CN105002791A - 一种抽换枕木的施工方法 - Google Patents
一种抽换枕木的施工方法 Download PDFInfo
- Publication number
- CN105002791A CN105002791A CN201510460365.7A CN201510460365A CN105002791A CN 105002791 A CN105002791 A CN 105002791A CN 201510460365 A CN201510460365 A CN 201510460365A CN 105002791 A CN105002791 A CN 105002791A
- Authority
- CN
- China
- Prior art keywords
- sleeper
- sleepers
- construction method
- replaced
- small size
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/06—Transporting, laying, removing or renewing sleepers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
一种抽换枕木的施工方法。其包括将待更换的新枕木按位置摆码整齐,并在该枕木的顶面和底面上分别安装多个小型轴承;利用人工将准备抽换的枕木旁道碴清空;拆除待抽换枕木的扣配件;将待抽换枕木用钢钳移动至线路外侧;由人工将新枕木利用撬棍并借助于小型轴承移动至设计位置;拆除所有小型轴承,然后安装好扣配件,直到完成所有枕木的抽换工作。本发明优点:利用小型轴承来减少枕木移动时的摩擦力,可在施工过程中将投入的劳力降至2人,每根枕木的更换时间缩短至3分钟,因此降低了施工成本。施工安全,操作简单。提高了工效,保证了工程的有序进行。
Description
技术领域
本发明属于铁路施工技术领域,特别是涉及一种抽换枕木的施工方法。
背景技术
在铁路站场施工过程中,对既有设备的提升改造已成为大势所趋。其中,为了增加线路的有效长度,目前常用的做法是将轨枕由II型混凝土枕木更换成Ⅲa型混凝土枕木。Ⅲa型混凝土枕木的宽度为220mm、厚度为160mm、长度为2500mm,重360kg。传统的更换枕木施工方法存在下列问题:
1、以抽换单根枕木为例,一般需由6人花费4分钟的时间才能完成,因此人工成本较高且耗时长。
2、由于铁路站场线间可作业空间狭小,施工人员过多会导致作业面更加紧凑。
3、如在铁路要点施工中施工此项内容,若施工组织不合理,易延长要点施工,直接导致铁路行车晚点,造成行车事故,有较大的安全隐患。
发明内容
为了解决上述问题,本发明的目的在于提供一种抽换枕木的施工方法。
为了达到上述目的,本发明提供的抽换枕木的施工方法包括按顺序进行的下列步骤:
(1)将待更换的新枕木按位置摆码整齐,做到角度一致,轮廓线一致,并在该枕木的顶面和底面上分别安装多个小型轴承;
(2)利用人工将准备抽换的枕木旁道碴清空;
(3)拆除待抽换枕木的扣配件;
(4)将待抽换枕木用钢钳移动至线路外侧;
(5)由人工将新枕木利用撬棍并借助于小型轴承移动至设计位置;
(6)拆除所有轴承小型,然后安装好扣配件,直到完成所有枕木的抽换工作。
所述的小型轴承在待更换的枕木顶面和底面上均匀分布。
本发明提供的抽换枕木的施工方法具有如下优点:
1)利用小型轴承来减少枕木移动时的摩擦力,可在施工过程中将投入的劳力降至2人,每根枕木的更换时间缩短至3分钟,因此降低了施工成本。
2)施工安全,操作简单。
3)提高了工效,保证了工程的有序进行。
具体实施方式
下面结合具体实施例对本发明提供的抽换枕木的施工方法进行详细说明。
本发明提供的抽换枕木的施工方法包括按顺序进行的下列步骤:
(1)将待更换的新枕木按位置摆码整齐,做到角度一致,轮廓线一致,并在该枕木的顶面和底面上分别安装多个小型轴承;
(2)利用人工将准备抽换的枕木旁道碴清空;
(3)拆除待抽换枕木的扣配件;
(4)将待抽换枕木用钢钳移动至线路外侧;
(5)由人工将新枕木利用撬棍并借助于小型轴承移动至设计位置;
(6)拆除所有小型轴承,然后安装好扣配件,直到完成所有枕木的抽换工作。
所述的小型轴承在待更换的枕木顶面和底面上均匀分布。
Claims (2)
1.一种抽换枕木的施工方法,其特征在于:所述的抽换枕木的施工方法包括按顺序进行的下列步骤:
(1)将待更换的新枕木按位置摆码整齐,做到角度一致,轮廓线一致,并在该枕木的顶面和底面上分别安装多个小型轴承;
(2)利用人工将准备抽换的枕木旁道碴清空;
(3)拆除待抽换枕木的扣配件;
(4)将待抽换枕木用钢钳移动至线路外侧;
(5)由人工将新枕木利用撬棍并借助于小型轴承移动至设计位置;
(6)拆除所有小型轴承,然后安装好扣配件,直到完成所有枕木的抽换工作。
2.根据权利要求1所述的抽换枕木的施工方法,其特征在于:所述的小型轴承在待更换的枕木顶面和底面上均匀分布。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510460365.7A CN105002791A (zh) | 2015-07-29 | 2015-07-29 | 一种抽换枕木的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510460365.7A CN105002791A (zh) | 2015-07-29 | 2015-07-29 | 一种抽换枕木的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105002791A true CN105002791A (zh) | 2015-10-28 |
Family
