CN105020706A - Solid state ignition method for circulating fluidized bed boiler - Google Patents

Solid state ignition method for circulating fluidized bed boiler Download PDF

Info

Publication number
CN105020706A
CN105020706A CN201510446688.0A CN201510446688A CN105020706A CN 105020706 A CN105020706 A CN 105020706A CN 201510446688 A CN201510446688 A CN 201510446688A CN 105020706 A CN105020706 A CN 105020706A
Authority
CN
China
Prior art keywords
firebrick
bed material
ignition
distribution plate
air distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510446688.0A
Other languages
Chinese (zh)
Inventor
崔猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510446688.0A priority Critical patent/CN105020706A/en
Publication of CN105020706A publication Critical patent/CN105020706A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Solid-Fuel Combustion (AREA)

Abstract

The invention relates to a solid state ignition method for a circulating fluidized bed boiler. The method comprises the steps that a layer of bed materials is laid on an air distribution plate, and two layers of ignition bricks formed by evenly mixing fuel and bed materials are evenly placed on the bed materials; a space of 0.5-0.8 square meters is reserved at a boiler entrance for containing firewood, the firewood is burned to ignite the ignition bricks, the ignition bricks burn inwards gradually from the boiler entrance, and the bed materials contained in the ignition bricks, hearth fireproof materials and the bed materials laid on the air distribution plate are heated at the same time; after the fuel burns completely, the bed materials are heated to a temperature being higher than 600 DEG C and evenly scattered onto the air distribution plate; and after the ignition bricks burn completely, primer coals are scattered to the boiler and covered tightly for 10-15 minutes by closing a boiler door, and then a draught fan is started to accelerate flaming. According to the method, biomasses are adopted as the fuel to heat the bed materials to the temperature of 600 DEG C in a solid state, the heating efficiency of the bed materials is improved, the heating time is shortened, and the ignition cost is greatly reduced. Meanwhile, equipment investment is reduced.

