040682A CN 201510300199 A CN201510300199 A CN 201510300199A CN 105040682 A CN105040682 A CN 105040682A
Authority
CN
China
Prior art keywords
framework
rotating shaft
gearbox
linear actuator
drill bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510300199.4A
Other languages
English (en)
Other versions
CN105040682B (zh
Inventor
张璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taicang Fansheng Electronic Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510300199.4A priority Critical patent/CN105040682B/zh
Publication of CN105040682A publication Critical patent/CN105040682A/zh
Application granted granted Critical
Publication of CN105040682B publication Critical patent/CN105040682B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种组合桩一次成型设备的实施方法,高压水配置系统对第一钻头和四个第二钻头分别配置高压水,一个第一钻头和四个第二钻头在转动中将其下的土与水搅拌成泥浆;中控装置控制第一气动缸、第二气动缸、第三气动缸、第四气动缸同步动作,由此同步驱动圆构架、第一方构架以及第二方构架同步上下不停止运动,圆构架、第一方构架以及第二方构架下部的第一刀齿以及第一方构架、第二方构架内部的第二刀齿将第一方构架、第二方构架以内、四个第二钻头以外第二钻头没能搅拌的土与高压水搅拌成泥浆,同时,四个气动缸排放的尾气在上升过程中将泥浆再次搅拌;泥浆从组合孔内流出成中间圆两头方的组合孔。

