CN105028731A - Organic green tea production system - Google Patents
Organic green tea production system Download PDFInfo
- Publication number
- CN105028731A CN105028731A CN201510532223.7A CN201510532223A CN105028731A CN 105028731 A CN105028731 A CN 105028731A CN 201510532223 A CN201510532223 A CN 201510532223A CN 105028731 A CN105028731 A CN 105028731A
- Authority
- CN
- China
- Prior art keywords
- green
- tealeaves
- air
- plate
- hot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Tea And Coffee (AREA)
Abstract
The invention discloses an organic green tea production system. The system comprises a boiling device, an airing device, a roller fixation device, a microwave fixation device, a tea strip tidying machine, a drying device and an aroma extracting machine, wherein the microwave fixation device comprises a third box; upper and lower conveyor belts horizontally and oppositely arranged up and down are arranged in the third box; the conveying directions of the upper and lower conveyor belts are opposite; the feed end of the upper conveyor belt and the discharge end of the lower conveyor belt are arranged outside the same end of the third box. The system has the beneficial effects that the tea is washed and is subjected to primary fixation during boiling to fix the color by using the microwave fixation device and the roller fixation device together; roller fixation is primary fixation and is used for forming the tea aroma, promoting non-enzymatic chemical reaction and improving the quality of the tea soup, so that the tea soup is mellow, fresh and brisk, and the tea is also developed into a tea with the aroma of chestnuts; microwave fixation is secondary fixation and is used for extracting and protecting the color of the tea, so that the finished tea is dark green and bright.
Description
Technical field
The present invention relates to Tea Production apparatus field, be specifically related to a kind of organic green-tea production system.
Background technology
Yuexi abounds with green tea, wherein famous with Yuexi Cuilan tea, and there are the following problems in current Yuexi Cuilan tea production:
1, because Urbanization Construction is implemented and the discharge of industrial waste gas, boundless and indistinct in air have a large amount of dusts and harmful substance, these harmful substances meeting sedimentation is attached on the surface of tea tree tender leaf, tender leaf is directly processed after being plucked, and people do not carry out cleaning (specialty sample tea except), therefore a large amount of harmful substance is drunk.At present, scald green grass or young crops and operate in the new process for processing of Yuexi Cuilan tea by adopting, to wash away the harmful substance on tealeaves surface, but boiling hot blue or green equipment used at present also cannot realize the abundant cleaning of tealeaves and tealeaves to carry out evenly scalding blue or green.
2, in modern streamline Tea Production system, general employing cylinder completes to tealeaves, but easily there is the phenomenon of complete uneven, red stalk, Jiao Bianjiaoye in roller fixation, affect the quality of finished tea, also the technique adopting microwave de-enzyming to carry out alternative roller fixation is had, although microwave de-enzyming is even, but the brewed millet paste of its obtained finished tea is not as the mellow of roller fixation and freshly feel well, that is the poor quality of millet paste, be therefore necessary to take into account both that improve tea product and millet paste and a kind of mode that completes newly is provided.
Summary of the invention
Object of the present invention is just to provide a kind of organic green-tea production system, and it at least effectively can solve an above-mentioned problem, promotes the quality of tealeaves.
A kind of organic green-tea production system, it is characterized in that: comprise the boiling hot blue or green device for carrying out scalding green grass or young crops to tealeaves be connected sequentially, for the airing device dried tealeaves, for carrying out the roller fixation device that one-level completes to tealeaves, for carrying out the first spreading for cooling device of one-level spreading for cooling to tealeaves, for carrying out the microwave green-killing device that secondary completes to tealeaves, for carrying out the carding machine managing bar to tealeaves, for the drying unit of drying tealeaves, and for carrying out the fragrance extracting machine of Titian to tealeaves, microwave green-killing device comprises the 3rd casing, positioned opposite upper of upper and lower level is provided with in 3rd casing, lower conveyer belt, on, the throughput direction of lower conveyer belt is contrary, the feed end of upper conveyor belt and the discharge end of lower conveyer belt are positioned at outside the same end of the 3rd casing, the delivery end of upper conveyor belt and the feed end of lower conveyer belt are positioned at the inside of the 3rd casing, the feed end of lower conveyer belt extends to the outside of upper conveyor belt delivery end, horizontally disposed air gathering plate and air distribution plate is provided with in 3rd casing, air gathering plate is positioned at the upside of upper conveyor belt, air distribution plate is positioned at the downside of lower conveyer belt, air gathering plate and air distribution plate are orifice plate and form, on, microwave generator is provided with between lower conveyer belt, the upper roof of the 3rd casing and lower diapire arrange collection air port and air outlet respectively, be connected by air delivery pipe between collection air port and air outlet, air delivery pipe is provided with dehumidifier and the 3rd blower fan, the arranged outside of upper conveyor belt delivery end has the material rotating plate be in tilted layout, the height of material rotating plate near upper conveyor belt one end is less than the high-end of the other end, material rotating plate is arranged with tealeaves is crossing in the path that upper conveyor belt delivery end falls, the lower end of material rotating plate and the barrier-like layout of conveyor surface of lower conveyer belt.