Description

A kind of CFBB SSI Solid State Ignition method
Technical field
The present invention relates to a kind of CFBB SSI Solid State Ignition scheme, belong to boiler cold-state start-up technique scheme.
Background technology
CFBB is the clean-burning technology of the new a kind of high-efficiency low-pollution risen in the world, and it is wide that it has combustion adaptive, especially has unique effect to burning of coal inferior, is therefore widely used in China.
CFBB igniting is a very important operation in start-up course.Due to CFBB, before igniting, air distribution plate is wanted to spread the bed material of certain thickness (400mm-500mm).The object of igniting is by some way by bed material heating uniform temperature, until the burning that feeder continuously can be stable to most fuel.
Firewood or Charcoal ignition on bed is mainly taked in bubbling bed boiler and early stage CFBB.This sparking mode needs to add a large amount of firewoods or charcoal in stove, and after burning, the thickness of charcoal fire layer is moderate, and carbon left has strict demand.So operation easier is comparatively large, careless slightlyly very easily cause coking or fire extinguishing.Along with the increase of air distribution plate area, in stove, interpolation timber or charcoal have also become a difficult problem.Therefore which is mainly applied small-sized circular flow and is changed in a boiler.
Increase along with boiler capacity adopts fluidization sparking mode more.Refer to that bed material is heated to firing temperature under fluidized state.It to comprise on bed hot gas ignition under grease gun igniting and bed.The former is that bed material directly heats with oil gun under the state of fluidisation, and the low Fuel Dosage of this mode long thermal efficiency duration of ignition is large especially, so cost is also higher.Fuel-oil atmozation is lighted and is added heat primary air form high-temperature hot flue gas by the latter, adds hott bed material with First air.Because bed material is that to add time of hott bed material shorter for fluidized state heat smoke, cause the igniting thermal efficiency low, though but to take some improvement opportunity fuel consumption still considerable for whole ignition process, and cost remains high always.
Fluidization sparking mode system complex, equipment investment is larger.Needing independently fuel feeding and ignition system, is also simultaneously potential safety hazard, careless slightlyly causes the accident.
Summary of the invention
The object of the invention is, provide a kind of without the need to equipment investment, use cost is cheap, and the CFBB SSI Solid State Ignition scheme of convenient operation, makes fuel add hott bed material in the stationary state.To solve above-mentioned technical problem.
For achieving the above object, the technical solution used in the present invention is: a kind of CFBB SSI Solid State Ignition scheme, it comprises making and the ignition method of a firebrick.It is characterized in that: on air distribution plate, layer overlay can cover the bed material of blast cap, some firebrick two superimposed biomass fuel and bed material are mixed evenly is placed on bed material, and at stove gate, place reserves 0.5-0.8m 2space is not temporarily put a firebrick and puts into firewood, light firewood and point of ignition firebrick, point firebrick is from stove gate propagating combustion gradually inward, by bed material heating contained by self during the burning of some firebrick, the bed material simultaneously heating furnace refractory material and air distribution plate laid, after firewood combustion is complete, reserved some firebrick is put into headspace, the fuel afterburnt, bed material is heated to more than 600 DEG C and is evenly scattered on air distribution plate, be sprinkled into introduction coal after the burning completely of some firebrick, closedown fire door starts blower fan after vexed 10-15 minute and raises fire.
One: the making of some firebrick
1: igniting bed material should use CFBB to arrange discharging bottom slags wide-size distribution particle diameter 0-8mm, wherein below 1mm should be less than 10%, 1-3mm and accounts for 40%, 3-5mm and account for 40%, 5-8mm and account for 10%.Selected bed material should remove ironware foreign material, and bed material total amount is multiplied by the air distribution plate gross area by 300mm thickness and calculates.Particle diameter 0-5mm coal 5kg should be mixed in every square metre.Require that caloric value is at more than 5000kcal, fugitive constituent is not less than 20%.
2: fuel should adopt the biomass energies such as agricultural crop straw, timber, bamboo.Because fuel type is different, different in kind, so firing rate also can be different.But the shaping volume of a firebrick must be met.
3: fuel and bed material are made into a firebrick.Adding adhesive in right amount for increasing some firebrick fastness, fully mixing with a firebrick and simply should ensure that bed material is evenly distributed, and there is good stability.Size is moderate, conveniently enters siege, is easy to put.
4: the hollow cylinder of external diameter 300mm internal diameter 100mm height at 1000mm made by some firebrick.Every square metre of air distribution plate can put 9 pieces, two-layer 18 pieces altogether.Point firebrick total quantity is 18 be multiplied by air distribution plate area.
5: after some firebrick is made into type, drying and processing should be carried out to get rid of moisture.
Two: ignition process
1: should ensure before igniting that air distribution plate cloth wind is even, blast cap aperture is without blocking.
2: lay bed material 100-150mm.Bed material particle diameter 0-8mm wherein 1mm should be less than 10%1-3mm and account for 40%, 3-5mm and account for 40%, 5-8mm and account for 10%, bed material should remove the foreign material such as ironware.Bed material fully should be able to cover blast cap.
3: be evenly placed on air distribution plate by a firebrick, superposition is put two-layer, must ensure that stability is not askew.0.5-0.8m is reserved at each stove gate 2a firebrick is not temporarily put in space.
4: choose length and put into headspace at 30-50cm diameter 3-5cm drying material, be highly greater than 50cm.