Description

一种组合桩一次成型设备的实施方法
技术领域
本发明涉及一种水泥土桩成型设备,特别是一种建筑基础工程中应用的组合桩一次成型设备的一种实施方法。
背景技术
目前,圆与矩形的组合孔都是通过多次钻挖而成。
发明内容
本发明弥补了以上缺点,提供了一种组合桩一次成型设备的一种实施方法。
本发明是通过如下技术方案实现的:
一种组合桩一次成型设备,主杆下端固定电机上端,电机下端固定第一变速箱,第一变速箱下端设有第三转轴,第三转轴下端设有第一钻头,第一变速箱左边连有第二变速箱,第二变速箱下端并排设有第一转轴和第二转轴,第一转轴和第二转轴下端分别设有一个第二钻头,第一变速箱右边连有第三变速箱,第三变速箱下端并排设有第四转轴和第五转轴,第四转轴和第五转轴下端分别设有一个第二钻头;第二变速箱前部固定有第一气动缸,第一气动缸的下端固定于第一方构架的前上部,第二变速箱后部固定有第三气动缸,第三气动缸的下端固定于第一方构架的后上部;第三变速箱前部固定有第二气动缸,第二气动缸的下端固定于第二方构架的前上部,第三变速箱后部固定有第四气动缸,第四气动缸的下端固定于第二方构架的后上部;圆构架位于以第三转轴为圆心的圆上,圆构架左边固定有第一方构架,圆构架右边固定有第二方构架;第一转轴以及第二转轴设于第一方构架内,第四转轴以及第五转轴设于第二方构架内;第一转轴上设有一个转套,此转套通过前后两个连接杆固定于第一方构架,第五转轴上设有一个转套,此转套通过前后两个连接杆固定于第二方构架;第一方构架、圆构架以及第二方构架的下部分别设有多个第一刀齿,第一方构架以及第二方构架的内部分别设有多个第二刀齿;第一气动缸的尾气排放管的出口端设置于第一转轴和第二转轴之间,第二气动缸的尾气排放管的出口端设置于第二转轴和第三转轴之间,第三气动缸的尾气排放管的出口端设置于第三转轴和第四转轴之间,第四气动缸的尾气排放管的出口端设置于第四转轴和第五转轴之间。
一种组合桩一次成型设备的一种实施方法,组合桩一次成型设备工作时,主杆牵动设备上行或下进,电机通过第一变速箱驱动第三转轴、第一钻头转动,电机通过第一变速箱、第二变速箱驱动第一转轴、第二转轴分别带动其下的第二钻头正向转动,电机通过第一变速箱、第三变速箱驱动第四转轴、第五转轴分别带动其下的第二钻头逆向转动,高压水配置系统对第一钻头和四个第二钻头分别配置高压水,一个第一钻头和四个第二钻头在转动中将其下的土与水搅拌成泥浆;中控装置控制第一气动缸、第二气动缸、第三气动缸、第四气动缸同步动作,由此同步驱动圆构架、第一方构架以及第二方构架同步上下不停止运动,圆构架、第一方构架以及第二方构架下部的第一刀齿以及第一方构架、第二方构架内部的第二刀齿将第一方构架、第二方构架以内、四个第二钻头以外第二钻头没能搅拌的土与高压水搅拌成泥浆,同时,四个气动缸排放的尾气在上升过程中将泥浆再次搅拌;泥浆从组合孔内流出成中间圆两头方的组合孔。
本发明具有以下的特点:
本发明圆构架、第一方构架以及第二方构架同步上下不停止运动,圆构架、第一方构架以及第二方构架下部的第一刀齿以及第一方构架、第二方构架内部的第二刀齿将第一方构架、第二方构架以内、四个第二钻头以外第二钻头没能搅拌的土与高压水搅拌成泥浆,同时,四个气动缸排放的尾气在上升过程中将泥浆再次搅拌;泥浆从组合孔内流出成中间圆两头矩形的组合孔。
附图说明
下面结合附图对本发明作进一步的说明:
图1为本发明的结构示意图;
图2为图1的A—A视图;
图3为图1的B—B视图;
图中:1、主杆,2、电机,3、第一变速箱,4、第二变速箱,5、第三变速箱,6、第一气动缸,7、第二气动缸,8、圆构架,9、第一方构架,10、第二方构架,11、第一刀齿,12、转套,13、第一转轴,14、第二转轴,15、第三转轴,16、第四转轴,17、第五转轴,18、第一钻头,19、第二钻头,20、连接杆,21、第二刀齿,22、第三气动缸,23、第四气动缸。
具体实施方式
附图为本发明的一种具体实施例,该实施例主杆1下端固定电机2上端,电机下端固定第一变速箱3,第一变速箱下端设有第三转轴15,第三转轴下端设有第一钻头18,第一变速箱左边连有第二变速箱4,第二变速箱下端并排设有第一转轴13和第二转轴14,第一转轴和第二转轴下端分别设有一个第二钻头19,第一变速箱右边连有第三变速箱5,第三变速箱下端并排设有第四转轴16和第五转轴17,第四转轴和第五转轴下端分别设有一个第二钻头19;第二变速箱前部固定有第一气动缸6,第一气动缸的下端固定于第一方构架9的前上部,第二变速箱后部固定有第三气动缸22,第三气动缸的下端固定于第一方构架的后上部;第三变速箱前部固定有第二气动缸7,第二气动缸的下端固定于第二方构架10的前上部,第三变速箱后部固定有第四气动缸23,第四气动缸的下端固定于第二方构架的后上部;圆构架8位于以第三转轴为圆心的圆上,圆构架左边固定有第一方构架9,圆构架右边固定有第二方构架10;第一转轴以及第二转轴设于第一方构架内,第四转轴以及第五转轴设于第二方构架内;第一转轴上设有一个转套12,此转套通过前后两个连接杆20固定于第一方构架,第五转轴上设有一个转套,此转套通过前后两个连接杆固定于第二方构架;第一方构架、圆构架以及第二方构架的下部分别设有多个第一刀齿11,第一方构架以及第二方构架的内部分别设有多个第二刀齿21;第一气动缸的尾气排放管的出口端设置于第一转轴和第二转轴之间,第二气动缸的尾气排放管的出口端设置于第二转轴和第三转轴之间,第三气动缸的尾气排放管的出口端设置于第三转轴和第四转轴之间,第四气动缸的尾气排放管的出口端设置于第四转轴和第五转轴之间。
本发明工作时,主杆牵动设备上行或下进,电机通过第一变速箱驱动第三转轴、第一钻头转动,电机通过第一变速箱、第二变速箱驱动第一转轴、第二转轴分别带动其下的第二钻头正向转动,电机通过第一变速箱、第三变速箱驱动第四转轴、第五转轴分别带动其下的第二钻头逆向转动,高压水配置系统对第一钻头和四个第二钻头分别配置高压水,一个第一钻头和四个第二钻头在转动中将其下的土与水搅拌成泥浆;中控装置控制第一气动缸、第二气动缸、第三气动缸、第四气动缸同步动作,由此同步驱动圆构架、第一方构架以及第二方构架同步上下不停止运动,圆构架、第一方构架以及第二方构架下部的第一刀齿以及第一方构架、第二方构架内部的第二刀齿将第一方构架、第二方构架以内、四个第二钻头以外第二钻头没能搅拌的土与高压水搅拌成泥浆,同时,四个气动缸排放的尾气在上升过程中将泥浆再次搅拌;泥浆从组合孔内流出成中间圆两头矩形的组合孔。