In technique scheme, by being used in conjunction of microwave green-killing device and roller fixation device, when scalding blue or green, cleaning is carried out to tealeaves and elementary completing carries out fixation; Roller fixation carries out one-level and completes shaping for tea aroma and promote non-enzymatic chemical reaction, promotes millet paste quality, makes millet paste mellow, fresh refreshing, makes tealeaves develop into Li Xiang simultaneously; Microwave de-enzyming carries out secondary and completes, and carries look and Bao Se for tealeaves, make the color of finished tea dark green, moisten bright.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of microwave de-enzyming machine;
Fig. 3 is the structural representation of boiling hot blue or green machine;
Fig. 4 is the structural representation of hot-water line;
Fig. 5 is the structural representation of boiling hot blue or green carrier pipe;
Fig. 6 is the schematic diagram of foraminous conveyer feed end;
Fig. 7 is inner bellows structural representation;
Fig. 8 is the schematic diagram of foraminous conveyer discharge end;
Fig. 9 is the structural representation of cloth materials and parts;
Figure 10 is that hot water circuit utilizes schematic diagram.
Detailed description of the invention
In order to make objects and advantages of the present invention clearly understand, below in conjunction with embodiment, the present invention is specifically described.Should be appreciated that following word only in order to describe one or more concrete embodiments of the present invention, considered critical is not carried out to the protection domain that the present invention specifically asks." heart yearn " described below all refers to the center line of these parts.
The invention provides a kind of green tea production equipment, as shown in Figure 1, comprise the boiling hot blue or green device 10 for carrying out scalding green grass or young crops to tealeaves be connected sequentially, for the airing device 20 dried tealeaves, for carrying out the roller fixation device 50 that one-level completes to tealeaves, for carrying out the first spreading for cooling device 41 of one-level spreading for cooling to tealeaves, for carrying out the microwave green-killing device W10 that secondary completes to tealeaves, for carrying out the carding machine 60 managing bar to tealeaves, for the drying unit 70 of drying tealeaves, and for carrying out the fragrance extracting machine 80 of Titian to tealeaves.Roller fixation device 50, carding machine 60, drying unit 70, fragrance extracting machine 80 all can adopt the existing tea machine equipment with identical function to use, and between neighboring devices, tealeaves conveying can adopt conveyer belt and/or manually transport.By being used in conjunction of microwave green-killing device W10 and roller fixation device 50, when scalding blue or green, cleaning being carried out to tealeaves and elementaryly to complete, fixation is carried out to tealeaves; The roller fixation one-level of carrying out in short-term completes shaping for tea aroma and promotes non-enzymatic chemical reaction, promotes millet paste quality, makes millet paste mellow, fresh refreshing, makes tealeaves odor type develop into Li Xiang shape simultaneously; Microwave de-enzyming carries out secondary and completes, and carries look and Bao Se for tealeaves, make the color of finished tea dark green, moisten bright.Microwave green-killing device specifically adopts as shown in Figure 2, comprise the 3rd casing, positioned opposite upper of upper and lower level is provided with in 3rd casing, lower conveyer belt W11a, W11b, on, lower conveyer belt W11a, the throughput direction of W11b is contrary, the feed end of upper conveyor belt W11a and the discharge end of lower conveyer belt W11b are positioned at outside the same end of the 3rd casing, the delivery end of upper conveyor belt W11a and the feed end of lower conveyer belt W11b are positioned at the inside of the 3rd casing, the feed end of lower conveyer belt W11b extends to the outside of upper conveyor belt W11a delivery end, horizontally disposed air gathering plate W13 and air distribution plate W14 is provided with in 3rd casing, air gathering plate W13 is positioned at the upside of upper conveyor belt W11a, air distribution plate W14 is positioned at the downside of lower conveyer belt W11b, air gathering plate W13 and air distribution plate W14 is orifice plate and forms, on, lower conveyer belt W11a, microwave generator W12 is provided with between W11b, the upper roof of the 3rd casing and lower diapire arrange collection air port W15 and air outlet W16 respectively, be connected by air delivery pipe between collection air port W15 and air outlet W16, air delivery pipe is provided with dehumidifier and the 3rd blower fan.Due to when microwave de-enzyming, the moisture in tealeaves can distribute, and is therefore extracted to remove by the steam of generation by arranging the 3rd blower fan, simultaneously by dried hot-air delivering in the 3rd casing, economize energy and promote the dehydration rate of tealeaves.Upper conveyor belt, lower conveyer belt all select the plastics guipure of food-grade to form, and avoid absorbing microwave and ensureing food security.
