CN105003235A - Method for improving condensate oil recovery ratio through injecting water into fracture-cave type carbonate condensate gas reservoir - Google Patents

Method for improving condensate oil recovery ratio through injecting water into fracture-cave type carbonate condensate gas reservoir Download PDF

Info

Publication number
CN105003235A
CN105003235A CN201510459638.6A CN201510459638A CN105003235A CN 105003235 A CN105003235 A CN 105003235A CN 201510459638 A CN201510459638 A CN 201510459638A CN 105003235 A CN105003235 A CN 105003235A
Authority
CN
China
Prior art keywords
condensate
reservoir
oil
gas
fracture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510459638.6A
Other languages
Chinese (zh)
Inventor
邓兴梁
蔡振忠
李世银
刘志良
周登洪
范崇海
李颖
沈磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong wins soft Polytron Technologies Inc
TARIM OILFIELD BRANCH, EXPLORATION AND DEVELOPMENT INSTITUTE
Original Assignee
Dongying Shengruan Oil And Gas Exploration And Development Research Institute
Tarim Oilfield Branch Exploration And Development Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongying Shengruan Oil And Gas Exploration And Development Research Institute, Tarim Oilfield Branch Exploration And Development Institute filed Critical Dongying Shengruan Oil And Gas Exploration And Development Research Institute
Priority to CN201510459638.6A priority Critical patent/CN105003235A/en
Publication of CN105003235A publication Critical patent/CN105003235A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides a method for improving the condensate oil recovery ratio through injecting water into a fracture-cave type carbonate condensate gas reservoir. The method comprises the following steps of: (1) reservoir type identification; (2) retrograde condensation and oil ring judgment; (3) study on the underground occurrence state of retrograde condensation oil; (4) indoor physical experiment analysis and study; (5) trial injection; (6) water injection; (7) well soaking; and (8) oil production. The method has the advantages that the technical storage and the favorable support are provided for the recovery ratio improvement through water injection development of the fracture-cave type carbonate condensate gas reservoir, and the recovery ratio is greatly improved.

