CN105019820B - 一种绝缘步梯 - Google Patents

一种绝缘步梯 Download PDF

Info

Publication number
CN105019820B
CN105019820B CN201510406391.1A CN201510406391A CN105019820B CN 105019820 B CN105019820 B CN 105019820B CN 201510406391 A CN201510406391 A CN 201510406391A CN 105019820 B CN105019820 B CN 105019820B
Authority
CN
China
Prior art keywords
hoop plate
arc hoop
cross bar
pedestal
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510406391.1A
Other languages
English (en)
Other versions
CN105019820A (zh
Inventor
郑宏伟
缪寿成
方玉群
孔晓峰
梁加凯
俞晓辉
潜力群
王斌
蒋其武
蒋卫东
李炯
柳浩�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510406391.1A priority Critical patent/CN105019820B/zh
Publication of CN105019820A publication Critical patent/CN105019820A/zh
Application granted granted Critical
Publication of CN105019820B publication Critical patent/CN105019820B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

本发明提供了一种绝缘步梯,旨在解决现有技术中两串绝缘子间距超过60cm时,工作人员进出等电位困难的问题,包括两根跳线和设置在两根跳线之间的绝缘横杆,每根绝缘横杆上两端均固连有安装座,每个安装座均包括固定在绝缘横杆上的座体、第一弧形箍板、第二弧形箍板和可拆式紧固件,第一弧形箍板设置在座体上,第二弧形箍板转接在座体上,第一弧形箍板和第二弧形箍板通过可拆式紧固件抱紧在跳线上。采用本发明攀爬方便,降低了工作人员的风险和劳动强度;工作人员不需要沿着两串绝缘子,按照“跨二短三”技术要求的“手脚同步横向移动”,解决了现有技术中两串绝缘子间距超过60cm时,工作人员进出等电位困难的问题。