In addition, the arranged outside of upper conveyor belt W11a delivery end has the material rotating plate W18 be in tilted layout, the height of material rotating plate W18 near upper conveyor belt W11a one end is less than the high-end of the other end, material rotating plate W18 and tealeaves are arranged the path that upper conveyor belt W11a delivery end falls is crossing, the lower end of material rotating plate W18 be positioned at lower conveyer belt W11b inner side and with the barrier-like layout of conveyor surface of lower conveyer belt W11b.Although microwave de-enzyming can heat uniformly to tealeaves, but tealeaves bottom attaches mutually with conveyer belt, tealeaves bottom is made cannot scatter rapidly by the steam of thermal evaporation, therefore upper and lower conveyer belt W11a, W11b and material rotating plate W18 are set, by tealeaves upper and lower pass between conveyer belt W11a, W11b time, stirring is carried out to tealeaves, the top and bottom of tealeaves are exchanged, ensure that the steam of tealeaves evaporation can effectively leave, avoid ponding on conveyer belt affect tea leaf quality and promote tea microwave de-enzyming effect.Preferably the angle of inclination of material rotating plate W18 is set to 45 ~ 60 °, the spacing between the lower end of material rotating plate W18 and the conveyor surface of lower conveyer belt W11b is 2.5 ~ 3.5cm.Secondly, the delivery end of upper conveyor belt W11a is also provided with airduct W17, upper conveyor belt W11a comprises upper conveyor belt body and lower conveying belt body, airduct W17 between upper and lower conveying belt body and airduct arrange along the width range of upper conveyor belt W11a, airduct W17 is connected with air jet system, the pipe shaft of airduct W17 is arranged at intervals with for jet air nozzle, the blowing direction of air nozzle is obliquely and the side pointed near material rotating plate W18.Arranging of airduct W17 can make the tealeaves on upper conveyor belt can drop down onto on lower conveyer belt, secondly can promote the effect of tealeaves stirring, ensure that all tealeaves all completes rotary movement as far as possible.
Scald blue or green device 10 as Fig. 3, shown in 4, comprising vertical shape arranges for adding the hopper 12 of tealeaves and installing the frame 11 of hopper 12, internal face at the bottom of the bucket of hopper 12 is hemispheric arcwall face, the center of curvature of arcwall face is positioned at hopper oral area side, the lowest part of arcwall face is provided with discharging interface 122a, hopper 12 rotates around its heart yearn and is fixed in frame 11, hopper 12 is connected with its first driving mechanism carrying out rotating of driving, the oral area of hopper 12 is provided with hot-water line 121, hot-water line 121 is that the body of inverted cone zigzag shape is formed, the lower end of hot-water line 121 is shutoff shape, the hypomere of hot-water line 121 to be plugged in hopper 12 and hot-water line 121 be positioned at hopper 12 pipe shaft on interval set out water hole 121a, the water outlet direction of apopore 121a is the interior sidewall surface pointing to hopper 12 obliquely, the downside of hopper 12 is provided with boiling hot blue or green carrier pipe 13, the upper end and the discharging interface 122a that scald blue or green carrier pipe 13 form to be rotatably assorted around the heart yearn of hopper 12 and are connected, boiling hot blue or green carrier pipe 13 and hot-water line 121 are fixed in frame, the upper end of hot-water line 121 is connected with hot-water cylinder and is connected, adjacent upper on hot-water line 121, lower two-layer apopore 121a is that interleaved shape is arranged.
Scald in blue or green device 10 by tealeaves being dropped in hopper 12, because the first driving mechanism drives hopper 12 together to rotate, the tealeaves fallen into like this in hopper 12 will enter boiling hot blue or green carrier pipe 13 with hot water is together spiral helicine from discharging interface 122a outflow, tealeaves can not be detained in hopper 12, ensure that all tealeaves can enter boiling hot blue or green carrier pipe 13 fast, the every sheet tealeaves entering boiling hot blue or green carrier pipe 13 is all surrounded by hot water and evenly carries out scalding green grass or young crops, thus improve boiling hot blue or green effect and shorten the boiling hot blue or green time, above-mentioned boiling hot blue or green machine is adopted to carry out scalding green grass or young crops to tealeaves, the time that tealeaves scalds green grass or young crops only needs 50 ~ 60s, avoid tealeaves to cross like this and scald blue or green and owe boiling hot blue or green, improve the color and luster of tealeaves and avoid the stripping of the benefit materials such as Tea Polyphenols, promote tea matter, simultaneously also very thorough to the cleaning of tealeaves.