ID=54375635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510460365.7A Pending CN105002791A (zh) | 2015-07-29 | 2015-07-29 | 一种抽换枕木的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105002791A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374297A (zh) * | 2018-02-07 | 2018-08-07 | 中铁二十局集团第五工程有限公司 | 营业线隧道、桥梁段混凝土轨枕抽换方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2499464A (en) * | 2012-02-14 | 2013-08-21 | John Sewell | Apparatus for transporting railway track sleeper panels |
CN103711049A (zh) * | 2013-12-27 | 2014-04-09 | 新余钢铁集团有限公司 | 一种移轨器 |
CN203530801U (zh) * | 2013-10-24 | 2014-04-09 | 中铁六局集团石家庄铁路建设有限公司 | 与撬棍配合使用的轨枕移动工具 |
US20140158785A1 (en) * | 2012-12-07 | 2014-06-12 | Martin Fink | Method for converting a ballasted track into a slab track |
-
2015
- 2015-07-29 CN CN201510460365.7A patent/CN105002791A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2499464A (en) * | 2012-02-14 | 2013-08-21 | John Sewell | Apparatus for transporting railway track sleeper panels |
US20140158785A1 (en) * | 2012-12-07 | 2014-06-12 | Martin Fink | Method for converting a ballasted track into a slab track |
CN203530801U (zh) * | 2013-10-24 | 2014-04-09 | 中铁六局集团石家庄铁路建设有限公司 | 与撬棍配合使用的轨枕移动工具 |
CN103711049A (zh) * | 2013-12-27 | 2014-04-09 | 新余钢铁集团有限公司 | 一种移轨器 |
Non-Patent Citations (1)
Title |
---|
庄碧涛等: "营运线人工抽换枕木施工工法", 《山西建筑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374297A (zh) * | 2018-02-07 | 2018-08-07 | 中铁二十局集团第五工程有限公司 | 营业线隧道、桥梁段混凝土轨枕抽换方法 |
CN108374297B (zh) * | 2018-02-07 | 2019-09-24 | 中铁二十一局集团第五工程有限公司 | 营业线隧道、桥梁段混凝土轨枕抽换方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104528500B (zh) | 双平台无脚手架电梯安装方法 | |
CN105059319A (zh) | 一种铁路货车无天车检修生产线及其检修工艺 | |
CN105002791A (zh) | 一种抽换枕木的施工方法 | |
CN107585668A (zh) | 副井、混合井尾绳更换施工工艺 | |
CN103967503B (zh) | 一种塔式盲竖井提升系统不停产改造方法 | |
CN105984821B (zh) | 一种按需使用的风电机组舱内起吊装置 | |
CN204110063U (zh) | 弯道销齿推车机 | |
CN203127962U (zh) | 一种热风炉物料运输装置 | |
CN204727536U (zh) | 一种天车传动轴升降式活动支架 | |
CN208516811U (zh) | 层叠式桥式起重机 | |
CN204262060U (zh) | 一种多辊轧机辊子更换装置 | |
CN204195229U (zh) | 一种风机电机总成流水线 | |
CN203701878U (zh) | 屏蔽门立柱分体式承载连接机构 | |
CN207294008U (zh) | 用于电气盘柜安装的安全移动架 | |
CN203022640U (zh) | 矿山竖井凿井和生产两用钢井架 | |
CN205775851U (zh) | 一种移动模架底模过孔装置 | |
CN204235312U (zh) | 一种磨床 | |
CN203449292U (zh) | 坡口切割平台 | |
CN204609239U (zh) | 高层建筑余灰回收装置 | |
CN204152175U (zh) | 定型铁路轨道型钢移动操作平台 | |
CN203430005U (zh) | 电熔炉检修平台 | |
CN204263095U (zh) | 一种轧制油过滤器滤芯快速拆装工具 | |
CN204038422U (zh) | 两侧双油缸式步进机 | |
CN203917677U (zh) | 制板机钢带自动就位器 | |
CN202467141U (zh) | 一种高空作业移动式脚手架与地牛的衔接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151028 |
|
WD01 | Invention patent application deemed withdrawn after publication |