CN105033260B - A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe - Google Patents

A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe Download PDF

Info

Publication number
CN105033260B
CN105033260B CN201510543561.0A CN201510543561A CN105033260B CN 105033260 B CN105033260 B CN 105033260B CN 201510543561 A CN201510543561 A CN 201510543561A CN 105033260 B CN105033260 B CN 105033260B
Authority
CN
China
Prior art keywords
metal
blank
pipe
ultra
mixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510543561.0A
Other languages
Chinese (zh)
Other versions
CN105033260A (en
Inventor
迟煜頔
李纲
荆鹏
王建
李广忠
刘海彦
沈磊
石英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Institute for Non Ferrous Metal Research
Original Assignee
Northwest Institute for Non Ferrous Metal Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Institute for Non Ferrous Metal Research filed Critical Northwest Institute for Non Ferrous Metal Research
Priority to CN201510543561.0A priority Critical patent/CN105033260B/en
Publication of CN105033260A publication Critical patent/CN105033260A/en
Application granted granted Critical
Publication of CN105033260B publication Critical patent/CN105033260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Powder Metallurgy (AREA)

Abstract

The invention discloses the integral formation method of a kind of ultra-fine long thin-walled seamless metal pipe, the method is: one, prepare mixture A, mixture B and mixture C;Two, the first blank, the second blank and the 3rd blank are prepared;Three, in the first blank, the 3rd blank and the second blank being sequentially placed into recipient and it is compacted successively, obtains extrusion billet, then use the mode of powder extrusion molding to be extruded continuously through tube extrusion mouth by extrusion billet, obtain metal tube green compact;Four, metal tube green compact are sintered, obtain ultra-fine long thin-walled seamless metal pipe.The present invention is applicable to prepare the ultra-fine long thin-walled seamless metal pipe of various metal material, the seamless metal pipe obtained is by metal compaction pipe and metal perforated pipe and is placed in metal transfer pipe seamless link between the two and forms, it is firmly combined with, good seal performance, mechanical strength is high, can meet in the various use environment high to helium leak rates requirement, and service life is long.