Tealeaves scalds the blue or green time can by arranging the boiling hot length of blue or green carrier pipe 13 and the flow velocity of hot water controls, and it is consistent with the optimal transport flow in boiling hot blue or green carrier pipe 13 that the hot water in hopper 12 injects flow.From boiling hot blue or green carrier pipe 13 lower end, out tealeaves is separated by foraminous conveyer (screen cloth) with hot water, and after being separated, tealeaves dries rapidly and carries out next step operation.
Further scheme is, scalding blue or green carrier pipe 13 is that spiral helicine insulating tube is formed, as shown in Figure 5.Spiral helicine insulating tube can reduce the length of boiling hot blue or green carrier pipe 13, avoids tealeaves to block in boiling hot blue or green carrier pipe 13.In addition, can arrange gripper shoe at the periphery wall of hopper 12, gripper shoe is set up and is fixed in frame 11, gripper shoe consists of to be rotatably assorted with frame 11 ball connector and is connected, first driving mechanism can be motor and forms, and hopper 12 is connected with motor by belt, and motor drives hopper 12 to rotate.
For airing device 20, its technical scheme taked is as Fig. 6, 7, shown in 8, airing device 20 comprises horizontally disposed foraminous conveyer, feed end and the corresponding layout of the lower end discharging mouth of pipe 131 of scalding blue or green carrier pipe 13 of foraminous conveyer, scalding to be provided with between blue or green carrier pipe 13 and foraminous conveyer makes tealeaves evenly drop down onto cloth materials and parts 24 on foraminous conveyer along the bandwidth direction of foraminous conveyer, the middle part of foraminous conveyer is positioned at bellows 25, and foraminous conveyer comprises, first of lower layout, two guipures 21, 22, first, two guipures 21, water leg 23 is provided with between 22, water leg 23 layout corresponding with the blanking port of cloth materials and parts 24, bellows 25 are that the casing of strip is formed, the vacancy portion passed for foraminous conveyer is offered at the two ends of casing, the bottom of bellows 25 arranges air inlet pipe interface 251, the top of bellows 25 sets out air pipe interface 252, horizontally disposed air distribution plate 253 and gas collection plate 254 is also provided with in bellows 25, air distribution plate 253 and gas collection plate 254 are orifice plate and form, gas collection plate 254 is positioned at the upside of the first guipure 21, air distribution plate 253 is positioned at the downside of the second guipure 22, in bellows 25 first, two guipures 21, also first is provided with between 22, two tracheae 20a, 20b, first, two tracheae 20a, 20b lays respectively at two edge (two edge of throughput direction) of foraminous conveyer and arranges (that is first respectively along the throughput direction of foraminous conveyer, two tracheae 20a, the length direction of 20b is consistent with the throughput direction of foraminous conveyer), first, two tracheae 20a, the pipe shaft of 20b is arranged at intervals with the first air nozzle, the outgassing direction of the first air nozzle points to the middle part of foraminous conveyer obliquely, and first, two guipures 21, the 3rd tracheae 20c is also provided with between 22, 3rd tracheae 20c is positioned at the discharge end of foraminous conveyer and the width along foraminous conveyer is arranged, the pipe shaft of the 3rd tracheae 20c is arranged at intervals with the second air nozzle, the outgassing direction of the second air nozzle points to the side away from foraminous conveyer obliquely, air inlet pipe interface 251 and first, two, three tracheaes are all connected with the air outlet of the second blower fan.
Drop down onto on foraminous conveyer because tealeaves can not directly impact, therefore needing, cloth materials and parts 24 are set and carries out buffering cloth, prevent tealeaves impaired and tealeaves is evenly arranged at the bandwidth direction of foraminous conveyer.By passing into thermal current in the air inlet mouth of pipe aweather case 25, thermal current makes the tealeaves of foraminous conveyer stir dehydration by being uniformly distributed of cloth materials and parts, makes tealeaves rapid airing.The setting of first and second tracheae 20a, 20b be drop and increase tealeaves when preventing tealeaves from stirring on the first guipure from the edge of guipure stir effect, shorten tealeaves flash-off time.The air-flow that 3rd air nozzle is formed can make tealeaves depart from from foraminous conveyer, enters subsequent processing.As arranged the first conveyer belt 26 at the blanking end of foraminous conveyer, the upper strata belt body of the first conveyer belt 26 takes the shape of the letter U, first conveyer belt 26 and foraminous conveyer interlaced arrangement, the tealeaves fallen from foraminous conveyer like this drops down onto in the first conveyer belt 26, is delivered to subsequent processing carries out other and operate by the first conveyer belt 26.