Claims (1)

1.一种组合桩一次成型设备的实施方法,其特征在于:组合桩一次成型设备工作时,主杆牵动设备上行或下进,电机通过第一变速箱驱动第三转轴、第一钻头转动,电机通过第一变速箱、第二变速箱驱动第一转轴、第二转轴分别带动其下的第二钻头正向转动,电机通过第一变速箱、第三变速箱驱动第四转轴、第五转轴分别带动其下的第二钻头逆向转动,高压水配置系统对第一钻头和四个第二钻头分别配置高压水,一个第一钻头和四个第二钻头在转动中将其下的土与水搅拌成泥浆;中控装置控制第一气动缸、第二气动缸、第三气动缸、第四气动缸同步动作,由此同步驱动圆构架、第一方构架以及第二方构架同步上下不停止运动,圆构架、第一方构架以及第二方构架下部的第一刀齿以及第一方构架、第二方构架内部的第二刀齿将第一方构架、第二方构架以内、四个第二钻头以外第二钻头没能搅拌的土与高压水搅拌成泥浆,同时,四个气动缸排放的尾气在上升过程中将泥浆再次搅拌;泥浆从组合孔内流出成中间圆两头方的组合孔。
CN201510300199.4A 2015-06-05 2015-06-05 一种组合桩一次成型设备的实施方法 Active CN105040682B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510300199.4A CN105040682B (zh) 2015-06-05 2015-06-05 一种组合桩一次成型设备的实施方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510300199.4A CN105040682B (zh) 2015-06-05 2015-06-05 一种组合桩一次成型设备的实施方法

Publications (2)

Publication Number Publication Date
CN105040682A true CN105040682A (zh) 2015-11-11
CN105040682B CN105040682B (zh) 2016-12-28

Family

ID=54447629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510300199.4A Active CN105040682B (zh) 2015-06-05 2015-06-05 一种组合桩一次成型设备的实施方法

Country Status (1)

Country Link
CN (1) CN105040682B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421362A (zh) * 2015-12-31 2016-03-23 卢兴耐 方圆组合桩成桩机
CN105421371A (zh) * 2015-12-31 2016-03-23 卢兴耐 组合型搅拌桩机
CN105442585A (zh) * 2015-12-31 2016-03-30 卢兴耐 方圆组合桩搅拌桩机
CN105544520A (zh) * 2015-12-31 2016-05-04 朱艳菊 V形插接方圆组合桩成桩机
CN105603974A (zh) * 2015-12-31 2016-05-25 卢兴耐 圆弧接口矩形组合成桩机
CN105649021A (zh) * 2015-12-31 2016-06-08 卢兴耐 方圆组合桩搅拌钻机
CN105649050A (zh) * 2015-12-31 2016-06-08 李会修 组合型桩机
CN105649043A (zh) * 2015-12-31 2016-06-08 卢兴耐 H形单插扣钻搅机
CN105672271A (zh) * 2015-12-31 2016-06-15 宗超 V形插接方圆组合桩成桩机

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10292362A (ja) * 1997-04-11 1998-11-04 Takenaka Doboku Co Ltd 地盤改良用の多軸同期装置及びこれを利用した多軸混合処理機とケーシングパイプ式地盤改良装置
JP2003138555A (ja) * 2001-10-31 2003-05-14 Tone Corp 地盤改良用攪拌ビット
CN201598638U (zh) * 2009-12-11 2010-10-06 上海强劲基础工程有限公司 一种三轴搅拌桩施工用型钢对点器
CN102493438A (zh) * 2011-12-19 2012-06-13 上海城地建设发展有限公司 一种多轴水泥土连续搅拌桩装置及施工方法
CN104612141A (zh) * 2015-02-28 2015-05-13 张璐 T型搅拌钻机

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10292362A (ja) * 1997-04-11 1998-11-04 Takenaka Doboku Co Ltd 地盤改良用の多軸同期装置及びこれを利用した多軸混合処理機とケーシングパイプ式地盤改良装置
JP2003138555A (ja) * 2001-10-31 2003-05-14 Tone Corp 地盤改良用攪拌ビット
CN201598638U (zh) * 2009-12-11 2010-10-06 上海强劲基础工程有限公司 一种三轴搅拌桩施工用型钢对点器
CN102493438A (zh) * 2011-12-19 2012-06-13 上海城地建设发展有限公司 一种多轴水泥土连续搅拌桩装置及施工方法
CN104612141A (zh) * 2015-02-28 2015-05-13 张璐 T型搅拌钻机