Description

一种绝缘步梯
技术领域
本发明涉及一种攀爬杆塔的领域,尤其涉及一种绝缘步梯。
背景技术
近年,我国特高压线路得到迅速发展,电网规模日益扩大。由于输送容量巨大,其运行可靠性要求极高,停电维护十分困难,常需等电位作业进行消缺或安装在线监控设备。由于特高压线路杆塔及各部件设计的特殊性,使等电位作业面临诸多技术难题。
通常,带电作业相关规程、导则规定:输电线路耐张杆塔进出等电位方式为“跨二短三”法(为尽可能小地占用绝缘空气间隙,手和脚跨过两片绝缘子、短接三片绝缘子)。实践经验表明,当两串绝缘子间水平距离超过60cm时,作业人员手、脚之间距离过大,无法按照“跨二短三”技术要求的“手脚同步横向移动”,作业风险和劳动强度极大。数据表明,特高压线路耐张两串绝缘子水平距离均大于60cm,在位于重冰区线路杆塔,该距离更是达到100cm,无法采用“跨二短三”法进出等电位。
发明内容
本发明提供了一种绝缘步梯,旨在解决现有技术中两串绝缘子间距超过60cm时,工作人员进出等电位困难的问题。
为了解决以上技术问题,本发明通过以下技术方案实现:一种绝缘步梯,包括两根跳线和设置在两根跳线之间的绝缘横杆,每根绝缘横杆上两端均固连有安装座,每个安装座均包括固定在绝缘横杆上的座体、第一弧形箍板、第二弧形箍板和可拆式紧固件,第一弧形箍板设置在座体上,第二弧形箍板转接在座体上,第一弧形箍板和第二弧形箍板通过可拆式紧固件抱紧在跳线上。
进一步,所述第一弧形箍板上设有第一安装耳,第一安装耳上设有半圆槽,第二弧形箍板上设有第二安装耳;可拆式紧固件由二级阶梯杆和手柄构成,二级阶梯杆由小径部和大径部构成,小径部直径大小与半圆槽宽度大小相同,小径部通过螺纹转接在第二安装耳上,手柄固定在大径部上。便于将可拆式紧固件的安装和拆卸。
进一步,所述第一弧形箍板固定在座体上,或者第一弧形箍板与座体一体设置,或者第一弧形箍板转接在座体上。
进一步,所述绝缘横杆为空心管。减轻了绝缘横杆的重量,减少了劳动强度。
进一步,所述绝缘横杆为伸缩杆。便于根据两根跳线的间距调整绝缘横杆的长度。
进一步,每个第一弧形箍板内侧壁上和每个第二弧形箍板内侧壁上均设有橡胶垫。有利于减小对跳线的磨损。
与现有技术相比本发明的优点是:本发明中若干根绝缘横杆通过可拆式紧固件安装在两根条线上形成步梯,在朝着等电位上爬的过程中将绝缘横杆一节一节的安装在跳线上,当下来时,一节一节的将横杆拆卸下来;攀爬方便,降低了工作人员的风险和劳动强度;工作人员不需要沿着两串绝缘子,按照“跨二短三”技术要求的“手脚同步横向移动”,解决了现有技术中两串绝缘子间距超过60cm时,工作人员进出等电位困难的问题。
附图说明
下面结合附图对本发明作进一步说明:
图1为本发明中横杆与安装座的结构示意图;
图2为本发明的结构示意图;
图3为本发明与杆塔的位置关系图。
具体实施方式
参阅图1和图2,一种绝缘步梯,包括两根跳线1和设置在两根跳线1之间的绝缘横杆2,每根绝缘横杆2上两端均固连有安装座3,每个安装座3均包括固定在绝缘横杆2上的座体4、第一弧形箍板5、第二弧形箍板6和可拆式紧固件7,第一弧形箍板5设置在座体4上,第二弧形箍板6转接在座体4上,第一弧形箍板5和第二弧形箍板6通过可拆式紧固件7抱紧在跳线1上。所述第一弧形箍板5上设有第一安装耳8,第一安装耳8上设有半圆槽81,第二弧形箍板6上设有第二安装耳9;可拆式紧固件7由二级阶梯杆10和手柄11构成,二级阶梯杆10由小径部和大径部构成,小径部直径大小与半圆槽81宽度大小相同,小径部通过螺纹转接在第二安装耳9上,手柄11固定在大径部上。所述第一弧形箍板5固定在座体4上,或者第一弧形箍板5与座体4一体设置,或者第一弧形箍板5转接在座体4上。所述绝缘横杆2为空心管。所述绝缘横杆2为伸缩杆。每个第一弧形箍板5内侧壁上和每个第二弧形箍板6内侧壁上均设有橡胶垫12。
工作时,安装座3安装在跳线1上时,先将第一弧形箍板5和第二弧形箍板6抱在跳线1上,同时二级阶梯杆10的小径部卡接在半圆槽81内,通过旋转手柄11将第一安装耳8和第二安装耳9逐渐靠拢,二级阶梯杆10的大径部被限定在第一安装耳8上,从而安装座3安装在跳线1上。
参阅图2和图3,上爬时,工作人员01携带绝缘横杆2,沿着跳线1每爬升一个高度,将一根绝缘横杆2通过安装座3固定在两根跳线1之间,然后踩着前面安装好的绝缘横杆2,安装下一个绝缘横杆2,知道爬到等电位。
工作人员01返回时,工作人员每下降一个高度,拆下一根绝缘横杆,直到下降到硬跳线03。
参阅图3,跳线悬垂绝缘子串02将硬跳线03悬挂在杆塔04上,耐张绝缘子串05悬挂在导线06(一般由6到8根,为了作图方便,只画出了2根)与杆塔04之间,跳线1(指的是软跳线,一般由6到8根,为了便于说明本发明,只画出了承载绝缘横杆2的2根)设置在硬跳线03和导线06之间,工作人员01从硬跳线03爬向跳线1。
本发明中若干根绝缘横杆通过可拆式紧固件安装在两根条线上形成步梯,在朝着等电位上爬的过程中将绝缘横杆一节一节的安装在跳线上,当下来时,一节一节的将横杆拆卸下来;攀爬方便,降低了工作人员的风险和劳动强度;工作人员不需要沿着两串绝缘子,按照“跨二短三”技术要求的“手脚同步横向移动”,解决了现有技术中两串绝缘子间距超过60cm时,工作人员进出等电位困难的问题。
以上所述仅为本发明的具体实施例,但本发明的技术特征并不局限于此,任何本领域的技术人员在本发明的领域内,所作的变化或修饰皆涵盖在本发明的专利范围之中。

Claims (4)

1.一种绝缘步梯,其特征是:包括两根跳线(1)和设置在两根跳线之间的绝缘横杆(2),每根绝缘横杆上两端均固连有安装座(3),每个安装座均包括固定在绝缘横杆上的座体(4)、第一弧形箍板(5)、第二弧形箍板(6)和可拆式紧固件(7),第一弧形箍板设置在座体上,第一弧形箍板与座体一体设置,第二弧形箍板转接在座体上,第一弧形箍板和第二弧形箍板通过可拆式紧固件抱紧在跳线上,每个第一弧形箍板内侧壁上和每个第二弧形箍板内侧壁上均设有橡胶垫(12)。
2.根据权利要求1所述的一种绝缘步梯,其特征是:所述第一弧形箍板上设有第一安装耳(8),第一安装耳上设有半圆槽(81),第二弧形箍板上设有第二安装耳(9);可拆式紧固件由二级阶梯杆(10)和手柄(11)构成,二级阶梯杆由小径部和大径部构成,小径部直径大小与半圆槽宽度大小相同,小径部通过螺纹转接在第二安装耳上,手柄固定在大径部上。
3.根据权利要求1所述的一种绝缘步梯,其特征是:所述绝缘横杆为空心管。
4.根据权利要求1所述的一种绝缘步梯,其特征是:所述绝缘横杆为伸缩杆。
CN201510406391.1A 2015-07-10 2015-07-10 一种绝缘步梯 Active CN105019820B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510406391.1A CN105019820B (zh) 2015-07-10 2015-07-10 一种绝缘步梯

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510406391.1A CN105019820B (zh) 2015-07-10 2015-07-10 一种绝缘步梯

Publications (2)

Publication Number Publication Date
CN105019820A CN105019820A (zh) 2015-11-04
CN105019820B true CN105019820B (zh) 2016-10-05

Family

ID=54410065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510406391.1A Active CN105019820B (zh) 2015-07-10 2015-07-10 一种绝缘步梯

Country Status (1)

Country Link
CN (1) CN105019820B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107086378A (zh) * 2017-06-12 2017-08-22 国电联合动力技术有限公司 一种电缆卡接装置及包括该装置的风电机组

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2041058B (en) * 1979-01-29 1982-12-15 Coubro & Scrutton M & I Ltd Felxible ladder
US4867275A (en) * 1988-05-05 1989-09-19 Islava Steven T Escape ladder
CN2777127Y (zh) * 2005-01-10 2006-05-03 无锡华润实业公司 部分预应力变锥度砼电杆
CN203514918U (zh) * 2013-08-30 2014-04-02 国家电网公司 带有爬梯装置的混凝土杆塔
CN204738737U (zh) * 2015-07-10 2015-11-04 国网浙江省电力公司金华供电公司 一种绝缘步梯

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2041058B (en) * 1979-01-29 1982-12-15 Coubro & Scrutton M & I Ltd Felxible ladder
US4867275A (en) * 1988-05-05 1989-09-19 Islava Steven T Escape ladder
CN2777127Y (zh) * 2005-01-10 2006-05-03 无锡华润实业公司 部分预应力变锥度砼电杆
CN203514918U (zh) * 2013-08-30 2014-04-02 国家电网公司 带有爬梯装置的混凝土杆塔
CN204738737U (zh) * 2015-07-10 2015-11-04 国网浙江省电力公司金华供电公司 一种绝缘步梯

Also Published As

Publication number Publication date
CN105019820A (zh) 2015-11-04

Similar Documents

Publication Publication Date Title
CN102882157B (zh) 便携式停电更换耐张导线防震锤工具
CN107069562B (zh) 带电更换绝缘子方法及载荷转移装置
CN204738737U (zh) 一种绝缘步梯
CN208078525U (zh) 用于配网带电作业立杆的三相导线撑开绝缘架
CN104638570A (zh) 输电线路停电、带电作业的分体式六分裂导线提线器及其应用
CN105019820B (zh) 一种绝缘步梯
CN205565511U (zh) 同塔双回钢管杆更换绝缘子作业用横担卡具
CN102623927B (zh) 带电更换220kV线路多回路双分裂导线绝缘子工具和方法
CN208337014U (zh) 一种带电更换高压线路绝缘子用起重滑车挂点加高装置
CN105514867A (zh) 一种输电线路杆塔的v型绝缘子串更换方法
CN201466574U (zh) 用于等电位更换输电线路铁塔绝缘子及附件的装置
CN108390311A (zh) 一种输电线路杆塔的v型绝缘子串带电更换方法
CN103825222B (zh) 一种带电更换220kV窄基塔耐张绝缘子串用工具
CN206575086U (zh) 绝缘紧线器拉板装置
CN105133909A (zh) 一种山区抗上拔直线塔
AU2015249876B2 (en) Temporary transfer bus
CN105406402B (zh) 一种可折叠式轻型出单串耐张绝缘子串装置
KR101392726B1 (ko) 송전탑 애자련 교체용 송전선 지지장치
CN103046794B (zh) 一种特高压直流曲臂直线塔
CN204243605U (zh) 输电线路耐张串复合绝缘子更换专用钩
CN202424015U (zh) 220kV及66kV线路防外力破坏警示仪
CN207150030U (zh) 用于110kV直线独横担杆塔带电更换绝缘子的卡具
CN103441443B (zh) 架空地线防振锤跑位追回器
CN206878422U (zh) 一种可变长度跳线托架
CN205212327U (zh) 一种110kV-220kV绝缘子更换器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fang Yuqun

Inventor after: Jiang Weidong

Inventor after: Li Jiong

Inventor after: Liu Hao

Inventor after: Kong Xiaofeng

Inventor after: Miao Shoucheng

Inventor after: Potential group

Inventor after: Wang Bin

Inventor after: Zheng Hongwei

Inventor after: Yu Xiaohui

Inventor after: Liang Jiakai

Inventor after: Jiang Qiwu

Inventor before: Zheng Hongwei

Inventor before: Jiang Weidong

Inventor before: Li Jiong

Inventor before: Liu Hao

Inventor before: Miao Shoucheng

Inventor before: Fang Yuqun

Inventor before: Kong Xiaofeng

Inventor before: Liang Jiakai

Inventor before: Yu Xiaohui

Inventor before: Potential group

Inventor before: Wang Bin

Inventor before: Jiang Qiwu

COR Change of bibliographic data
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20151104

Assignee: ZHEJIANG STED ELECTRIC CO.,LTD.

Assignor: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY JINHUA POWER SUPPLY Co.

Contract record no.: 2017330000004

Denomination of invention: Insulation step ladder

Granted publication date: 20161005

License type: Common License

Record date: 20170222

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20151104

Assignee: THE LIVE WORKING CENTER OF HUNAN ELECTRIC POWER Corp.

Assignor: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY JINHUA POWER SUPPLY Co.

Contract record no.: 2017330000006

Denomination of invention: Insulation step ladder

Granted publication date: 20161005

License type: Common License

Record date: 20170301