Concrete is operating as, as shown in Figure 9, cloth materials and parts 24 comprise the coaming plate 243 of drapery panel and the setting of drapery panel periphery, drapery panel is that a folding shape plate body is formed, the height of folding shape plate body reduces gradually along the throughput direction of foraminous conveyer, the width of folding shape plate body increases gradually along the throughput direction of foraminous conveyer, folding shape plate body comprises the first plate body 241 and the second plate body 242 that the throughput direction along foraminous conveyer is arranged successively, second plate body 242 is arranged to concordant blade-like compared with the side of low side, second plate body 242 is 3 ~ 5 ° with angle formed by horizontal plane, first plate body 241 is 5 ~ 8 ° with angle formed by horizontal plane, scald the lower end charging mouth of pipe and the corresponding layout of the first plate body 241 of blue or green carrier pipe 13, the boiling hot blue or green heart yearn of the carrier pipe 13 lower end discharging mouth of pipe 131 and the angle of the first plate body 241 are 8 ~ 10 °, scald the lower end discharging mouth of pipe 131 of blue or green carrier pipe 13 and be arranged to horn-like (that is the lower end discharging mouth of pipe 131 be arranged to cross section that is horn-like and the lower end discharging mouth of pipe 131 be elliposoidal) that cross section is elliposoidal.Above-mentioned drapery panel can make tealeaves be uniformly distributed along the width of foraminous conveyer, improves follow-up tealeaves and dries effect.The control of above-mentioned angle is necessary, its can make tealeaves smooth-going drop down onto on foraminous conveyer, prevent tealeaves and foraminous conveyer from clashing into, tealeaves is made to be stuck in mesh interior or broken, found by great many of experiments optimization, adopt above-mentioned angle to implement, the breakage rate of tealeaves can be down to less than 0.8%, greatly improves tea leaf quality.Cloth materials and parts 24 are by connector and support Joint.
Because tealeaves is in boiling hot blue or green process, the impurity on tealeaves surface and pesticide residue can be in the hot water molten, in order to energy-conservation, general hot water and thermal current repeat to recycle, therefore, the present invention adopts scheme as shown in Figure 10 to implement: the delivery port of water leg 23 is connected with rough filtering device 10A, the delivery port of rough filtering device 10A is connected with organic matter removal device 10B, the delivery port of organic matter removal device 10B is connected with heater 10C, the delivery port of heater 10C is connected with hot-water cylinder 10D, and the delivery port of hot-water cylinder 10D is connected with hot-water line and is connected; The escape pipe interface of bellows is connected with the first blower fan 20A, the gas outlet of the first blower fan is connected with dehydrating unit 20B, the gas outlet of dehydrating unit 20B is connected with heater 20C, the gas outlet of heater 20C is connected with the second blower fan 20D, and the gas outlet of the second blower fan 20D is connected with the air inlet pipe interface of bellows.Rough filtering device 10A can be general net filtration device, and for removing some larger impurity, organic matter removal device 10B is mainly used for removing the pesticide residue in water body, can be charcoal absorption filter or other conventional pesticides removal devices; Heater 10C heats hot water, makes the water temperature of hot water meet tealeaves and scalds blue or green demand, realized the conveying of hot water between rough filtering device 10A, organic matter removal device 10B, heater 10C, hot-water cylinder 10D, hopper by the pump housing.Thus realize energy-conservation basis ensureing scalding continuously of tealeaves is blue or green.Dehydrating unit 20B for removing the moisture in thermal current, the demand that heater 20C dries to meet tealeaves for the temperature improving thermal current.
All spreading for cooling devices all can adopt bamboo plaque to form.
