CN105017790A - Production process of SBS modified asphalt - Google Patents

Production process of SBS modified asphalt Download PDF

Info

Publication number
CN105017790A
CN105017790A CN201510488358.8A CN201510488358A CN105017790A CN 105017790 A CN105017790 A CN 105017790A CN 201510488358 A CN201510488358 A CN 201510488358A CN 105017790 A CN105017790 A CN 105017790A
Authority
CN
China
Prior art keywords
sbs
modifying asphalt
asphalt
parts
latex
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510488358.8A
Other languages
Chinese (zh)
Inventor
陈际江
扈利东
吕小博
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG DASHAN ROAD&BRIDGE Co Ltd
Original Assignee
SHANDONG DASHAN ROAD&BRIDGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG DASHAN ROAD&BRIDGE Co Ltd filed Critical SHANDONG DASHAN ROAD&BRIDGE Co Ltd
Priority to CN201510488358.8A priority Critical patent/CN105017790A/en
Publication of CN105017790A publication Critical patent/CN105017790A/en
Pending legal-status Critical Current

Links

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)
  • Processes Of Treating Macromolecular Substances (AREA)

Abstract

The invention discloses a production process of SBS modified asphalt and belongs to the field of modified asphalt. The process comprises the steps of heating 100 parts of matrix asphalt to be from 125 DEG C to 145 DER C, serving 4-20 parts of SBS latex as a modifying agent, adding the modifying agent into the heated matrix asphalt, stirring until bubbles are vanished, namely after the moisture in the SBS latex is evaporated, heating the mixture to be from 160 DEG C to 170 DEG C, adding 1-8 parts of cosolvent and 0.1-0.8 parts of stabilizing agents, stirring for 1-2 hours for development, and obtaining the SBS modified asphalt. The particle size in the SBS latex is less than 5 micrometers, by adding the SBS latex into the hot matrix asphalt directly for stirring, the SBS latex can be dispersed into the hot matrix asphalt uniformly, and swelling and crosslink are achieved between the SBS latex and the matrix asphalt for forming the modified asphalt. According to the production process of the SBS modified asphalt, the process is simple, the equipment investment is low, the energy is saved, the energy consumption is achieved, and the SBS modified asphalt which is prepared through the method is better than the SBS modified asphalt which is prepared with the solid SBS as modifying agents in performance.

Description

A kind of production technique of SBS modifying asphalt
Technical field
The present invention relates to modified asphalt technology FIELD OF THE INVENTIONThe, particularly a kind of production technique of SBS modifying asphalt.
Background technology
Solid thermoplastic elastomeric SBS joins in the matrix pitch of 170-185 DEG C by the many employings of current highway industry SBS modifying asphalt production stirs premix, then is ground by colloidal mill, and the growth long period forms.Its technique depends on colloidal mill, and SBS be sheared and be ground to certain particulate, improve the miscibility of itself and matrix pitch, need the motor of relatively high power, current consumption is large; If do not adopt colloidal mill directly to stir growth, in order to ensure SBS dissolving, completely then the production time extends greatly, and holding temperature also needs to consume the more energy, and long-time high temperature also can accelerate the aging of pitch and affect use properties simultaneously.
Adopt solid SBS to prepare SBS modifying asphalt as properties-correcting agent in prior art, shear through colloidal mill and grind and the production technology needing the long period to grow; And SBS latex of the present invention to join in hot matrix pitch and directly stirs the short period of time and grow and form, colloidal mill was not needed to shear the growth of grinding and long period; Present invention process is simple, facility investment is little, energy-saving and cost-reducing, and SBS performance of modified bitumen prepared by the present invention is more excellent than the performance of the SBS modifying asphalt adopting solid SBS to prepare as properties-correcting agent.
Summary of the invention
In order to make up above deficiency, the invention provides a kind of production technique of energy-saving and cost-reducing, facility investment is little, production cost is low SBS modifying asphalt.
Technical scheme of the present invention is:
A kind of production technique of SBS modifying asphalt, 100 parts of matrix pitches are heated to 125-145 DEG C, 4-20 part SBS latex slowly joins in hot matrix pitch as properties-correcting agent, stir, treat bubble collapse, namely, after moisture in SBS latex is evaporated, be warming up to 160-170 DEG C, add 1-8 part solubility promoter and 0.1-0.8 part stablizer, stir growth 1-2h and namely obtain SBS modifying asphalt.
When adding SBS latex, slowly add while stirring, add speed and be advisable with not tank boil-overs.
Preferably, matrix pitch is heated to 130-140 DEG C.
Further, 6-12 part SBS latex is added in 100 parts of hot matrix pitches.
Preferably, 1-4 part solubility promoter and 0.1-0.5 part stablizer is added.
Preferably, described solubility promoter be rubber oil, subtract third fractional oil, subtract four lines oil, furfural oily in any one or a few.
Preferably, described matrix pitch is attached most importance to friendship petroleum pitch.Label can be 50#, 70#, 90# etc.
Diameter of particle in SBS latex is less than 5 microns, directly adds in the matrix pitch of heat and stirs, can evenly spread in hot matrix pitch, and is cross-linked with matrix pitch Fast-swelling, forms modifying asphalt.
As shown in Figure 1 and Figure 2, the difference that the present invention and traditional employing solid SBS prepare the SBS modifying asphalt working method (referred to as " traditional SBS modifying asphalt technology of preparing ") of SBS modifying asphalt as properties-correcting agent is:
1) modifier material is different, and the properties-correcting agent that traditional SBS modifying asphalt technology of preparing adopts is SBS is solid, and the properties-correcting agent that the present invention adopts is liquid SBS latex;
2) traditional SBS modifying asphalt technology of preparing needs heated substrate pitch to more than 170 DEG C, and needs to carry out shearing grinding by colloidal mill, then keeps high temperature to grow 4-10 hour, production temperature is high, and the production cycle is long, and energy consumption is high, and easily cause ageing of asphalt, facility investment and production cost high; The present invention's heated substrate pitch in early stage 130-140 DEG C, be warmed up to 160-170 DEG C after evaporation removing moisture, then constant temperature grows 1-2 hour, production temperature is lower, with short production cycle, save energy, and not easily causes ageing of asphalt;
3) facility investment of traditional SBS modifying asphalt technology of preparing is large, and facility investment of the present invention is little, and decrease purchasing of colloidal mill and support equipment, with low cost, apparatus and process is simple.
Beneficial effect of the present invention is:
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the production technological process of SBS modifying asphalt of the present invention;
Fig. 2 is the production technological process of prior art SBS modifying asphalt.
Embodiment
For the SBS latex of 40% commercially available solid content.The SBS latex produced as Shandong Dashan Road & Bridge Co., Ltd. is example
Embodiment 1
Extra large 70# during matrix pitch adopts, reaches I-D index.70# extra large in 100 parts is heated to 130 DEG C, the SBS latex of 6 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, heat to 165 DEG C and add the rubber oil of 1 part and the stablizer (sulphur or sulfide) of 0.2 part again and stir growth 1 hour i.e. obtained SBS modifying asphalt.The index of gained modifying asphalt is: softening temperature 62 DEG C, penetration degree 53dmm, 5 DEG C of ductility 23cm.
Embodiment 2
Matrix pitch adopts Shandong 70#, reaches I-D index.The Shandong 70# of 100 parts is heated to 140 DEG C, the SBS latex of 8 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, heat to 170 DEG C and add the rubber oil of 2 parts and the stablizer (sulphur) of 0.2 part again and stir growth 1 hour i.e. obtained SBS modifying asphalt.The index of gained modifying asphalt is: softening temperature 66 DEG C, penetration degree 55dmm, 5 DEG C of ductility 27cm.
Embodiment 3
Extra large 90# during matrix pitch adopts, reaches I-C index.90# extra large in 100 parts is heated to 140 DEG C, the SBS latex of 8 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, heat to 165 DEG C and add the furfural oil of 1 part and the stablizer (sulfide) of 0.2 part again and stir growth and namely obtain SBS modifying asphalt in 1 hour.The index of gained modifying asphalt is: softening temperature 63 DEG C, penetration degree 65dmm, 5 DEG C of ductility 35cm.
Embodiment 4
Matrix pitch adopts Shandong 90#, reaches I-C index.The Shandong 90# of 100 parts is heated to 140 DEG C, the SBS latex of 10 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, be heated to 170 DEG C of subtract four lines oil and stablizers (sulphur or sulfide) of 0.15 part adding 2 parts again and stir growth and namely obtain SBS modifying asphalt in 1 hour.The index of gained modifying asphalt is: softening temperature 70 DEG C, penetration degree 60dmm, 5 DEG C of ductility 40cm.
Embodiment 5
Extra large 50# during matrix pitch adopts, reaches I-D index.50# extra large in 100 parts is heated to 135 DEG C, the SBS latex of 12 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, heat to 168 DEG C of stablizers (sulphur or sulfide) subtracting third fractional oil and 0.25 part adding 4 parts again and stir growth 2 hours i.e. obtained SBS modifying asphalt.The index of gained modifying asphalt is: softening temperature 70 DEG C, penetration degree 48dmm, 5 DEG C of ductility 26cm.
Embodiment 6
Matrix pitch adopts SK90#, reaches I-C index.The SK90# of 100 parts is heated to 130 DEG C, the SBS latex of 6 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, heat to 165 DEG C of stablizers (sulphur or sulfide) adding 0.25 part again and stir growth 1 hour i.e. obtained SBS modifying asphalt.The index of gained modifying asphalt is: softening temperature 58 DEG C, penetration degree 65dmm, 5 DEG C of ductility 32cm.
Embodiment 7
Matrix pitch adopts SK70#, reaches I-C index.The SK70# of 100 parts is heated to 130 DEG C, the SBS latex of 8 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, heat to 167 DEG C and add the rubber oil of 3 parts and the stablizer (sulphur or sulfide) of 0.20 part again and stir growth 2 hours i.e. obtained SBS modifying asphalt.The index of gained modifying asphalt is: softening temperature 64 DEG C, penetration degree 63dmm, 5 DEG C of ductility 33cm.
Embodiment 8
Matrix pitch adopts SK70#, reaches I-D index.The SK70# of 100 parts is heated to 130 DEG C, the SBS latex of 10 parts is slowly counted under stirring, treat that bubble collapse shows that moisture is evaporated, heat to 170 DEG C and add the rubber oil of 1 part and the stablizer (sulphur or sulfide) of 0.20 part again and stir growth 2 hours i.e. obtained SBS modifying asphalt.The index of gained modifying asphalt is: softening temperature 75 DEG C, penetration degree 51dmm, 5 DEG C of ductility 25cm.

Claims (6)

1. the production technique of a SBS modifying asphalt, it is characterized in that: 100 parts of matrix pitches are heated to 125-145 DEG C, 4-20 part SBS latex slowly joins in hot matrix pitch as properties-correcting agent, stir, treat bubble collapse, namely, after moisture in SBS latex is evaporated, be warming up to 160-170 DEG C, add 1-8 part solubility promoter and 0.1-0.8 part stablizer, stir growth 1-2h and namely obtain SBS modifying asphalt.
2. the production technique of SBS modifying asphalt as claimed in claim 1, is characterized in that: matrix pitch is heated to 130-140 DEG C.
3. the production technique of SBS modifying asphalt as claimed in claim 2, is characterized in that: add 6-12 part SBS latex in 100 parts of hot matrix pitches.
4. the production technique of SBS modifying asphalt as claimed in claim 1, is characterized in that: add 1-4 part solubility promoter and 0.1-0.5 part stablizer.
5. the production technique of SBS modifying asphalt as described in any one of claim 1-4, is characterized in that: described solubility promoter is rubber oil, subtract third fractional oil, subtract four lines oil, furfural oily in any one or a few.
6. the production technique of SBS modifying asphalt as described in any one of claim 1-4, is characterized in that: described matrix pitch is attached most importance to friendship petroleum pitch.
CN201510488358.8A 2015-08-11 2015-08-11 Production process of SBS modified asphalt Pending CN105017790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510488358.8A CN105017790A (en) 2015-08-11 2015-08-11 Production process of SBS modified asphalt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510488358.8A CN105017790A (en) 2015-08-11 2015-08-11 Production process of SBS modified asphalt

Publications (1)

Publication Number Publication Date
CN105017790A true CN105017790A (en) 2015-11-04

Family

ID=54408112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510488358.8A Pending CN105017790A (en) 2015-08-11 2015-08-11 Production process of SBS modified asphalt

Country Status (1)

Country Link
CN (1) CN105017790A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107459826A (en) * 2017-08-14 2017-12-12 江苏诺路桥工程检测有限公司 One kind is exempted to shear SBS modified pitch and preparation method thereof
CN111073322A (en) * 2019-12-31 2020-04-28 六安市共鑫道路材料有限公司 Preparation method of SBS latex modified asphalt
CN113861708A (en) * 2021-10-19 2021-12-31 广州鸿绵合成材料有限公司 High-viscosity high-elasticity modified asphalt and preparation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103665599A (en) * 2013-12-21 2014-03-26 栾晓健 SBS (styrene butadiene styrene) modified asphalt stabilizer
CN103655990A (en) * 2013-12-03 2014-03-26 宋爱民 Traditional Chinese medicinal pill for treating exertional angina pectoris
CN103965492A (en) * 2014-04-23 2014-08-06 安徽路达泰克沥青新材料有限公司 Method for preparing low-temperature cross-linked emulsified SBS pitch modifier

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103655990A (en) * 2013-12-03 2014-03-26 宋爱民 Traditional Chinese medicinal pill for treating exertional angina pectoris
CN103665599A (en) * 2013-12-21 2014-03-26 栾晓健 SBS (styrene butadiene styrene) modified asphalt stabilizer
CN103965492A (en) * 2014-04-23 2014-08-06 安徽路达泰克沥青新材料有限公司 Method for preparing low-temperature cross-linked emulsified SBS pitch modifier

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国石化出版社: "《沥青生产与应用技术手册》", 31 May 2010 *
陈淳: "《中国石油炼化与销售事业部"十一五"科技论文集》", 31 July 2011, 中国石化出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107459826A (en) * 2017-08-14 2017-12-12 江苏诺路桥工程检测有限公司 One kind is exempted to shear SBS modified pitch and preparation method thereof
CN107459826B (en) * 2017-08-14 2020-04-03 江苏一诺路桥工程检测有限公司 Shear-free SBS (styrene butadiene styrene) modified asphalt and preparation method thereof
CN111073322A (en) * 2019-12-31 2020-04-28 六安市共鑫道路材料有限公司 Preparation method of SBS latex modified asphalt
CN111073322B (en) * 2019-12-31 2021-12-24 六安市共鑫道路材料有限公司 Preparation method of SBS latex modified asphalt
CN113861708A (en) * 2021-10-19 2021-12-31 广州鸿绵合成材料有限公司 High-viscosity high-elasticity modified asphalt and preparation method thereof

Similar Documents

Publication Publication Date Title
CN103073903B (en) A kind of rubber powder modified asphalt and preparation method thereof
CN105017790A (en) Production process of SBS modified asphalt
CN110669345B (en) Slow-release asphalt modified regenerant and preparation method thereof
CN100355834C (en) SBS modified emulsifying asphalt and preparation process thereof
Abrol et al. Efficacy of dry granular anionic polyacrylamide (PAM) on infiltration, runoff and erosion
CN106800787B (en) High-temperature-storage-resistant high-viscosity high-elasticity modified asphalt and preparation method thereof
CN105419359A (en) Waste tyre powder modified asphalt and preparation method therefor
CN110551401B (en) Asphalt regenerant with slow release function and preparation method thereof
CN105331330A (en) Ultraviolet-resistant bituminous pavement crack filling glue and preparation method thereof
CN104001205B (en) A kind of fluid dressing and preparation method thereof
CN106977960A (en) A kind of cationic composite modified emulsification asphalt material and preparation method thereof
CN102010603B (en) Rubber powder modified emulsified asphalt and preparation method thereof
CN104672928B (en) Low-viscosity regenerant for thermal regeneration of asphalt pavement, preparation method of low-viscosity regenerant and asphalt pavement thermal-regeneration mixture containing low-viscosity regenerant
CN107936590A (en) A kind of high storage stability rubber powder modified asphalt material and preparation method thereof
CN105368078A (en) Improved high-resilience modified asphalt and manufacturing method thereof
CN102775799A (en) Modified asphalt made from rinkolite material and preparation method of modified asphalt
CN105384956A (en) Rubber powder subjected to surface activation and preparation method and application thereof
CN106147258A (en) Bitumen regenerant and preparation method thereof
CN108587202A (en) A kind of bottom of tower oil rubber modified bitumen and preparation method thereof
CN103788667A (en) Multicomponent system for improving modulus of asphalt mixture, and application method and modified asphalt thereof
CN103881401A (en) Waste rubber powder-modified emulsified asphalt and preparation method thereof
CN113861708A (en) High-viscosity high-elasticity modified asphalt and preparation method thereof
CN105385176A (en) Expanded vermiculite/waste rubber powder composite modified asphalt material and preparation method thereof
CN109504108A (en) A kind of weather-proof modified pitch
CN104059370B (en) Inorganic modified emulsified asphalt and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Jijiang

Inventor after: Wang Zhenghong

Inventor after: Hu Lidong

Inventor after: Lv Xiaobo

Inventor after: Zhang Chao

Inventor before: Chen Jijiang

Inventor before: Hu Lidong

Inventor before: Lv Xiaobo

Inventor before: Zhang Chao

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication

Application publication date: 20151104

RJ01 Rejection of invention patent application after publication