Description

A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe
Technical field
The invention belongs to metal tube preparing technical field, be specifically related to a kind of ultra-fine long thin-walled seamless metal The integral formation method of pipe.
Background technology
Metal perforated pipe with special pore structure and excellent corrosion resistance, non-oxidizability, wearability, The performances such as mechanical property (ductility and impact strength), nuclear industry, energy manufacture, petrochemical industry, The function necks such as the filtration in the fields such as metal metallurgy smelting, exhaust-gas treatment, waste water control, separation, fluid distrbution Territory is taken on important role.The most in the industrial production in order to increase filter area, improve to filter and divide From efficiency, majority be metal perforated pipe is fabricated to an assembly or tube bank replace the most single metal Antipriming pipe carries out filtering separation, identical with the most metal porous single pipe volume at assembly or tube bank cumulative volume Under the conditions of, this just requires that the size that the metal perforated pipe in assembly or tube bank has relatively big L/D ratio is wanted Ask, and owing to filtering the lifting of separation condition, also require that metal perforated pipe has the feature of thin-walled. This is accomplished by reliable connecting mode and is combined by ultra-fine long thin-wall metal antipriming pipe.General employing Be the making first completing ultra-fine long thin-wall metal antipriming pipe, the then access way to metal compaction pipe It is designed, carries out the pattern welded the most again.The quality of welding directly determines the military service neck of element Territory and use occasion.Typically, the occasion that butt welded seam consistency requirements is the highest, as gas/solid separation, Use in the fields such as solid/liquid separation, owing to the material grains of required separation is relatively big, thus many to metal Hole pipe and commissure performance requirement thereof are less.But in some harsh conditions such as gas gas separation occasion Application, usually requires that the helium leak rates of black box is less than 10-9Pa·m3/ s, this is just to metal porous Commissure performance requirement between pipe and metal compaction pipe is strict.Such as use metal perforated pipe as propping up During the palladium-based composite membrane purifying hydrogen of support body, the compactness of metal perforated pipe and the commissure of fine and close pipe is wanted Ask the strictest, it is desirable to helium leak rates as little as 10-10Pa·m3/ s magnitude.
Welding method conventional between common metal have vacuum brazing, arc welding, electrogas arc welding, Laser Welding, Electron beam welderings etc., ultra-fine long thin-wall metal antipriming pipe welds with metal compaction pipe after having prepared again Connect, the pore structure special due to metal perforated pipe and elongated dimensional requirement, welding process can be caused Being difficult to operation complete, after welding, there is the hole that aperture more own than metal perforated pipe is the biggest in commissure, The compactness degradation of welding line joint, this is to reliable under multiple occasions of metal porous tube bundle assembly Usability creates adverse effect, particularly in some require harsh gas gas separation use occasion, Do not reach the use requirement that operating mode enterprise is proposed at all, due to metal perforated pipe itself have special Structure so that after using generally conventional method to weld with metal compaction pipe, the commissure after welding The aperture bigger than metal perforated pipe itself often occur, helium leak rates can only achieve 10-3~10-5Pa·m3/ s, has no idea to meet application requirement at all.
Up to now, although the relevant report in terms of existing more metal solder, but be fine and close material mostly Welding between material, affiliated research field is entirely different, and about metal perforated pipe and metal compaction pipe Between integral seamless welding procedure and theoretical research, both at home and abroad temporarily without report, also have no that Patents is remembered State.
Summary of the invention
The technical problem to be solved is for above-mentioned deficiency of the prior art, it is provided that one Plant the integral formation method of ultra-fine long thin-walled seamless metal pipe, the method is reasonable in design, technique is simple, Simple operating steps and the highest to equipment requirement, it is adaptable to prepare the ultra-fine long thin-walled of various metal material Seamless metal pipe, the seamless metal pipe obtained is by metal compaction pipe and metal perforated pipe and is placed in both Between metal transfer pipe seamless link form, be firmly combined with, good seal performance, mechanical strength is high, Can meet in the various use environment high to helium leak rates requirement, and service life is long.
For solving above-mentioned technical problem, the technical solution used in the present invention is: a kind of ultra-fine long thin-wall seamless The integral formation method of metal tube, it is characterised in that comprise the following steps:
Step one, plasticizer is mixed with metal dust A, obtain mixture A, by plasticizer Mix with metal dust B, obtain mixture B, then by described for part mixture A and part Described mixture B 1:(1 in mass ratio~3) mix, obtain mixture C;Described metal dust A is identical with the material of described metal dust B, and the average grain diameter of described metal dust A is 20 μm~110 μm, the average grain diameter of described metal dust B is 30 μm~150 μm, described metal powder The average grain diameter of end B is 10 μm~50 μm with the difference of the average grain diameter of described metal dust A;
Step 2, under preheating condition, it is squeezed into base by step one remains described mixture A, obtains First blank, is squeezed into base by remaining described mixture B in step one under preheating condition, obtains Two blanks, are squeezed into base by mixture C described in step one under preheating condition, obtain the 3rd blank; The temperature of described preheating is 35 DEG C~45 DEG C;