The concrete technology adopting the said equipment to produce green tea is:
A kind of process for producing green tea, comprises the following steps:
Spread: the just fresh leaf of exhibition (bud one leaf, two leaves and a bud) of plucking is positioned over to spread on device to be carried out spreading until tealeaves color starts to turn dark, spreads in process and stirs fresh leaf;
Scald blue or green: the tealeaves after spreading is dropped into boiling hot blue or green process 50 ~ 55s in boiling hot blue or green device, and controlling hot water temperature is 95 ~ 98 DEG C, after boiling hot green grass or young crops, tea leaf conveying is delivered to airing device and dries;
One-level completes: after drying, tealeaves is put into roller fixation machine 130 ~ 140 DEG C of one-levels and to complete process 1.5 ~ 2min;
, there is non-enzymatic chemical reaction in spreading for cooling: the tealeaves after one-level being completed is put on the first spreading for cooling device, and room temperature spreading for cooling 2 ~ 3min, makes tealeaves recover, development odor type and fragrance;
Secondary completes: the tea leaf conveying after spreading for cooling is delivered to microwave green-killing device and carry out secondary and complete, secondary fixation time 1.2 ~ 1.25min, power 12KW (microwave output power);
Post processing: after secondary completes, tealeaves is placed in carding machine and carries out reason bar, spread after reason bar terminates on baking bed, baking bed to be pushed in drying unit 120 DEG C and carries out one-level drying and processing until the moisture content of tealeaves is down to 20%, after one-level drying and processing terminates, tealeaves is taken out spreading for cooling 20min, after spreading for cooling, again push 110 DEG C of secondary drying and processing 20min in drying unit; Take out spreading for cooling 30min after secondary drying and processing, finally tealeaves is put into fragrance extracting machine 85 DEG C of Titian 25min, Titian terminates rear cooling and vacuum packaging.
The green tea that above-mentioned technique is produced, bar shaped is unfolded neat and well spaced, and the dark green profit of color and luster is bright, aobvious milli, and fragrance is Li Xiang, and soup look dark green is bright, and millet paste is mellow fresh refreshing, is fine work in green tea.
The above is only the preferred embodiment of the present invention; should be understood that; for those skilled in the art; to know in the present invention after contents; under the premise without departing from the principles of the invention; can also make some equal conversion to it and substitute, these convert on an equal basis and substitute and also should be considered as belonging to protection scope of the present invention.
Claims (9)
1. an organic green-tea production system, it is characterized in that: comprise the boiling hot blue or green device for carrying out scalding green grass or young crops to tealeaves be connected sequentially, for the airing device dried tealeaves, for carrying out the roller fixation device that one-level completes to tealeaves, for carrying out the first spreading for cooling device of one-level spreading for cooling to tealeaves, for carrying out the microwave green-killing device that secondary completes to tealeaves, for carrying out the carding machine managing bar to tealeaves, for the drying unit of drying tealeaves, and for carrying out the fragrance extracting machine of Titian to tealeaves, microwave green-killing device comprises the 3rd casing, positioned opposite upper of upper and lower level is provided with in 3rd casing, lower conveyer belt, on, the throughput direction of lower conveyer belt is contrary, the feed end of upper conveyor belt and the discharge end of lower conveyer belt are positioned at outside the same end of the 3rd casing, the delivery end of upper conveyor belt and the feed end of lower conveyer belt are positioned at the inside of the 3rd casing, the feed end of lower conveyer belt extends to the outside of upper conveyor belt delivery end, horizontally disposed air gathering plate and air distribution plate is provided with in 3rd casing, air gathering plate is positioned at the upside of upper conveyor belt, air distribution plate is positioned at the downside of lower conveyer belt, air gathering plate and air distribution plate are orifice plate and form, on, microwave generator is provided with between lower conveyer belt, the upper roof of the 3rd casing and lower diapire arrange collection air port and air outlet respectively, be connected by air delivery pipe between collection air port and air outlet, air delivery pipe is provided with dehumidifier and the 3rd blower fan, the arranged outside of upper conveyor belt delivery end has the material rotating plate be in tilted layout, the height of material rotating plate near upper conveyor belt one end is less than the height of the other end, material rotating plate is arranged with tealeaves is crossing in the path that upper conveyor belt delivery end falls, the lower end of material rotating plate and the barrier-like layout of conveyor surface of lower conveyer belt.
2. organic green-tea production system according to claim 1, is characterized in that: the angle of inclination of material rotating plate is 45 ~ 60 °, and the spacing between the lower end of material rotating plate and the conveyor surface of lower conveyer belt is 2.5 ~ 3.5cm.
3. organic green-tea production system according to claim 1, it is characterized in that: the delivery end of upper conveyor belt is also provided with airduct, upper conveyor belt comprises upper conveyor belt body and lower conveying belt body, airduct between upper and lower conveying belt body and airduct arrange along the width range of upper conveyor belt, airduct is connected with air jet system, the pipe shaft of airduct is arranged at intervals with for jet air nozzle, the blowing direction of air nozzle is obliquely and the side pointed near material rotating plate.
4. organic green-tea production system according to claim 1, is characterized in that: the front end of scalding blue or green device is also provided with and spreads device for what spread tealeaves.
