CN104991932B - The method and its system of satellite real-time early warning grid equipment fire based on power grid GIS - Google Patents
The method and its system of satellite real-time early warning grid equipment fire based on power grid GIS Download PDFInfo
- Publication number
- CN104991932B CN104991932B CN201510383610.9A CN201510383610A CN104991932B CN 104991932 B CN104991932 B CN 104991932B CN 201510383610 A CN201510383610 A CN 201510383610A CN 104991932 B CN104991932 B CN 104991932B
- Authority
- CN
- China
- Prior art keywords
- grid equipment
- grid
- goods
- fire
- materials
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 239000000463 material Substances 0.000 claims abstract description 69
- 230000005540 biological transmission Effects 0.000 claims abstract description 11
- 238000007796 conventional method Methods 0.000 claims abstract description 7
- 238000012545 processing Methods 0.000 claims abstract description 4
- 230000003139 buffering effect Effects 0.000 claims description 22
- 238000012550 audit Methods 0.000 claims description 9
- 230000006978 adaptation Effects 0.000 claims description 3
- 239000003086 colorant Substances 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Economics (AREA)
- Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Remote Sensing (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Alarm Systems (AREA)
Abstract
The method and its system of the invention discloses a kind of satellite real-time early warning grid equipment fire based on power grid GIS, this method include:In power network GIS platform, the grid equipment coordinate of prewarning area is positioned;Grid power transmission circuit figure layer is established according to the coordinate of grid equipment;It is positioned by longitude and latitude, the grid equipment of specific longitude and latitude is monitored in real time, obtain the Satellite Remote Sensing image of grid equipment overlay area;It carries out sentencing the fire point known in Satellite Remote Sensing image using conventional method;Data correlation processing:The grid equipment figure layer of prewarning area is associated with Satellite Remote Sensing image, the latitude and longitude coordinates for the fire point for establishing grid equipment overlay area are simultaneously shown on power grid GIS map;According to the latitude and longitude coordinates of the fire point of grid equipment overlay area, the type and grade of grid equipment fire are determined;According to the type and grade of grid equipment fire, corresponding emergency disposal prediction scheme is called, and determine the goods and materials type for needing to allot and goods and materials quantity.
Description
Technical field
The present invention relates to electric power applied technical field more particularly to a kind of satellite real-time early warning power grids based on power grid GIS
The method and its system of equipment fire.
Background technology
With the rapid development of electric power network technique, power grid scale constantly expands, electrical network facilities and power network safety operation
It has great significance for power supply production.Electrical network facilities can not only be influenced by diastrous weather, such as:Thunder and lightning, strong wind,
The diastrous weathers such as hail, typhoon, cold wave, frost and dense fog;The influence of electrical network facilities local environment is also suffered from, such as:It is gloomy
Forest zone and mountain area etc..Under case above, it is susceptible to fire disaster of power transmission line, operation of power networks is finally resulted in and serious failure occurs.
The construction of existing grid equipment fire early-warning system has the following disadvantages:(1) it cannot intuitively judge electricity
The coverage of net equipment fire, can not be accurately positioned the accurate location of grid equipment fire;(2) warning information is difficult in time
Allot fire disaster emergency goods and materials.
Invention content
To solve the above-mentioned problems, the present invention provides a kind of satellite real-time early warning grid equipment fire based on power grid GIS
Method and its system, the present invention can not only intuitively and accurately judge grid equipment fire place and coverage,
And grid equipment fire can be reported to corresponding administrative unit division and be illustrated on power grid GIS map, and allot in time
Fire disaster emergency goods and materials.
