CN105040645B - A kind of teleblem dash method for canal lining repair works under water - Google Patents

A kind of teleblem dash method for canal lining repair works under water Download PDF

Info

Publication number
CN105040645B
CN105040645B CN201510312528.7A CN201510312528A CN105040645B CN 105040645 B CN105040645 B CN 105040645B CN 201510312528 A CN201510312528 A CN 201510312528A CN 105040645 B CN105040645 B CN 105040645B
Authority
CN
China
Prior art keywords
water
teleblem
canal lining
flexible
works under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510312528.7A
Other languages
Chinese (zh)
Other versions
CN105040645A (en
Inventor
贾永奕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510312528.7A priority Critical patent/CN105040645B/en
Publication of CN105040645A publication Critical patent/CN105040645A/en
Application granted granted Critical
Publication of CN105040645B publication Critical patent/CN105040645B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The present invention relates to a kind of teleblem dash method for canal lining repair works under water, including following construction technology:The edge of sealing, back side will be needed in flexible water film to install sealant additional, upstream face installs counterweight additional;Flexible water film backwater is faced down submerged, patch is laid on the canal lining surface in Awaiting Overhaul region, and the unencapsulated edge exposure of flexible water film is more than the water surface of bank.The present invention has small investment, simple structure, selection environmental protection, stagnant water effect are good, and additional load is little, canal lining will not be injured, transport, installation, water transit depot are convenient, can prop up waterproof membrane with crane barge waterborne, mobile maintenance lock and maintenance gallery etc., on the operation basal plane for being provided, flexible working space is provided for lining cutting maintenance, it is also possible to as the dash curtain of speedily carrying out rescue work for preventing landslide area from expanding.

Description

A kind of teleblem dash method for canal lining repair works under water
Technical field
The present invention relates to a kind of dash method, and in particular to a kind of teleblem dash side for canal lining repair works under water Method, belongs to hydraulic engineering technical field.
Background technology
Water diversion project is the trans-regional important infrastructure for distributing water resource rationally, and concrete lining open channel cost advantage shows Write, using relatively broad in engineering, crack, degrade, waterproof failure, the canal lining disease such as landslide such as cannot be located in time Reason, will seriously threaten engineering water delivery safety, for this purpose, carrying out the maintenance of water flowing phase heavy construction more.Economy, quickly offer operation base Face, is the key technology for realizing water flowing phase lining cutting maintenance, the gear such as current general steel sheet-pile cofferdam, earth rock cofferdam, caisson cofferdam Water scheme, not only high cost, long in time limit, and the canal section operation basal plane for traversing two sides can not be typically provided, while being also possible to brokenly It is bad to account for nip lining cutting.
The content of the invention
To solve above-mentioned technical problem, it is an object of the invention to provide a kind of economy, efficiently dash method, in not Under conditions of disconnected water delivery, the operation basal plane isolated with water in a canal is provided for canal lining maintenance, it can also be used to prevent landslide area from expanding Dash curtain of speedily carrying out rescue work.
For achieving the above object, the technical solution used in the present invention is that a kind of teleblem for canal lining repair works under water keeps off Water method, which includes following construction technology:The flexible water film is made up of the polyamide fibre dipped canvas for increasing density, upstream face point Cloth is withheld;The edge of sealing, back side is needed to install sealant additional in flexible water film, upstream face installs counterweight additional;By flexible water Film backwater faces down submerged, and patch is laid on the canal lining surface in Awaiting Overhaul region, and the unencapsulated edge of flexible water film goes out It is exposed to more than the bank water surface.
The present invention the teleblem dash method for canal lining repair works under water be further:The sealant is by nontoxic poly- Sulphur fluid sealant is made.
The present invention the teleblem dash method for canal lining repair works under water be further:The counterweight is by sand pocket system Into.
The present invention the teleblem dash method for canal lining repair works under water be further:The flexible water film is not close The edge of envelope can be in the water surface above exposure of side bank, also can be in the exposure simultaneously of both sides bank.
Compared with prior art, the beneficial effects of the utility model are:Dash formula investing is few, simple structure, selection Environmental protection;Stagnant water effect is good;Transport, installation, water transit depot are convenient;Additional load is little, will not injure canal lining;It can be not only bank Slope maintenance provides operation basal plane, can also provide operation basal plane for the maintenance of canal section tunneling boring, it is also possible to expand as landslide area is prevented Big dash curtain of speedily carrying out rescue work;Crane barge waterborne, mobile maintenance lock and maintenance gallery etc. is can use to prop up waterproof membrane, in the operation for being provided On basal plane, flexible working space is provided for lining cutting maintenance.
Description of the drawings
Fig. 1 is the teleblem dash method schematic diagram of the canal lining repair works under water for the present invention.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is described in further detail:
As shown in figure 1, the present invention is a kind of teleblem dash method for canal lining repair works under water, which includes following applying Work technique:The flexible water film 1 is made up of the polyamide fibre dipped canvas for increasing density, can be sunken to the bottom, upstream face point with deadweight Cloth is withheld, and lifts by crane for the water surface;The edge of sealing, back side is needed to install sealant 2 additional in flexible water film 1, upstream face is installed additional Counterweight 3;1 backwater of flexible water film is faced down submerged, patch is laid on 4 surface of canal lining in Awaiting Overhaul region, flexible anti- 1 unencapsulated edge exposure of moisture film is more than the water surface of bank.
The sealant 2 is made up of nontoxic polysulfide sealant, is closely connect with canal liner plate under the pressure effect of counterweight 3 Touch.
The counterweight 3 is made up of sand pocket.
1 unencapsulated edge of the flexible water film can be in the water surface above exposure of side bank, also can be same on both sides bank When exposure, provide gateway for upkeep operation.
Dash formula investing of the present invention is few, simple structure, selection environmental protection;Stagnant water effect is good;Transport, installation, water transit depot It is convenient;Additional load is little, will not injure canal lining;Not only operation basal plane can be provided for bank slope maintenance, can also be canal Duan Quan Section maintenance provides operation basal plane, it is also possible to as the dash curtain of speedily carrying out rescue work for preventing landslide area from expanding;Available crane barge waterborne, movement Maintenance lock and maintenance gallery etc. prop up waterproof membrane, on the operation basal plane for being provided, provide flexible operation for lining cutting maintenance empty Between.
Specific embodiment above is only presently preferred embodiments of the present invention, not to limit the present invention, all at this Any modification for being made within bright spirit and principle, equivalent substitute, improvement etc., should be included in protection scope of the present invention it It is interior.