5. organic green-tea production system according to claim 1, it is characterized in that: scald blue or green device and comprise vertical shape layout for adding the hopper of tealeaves and installing the frame of hopper, internal face at the bottom of the bucket of hopper is hemispheric arcwall face, the center of curvature of arcwall face is positioned at hopper oral area side, the lowest part of arcwall face is provided with discharging interface, hopper rotates around its heart yearn and is fixed in frame, hopper is connected with its first driving mechanism carrying out rotating of driving, the oral area of hopper is provided with hot-water line, hot-water line is that the body of inverted cone zigzag shape is formed, the lower end of hot-water line is shutoff shape, the hypomere of hot-water line to be plugged in hopper and hot-water line be positioned at hopper pipe shaft on interval set out water hole, the water outlet direction of apopore is the interior sidewall surface pointing to hopper obliquely, the downside of hopper is provided with boiling hot blue or green carrier pipe, the upper end and the discharging interface that scald blue or green carrier pipe form to be rotatably assorted around the heart yearn of hopper and are connected, boiling hot blue or green carrier pipe and hot-water line are fixed in frame, the upper end of hot-water line is connected with hot-water cylinder and is connected, adjacent upper on hot-water line, lower two-layer apopore is that interleaved shape is arranged.
6. organic green-tea production system according to claim 1, it is characterized in that: airing device comprises horizontally disposed foraminous conveyer, feed end and the corresponding layout of the lower end discharging mouth of pipe of scalding blue or green carrier pipe of foraminous conveyer, scalding to be provided with between blue or green carrier pipe and foraminous conveyer makes tealeaves evenly drop down onto cloth materials and parts on foraminous conveyer along the bandwidth direction of foraminous conveyer, the middle part of foraminous conveyer is positioned at bellows, foraminous conveyer comprises, first of lower layout, two guipures, first, water leg is provided with between two guipures, water leg layout corresponding with the blanking port of cloth materials and parts, bellows are that the casing of strip is formed, the vacancy portion passed for foraminous conveyer is offered at the two ends of casing, the bottom of bellows arranges air inlet pipe interface, the top of bellows sets out air pipe interface, horizontally disposed air distribution plate and gas collection plate is also provided with in bellows, air distribution plate and gas collection plate are orifice plate and form, gas collection plate is positioned at the upside of the first guipure, air distribution plate is positioned at the downside of the second guipure, in bellows first, also first is provided with between two guipures, two tracheaes, first, two tracheaes lay respectively at two edge of foraminous conveyer and the throughput direction along foraminous conveyer is arranged respectively, first, the pipe shaft of two tracheaes is arranged at intervals with the first air nozzle, the outgassing direction of the first air nozzle points to the middle part of foraminous conveyer obliquely, first, the 3rd tracheae is also provided with between two guipures, 3rd tracheae is positioned at the discharge end of foraminous conveyer and the width along foraminous conveyer is arranged, the pipe shaft of the 3rd tracheae is arranged at intervals with the second air nozzle, the outgassing direction of the second air nozzle points to the side away from foraminous conveyer obliquely.
7. organic green-tea production system according to claim 6, it is characterized in that: cloth materials and parts comprise the coaming plate of drapery panel and the setting of drapery panel periphery, drapery panel is that a folding shape plate body is formed, the height of folding shape plate body reduces gradually along the throughput direction of foraminous conveyer, the width of folding shape plate body increases gradually along the throughput direction of foraminous conveyer, folding shape plate body comprises the first plate body and the second plate body that the throughput direction along foraminous conveyer arranges successively, second plate body is arranged to concordant blade-like compared with the side of low side, formed by second plate body and horizontal plane, angle is 3 ~ 5 °, formed by first plate body and horizontal plane, angle is 5 ~ 8 °, scald the lower end charging mouth of pipe and the corresponding layout of the first plate body of blue or green carrier pipe, the boiling hot blue or green heart yearn of the carrier pipe lower end discharging mouth of pipe and the angle of the first plate body are 8 ~ 10 °, it is the horn-like of elliposoidal that the lower end discharging mouth of pipe of boiling hot blue or green carrier pipe is arranged to cross section.
8. organic green-tea production system according to claim 6, it is characterized in that: the delivery port of water leg is connected with rough filtering device, the delivery port of rough filtering device is connected with organic matter removal device, the delivery port of organic matter removal device is connected with heater, the delivery port of heater is connected with hot-water cylinder, and the delivery port of hot-water cylinder is connected with hot-water line and is connected; The escape pipe interface of bellows is connected with the first blower fan, the gas outlet of the first air-introduced machine is connected with dehydrating unit, the gas outlet of dehydrating unit is connected with heater, the gas outlet of heater is connected with the second blower fan, and air inlet pipe interface is all connected with the gas outlet of the second blower fan with first, second and third tracheae.