5: light timber, lead fire turns, some firebrick from stove gate propagating combustion gradually inward, by bed material heating contained by self during the burning of some firebrick, heat the bed material that refractory material and air distribution plate are laid simultaneously, after firewood combustion is complete, reserved some firebrick is put into headspace.In the fuel afterburnt, bed material can evenly be scattered on air distribution plate.
6: switch fire door mode can be adopted to control air inlet, control point firebrick burning time is at 2-3 hour.
7: whether the some firebrick burning later stage uses creeper checkpoint firebrick to burn completely, the residual brick being embedded in the incomplete after-flame in bottom is routed up and burns away.
8: after the burning completely of some firebrick, be as far as possible evenly sprinkled into particle coal in stove, every square of air distribution plate should be sprinkled into 2-3kg and close the vexed 10-15 minute of fire door.
9: startup air-introduced machine primary air fan maintenance emulsion zone does negative pressure adjustment primary air flow every square metre of air distribution plate and controls at 1500m 3/ h.Start a small amount of coal supply of feeder.
10: due to entering of cold wind, bed temperature can decline to some extent, and bed temperature suitably can reduce primary air flow lower than 700 DEG C, but every square metre of air distribution plate must not lower than 1000m 3/ h.Heating rate is controlled at 10 DEG C/min when bed temperature rises to more than 750 DEG C, if bed temperature raising speed is too fast suitably can increase air quantity, if desired can pulse coal supply.
11: stablize bed temperature when bed temperature rises to 850 DEG C and suitably carry wind coal, ignition of the boiler successfully can tape splicing load.Between the some campaign, other operations are undertaken by operating standard.
This programme takes the technology of SSI Solid State Ignition, adopts living beings to add hott bed material in the stationary state as fuel and reaches 600 DEG C, improve the efficiency of heating surface of bed material, has saved the time of heating, has greatly reduced igniting cost.Save equipment investment simultaneously.
Detailed description of the invention
The bed material laying 400mm-500mm thickness is needed before CFBB igniting.For protection blast cap, first lay the bed material 100mm-150mm that one deck covers blast cap.All the other 300mm are made into a firebrick.
One: the making of some firebrick
1: igniting bed material should use CFBB to arrange discharging bottom slags wide-size distribution particle diameter 0-8mm, wherein below 1mm should be less than 10%, 1-3mm and accounts for 40%, 3-5mm and account for 40%, 5-8mm and account for 10%.Selected bed material should remove ironware foreign material, and bed material total amount is multiplied by the air distribution plate gross area by 300mm thickness and calculates.Particle diameter 0-5mm coal 5kg should be mixed in every square metre.Require that caloric value is at more than 5000kcal, fugitive constituent is not less than 20%.
2: fuel should adopt the biomass energies such as agricultural crop straw, timber, bamboo.Because fuel type is different, different in kind, so firing rate also can be different.But the shaping volume of a firebrick must be met.
3: abundant to fuel and bed material mixing manufacture is become some firebrick.Add adhesive in right amount for increasing some firebrick fastness, some firebrick answers structure simple, ensures that bed material is evenly distributed, and has good stability.Size is moderate, conveniently enters siege, is easy to put.
4: the hollow cylinder of external diameter 300mm internal diameter 100mm height at 1000mm made by some firebrick.Every square metre of air distribution plate can put 9 pieces, two-layer 18 pieces altogether.Point firebrick total quantity is 18 be multiplied by air distribution plate area.
5: after some firebrick is made into type, drying and processing should be carried out to get rid of moisture.
Two: ignition process
1: should ensure before igniting that air distribution plate cloth wind is even, blast cap aperture is without blocking.
2: lay bed material 100-150mm.Bed material particle diameter 0-8mm wherein 1mm should be less than 10%1-3mm and account for 40%, 3-5mm and account for 40%, 5-8mm and account for 10%, bed material should remove the foreign material such as ironware.Bed material should be able to fully cover a cap.
3: be evenly placed on air distribution plate by a firebrick, superposition is put two-layer, must ensure that stability is not askew.0.5-0.8m is reserved at each stove gate 2a firebrick is not temporarily put in space.
4: choose length and put into headspace at 30-50cm diameter 3-5cm drying material, be highly greater than 50cm.
5: light timber, lead fire turns, and some firebrick, from stove gate propagating combustion gradually inward, by bed material heating contained by self during the burning of some firebrick, heats castable simultaneously, firewood combustion completely after reserved some firebrick is put into headspace.In the fuel afterburnt, bed material can evenly be scattered on air distribution plate.
6: switch fire door can be adopted to control air inlet, control point firebrick burning time is at 2-3 hour.
7: whether the some firebrick burning later stage uses creeper checkpoint firebrick to burn completely, the residual brick being embedded in the incomplete after-flame in bottom is routed up and burns away.
8: after the burning completely of some firebrick, be as far as possible evenly sprinkled into particle coal in stove, every square of air distribution plate should be sprinkled into 2-3kg and close the vexed 10-15 minute of fire door.
9: startup air-introduced machine primary air fan maintenance emulsion zone does negative pressure adjustment primary air flow every square metre of air distribution plate and controls at 1500m 3/ h.Start a small amount of coal supply of feeder.
10: due to entering of cold wind, bed temperature can decline to some extent, and bed temperature suitably can reduce primary air flow lower than 700 DEG C, but every square metre of air distribution plate must not lower than 1000m 3/ h.Heating rate is controlled at 10 DEG C/min when bed temperature rises to more than 750 DEG C, if bed temperature raising speed is too fast suitably can increase air quantity, if desired can pulse coal supply.
11: stablize bed temperature when bed temperature rises to 850 DEG C and suitably carry wind coal, ignition of the boiler successfully can tape splicing load.