Claims (4)

1. a kind of teleblem dash method for canal lining repair works under water, it is characterised in that including following construction technology:It is flexible Waterproof membrane (1) is made up of the polyamide fibre dipped canvas for increasing density, and the EDS maps that meet water are withheld;Sealing is needed in flexible water film (1) Edge, back side installs sealant (2) additional, and upstream face installs counterweight (3) additional;Flexible water film (1) backwater is faced down and sinks to water In, patch is laid on canal lining (4) surface in Awaiting Overhaul region, and the unencapsulated edge exposure of flexible water film (1) is in the bank water surface More than.
2. the teleblem dash method for canal lining repair works under water according to claim 1, it is characterised in that sealant (2) it is made up of nontoxic polysulfide sealant.
3. the teleblem dash method for canal lining repair works under water according to claim 1, it is characterised in that counterweight (3) It is made up of sand pocket.
4. the teleblem dash method for canal lining repair works under water according to claim 1, flexible water film (1) be not close The edge of envelope can be in the water surface above exposure of side bank, also can be in the exposure simultaneously of both sides bank.
CN201510312528.7A 2015-06-09 2015-06-09 A kind of teleblem dash method for canal lining repair works under water Expired - Fee Related CN105040645B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510312528.7A CN105040645B (en) 2015-06-09 2015-06-09 A kind of teleblem dash method for canal lining repair works under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510312528.7A CN105040645B (en) 2015-06-09 2015-06-09 A kind of teleblem dash method for canal lining repair works under water

Publications (2)

Publication Number Publication Date
CN105040645A CN105040645A (en) 2015-11-11
CN105040645B true CN105040645B (en) 2017-03-29

Family

ID=54447594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510312528.7A Expired - Fee Related CN105040645B (en) 2015-06-09 2015-06-09 A kind of teleblem dash method for canal lining repair works under water

Country Status (1)

Country Link
CN (1) CN105040645B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409378B (en) * 2019-09-02 2021-02-09 黄河勘测规划设计研究院有限公司 Non-water-stop maintenance method for large channel

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001059214A (en) * 1999-08-23 2001-03-06 Otsuka Kogyo:Kk Repairing structure of concrete channel
CN1200172C (en) * 2002-10-16 2005-05-04 党海愚 Composite type siltbeach dam body engineering technology
CN101545251B (en) * 2009-03-18 2010-12-01 云南三环中化化肥有限公司 Method for storing and getting water by blocking river on natural river course

Also Published As

Publication number Publication date
CN105040645A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN103410175A (en) Water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN104631475A (en) Safe and fast construction method of down-traversing river shallow depth bored tunnel
CN108316354A (en) With waterproof, the underground pipe gallery structure of drain function and its construction method
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
Liu et al. A case study on key techniques for long-distance sea-crossing shield tunneling
CN103603666B (en) Tailing pond sand excavation method
CN105040645B (en) A kind of teleblem dash method for canal lining repair works under water
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN109577277A (en) A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN206554930U (en) It is a kind of it is round overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel
CN109797717A (en) The construction method for having subway tunnel is worn on a kind of river
Lo et al. Design considerations for tailings dams
CN208563267U (en) A kind of earth and rockfill dam pressure slope body discharge structure
CN202451974U (en) Anti-floating structure of buried pipeline
CN105568938B (en) A kind of method for changing existing horizontal sluice hydraulic gate load mode
CN203668975U (en) Sedimentation post-cast strip advancing water stopping anti-permeability concrete structure
CN205370600U (en) Subway tunnel prevents discharge area section and divides boundary point combination formula seepage flow to block isolating device
CN206800459U (en) A kind of submerged structure waterproof roofing structure
Winterberg et al. Santoña–Laredo general interceptor collector–challenges and solutions
Birid et al. Nearshore deep excavation and associated problems in cohesionless soil
CN203256746U (en) High-pressure and large-flow centralized leakage grouting processing device
Farràs et al. Solving the challenges of the San-toña-Laredo general interceptor collector
CN207829904U (en) A kind of buried lateral sulcus L-shaped abutment wall Tunnel construction of setting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20180609

CF01 Termination of patent right due to non-payment of annual fee