9. organic green-tea production system according to claim 6, is characterized in that: scalding blue or green carrier pipe is that spiral helicine insulating tube is formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510532223.7A CN105028731A (en) | 2015-08-24 | 2015-08-24 | Organic green tea production system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510532223.7A CN105028731A (en) | 2015-08-24 | 2015-08-24 | Organic green tea production system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105028731A true CN105028731A (en) | 2015-11-11 |
Family
ID=54436206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510532223.7A Pending CN105028731A (en) | 2015-08-24 | 2015-08-24 | Organic green tea production system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105028731A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105394215A (en) * | 2015-11-30 | 2016-03-16 | 无锡市茗雅东方茶艺科技有限公司 | Tea production equipment integrating microwave system and drying system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201266007Y (en) * | 2008-08-21 | 2009-07-01 | 温州大学 | Continuous microwave hot wind combined drying equipment |
CN102753029A (en) * | 2010-02-16 | 2012-10-24 | 株式会社伊藤园 | Tea leaf-transporting apparatus |
CN203020909U (en) * | 2012-11-29 | 2013-06-26 | 湖南三十九铺茶业有限公司 | Full automatic conveying device |
CN203969102U (en) * | 2014-07-28 | 2014-12-03 | 林清矫 | A kind of tea leaf water-removing device |
CN104255959A (en) * | 2014-07-18 | 2015-01-07 | 黄山市猴坑茶业有限公司 | Automatic production line for Houdou Lanxiang |
CN104543262A (en) * | 2014-12-12 | 2015-04-29 | 王丽 | Tea leaves and preparation method thereof |
-
2015
- 2015-08-24 CN CN201510532223.7A patent/CN105028731A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201266007Y (en) * | 2008-08-21 | 2009-07-01 | 温州大学 | Continuous microwave hot wind combined drying equipment |
CN102753029A (en) * | 2010-02-16 | 2012-10-24 | 株式会社伊藤园 | Tea leaf-transporting apparatus |
CN203020909U (en) * | 2012-11-29 | 2013-06-26 | 湖南三十九铺茶业有限公司 | Full automatic conveying device |
CN104255959A (en) * | 2014-07-18 | 2015-01-07 | 黄山市猴坑茶业有限公司 | Automatic production line for Houdou Lanxiang |
CN203969102U (en) * | 2014-07-28 | 2014-12-03 | 林清矫 | A kind of tea leaf water-removing device |
CN104543262A (en) * | 2014-12-12 | 2015-04-29 | 王丽 | Tea leaves and preparation method thereof |
Non-Patent Citations (1)
Title |
---|
张厅: "夏秋茶原料加工名优绿茶的工艺及品质研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105394215A (en) * | 2015-11-30 | 2016-03-16 | 无锡市茗雅东方茶艺科技有限公司 | Tea production equipment integrating microwave system and drying system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105028720A (en) | System for roasted green tea production | |
CN105028732A (en) | Production method of green tea | |
CN105028725A (en) | Production method of roasted green tea | |
CN105325578A (en) | Roasted green tea production line | |
CN105028731A (en) | Organic green tea production system | |
CN105076531A (en) | Method for producing pan-fired green tea by combination of blanching and microwave de-enzyming | |
CN105145933A (en) | Process for organic green tea production | |
CN105028721A (en) | Green tea production system | |
CN105028727A (en) | Selenium-rich organic green tea production system | |
CN105028718A (en) | System for production of selenium-enriched organic green tea | |
CN105192125A (en) | Novel continuous green tea production line | |
CN105028729A (en) | Selenium-enriched organic green tea production process | |
CN105028730A (en) | System for producing pan-fired green tea | |
CN105028723A (en) | Production process of selenium-rich organic green tea | |
CN105166108A (en) | Organic green tea production system by combining blanching tea leaves and two-stage fixation | |
CN105028726A (en) | Selenium-enriched green tea production process | |
CN105028722A (en) | Method for producing roasting green tea | |
CN105028728A (en) | System for producing organic green tea | |
CN105028719A (en) | Novel organic green tea production technology | |
CN105192129A (en) | Organic green tea production system based on combination of blanch fixation and two-stage fixation | |
CN105104592A (en) | Method for producing green tea by combination of scalding and microwave deactivation | |
CN105076534A (en) | Selenium-enriched organic green tea continuous production system with secondary fixation function | |
CN105166109A (en) | Tea leaf boiling and microwave enzyme deactivating combined processing technology for the production of roasted green tea | |
CN105028724A (en) | Tea processing equipment | |
CN105124013A (en) | Technology for production of pan-fired green teas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151111 |