Description

The water filling of a kind of fracture-cavity type carbonate gas condensate reservoir improves condensate recovery ratio method
Technical field
The present invention relates to a kind of oil and gas development method, especially relate to a kind of for fracture-cavity type carbonate gas condensate reservoir condensate recovery method.
Background technology
Gas condensate reservoir mining site Development Practice shows, the low condensate gas condensate reservoir that contains can carry out the exploitation of exhaustion formula, and gas recycling technology is then the agent technology containing condensate gas condensate reservoir high in exploitation.But for the fracture-cavity type carbonate gas condensate reservoir of middle height containing condensate, because its reservoir space is mainly the hole of corrosion formation, hole, seam, non-homogeneity is extremely strong, Reservoir Body connectivity structure and mode of communicating complexity various, early stage well spacing is large, connected relation is difficult to determine, gas recycling is caused to be difficult to carry out, therefore, many employing exhaustion formulas exploitation at present, mid-later development phase strata pressure declines, retrograde condensation is there is in stratum, certainly exist a large amount of condensates, how to meet the condensate recovery ratio improving such gas reservoir under economic benefit prerequisite further, it is the main bugbear that seam hole type gas condensate reservoir exhaustion formula development late stage faces, still lack effective exploitation method at present.Therefore, propose a kind of fracture-cavity type carbonate gas condensate reservoir water filling and improve condensate recovery ratio method, actual guidance is carried out to such gas reservoir Efficient Development, just seems particularly important.
Summary of the invention
The object of the invention is to avoid the deficiencies in the prior art and provide a kind of fracture-cavity type carbonate gas condensate reservoir water filling to improve condensate recovery ratio method.
For reaching above object, technical scheme of the present invention is:
The water filling of a kind of fracture-cavity type carbonate gas condensate reservoir improves condensate recovery ratio method, containing following steps:
1) identification of Storage category: seismic profile shows as " strong beading ", during drilling well, emptying, leakage occur, and during pilot production, oil pressure presents exponential decrease, show as relative constant volume feature, successively decrease large, well test analysis well storage coefficient is large, kh value is large, can be judged to be fractured-vuggy reservoir;
2) retrograde condensation and oil ring judge: according to PVT test, and a situation arises for production gas-oil ratio, output condensate variable density judgement retrograde condensation; Calculate relevant parameter by well stream thing data and determine whether to there is oil ring in conjunction with oil density variation tendency;
3) retrograde gas condensate is studied at underground occurrence status: fracture-cavity type carbonate reservoir space is based on cave, corrosion hole, crack, capillary force effect is weak, in retrograde condensation process, the main gravitate of condensate is dominated, exist with the occurrence patterns be gathered in bottom the body of seam hole, before CONDENSATE OIL AND GAS interface reaches shaft bottom, condensate participates in flowing hardly;
4) indoor Physical Experiment analysis and research: level is communicated with fracture-cavity units, water injection to keep pressure exploitation condensate recovery ratio is high, is better than gas injection pressurize, should preferably considers; Vertical connection fracture cave reservoir, water filling is effective for gas, improves condensate recovery ratio;
5) injection test: after seam hole type gas condensate reservoir exhaustion formula end-of-development, before normal water filling, carry out injection test and select the well location that condensate is adopted in applicable water filling in some cycles, then in conjunction with Reservoir Body type and condensate in place determination water injection intensity and water injection rate;
6) water filling: inject in this gas condensate reservoir appropriate density ratio crude oil large and with the immiscible simply and easy treat of crude oil after stratum sewage, with renwing stratum energy, displacement condensate;
7) stewing well: utilize the difference injecting stratum sewage and oil density, allow profit fully replace by gravitational differentiation, makes low-density condensate converge to reservoir high-order bit thus be plucked out of;
8) recover the oil: when well head oil pressure return to basicly stable after drive a well and adopt condensate.
It is better that condensate effect is adopted in the first run time water filling, can carry out multiple round water filling and adopt condensate operation, until without economic benefit.
Compared with prior art, the invention has the beneficial effects as follows: provide technological reserve and beneficial support for fracture-cavity type carbonate gas condensate reservoir waterflooding extraction improves recovery ratio, recovery ratio improves a lot.
Accompanying drawing explanation
Fig. 1 is that condensate correlation curve is adopted in fracture-cavity type carbonate gas condensate reservoir huff and puff/water filling of the present invention.
Fig. 2 is that the present invention is not with/gas condensate reservoir with oil rim retrograde condensation phase judgement (envelop).
Fig. 3 is that the present invention is not with/gas condensate reservoir with oil rim retrograde condensation phase judgement (condensate density, viscosity).
Fig. 4 is that the present invention is not with/gas condensate reservoir with oil rim retrograde condensation phase judgement (production gas-oil ratio).
Detailed description of the invention
State in detail below in conjunction with accompanying drawing and chat embodiments of the invention.
The water filling of a kind of fracture-cavity type carbonate gas condensate reservoir improves condensate recovery ratio method, containing following steps:
1) identification of Storage category: seismic profile shows as " strong beading ", during drilling well, emptying, leakage occur, and during pilot production, oil pressure presents exponential decrease, show as relative constant volume feature, successively decrease large, well test analysis well storage coefficient is large, kh value is large, can be judged to be fractured-vuggy reservoir;
2) retrograde condensation and oil ring judge: according to PVT test, and a situation arises for production gas-oil ratio, output condensate variable density judgement retrograde condensation; Calculate relevant parameter by well stream thing data and determine whether to there is oil ring in conjunction with oil density variation tendency; For height containing condensate and with the gas reservoir of oil ring, once there is retrograde condensation during blowdown, the later stage has a high potential, and is the highest priority of carrying out water filling;
3) retrograde gas condensate is studied at underground occurrence status: sandstone reservoir space is mainly hole and throat, after such gas condensate reservoir generation retrograde condensation, the leading role that condensate is often subject to capillary force can be attracted to throat surface, hole, initial stage does not flow, middle and later periods reduces further along with strata pressure, retrograde condensation aggravates, and condensate reaches critically connected graph and participates in seepage flow; And fracture-cavity type carbonate reservoir space is based on cave, corrosion hole, crack, capillary force effect is weak, in retrograde condensation process, the main gravitate of condensate is dominated, exist with the occurrence patterns be gathered in bottom the body of seam hole, before CONDENSATE OIL AND GAS interface reaches shaft bottom, condensate participates in flowing hardly; , so seam hole type gas condensate reservoir blowdown condensate recovery ratio is lower;
4) indoor Physical Experiment analysis and research: the exploitation of exhaustion formula can cause a large amount of condensate to be lost in underground, and condensate recovery ratio is low; Huff and puff, owing to not forming the Efficient Cycle of injected gas, does not have displacement of reservoir oil effect, improves recovery ratio effect poor; And early stage pressurize exploitation can significantly improve condensate recovery ratio.Be communicated with fracture-cavity units for level, water injection to keep pressure exploitation condensate recovery ratio is high, is better than gas injection pressurize, should preferably considers; Vertical connection fracture cave reservoir, water filling is effective for gas, improves condensate recovery ratio;
5) injection test: after seam hole type gas condensate reservoir exhaustion formula end-of-development, before normal water filling, carry out injection test and select the well location that condensate is adopted in applicable water filling in some cycles, then in conjunction with Reservoir Body type and condensate in place determination water injection intensity and water injection rate;
6) water filling: inject in this gas condensate reservoir appropriate density ratio crude oil large and with the immiscible simply and easy treat of crude oil after stratum sewage, with renwing stratum energy, displacement condensate;
7) stewing well: utilize the difference injecting stratum sewage and oil density, allow profit fully replace by gravitational differentiation, makes low-density condensate converge to reservoir high-order bit thus be plucked out of;
8) recover the oil: when well head oil pressure return to basicly stable after drive a well and adopt condensate.
It is better that condensate effect is adopted in the first run time water filling, can carry out multiple round water filling and adopt condensate operation, until without economic benefit.