Claims (4)

1. a CFBB SSI Solid State Ignition scheme, it is characterized in that: on air distribution plate, layer overlay can cover the bed material of blast cap, point firebrick two superimposed biomass fuel and bed material are mixed evenly is placed on bed material, and at stove gate, place reserves 0.5-0.8m 2space is not temporarily put a firebrick and puts into firewood, light firewood and point of ignition firebrick, point firebrick is from stove gate propagating combustion gradually inward, by bed material heating contained by self during the burning of some firebrick, the bed material simultaneously heating furnace refractory material and air distribution plate laid, after firewood combustion is complete, reserved some firebrick is put into headspace, the fuel afterburnt, bed material is heated to more than 600 DEG C and is evenly scattered on air distribution plate, be sprinkled into introduction coal after the burning completely of some firebrick, closedown fire door starts blower fan after vexed 10-15 minute and raises fire.
2. CFBB SSI Solid State Ignition scheme according to claim 1, it is characterized in that: some firebrick bed material should use CFBB to arrange discharging bottom slags, wide-size distribution particle diameter 0-8mm, wherein below 1mm should be less than 10%, 1-3mm accounts for 40%, 3-5mm accounts for 40%, 5-8mm accounts for 10%, selected bed material should remove ironware foreign material, and bed material total amount is multiplied by the air distribution plate gross area by 300mm thickness and calculates volume, should mix the coal 15kg of particle diameter 0-5mm in every cubic metre of bed material, require that caloric value is at more than 5000kcal, fugitive constituent is not less than 20%.
3. CFBB SSI Solid State Ignition scheme according to claim 1, is characterized in that: hollow cylinder made by some firebrick.
4. CFBB SSI Solid State Ignition scheme according to claim 1, is characterized in that: switch fire door mode can be adopted to control air inlet, and control point firebrick burning time is at 2-3 hour.
CN201510446688.0A 2015-07-26 2015-07-26 Solid state ignition method for circulating fluidized bed boiler Pending CN105020706A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510446688.0A CN105020706A (en) 2015-07-26 2015-07-26 Solid state ignition method for circulating fluidized bed boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510446688.0A CN105020706A (en) 2015-07-26 2015-07-26 Solid state ignition method for circulating fluidized bed boiler

Publications (1)

Publication Number Publication Date
CN105020706A true CN105020706A (en) 2015-11-04

Family

ID=54410876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510446688.0A Pending CN105020706A (en) 2015-07-26 2015-07-26 Solid state ignition method for circulating fluidized bed boiler

Country Status (1)