Step 3, the first blank described in step 2, the 3rd blank and the second blank are sequentially placed into crowded In pressure cylinder and it is compacted successively, obtains extrusion billet, then use the mode of powder extrusion molding by described Extrusion billet is extruded continuously, obtains metal tube green compact;The pressure of described powder extrusion molding is 2T~10T, temperature is 35 DEG C~45 DEG C;
Step 4, under protective atmosphere, metal tube green compact described in step 3 is sintered, To ultra-fine long thin-walled seamless metal pipe, the external diameter of described ultra-fine long thin-walled seamless metal pipe is 4mm~10mm, wall thickness is 0.2mm~1mm, the length of ultra-fine long thin-walled seamless metal pipe and external diameter Ratio more than 3, the temperature of described sintering processes is the fusing point of metal dust A described in step one 0.75~0.9 times, the temperature retention time of sintering processes is 120min~180min.
The integral formation method of above-mentioned a kind of ultra-fine long thin-walled seamless metal pipe, it is characterised in that step Plasticizer described in rapid one is (3~7) with the mass ratio of metal dust A: 50, described plasticizer and gold The mass ratio belonging to powder B is (3~7): 50.
The integral formation method of above-mentioned a kind of ultra-fine long thin-walled seamless metal pipe, it is characterised in that step The quality of mixture C described in rapid one is the 30%~50% of described mixture A mass.
The integral formation method of above-mentioned a kind of ultra-fine long thin-walled seamless metal pipe, it is characterised in that step Plasticizer described in rapid one is paraffin, carboxymethylcellulose calcium, starch or resin.
The integral formation method of above-mentioned a kind of ultra-fine long thin-walled seamless metal pipe, it is characterised in that step The pressure being compacted described first blank, the 3rd blank and the second blank in rapid three is 15T~30T.
The integral formation method of above-mentioned a kind of ultra-fine long thin-walled seamless metal pipe, it is characterised in that step Metal dust A described in rapid one and metal dust B is powder of stainless steel, nickel powder, titanium valve, nickel Base alloy powder or Fe-Al intermetallic compound powder.
The present invention compared with prior art has the advantage that
1, the present invention is reasonable in design, technique is simple, simple operating steps and the highest to equipment requirement, Be applicable to prepare the ultra-fine long thin-walled seamless metal pipe of various metal material, the seamless metal pipe obtained by Metal compaction pipe and metal perforated pipe and be placed in metal transfer pipe seamless link between the two and form, Being firmly combined with, good seal performance, mechanical strength is high, can meet various high to helium leak rates requirement Use environment in, and service life is long.
2, the seamless metal pipe that the present invention obtains is integral type structure, it is to avoid traditional welding method pair Instrument or the rigors of operating condition, by designing filler mode cleverly, it is achieved that metal porous Pipe and the seamless link of metal compaction pipe, metal tube commissure air-tightness after the conventional bonding technique of solution It is difficult to ensure that a difficult problem, in the seamless metal pipe that the present invention obtains metal compaction pipe and metal perforated pipe by Metal transfer pipe realizes strong bonded, and in metal tube, porous position is steady with fine and close position transition, and tool There are good sealing property and machining intensity, it is adaptable to use and require that more stringent gas gas separates Occasion.
3, the present invention is applied widely, it is possible to promote the ultra-fine long thin-walled being applicable to various metal material In the preparation of seamless metal pipe, it is particularly suited for the high (helium of weld seam of consistency requirements at butt welded seam Slip requires as little as 10-9~10-10Pa·m3/ s) occasion.
4, the present invention is by the metal dust A different to average grain diameter, material is identical and metal dust B carries out reasonably combined, controls specific sintering processes temperature, it is achieved densified compared with fine grain powder And between relatively coarse grain footpath powder particle, sinter the formation of neck, and by design metal transfer pipe, solve Thicker diameter powders and compared with the fine grain problem that time powder sintered, shrinkage factor is inconsistent, it is to avoid sintering Processing procedure interrupts a difficult problem for pipe, if the temperature of sintering processes is too high, and the overall densified nothing of metal tube Porous part, temperature is too low then the most densified compared with fine grain powder part, it is impossible to obtains having and well connects Connect the transition conduit of effect, so the temperature of sintering processes must strictly be controlled, relatively fine grain could be realized Densified and the thicker diameter powders of powder forms porous material, solves metal compaction Guan Yujin further The connectivity problem of genus polyporus pipe.
Below by drawings and Examples, technical scheme is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of extrusion billet in the present invention.
Fig. 2 is the structural representation of ultra-fine long thin-walled seamless metal pipe in the present invention.
Fig. 3 is that the SEM of ultra-fine long thin-walled seamless metal pipe longitudinal cross-section in the embodiment of the present invention 1 shines Sheet.
Fig. 4 is metal compaction tube portion in ultra-fine long thin-walled seamless metal pipe in the embodiment of the present invention 1 SEM photograph.
Fig. 5 is metal transfer tube portion in ultra-fine long thin-walled seamless metal pipe in the embodiment of the present invention 1 SEM photograph.
Fig. 6 is metal porous tube portion in ultra-fine long thin-walled seamless metal pipe in the embodiment of the present invention 1 SEM photograph.
Description of reference numerals:
1 first blank;2 second blanks;3 the 3rd blanks;
4 recipients;5 metal compaction pipes;6 metal transfer pipes;
7 metal perforated pipes.
Detailed description of the invention
Embodiment 1
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 5:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 5:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:2 in mass ratio is mixed, To mixture C;Described metal dust A and described metal dust B is 316L powder of stainless steel, The average grain diameter of described metal dust A is 22 μm, and the average grain diameter of described metal dust B is 34 μm, The quality of described mixture C is the 50% of described mixture A mass, and described plasticizer is paraffin;
Step 2 is as it is shown in figure 1, be 40 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 40 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 40 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 6T, and temperature is 40 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 25T;
Step 4, under high-purity argon gas (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 6mm, and wall thickness is 1mm, a length of 530mm, at described sintering Temperature is the fusing point of metal dust A described in step one 0.77 times (1150 DEG C) of reason, sintering The temperature retention time processed is 160min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 20mm by length Metal compaction pipe 5, length is about 10mm metal transfer pipe 6 and length is about the metal of 500mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
From figure 3, it can be seen that use the ultra-fine length that the processing mode of line cutting is prepared along the present embodiment The longitudinal direction of thin-walled seamless metal pipe is cut open, and under the Electronic Speculum that multiplication factor is 100, metal is can't see in scanning The obvious boundary that antipriming pipe is connected with metal compaction pipe, illustrates that ultra-fine long thin-walled seamless metal pipe connects and causes Close, air-tightness is good;Figure 4, it is seen that ultra-fine long thin-walled seamless metal prepared by the present embodiment The metal compaction tube portion of pipe exists without obvious space, and sintered body is fine and close;From figure 5 it can be seen that The body of the metal transfer tube portion of ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is by difference The metal powder sintered of particle diameter forms, and still suffers from hole;From fig. 6 it can be seen that the present embodiment system The metal porous tube portion of standby ultra-fine long thin-walled seamless metal pipe sinters between metallic particles neck grow Well, hole there occurs nodularization, makes irregular duct become round and smooth, has good through hole Structure.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 340.83MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
Embodiment 2
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 7:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 7:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:1 in mass ratio is mixed, To mixture C;Described metal dust A and described metal dust B is nickel powder, described metal dust The average grain diameter of A is 110 μm, and the average grain diameter of described metal dust B is 150 μm, described mixing The quality of thing C is the 35% of described mixture A mass, and described plasticizer is paraffin;
Step 2 is as it is shown in figure 1, be 45 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 45 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 45 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 10T, and temperature is 35 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 30T;
Step 4, under high-purity argon gas (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 8mm, and wall thickness is 1mm, a length of 840mm, at described sintering Temperature is the fusing point of metal dust A described in step one 0.75 times (1100 DEG C) of reason, sintering The temperature retention time processed is 180min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 30mm by length Metal compaction pipe 5, length is about 10mm metal transfer pipe 6 and length is about the metal of 800mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 247.36MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
Embodiment 3
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 6:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 6:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:3 in mass ratio is mixed, To mixture C;Described metal dust A and described metal dust B is Fe-Al intermetallic compound Powder, the average grain diameter of described metal dust A is 80 μm, the average grain diameter of described metal dust B Being 130 μm, the quality of described mixture C is the 50% of described mixture A mass, described plasticising Agent is carboxymethylcellulose calcium;
Step 2 is as it is shown in figure 1, be 35 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 35 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 35 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 2T, and temperature is 45 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 15T;
Step 4, under high-purity argon gas (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 4mm, and wall thickness is 0.6mm, a length of 645mm, described sintering Temperature is the fusing point of metal dust A described in step one 0.85 times (1300 DEG C) processed, burn The temperature retention time that knot processes is 150min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 30mm by length Metal compaction pipe 5, length is about 15mm metal transfer pipe 6 and length is about the metal of 600mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine at 96.87MPa Under the conditions of record the fracture of metal perforated pipe position, and other positions are the most unbroken, illustrate that this ultra-fine length is thin Wall seamless metal tube has good sealing property and machining intensity.
Embodiment 4