Claims (2)

1. the water filling of fracture-cavity type carbonate gas condensate reservoir improves a condensate recovery ratio method, it is characterized in that: containing following steps:
1) identification of Storage category: seismic profile shows as " strong beading ", during drilling well, emptying, leakage occur, and during pilot production, oil pressure presents exponential decrease, show as relative constant volume feature, successively decrease large, well test analysis well storage coefficient is large, kh value is large, can be judged to be fractured-vuggy reservoir;
2) retrograde condensation and oil ring judge: according to PVT test, and a situation arises for production gas-oil ratio, output condensate variable density judgement retrograde condensation; Calculate relevant parameter by well stream thing data and determine whether to there is oil ring in conjunction with oil density variation tendency;
3) retrograde gas condensate is studied at underground occurrence status: fracture-cavity type carbonate reservoir space is based on cave, corrosion hole, crack, capillary force effect is weak, in retrograde condensation process, the main gravitate of condensate is dominated, exist with the occurrence patterns be gathered in bottom the body of seam hole, before CONDENSATE OIL AND GAS interface reaches shaft bottom, condensate participates in flowing hardly;
4) indoor Physical Experiment analysis and research: level is communicated with fracture-cavity units, water injection to keep pressure exploitation condensate recovery ratio is high, is better than gas injection pressurize, should preferably considers; Vertical connection fracture cave reservoir, water filling is effective for gas, improves condensate recovery ratio;
5) injection test: after seam hole type gas condensate reservoir exhaustion formula end-of-development, before normal water filling, carry out injection test and select the well location that condensate is adopted in applicable water filling in some cycles, then in conjunction with Reservoir Body type and condensate in place determination water injection intensity and water injection rate;
6) water filling: inject in this gas condensate reservoir appropriate density ratio crude oil large and with the immiscible simply and easy treat of crude oil after stratum sewage, with renwing stratum energy, displacement condensate;
7) stewing well: utilize the difference injecting stratum sewage and oil density, allow profit fully replace by gravitational differentiation, makes low-density condensate converge to reservoir high-order bit thus be plucked out of;
8) recover the oil: when well head oil pressure return to basicly stable after drive a well and adopt condensate.
2. a kind of fracture-cavity type carbonate gas condensate reservoir water filling according to claim 1 improves condensate recovery ratio method, it is characterized in that: it is better that condensate effect is adopted in the first run time water filling, can carry out multiple round water filling and adopt condensate operation, until without economic benefit.
CN201510459638.6A 2015-07-29 2015-07-29 Method for improving condensate oil recovery ratio through injecting water into fracture-cave type carbonate condensate gas reservoir Pending CN105003235A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510459638.6A CN105003235A (en) 2015-07-29 2015-07-29 Method for improving condensate oil recovery ratio through injecting water into fracture-cave type carbonate condensate gas reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510459638.6A CN105003235A (en) 2015-07-29 2015-07-29 Method for improving condensate oil recovery ratio through injecting water into fracture-cave type carbonate condensate gas reservoir

Publications (1)

Publication Number Publication Date
CN105003235A true CN105003235A (en) 2015-10-28

Family

ID=54376066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510459638.6A Pending CN105003235A (en) 2015-07-29 2015-07-29 Method for improving condensate oil recovery ratio through injecting water into fracture-cave type carbonate condensate gas reservoir

Country Status (1)