Country Link
CN (1) CN105020706A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108730965A (en) * 2017-04-24 2018-11-02 北新集团建材股份有限公司 Fluidized bed furnace ignition system control method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033833A (en) * 1987-12-25 1989-07-12 王庆臣 Plant-fibre type up-ignited briquet and processing method
CN1041928A (en) * 1989-11-09 1990-05-09 南江县白鹿饲料厂 Non-fuel autoignition sintered brick
CN2163303Y (en) * 1992-09-24 1994-04-27 煤炭科学研究总院 Bottom igniting device of fluidized-bed boiler
CN101760275A (en) * 2010-01-05 2010-06-30 山西大学 Square ignition briquette and production method thereof
CN102095196A (en) * 2011-03-08 2011-06-15 张全胜 Oilless ignition method of fluidized bed boiler
CN103499093A (en) * 2013-09-26 2014-01-08 吉木萨尔县光源发电有限责任公司 Starting ignition method of circulating fluidized bed boiler

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033833A (en) * 1987-12-25 1989-07-12 王庆臣 Plant-fibre type up-ignited briquet and processing method
CN1041928A (en) * 1989-11-09 1990-05-09 南江县白鹿饲料厂 Non-fuel autoignition sintered brick
CN2163303Y (en) * 1992-09-24 1994-04-27 煤炭科学研究总院 Bottom igniting device of fluidized-bed boiler
CN101760275A (en) * 2010-01-05 2010-06-30 山西大学 Square ignition briquette and production method thereof
CN102095196A (en) * 2011-03-08 2011-06-15 张全胜 Oilless ignition method of fluidized bed boiler
CN103499093A (en) * 2013-09-26 2014-01-08 吉木萨尔县光源发电有限责任公司 Starting ignition method of circulating fluidized bed boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108730965A (en) * 2017-04-24 2018-11-02 北新集团建材股份有限公司 Fluidized bed furnace ignition system control method

Similar Documents

Publication Publication Date Title
CN204232265U (en) A kind of tobacco-leaf bulk curing barn utilizing biomass fuel
CN109140431B (en) Ignition method of circulating fluidized bed boiler
CN100504164C (en) Coal firing method with low emission for nitrous oxides
CN102095196A (en) Oilless ignition method of fluidized bed boiler
CN105202575B (en) Coal dust or broken coal burning produce the method and device of high temperature hyperoxia torch ignition
CN204574124U (en) A kind of environmental protection cooking and heating furnace of the pluralities of fuel that can burn
CN102072651A (en) Heat accumulating type heating furnace totally using blast furnace gas as fuel
CN204301041U (en) Lower feeding biomass combustion boiler
CN105020706A (en) Solid state ignition method for circulating fluidized bed boiler
CN106379866B (en) A kind of fluidized bed furnace for pyrite-based sulphuric acid ignition method of energy-saving and environmental protection
CN205048425U (en) Biomass fuel combustor
CN203223939U (en) Numerical control biomass combustion furnace
CN204273210U (en) Biomass fuel counter-burning type oven
CN102175042B (en) Method for oven furnace or cold furnace ignition of heat-accumulating-type heating furnace totally adopting blast-furnace gas as fuel
CN105648130A (en) Automatic ignition control system and method for stove burning of hot blast stove
RU2417341C2 (en) Procedure facilitating combustion of fuel
CN106032907B (en) Blast furnace gas burner igniter
CN209511994U (en) A kind of non helping hand spontaneous combustion heat accumulating type biological particles combustion furnace
CN106958833A (en) A kind of biomass suspension-combustion furnace autocontrol method
CN205746991U (en) Multifunctional environment protection energy saving biomass gasification combustion furnace
CN205048486U (en) Blast air coal stove
CN205279434U (en) A high -efficient coal -fired hot -blast furnace for grain drying -machine
CN106168377B (en) A kind of boiler hot flue gas igniter
CN204329310U (en) Be applicable to the atmospheric heating hot-water boiler of biomass burning particle
CN205119137U (en) Automatic intelligent biomass furnace who adjusts temperature

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151104