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 7:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 7:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:2 in mass ratio is mixed, obtain Mixture C;Described metal dust A and described metal dust B is NiCrAl Co-based alloy powder, The average grain diameter of described metal dust A is 30 μm, and the average grain diameter of described metal dust B is 40 μm, The quality of described mixture C is the 50% of described mixture A mass, and described plasticizer is starch;
Step 2 is as it is shown in figure 1, be 40 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 40 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 40 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 8T, and temperature is 40 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 25T;
Step 4, under high-purity hydrogen (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 6mm, and wall thickness is 1mm, a length of 530mm, at described sintering Temperature is the fusing point of metal dust A described in step one 0.85 times (1200 DEG C) of reason, sintering The temperature retention time processed is 180min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 30mm by length Metal compaction pipe 5, length is about 15mm metal transfer pipe 6 and length is about the gold of 1000mm Genus polyporus pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after process, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3 Arriving, metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 298.63MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
Embodiment 5
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 4:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 4:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:2 in mass ratio is mixed, obtain Mixture C;Described metal dust A and described metal dust B is Inconel625 nickel-base alloy powder End, the average grain diameter of described metal dust A is 38 μm, and the average grain diameter of described metal dust B is 52 μm, the quality of described mixture C is the 50% of described mixture A mass, and described plasticizer is Resin;
Step 2 is as it is shown in figure 1, be 40 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 40 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 40 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 9T, and temperature is 35 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 25T;
Step 4, under high-purity hydrogen (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 6mm, and wall thickness is 1mm, a length of 530mm, at described sintering Temperature is the fusing point of metal dust A described in step one 0.8 times (1130 DEG C) of reason, at sintering The temperature retention time of reason is 120min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 20mm by length Metal compaction pipe 5, length is about 10mm metal transfer pipe 6 and length is about the metal of 500mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 352.64MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
Embodiment 6
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 4:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 4:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:2 in mass ratio is mixed, obtain Mixture C;Described metal dust A and described metal dust B is titanium valve, described metal dust A Average grain diameter be 80 μm, the average grain diameter of described metal dust B is 106 μm, described mixture The quality of C is the 50% of described mixture A mass, and described plasticizer is paraffin;
Step 2 is as it is shown in figure 1, be 38 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 38 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 38 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 10T, and temperature is 40 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 25T;
Step 4, under high-purity argon gas (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 6mm, and wall thickness is 1mm, a length of 530mm, at described sintering Temperature is the fusing point of metal dust A described in step one 0.78 times (1320 DEG C) of reason, sintering The temperature retention time processed is 130min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 20mm by length Metal compaction pipe 5, length is about 10mm metal transfer pipe 6 and length is about the metal of 500mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 186.31MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
Embodiment 7
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 6:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 6:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:1 in mass ratio is mixed, obtain Mixture C;Described metal dust A and described metal dust B is 316L powder of stainless steel, institute The average grain diameter stating metal dust A is 75 μm, and the average grain diameter of described metal dust B is 100 μm, The quality of described mixture C is the 50% of described mixture A mass, and described plasticizer is paraffin;
Step 2 is as it is shown in figure 1, be 42 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 42 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 42 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 8T, and temperature is 40 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 22T;
Step 4, under high-purity hydrogen (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 6mm, and wall thickness is 1mm, a length of 530mm, at described sintering Temperature is the fusing point of metal dust A described in step one 0.88 times (1330 DEG C) of reason, sintering The temperature retention time processed is 130min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 20mm by length Metal compaction pipe 5, length is about 10mm metal transfer pipe 6 and length is about the metal of 500mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 249.86MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
Embodiment 8
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 6:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 6:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:2 in mass ratio is mixed, obtain Mixture C;Described metal dust A and described metal dust B is 304 powder of stainless steel, described The average grain diameter of metal dust A is 100 μm, and the average grain diameter of described metal dust B is 150 μm, The quality of described mixture C is the 48% of described mixture A mass, and described plasticizer is paraffin;