To achieve the goals above, the present invention adopts the following technical scheme that:
A method of the satellite real-time early warning grid equipment fire based on power grid GIS, including:
Step (1):In power network GIS platform, the grid equipment coordinate of prewarning area is positioned;According to grid equipment
Coordinate establish grid power transmission circuit figure layer;
Step (2):It is positioned by longitude and latitude, the grid equipment of specific longitude and latitude is monitored in real time, obtained grid equipment and cover
The Satellite Remote Sensing image of cover area;
Step (3):It carries out sentencing the fire point known in Satellite Remote Sensing image using conventional method;
Step (4):Data correlation processing:The grid equipment figure layer of prewarning area is closed with Satellite Remote Sensing image
Connection, the latitude and longitude coordinates for the fire point for establishing grid equipment overlay area are simultaneously shown on power grid GIS map;
Step (5):According to the latitude and longitude coordinates of the fire point of grid equipment overlay area, the class of grid equipment fire is determined
Type and grade;The type of grid equipment fire and class information are reported into corresponding administrative unit division, and are illustrated in power grid
In GIS map;
Step (6):According to the type and grade of grid equipment fire, corresponding emergency disposal prediction scheme is called, and determining need to
The goods and materials type and goods and materials quantity to be alloted.
The grid equipment includes:Substation, transmission tower, distribution shaft tower, switchgear house, box-type substation, ring main unit and
Marketing network.
The type and class information of the grid equipment fire reported are shown in the step (5) on power grid GIS map
Process is:
Step (5.1):Acquisition needs to carry out the administrative unit division that data report;Administrative unit division information storage is arrived
First buffering area;
Step (5.2):The area coordinate of the administrative unit division belonging to grid equipment fire is marked on power grid GIS map
Information:The second buffering area for having correspondence with first buffering area is established, area coordinate information is stored one by one to the second data
Buffer area;
Step (5.3):Range is reported and submitted using grader division information:The type of grid equipment fire is directed to using grader
Report and submit situation to be divided with class information, the type and class information of grid equipment fire report and submit situation be divided into do not report,
It has reported and not by auditing and having reported and by audit, define data and situation result is reported to show legend, with difference
Color mark different data uploaded states;
Step (5.4):Information is reported and submitted:
Summarize the information reporting situation in first buffering area and second buffering area, corresponding administrative region is reported into situation
The information divided according to step (5.3) reports and submits range to carry out different colours filling on power grid GIS map, for administrative division
Lower Establishment repeats step (5.1)-step (5.4), has been shown until by the information reporting situation of the administrative division of each rank
At;
Summarize the information reporting situation in first buffering area and second buffering area, the information reported is obtained using adaptation
Ownership place and information of home location, the information of home location that will be matched are marked and drawed on power grid GIS map according to longitude and latitude, with
Different color values distinguishes different areas.
Step (5.3) the Green mark audit is completed, and yellow mark reports end, red mark not to report.
The area marking not reported in the step (5.4) is red;Report that completes not audited to be labeled as
Yellow, report completion and audit finish be labeled as green.
The detailed process of the step (6) is:
Step (6.1):Each plan for emergency handling is corresponding with a kind of type of grid equipment fire and grade, meets an urgent need
Each event all corresponds to a Response project template in Response project, according to the type of grid equipment fire and grade calling pair
The Response project masterplate answered, the goods and materials for reading type and grade in Response project template to corresponding grid equipment fire are allocated
Method;
Step (6.2):It is existing in the goods and materials concocting method and goods and materials database that are gone out according to Response project template matches
Material information determines the goods and materials type for needing to allot and goods and materials quantity.
The goods and materials alloted in the step (6) are associated with the vehicle of alloting that goods and materials carry, in GIS map in real time with
The track for the goods and materials that track is alloted.
The process of the track for the goods and materials that the real-time tracking in GIS map in the step (6) is alloted is:
The goods and materials alloted allot vehicle real time correlation with what goods and materials carried, and power network GIS platform receives to allot vehicle in real time
GPS data draws the GPS track of vehicle in GIS map, finally obtains track of the goods and materials alloted in GIS map.
A kind of system of the satellite real-time early warning grid equipment fire based on power grid GIS, including:
For in power network GIS platform, being positioned to the grid equipment coordinate of prewarning area, and according to the seat of grid equipment
Mark establishes the device of grid equipment figure layer;
For being positioned by longitude and latitude, the grid equipment of specific longitude and latitude is monitored in real time, obtains the grid equipment area of coverage
The device of the Satellite Remote Sensing image in domain;
For using conventional method to carry out sentencing the device for knowing the fire point in Satellite Remote Sensing image;
For the grid equipment figure layer of prewarning area to be associated with Satellite Remote Sensing image, and establish grid equipment
The latitude and longitude coordinates of the fire point of overlay area and the device shown on power grid GIS map;
For the latitude and longitude coordinates according to the fire point of grid equipment overlay area, to determine the type of grid equipment fire
With the device of grade;For the type of grid equipment fire and class information to be reported to corresponding administrative unit division, and open up
Show the device on power grid GIS map;
For the type and grade according to grid equipment fire, corresponding emergency disposal prediction scheme is called, and determination needs to adjust
The device of the goods and materials type and goods and materials quantity dialled.
The system of the satellite real-time early warning grid equipment fire based on power grid GIS, further includes the goods and materials for alloting
The vehicle of alloting carried with goods and materials is associated, the device of the track for the goods and materials that real-time tracking is alloted in GIS map.
Beneficial effects of the present invention are:
(1) the grid power transmission circuit figure layer combination Satellite Remote Sensing figure of the invention by will be established in power network GIS platform
Picture, the latitude and longitude coordinates for the fire point for establishing grid equipment overlay area are simultaneously shown on power grid GIS map, are reached and are intuitively sentenced
The purpose of the coverage and the accurate location that fire disaster of power transmission line is accurately positioned of disconnected fire disaster of power transmission line;
(2) present invention calls corresponding emergency disposal prediction scheme also according to the type and grade of grid equipment fire, can be true
Goods and materials type and the goods and materials quantity alloted are needed calmly, achieve the purpose that fire is met an urgent need in time;
(3) goods and materials alloted and the vehicle of alloting that goods and materials carry are associated in the plan for emergency handling in the present invention, also
It is capable of the track of real-time tracking is alloted in GIS map goods and materials;
(4) type of grid equipment fire and class information can be reported into corresponding administrative division in time in the present invention
Unit, additionally it is possible to intuitively be illustrated on power grid GIS map.
Description of the drawings
Fig. 1 is the method flow diagram of the satellite real-time early warning grid equipment fire based on power grid GIS of the present invention.
Specific implementation mode
The present invention will be further described with embodiment below in conjunction with the accompanying drawings:
As shown in Figure 1, a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS, including:
Step (1):In power network GIS platform, the grid equipment coordinate of prewarning area is positioned;According to grid equipment
Coordinate establish grid power transmission circuit figure layer;
Step (2):It is positioned by longitude and latitude, the grid equipment of specific longitude and latitude is monitored in real time, obtained grid equipment and cover
The Satellite Remote Sensing image of cover area;
Step (3):It carries out sentencing the fire point known in Satellite Remote Sensing image using conventional method;
Step (4):Data correlation processing:The grid equipment figure layer of prewarning area is closed with Satellite Remote Sensing image
Connection, the latitude and longitude coordinates for the fire point for establishing grid equipment overlay area are simultaneously shown on power grid GIS map;
Step (5):According to the latitude and longitude coordinates of the fire point of grid equipment overlay area, the class of grid equipment fire is determined
Type and grade;The type of grid equipment fire and class information are reported into corresponding administrative unit division, and are illustrated in power grid
In GIS map;
Step (6):According to the type and grade of grid equipment fire, corresponding emergency disposal prediction scheme is called, and determining need to
The goods and materials type and goods and materials quantity to be alloted.
Grid equipment fire alarm result is generated in the step (5) passes through comprehensive detection early warning system publication of preventing and reducing natural disasters
Text document is intuitively shown with scrolling information, issues early warning result.
The grid equipment includes:Substation, transmission tower, distribution shaft tower, switchgear house, box-type substation, ring main unit and
Marketing network.
The type and class information of the grid equipment fire reported are shown in the step (5) on power grid GIS map
Process is:
Step (5.1):Acquisition needs to carry out the administrative unit division that data report;Administrative unit division information storage is arrived
First buffering area;
Step (5.2):The area coordinate of the administrative unit division belonging to grid equipment fire is marked on power grid GIS map
Information:The second buffering area for having correspondence with first buffering area is established, area coordinate information is stored one by one to the second data
Buffer area;
Step (5.3):Range is reported and submitted using grader division information:The type of grid equipment fire is directed to using grader
Report and submit situation to be divided with class information, the type and class information of grid equipment fire report and submit situation be divided into do not report,
It has reported and not by auditing and having reported and by audit, define data and situation result is reported to show legend, with difference
Color mark different data uploaded states;
Step (5.4):Information is reported and submitted:
Summarize the information reporting situation in first buffering area and second buffering area, corresponding administrative region is reported into situation
The information divided according to step (5.3) reports and submits range to carry out different colours filling on power grid GIS map, for administrative division
Lower Establishment repeats step (5.1)-step (5.4), has been shown until by the information reporting situation of the administrative division of each rank
At;
Summarize the information reporting situation in first buffering area and second buffering area, the information reported is obtained using adaptation
Ownership place and information of home location, the information of home location that will be matched are marked and drawed on power grid GIS map according to longitude and latitude, with
Different color values distinguishes different areas.
Step (5.3) the Green mark audit is completed, and yellow mark reports end, red mark not to report.
The area marking not reported in the step (5.4) is red;Report that completes not audited to be labeled as
Yellow, report completion and audit finish be labeled as green.
The detailed process of the step (6) is:
Step (6.1):Each plan for emergency handling is corresponding with a kind of type of grid equipment fire and grade, meets an urgent need
Each event all corresponds to a Response project template in Response project, according to the type of grid equipment fire and grade calling pair
The Response project masterplate answered, the goods and materials for reading type and grade in Response project template to corresponding grid equipment fire are allocated
Method;
Step (6.2):It is existing in the goods and materials concocting method and goods and materials database that are gone out according to Response project template matches
Material information determines the goods and materials type for needing to allot and goods and materials quantity.
The goods and materials alloted in the step (6) are associated with the vehicle of alloting that goods and materials carry, in GIS map in real time with
The track for the goods and materials that track is alloted.
The process of the track for the goods and materials that the real-time tracking in GIS map in the step (6) is alloted is:
The goods and materials alloted allot vehicle real time correlation with what goods and materials carried, and power network GIS platform receives to allot vehicle in real time
GPS data draws the GPS track of vehicle in GIS map, finally obtains track of the goods and materials alloted in GIS map.
A kind of system of the satellite real-time early warning grid equipment fire based on power grid GIS, including:
For in power network GIS platform, being positioned to the grid equipment coordinate of prewarning area, and according to the seat of grid equipment
Mark establishes the device of grid equipment figure layer;
For being positioned by longitude and latitude, the grid equipment of specific longitude and latitude is monitored in real time, obtains the grid equipment area of coverage
The device of the Satellite Remote Sensing image in domain;
For using conventional method to carry out sentencing the device for knowing the fire point in Satellite Remote Sensing image;
For the grid equipment figure layer of prewarning area to be associated with Satellite Remote Sensing image, and establish grid equipment
The latitude and longitude coordinates of the fire point of overlay area and the device shown on power grid GIS map;
For the latitude and longitude coordinates according to the fire point of grid equipment overlay area, to determine the type of grid equipment fire
With the device of grade;For the type of grid equipment fire and class information to be reported to corresponding administrative unit division, and open up
Show the device on power grid GIS map;
For the type and grade according to grid equipment fire, corresponding emergency disposal prediction scheme is called, and determination needs to adjust
The device of the goods and materials type and goods and materials quantity dialled.
The system of the satellite real-time early warning grid equipment fire based on power grid GIS, further includes the goods and materials for alloting
The vehicle of alloting carried with goods and materials is associated, the device of the track for the goods and materials that real-time tracking is alloted in GIS map.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention
The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not
Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.
Claims (9)
1. a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS, which is characterized in that including:
Step (1):In power network GIS platform, the grid equipment coordinate of prewarning area is positioned;According to the seat of grid equipment
Mark establishes grid power transmission circuit figure layer;
Step (2):It is positioned by longitude and latitude, the grid equipment of specific longitude and latitude is monitored in real time, obtain the grid equipment area of coverage
The Satellite Remote Sensing image in domain;
Step (3):It carries out sentencing the fire point known in Satellite Remote Sensing image using conventional method;
Step (4):Data correlation processing:The grid equipment figure layer of prewarning area is associated with Satellite Remote Sensing image,
The latitude and longitude coordinates for the fire point for establishing grid equipment overlay area are simultaneously shown on power grid GIS map;
Step (5):According to the latitude and longitude coordinates of the fire point of grid equipment overlay area, determine grid equipment fire type and
Grade;The type of grid equipment fire and class information are reported into corresponding administrative unit division, and with being illustrated in power grid GIS
On figure;
Step (6):According to the type and grade of grid equipment fire, corresponding emergency disposal prediction scheme is called, and determination needs to adjust
The goods and materials type and goods and materials quantity dialled;
The process of the type and class information of the grid equipment fire reported is shown in the step (5) on power grid GIS map
For:
Step (5.1):Acquisition needs to carry out the administrative unit division that data report;By administrative unit division information storage to first
Buffering area;
Step (5.2):The area coordinate letter of the administrative unit division belonging to grid equipment fire is marked on power grid GIS map
Breath establishes the second buffering area for having correspondence with first buffering area, and area coordinate information is stored one by one and arrives second buffering area;
Step (5.3):Range is reported and submitted using grader division information:It for the type of grid equipment fire and is waited using grader
Grade information reports and submits situation to be divided, and the type and class information of grid equipment fire are reported and submitted situation to be divided into and do not reported,
It reports and not by auditing and having reported and by audit, define data and situation result is reported to show legend, with different face
Colour code notes different data uploaded states;
Step (5.4):Information is reported and submitted:
Summarize the information reporting situation in first buffering area and second buffering area, by corresponding administrative division report situation according to
The information that step (5.3) divides reports and submits range to carry out different colours filling on power grid GIS map, for the subordinate of administrative division
Mechanism repeats step (5.1)-step (5.4), is completed until showing the information reporting situation of the administrative division of each rank;
Summarize the information reporting situation in first buffering area and second buffering area, the ownership of the information reported is obtained using adaptation
Ground and information of home location, the information of home location that will be matched are marked and drawed on power grid GIS map according to longitude and latitude, with difference
Color value distinguish different areas.
2. a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS as described in claim 1, feature
It is, the grid equipment includes:Substation, transmission tower, distribution shaft tower, switchgear house, box-type substation, ring main unit and marketing
Site.
3. a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS as described in claim 1, feature
It is, step (5.3) the Green mark audit is completed, and yellow mark reports end, red mark not to report.
4. a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS as described in claim 1, feature
It is, the area marking not reported in the step (5.4) is red;Report that completes not audited to be labeled as Huang
Color, report completion and audit finish be labeled as green.
5. a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS as described in claim 1, feature
It is, the detailed process of the step (6) is:
Step (6.1):Each plan for emergency handling is corresponding with a kind of type of grid equipment fire and grade, emergency disposal
Each event all corresponds to a Response project template in prediction scheme, is called according to the type of grid equipment fire and grade corresponding
Response project masterplate is read in Response project template to the type of corresponding grid equipment fire and the goods and materials allotment side of grade
Method;
Step (6.2):Existing goods and materials in the goods and materials concocting method and goods and materials database that are gone out according to Response project template matches
Information determines the goods and materials type for needing to allot and goods and materials quantity.
6. a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS as described in claim 1, feature
It is, the goods and materials alloted in the step (6) are associated with the vehicle of alloting that goods and materials carry, the real-time tracking in GIS map
The track for the goods and materials alloted.
7. a kind of method of the satellite real-time early warning grid equipment fire based on power grid GIS as claimed in claim 6, feature
It is, the process of the track for the goods and materials that the real-time tracking in GIS map in the step (6) is alloted is:
The goods and materials alloted allot vehicle real time correlation with what goods and materials carried, and power network GIS platform receives to allot the GPS numbers of vehicle in real time
According to the GPS track of drafting vehicle, finally obtains track of the goods and materials alloted in GIS map in GIS map.
8. a kind of using the method for the satellite real-time early warning grid equipment fire based on power grid GIS as described in claim 1
System, which is characterized in that including:
For in power network GIS platform, being positioned to the grid equipment coordinate of prewarning area, and true according to the coordinate of grid equipment
The device of vertical grid equipment figure layer;
For being positioned by longitude and latitude, the grid equipment of specific longitude and latitude is monitored in real time, obtains grid equipment overlay area
The device of Satellite Remote Sensing image;
For using conventional method to carry out sentencing the device for knowing the fire point in Satellite Remote Sensing image;
For the grid equipment figure layer of prewarning area to be associated with Satellite Remote Sensing image, and establish grid equipment covering
The latitude and longitude coordinates of the fire point in region and the device shown on power grid GIS map;
For the latitude and longitude coordinates according to the fire point of grid equipment overlay area, to determine the type of grid equipment fire and wait
The device of grade;For the type of grid equipment fire and class information to be reported to corresponding administrative unit division, and it is illustrated in
Device on power grid GIS map;
For the type and grade according to grid equipment fire, corresponding emergency disposal prediction scheme is called, and determines what needs were alloted
The device of goods and materials type and goods and materials quantity.
9. a kind of system as claimed in claim 8, which is characterized in that the satellite real-time early warning power grid based on power grid GIS
The system of equipment fire further includes that goods and materials for alloting are associated with the vehicle of alloting that goods and materials carry, real in GIS map
When the device of the tracks of goods and materials alloted of tracking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510383610.9A CN104991932B (en) | 2015-07-02 | 2015-07-02 | The method and its system of satellite real-time early warning grid equipment fire based on power grid GIS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510383610.9A CN104991932B (en) | 2015-07-02 | 2015-07-02 | The method and its system of satellite real-time early warning grid equipment fire based on power grid GIS |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104991932A CN104991932A (en) | 2015-10-21 |
CN104991932B true CN104991932B (en) | 2018-07-17 |
Family
ID=54303748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510383610.9A Active CN104991932B (en) | 2015-07-02 | 2015-07-02 | The method and its system of satellite real-time early warning grid equipment fire based on power grid GIS |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104991932B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105513247B (en) * | 2015-11-25 | 2018-01-16 | 北京环境特性研究所 | A kind of fire monitoring alignment system and method that ship is tethered at based on floating |
CN107220280B (en) * | 2017-04-19 | 2020-11-27 | 应急管理部国家减灾中心(应急管理部卫星减灾应用中心) | Disaster information acquisition and reporting method and system based on zoning mapping |
CN109215275B (en) * | 2018-10-18 | 2021-03-09 | 国网山东省电力公司应急管理中心 | Fire monitoring and early warning method based on temperature data in power grid operation |
CN110070616A (en) * | 2019-04-23 | 2019-07-30 | 北京睿呈时代信息科技有限公司 | Memory, statistical data rendering method, device and equipment based on GIS platform |
CN110570628B (en) * | 2019-09-18 | 2021-07-23 | 中国电建集团贵州电力设计研究院有限公司 | Power transmission line pole tower geological disaster monitoring, early warning and analyzing system and using method |
CN111061897B (en) * | 2020-01-15 | 2023-06-16 | 国网江西省电力有限公司电力科学研究院 | Multi-scale automatic intercepting and classifying method suitable for high-resolution remote sensing image of power grid |
CN113112729B (en) * | 2021-03-29 | 2023-01-13 | 青岛海尔空调器有限总公司 | Air conditioner with fire monitoring function and fire monitoring method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101202661A (en) * | 2007-11-30 | 2008-06-18 | 中国移动通信集团重庆有限公司 | Method for matching business data and map data based on requirement |
CN103337133A (en) * | 2013-06-14 | 2013-10-02 | 广东电网公司中山供电局 | System and method for power grid thunderstorm disaster early warning based on recognition and forecast |
CN103383798A (en) * | 2012-05-04 | 2013-11-06 | 山西省电力公司阳泉供电公司 | Mountain fire hazard monitoring and prewarning analyzing method and system based on power grid GIS |
CN103390218A (en) * | 2013-07-17 | 2013-11-13 | 中商流通生产力促进中心有限公司 | Three-chain coupling integrated emergency security system and method for emergencies |
CN104077641A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Power grid operation and emergency command method and power commanding system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050034075A1 (en) * | 2003-06-05 | 2005-02-10 | Ch2M Hill, Inc. | GIS-based emergency management |
-
2015
- 2015-07-02 CN CN201510383610.9A patent/CN104991932B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101202661A (en) * | 2007-11-30 | 2008-06-18 | 中国移动通信集团重庆有限公司 | Method for matching business data and map data based on requirement |
CN103383798A (en) * | 2012-05-04 | 2013-11-06 | 山西省电力公司阳泉供电公司 | Mountain fire hazard monitoring and prewarning analyzing method and system based on power grid GIS |
CN104077641A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Power grid operation and emergency command method and power commanding system |
CN103337133A (en) * | 2013-06-14 | 2013-10-02 | 广东电网公司中山供电局 | System and method for power grid thunderstorm disaster early warning based on recognition and forecast |
CN103390218A (en) * | 2013-07-17 | 2013-11-13 | 中商流通生产力促进中心有限公司 | Three-chain coupling integrated emergency security system and method for emergencies |
Non-Patent Citations (1)
Title |
---|
基于GIS的电网气象灾害监测预警系统的研制;姚楠 等;《电力信息与通信技术》;20130331;第11卷(第3期);第41-45页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104991932A (en) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104991932B (en) | The method and its system of satellite real-time early warning grid equipment fire based on power grid GIS | |
CN103942941B (en) | Mobile monitoring convergence platform based on GIS | |
CN108922188A (en) | The four-dimensional outdoor scene traffic of radar tracking positioning perceives early warning monitoring management system | |
CN108320462A (en) | Urban Flood control early-warning and predicting system | |
CN110796900A (en) | Fishing boat safety monitoring command system | |
CN104951993A (en) | Comprehensive monitoring and early warning system based on meteorology and power grid GIS and method thereof | |
CN104899922A (en) | Three-dimensional holographic generation method for intelligent power grid visualization application | |
CN106022610A (en) | Typhoon prevention and resistance monitoring emergency method for electric power system | |
CN104950348B (en) | The correlating method of a kind of weather data and electrical network facilities and system | |
CN106530626A (en) | Mountain flood disaster monitoring and early warning system and monitoring method | |
CN105278004B (en) | A kind of weather condition analysis method of grid power transmission circuit section | |
CN103150598B (en) | Processing system and method for sudden failure of power transmission network | |
CN104950349A (en) | Power-grid-GIS-based real-time early warning method and apparatus of satellite cloud picture | |
KR20160099931A (en) | Disaster preventing and managing method for the disaster harzard and interest area | |
Esch et al. | Urban remote sensing–how can earth observation support the sustainable development of urban environments? | |
CN112488477A (en) | Highway emergency management system and method | |
CN109446290A (en) | A kind of intelligent three-dimensional virtual visualization meteorological equipment comprehensive coverage method | |
CN113487094B (en) | Ocean data management application platform | |
CN110807891A (en) | Power grid forest fire monitoring and early warning system and method | |
CN210006086U (en) | Offshore wind farm dispatching management system | |
CN104951992B (en) | The longitudinal correlating method of electric power based on GIS-meteorology and system | |
CN109683211A (en) | A kind of navigation channel weather monitoring early warning system and method | |
CN109188568B (en) | Doppler radar meteorological vectorization power grid fine early warning system | |
CN109471205B (en) | Monitoring and early warning method based on gridding meteorological data in power grid operation | |
CN104808260A (en) | Power gird radar early warning method based on GIS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210729 Address after: 250000 room 222-4, building 17, Qilu cultural and creative base, 101 Shunfeng Road, high tech Zone, Jinan, Shandong Province Patentee after: Shandong Hongshi Internet Technology Co.,Ltd. Address before: 213161 room a-1-801, Zhongke entrepreneurship center, Changzhou science and Education City, No. 18, Changwu Middle Road, Wujin District, Changzhou City, Jiangsu Province Patentee before: JIANGSU LIWEIXUN ELECTRIC TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right |