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421362A (zh) * 2015-12-31 2016-03-23 卢兴耐 方圆组合桩成桩机
CN105421371A (zh) * 2015-12-31 2016-03-23 卢兴耐 组合型搅拌桩机
CN105442585A (zh) * 2015-12-31 2016-03-30 卢兴耐 方圆组合桩搅拌桩机
CN105544520A (zh) * 2015-12-31 2016-05-04 朱艳菊 V形插接方圆组合桩成桩机
CN105603974A (zh) * 2015-12-31 2016-05-25 卢兴耐 圆弧接口矩形组合成桩机
CN105649021A (zh) * 2015-12-31 2016-06-08 卢兴耐 方圆组合桩搅拌钻机
CN105649050A (zh) * 2015-12-31 2016-06-08 李会修 组合型桩机
CN105649043A (zh) * 2015-12-31 2016-06-08 卢兴耐 H形单插扣钻搅机
CN105672271A (zh) * 2015-12-31 2016-06-15 宗超 V形插接方圆组合桩成桩机

Also Published As

Publication number Publication date
CN105040682B (zh) 2016-12-28

Similar Documents

Publication Publication Date Title
CN105040682A (zh) 一种组合桩一次成型设备的实施方法
CN104727313A (zh) 四头钻搅拌钻机
CN105507294A (zh) π桩与矩形桩联合工作设备
CN105421389A (zh) 十字桩与矩形桩圆弧对合设备
CN105586953A (zh) 三角形桩与矩形桩接合成墙装置
CN105735282A (zh) 锁口十字桩制造设备
CN104141455A (zh) 钻机设备和钻机钻进方法
CN105569022A (zh) H桩与圆桩圆弧插扣设备
CN105569021A (zh) H桩与圆桩圆弧锁扣设备
CN105649047A (zh) 插接桩钻搅机
CN106088075A (zh) 插接v形钻搅机
CN105568968A (zh) 楔形插扣t形桩钻搅机
CN104912064A (zh) 组合桩一次成型设备
CN105421361A (zh) 插接桩钻搅机
CN105569023A (zh) 十字桩与圆桩圆弧插接设备
CN105507308A (zh) V形接口π桩钻搅机
CN105464104A (zh) 半圆锁口t形桩钻搅机
CN105484238A (zh) H形单插扣钻搅机
CN105569025A (zh) 十字桩与圆桩圆弧接合设备
CN105507283A (zh) T桩与矩形桩圆弧插扣设备
CN105421373A (zh) 梯形钻搅机
CN105421358A (zh) V形插口t形桩钻搅机
CN105421365A (zh) 接口桩搅拌钻机
CN105442534A (zh) 半圆形锁口桩搅拌桩机
CN105507257A (zh) H桩与矩形桩圆弧插接设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Chen Xianxue

Inventor before: Zhang Lu

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161125

Address after: 401320 Chongqing city Banan District Longzhou Bay Street Village Social Solidarity

Applicant after: Chongqing Xuxinyue CNC Machinery Co.,Ltd.

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20161125

Address after: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: Ji'nan road 276800 in Shandong Province, Rizhao City Donggang District No. 277 Belvedere Garden

Applicant before: Zhang Lu

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200415

Address after: 343808 Haruki, Earth Dragon 78, Kuai Bu, Bai Jia town, Wan An county, Ji'an, Jiangxi

Patentee after: Yan Xiaohu

Address before: 401320 Chongqing city Banan District Longzhou Bay Street Village Social Solidarity

Patentee before: Chongqing Xuxinyue CNC Machinery Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200610

Address after: 215400 downstairs of financial office, west side of jinlang Quyuan Road, Fuqiao Town, Taicang City, Suzhou City, Jiangsu Province

Patentee after: Taicang Fansheng Electronic Technology Co.,Ltd.

Address before: 343808 Haruki, Earth Dragon 78, Kuai Bu, Bai Jia town, Wan An county, Ji'an, Jiangxi

Patentee before: Yan Xiaohu

TR01 Transfer of patent right