Step 2 is as it is shown in figure 1, be 40 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 40 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 40 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 7T, and temperature is 35 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 20T;
Step 4, under high-purity hydrogen (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 6mm, and wall thickness is 1mm, a length of 530mm, at described sintering Temperature is the fusing point of metal dust A described in step one 0.9 times (1380 DEG C) of reason, at sintering The temperature retention time of reason is 145min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 20mm by length Metal compaction pipe 5, length is about 10mm metal transfer pipe 6 and length is about the metal of 500mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 347.52MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
Embodiment 9
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 7:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 7:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:2 in mass ratio is mixed, obtain Mixture C;Described metal dust A and described metal dust B is 316L powder of stainless steel, institute The average grain diameter stating metal dust A is 70 μm, and the average grain diameter of described metal dust B is 100 μm, The quality of described mixture C is the 40% of described mixture A mass, and described plasticizer is paraffin;
Step 2 is as it is shown in figure 1, be 40 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 40 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 40 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 8T, and temperature is 45 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 20T;
Step 4, under high-purity hydrogen (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 10mm, and wall thickness is 0.2mm, a length of 32mm, described sintering Temperature is the fusing point of metal dust A described in step one 0.88 times (1330 DEG C) processed, burn The temperature retention time that knot processes is 120min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 5mm by length Metal compaction pipe 5, length be about 2mm metal transfer pipe 6 and length to be about the metal of 25mm many Hole pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering processes After obtain, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine at 98.73MPa Under the conditions of record the fracture of metal perforated pipe position, and other positions are the most unbroken, illustrate that this ultra-fine length is thin Wall seamless metal tube has good sealing property and machining intensity.
Embodiment 10
The present embodiment comprises the following steps:
Step one, plasticizer is mixed with metal dust A 5:50 in mass ratio, mixed Thing A, mixes plasticizer with metal dust B 5:50 in mass ratio, obtains mixture B, so After described for part mixture A and part described mixture B 1:1 in mass ratio is mixed, obtain Mixture C;Described metal dust A and described metal dust B is 316L powder of stainless steel, institute The average grain diameter stating metal dust A is 105 μm, and the average grain diameter of described metal dust B is 133 μm, The quality of described mixture C is the 30% of described mixture A mass, and described plasticizer is resin;
Step 2 is as it is shown in figure 1, be 40 DEG C by remaining described mixture A in step one in temperature Under the conditions of be squeezed into base, obtain the first blank 1, step one will remain described mixture B in temperature It is squeezed into base under the conditions of being 40 DEG C, obtains the second blank 2, by mixture C described in step one in temperature Degree is squeezed into base under the conditions of being 40 DEG C, obtains the 3rd blank 3;
Step 3, by the first blank the 1, the 3rd blank 3 and the second blank 2 described in step 2 successively In being placed in recipient 4 and it is compacted successively, obtains extrusion billet, then use the side of powder extrusion molding Described extrusion billet is extruded continuously by formula through tube extrusion mouth, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 7T, and temperature is 35 DEG C, is compacted described first blank the 1, the 3rd blank 3 and The pressure of the second blank 2 is 18T;
Step 4, under high-purity hydrogen (quality purity is not less than 99.99%) atmosphere to step 3 in institute Stating metal tube green compact to be sintered, obtain ultra-fine long thin-walled seamless metal pipe, described ultra-fine length is thin The external diameter of wall seamless metal tube is 5mm, and wall thickness is 0.5mm, a length of 150mm, described sintering Temperature is the fusing point of metal dust A described in step one 0.9 times (1350 DEG C) processed, sintering The temperature retention time processed is 140min.
As in figure 2 it is shown, ultra-fine long thin-walled seamless metal pipe prepared by the present embodiment is about 15mm by length Metal compaction pipe 5, length is about 5mm metal transfer pipe 6 and length is about the metal of 130mm Antipriming pipe 7 forms, wherein metal compaction pipe 5 by the first blank 1 through powder extrusion molding and sintering Obtaining after reason, metal transfer pipe 6 obtains after powder extrusion molding and sintering processes through the 3rd blank 3, Metal perforated pipe 7 is obtained after powder extrusion molding and sintering processes by the second blank 2.
The ultra-fine long thin-walled seamless metal pipe obtaining the present embodiment carries out sealing pores, then uses helium The air-tightness at mass-spectrometer leak detector detection metal transfer pipe position, result is that slip can reach 10-10Pa·m3/ s magnitude level, uses 30KNInstron5967 universal testing machine to exist Record the fracture of metal perforated pipe position under the conditions of 137.36MPa, and other positions are the most unbroken, explanation This ultra-fine long thin-walled seamless metal pipe has good sealing property and machining intensity.
The above, be only presently preferred embodiments of the present invention, not impose any restrictions the present invention, every Any simple modification, change and equivalent structure above example made according to the technology of the present invention essence Change, all still falls within the protection domain of technical solution of the present invention.