Country Link
CN (1) CN105003235A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105628894A (en) * 2016-01-13 2016-06-01 西南石油大学 Simulation and evaluation system for low-salinity water injection experiment and method
CN107038272A (en) * 2016-11-11 2017-08-11 福建工程学院 A kind of rock salt under Action of Gravity Field moves the creation method of water-soluble erosion parameter model
CN107288590A (en) * 2016-04-11 2017-10-24 中国石油化工股份有限公司 One kind note CO2Improve the experimental method of Recovery of Gas Condensate Reservoirs
CN108868724A (en) * 2018-06-26 2018-11-23 中国石油天然气股份有限公司 Method and device for determining gas lift production increasing oil and gas quantity of condensate gas well
CN109973059A (en) * 2019-03-29 2019-07-05 中国石油化工股份有限公司 A kind of rapid analysis method of fracture-pore reservoir gas injection body mechanism
CN110067541A (en) * 2018-01-22 2019-07-30 中国石油天然气股份有限公司 Single-well water injection oil replacement method and device for fracture-cavity type carbonate reservoir
CN110761754A (en) * 2018-07-26 2020-02-07 中国石油天然气股份有限公司 Water injection method for fracture-cave type carbonate reservoir well group unit
CN112483064A (en) * 2019-09-12 2021-03-12 中国石油天然气股份有限公司 Method, device and equipment for determining well arrangement mode of condensate gas reservoir and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4848466A (en) * 1988-01-29 1989-07-18 Union Oil Company Of California Enhanced oil recovery using a three-stage injection of solvent and water
US5515923A (en) * 1994-08-26 1996-05-14 Loree; Dwight N. Oil and gas well productivity
CN1757877A (en) * 2004-10-10 2006-04-12 中国石油天然气股份有限公司 Method for removing near-well retrograde condensate pollution through gas injection of condensate gas well
CN102518414A (en) * 2011-12-28 2012-06-27 西南石油大学 Test method for fracture-cavity carbonate condensate gas reservoir water injection substituting gas experiment
CN102953717A (en) * 2011-08-26 2013-03-06 中国石油天然气股份有限公司 Waste condensate gas reservoir water injection development method
CN104632205A (en) * 2015-01-23 2015-05-20 江杰 Fracture-cavity type carbonate reservoir storage type discriminating method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4848466A (en) * 1988-01-29 1989-07-18 Union Oil Company Of California Enhanced oil recovery using a three-stage injection of solvent and water
US5515923A (en) * 1994-08-26 1996-05-14 Loree; Dwight N. Oil and gas well productivity
CN1757877A (en) * 2004-10-10 2006-04-12 中国石油天然气股份有限公司 Method for removing near-well retrograde condensate pollution through gas injection of condensate gas well
CN102953717A (en) * 2011-08-26 2013-03-06 中国石油天然气股份有限公司 Waste condensate gas reservoir water injection development method
CN102518414A (en) * 2011-12-28 2012-06-27 西南石油大学 Test method for fracture-cavity carbonate condensate gas reservoir water injection substituting gas experiment
CN104632205A (en) * 2015-01-23 2015-05-20 江杰 Fracture-cavity type carbonate reservoir storage type discriminating method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杜箫笙: "《缝洞型碳酸盐岩油藏主体开发方式研究》", 《中国优秀硕士学位论文全文数据库基础科学辑》 *
肖阳等: "《缝洞型碳酸盐岩凝析气藏不同开发方式全直径物理模拟研究》", 《新疆石油天然气》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105628894A (en) * 2016-01-13 2016-06-01 西南石油大学 Simulation and evaluation system for low-salinity water injection experiment and method
CN107288590A (en) * 2016-04-11 2017-10-24 中国石油化工股份有限公司 One kind note CO2Improve the experimental method of Recovery of Gas Condensate Reservoirs
CN107288590B (en) * 2016-04-11 2019-05-07 中国石油化工股份有限公司 A kind of note CO2Improve the experimental method of Recovery of Gas Condensate Reservoirs
CN107038272A (en) * 2016-11-11 2017-08-11 福建工程学院 A kind of rock salt under Action of Gravity Field moves the creation method of water-soluble erosion parameter model
CN110067541A (en) * 2018-01-22 2019-07-30 中国石油天然气股份有限公司 Single-well water injection oil replacement method and device for fracture-cavity type carbonate reservoir
CN108868724A (en) * 2018-06-26 2018-11-23 中国石油天然气股份有限公司 Method and device for determining gas lift production increasing oil and gas quantity of condensate gas well
CN108868724B (en) * 2018-06-26 2020-09-08 中国石油天然气股份有限公司 Method and device for determining gas lift production increasing oil and gas quantity of condensate gas well
CN110761754A (en) * 2018-07-26 2020-02-07 中国石油天然气股份有限公司 Water injection method for fracture-cave type carbonate reservoir well group unit
CN109973059A (en) * 2019-03-29 2019-07-05 中国石油化工股份有限公司 A kind of rapid analysis method of fracture-pore reservoir gas injection body mechanism
CN109973059B (en) * 2019-03-29 2020-05-19 中国石油化工股份有限公司 Rapid analysis method for gas injection mechanism of fracture-cavity oil reservoir
CN112483064A (en) * 2019-09-12 2021-03-12 中国石油天然气股份有限公司 Method, device and equipment for determining well arrangement mode of condensate gas reservoir and storage medium

Similar Documents

Publication Publication Date Title
CN105003235A (en) Method for improving condensate oil recovery ratio through injecting water into fracture-cave type carbonate condensate gas reservoir
CN105114048B (en) A kind of staged fracturing of horizontal well single-well injection-production oil production method
CN105888630B (en) Method for improving recovery efficiency by huff-puff oil recovery of tight oil fracturing horizontal well
CN103206199B (en) Device and method for exploiting natural gas hydrates by means of thermal fluid fracturing
CN109838279B (en) Method for improving salt cavern storage utilization rate by discharging brine from cavity bottom through communicating well
CN103174403B (en) Gravity and steam flooding combined mining method for thick-layer interlayer-containing common heavy oil reservoir
CN104632205B (en) Fracture-cavity carbonate reservoir storage type distinguishing method
CN105201481A (en) Liquid CO2 phase transition multipoint fracturing and permeability increasing method
CN104895537B (en) Water injection oil replacement mining method suitable for fracture-cavity type carbonate rock condensate gas reservoir
CN105507858A (en) Immiscible gas injection and oil replacement type exploitation method for ultra-deep fractured-vuggy carbonate reservoirs
CN201705219U (en) Lateral drilling gravel pack completion string
CN110397428A (en) A kind of gas displacing coal-bed method for increasing of straight well and U-shaped butt shaft unitized production coal bed gas
CN101315025A (en) Construction method for rock salt cavity gas storage house
CN103590801A (en) Coal bed methane horizontal well nitrogen foam fracturing mining technology
CN111749658B (en) Carbon dioxide huff and puff oil production method and device
CN106761612B (en) The asynchronous water injection oil extraction method of double different wells of pressure break horizontal well of zip mode cloth seam
CN106761606A (en) The asynchronous note CO of different well of symmetrical expression cloth seam2Oil production method
CN106437642A (en) Injection-production asynchronous mining method for horizontal well of fractured reservoir
CN103603628A (en) Downhole operation plug injection method
CN102230377A (en) Multifunctional gas lifting strata testing string
CN109025940A (en) A kind of CO for compact oil reservoir2Pressure break displacement of reservoir oil integration oil production method
CN112253071A (en) Design method for pretreatment, blockage removal and capacity increase fracturing of compact sandstone reservoir
CN203394482U (en) Thickened oil exploitation device for horizontal well
CN105178931B (en) Method for improving initial production speed of SAGD (steam assisted gravity drainage)
CN104389569A (en) Steam huff and puff mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Deng Xingliang

Inventor after: Gu Xingming

Inventor after: Tang Yang

Inventor after: Cai Zhenzhong

Inventor after: Li Shiyin

Inventor after: Liu Zhiliang

Inventor after: Zhou Denghong

Inventor after: Fan Chonghai

Inventor after: Li Ying

Inventor after: Shen Lei

Inventor after: Li Maohui

Inventor before: Deng Xingliang

Inventor before: Cai Zhenzhong

Inventor before: Li Shiyin

Inventor before: Liu Zhiliang

Inventor before: Zhou Denghong

Inventor before: Fan Chonghai

Inventor before: Li Ying

Inventor before: Shen Lei

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170509

Address after: 841000 No. 26, petrochemical Avenue, Korla, Xinjiang

Applicant after: TARIM OILFIELD BRANCH, EXPLORATION AND DEVELOPMENT INSTITUTE

Applicant after: Shandong wins soft Polytron Technologies Inc

Address before: 841000 the Xinjiang Uygur Autonomous Region Bayinguoleng Mongolia Autonomous Prefecture Petrochemical Avenue, Tarim Oilfield Branch exploration and Development Research Institute

Applicant before: TARIM OILFIELD BRANCH, EXPLORATION AND DEVELOPMENT INSTITUTE

Applicant before: DONGYING SHENGRUAN OIL AND GAS EXPLORATION AND DEVELOPMENT RESEARCH INSTITUTE

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20151028

RJ01 Rejection of invention patent application after publication