Claims (6)

1. the integral formation method of a ultra-fine long thin-walled seamless metal pipe, it is characterised in that include with Lower step:
Step one, plasticizer is mixed with metal dust A, obtain mixture A, by plasticizer Mix with metal dust B, obtain mixture B, then by described for part mixture A and part Described mixture B 1:(1 in mass ratio~3) mix, obtain mixture C;Described metal dust A is identical with the material of described metal dust B, and the average grain diameter of described metal dust A is 20 μm~110 μm, the average grain diameter of described metal dust B is 30 μm~150 μm, described metal powder The average grain diameter of end B is 10 μm~50 μm with the difference of the average grain diameter of described metal dust A;
Step 2, under preheating condition, it is squeezed into base by step one remains described mixture A, obtains First blank (1), is squeezed into base by remaining described mixture B in step one under preheating condition, Obtain the second blank (2), mixture C described in step one be squeezed into base under preheating condition, Obtain the 3rd blank (3);The temperature of described preheating is 35 DEG C~45 DEG C;
Step 3, by the first blank (1) described in step 2, the 3rd blank (3) and the second blank (2) in being sequentially placed into recipient (4) and it is compacted successively, obtains extrusion billet, then use powder Described extrusion billet is extruded by the mode of plasticising extruding continuously, obtains metal tube green compact;Described powder increases The pressure moulding extruding is 2T~10T, and temperature is 35 DEG C~45 DEG C;
Step 4, under protective atmosphere, metal tube green compact described in step 3 is sintered, To ultra-fine long thin-walled seamless metal pipe, the external diameter of described ultra-fine long thin-walled seamless metal pipe is 4mm~10mm, wall thickness is 0.2mm~1mm, the length of ultra-fine long thin-walled seamless metal pipe and external diameter Ratio more than 3, the temperature of described sintering processes is the fusing point of metal dust A described in step one 0.75~0.9 times, the temperature retention time of sintering processes is 120min~180min.
2. according to the one-body molded side of a kind of ultra-fine long thin-walled seamless metal pipe described in claim 1 Method, it is characterised in that plasticizer described in step one is (3~7) with the mass ratio of metal dust A: 50, Described plasticizer is (3~7) with the mass ratio of metal dust B: 50.
3. according to the one-body molded side of a kind of ultra-fine long thin-walled seamless metal pipe described in claim 1 Method, it is characterised in that the quality of mixture C described in step one is described mixture A mass 30%~50%.
4. according to the one-body molded side of a kind of ultra-fine long thin-walled seamless metal pipe described in claim 1 Method, it is characterised in that plasticizer described in step one is paraffin, carboxymethylcellulose calcium, starch or tree Fat.
5. according to the one-body molded side of a kind of ultra-fine long thin-walled seamless metal pipe described in claim 1 Method, it is characterised in that be compacted described first blank (1), the 3rd blank (3) and in step 3 The pressure of two blanks (2) is 15T~30T.
6. according to the one-body molded side of a kind of ultra-fine long thin-walled seamless metal pipe described in claim 1 Method, it is characterised in that metal dust A described in step one and metal dust B are stainless steel powder End, nickel powder, titanium valve, Co-based alloy powder or Fe-Al intermetallic compound powder.
CN201510543561.0A 2015-08-28 2015-08-28 A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe Active CN105033260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510543561.0A CN105033260B (en) 2015-08-28 2015-08-28 A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510543561.0A CN105033260B (en) 2015-08-28 2015-08-28 A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe

Publications (2)

Publication Number Publication Date
CN105033260A CN105033260A (en) 2015-11-11
CN105033260B true CN105033260B (en) 2016-09-07

Family

ID=54440554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510543561.0A Active CN105033260B (en) 2015-08-28 2015-08-28 A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe

Country Status (1)

Country Link
CN (1) CN105033260B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109317667B (en) * 2018-11-28 2021-07-30 湖南金马铝业有限责任公司 Preparation method of hybrid aluminum-based composite pipe
CN110408963A (en) * 2019-07-29 2019-11-05 益阳市菲美特新材料有限公司 A kind of porous metals screen casing and preparation method thereof
CN111299572B (en) * 2019-11-28 2022-05-03 天钛隆(天津)金属材料有限公司 Production method of titanium and titanium alloy seamless tube

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101166597A (en) * 2005-06-27 2008-04-23 Tdy工业公司 Composite article with coolant channels and tool fabrication method
CN101733404A (en) * 2009-12-18 2010-06-16 西北有色金属研究院 Preparation method of super-elongated metallic porous thin-walled tube
CN103688012A (en) * 2011-07-29 2014-03-26 贝克休斯公司 Extruded powder metal compact
CN104259787A (en) * 2014-09-28 2015-01-07 哈尔滨工业大学(威海) Preparation method of powdery deformable tungsten-copper composite material thin tube
CN104271290A (en) * 2012-06-25 2015-01-07 株式会社栗本铁工所 Long light metal billet and manufacturing method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101166597A (en) * 2005-06-27 2008-04-23 Tdy工业公司 Composite article with coolant channels and tool fabrication method
CN101733404A (en) * 2009-12-18 2010-06-16 西北有色金属研究院 Preparation method of super-elongated metallic porous thin-walled tube
CN103688012A (en) * 2011-07-29 2014-03-26 贝克休斯公司 Extruded powder metal compact
CN104271290A (en) * 2012-06-25 2015-01-07 株式会社栗本铁工所 Long light metal billet and manufacturing method therefor
CN104259787A (en) * 2014-09-28 2015-01-07 哈尔滨工业大学(威海) Preparation method of powdery deformable tungsten-copper composite material thin tube

Also Published As

Publication number Publication date
CN105033260A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105033260B (en) A kind of integral formation method of ultra-fine long thin-walled seamless metal pipe
CN1660540B (en) Process for producing components or semi-finished products which contain only titanium aluminide alloys
CN106041101B (en) A kind of composition metal antipriming pipe and preparation method thereof
CN106493371B (en) A kind of preparation method of compact metal flange porous metal tube
CN101890500B (en) Preparation method of double-layer sintered metal powder filter element
US8916091B2 (en) Method for producing semi-finished products from NiTi shape memory alloys
CN101358304B (en) Nial intermetallic compound porous material and preparation method thereof
CN102527167B (en) High-strength metal filtering tube and preparation method thereof
RU2010147810A (en) A COMPOSITE PREPARATION HAVING A MANAGED POROSITY PORT IN, AT LEAST, ONE LAYER, AND WAYS OF ITS MANUFACTURE AND USE
CN101708400A (en) Method for preparing seamless sintering metal powder filtering membrane tube
CN109454321B (en) Hot isostatic pressing diffusion connection method for tungsten/steel cylinder structural member
EP0466401A1 (en) Gear
CN103586468B (en) TiAl alloy powder near-net-shaping method
CN109454231B (en) Preparation method of iron-aluminum-copper alloy microporous filter material
CN110899703B (en) Preparation method of high-porosity metal film
CN206777972U (en) A kind of overlay film filtration core
CN106041097A (en) Copper and iron powder metallurgical pipe and preparing method and application thereof
KR20200134235A (en) Porous titanium-based sintered body, its manufacturing method and electrode
US6375705B1 (en) Oxide-dispersion strengthening of porous powder metalurgy parts
CN111298659A (en) Production process of composite metal ceramic
CN103691324B (en) A kind of monoblock type tubulose metal micro-filtration membrane element and its preparation method
CN207324456U (en) Palladium membrane filter
JPH04341508A (en) Production of coupling formed body for different kinds of materials
CN111229058A (en) Preparation process of ceramic composite membrane with metal protective layer
CN105385889B (en) A kind of banding copper base brazing material and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant