CN104991596B CN201510402443.8A CN201510402443A CN104991596B CN 104991596 B CN104991596 B CN 104991596B CN 201510402443 A CN201510402443 A CN 201510402443A CN 104991596 B CN104991596 B CN 104991596B
Authority
CN
China
Prior art keywords
equipment
temperature
humidity
pipeline
control unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510402443.8A
Other languages
Chinese (zh)
Other versions
CN104991596A (en
Inventor
陈晓鸣
高阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ANKURA SMART TRANSMISSION ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
JIANGSU ANKURA SMART TRANSMISSION ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ANKURA SMART TRANSMISSION ENGINEERING TECHNOLOGY Co Ltd filed Critical JIANGSU ANKURA SMART TRANSMISSION ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201510402443.8A priority Critical patent/CN104991596B/en
Publication of CN104991596A publication Critical patent/CN104991596A/en
Application granted granted Critical
Publication of CN104991596B publication Critical patent/CN104991596B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a kind of cable outdoor terminal installation environment system, including external insulation equipment, Temperature-controlled appliance, moisture control unit, temperature cycles equipment and humidity cycle equipment, wherein, the temperature cycles equipment and humidity cycle equipment, include blower fan and n pipeline, n >=1 respectively, pipeline is net distribution and is interconnected, in the duct, pipeline one end includes pipeline opening to assembling;Temperature cycles equipment is also included installed in pipeline opening, the temperature sensor electrically connected with the Temperature-controlled appliance;Humidity cycle equipment is also included installed in pipeline opening, the humidity sensor electrically connected with the moisture control unit.The invention also discloses a kind of building method of cable outdoor terminal installation environment system.The present invention can effectively control the temperature humidity of installation environment in 330kV and above outdoor terminal installation process, be easy to the installation of outdoor terminal.

Description

A kind of cable outdoor terminal installation environment system and building method
Technical field
It is particularly a kind of to be used for 330kV and above cable open air eventually the present invention relates to cable installing area in power industry Hold installation environment system and building method.
Background technology
With the fast development of China's economic construction, power industry is driven recovery.Will to urban beautification and power supply safety Ask and also increasingly improve, transmission line of electricity uses cable transfer on a large scale, and wherein cable intermediate joint is to be used to power industry convey electricity In important component in cable system, the project for being widely used in the engineerings such as electric power, railway, urban construction, water conservancy, track traffic.
Cable outdoor terminal is the device that cable is connected with other electrical equipments.And cable outdoor terminal is when mounted to peace The requirement for filling environment is higher, and environment temperature need to be controlled in 10~25 DEG C of intervals, and relative humidity is then controlled in < 70%, in operation In engineering, it should be specifically noted that the protection insulated to cable body.Current cable outdoor terminal installation environment canopy, it requires most In being the voltage class for below 330kV, but with the lifting of cable voltage class, the increase in installment work region is right What the control of temperature and humidity also became is more difficult to, and builds mode using traditional cable outdoor terminal installation environment canopy, it is impossible to protect The control of card temperature humidity can reach requirement, and can not ensure that the temperature humidity of each working region is uniform.
The content of the invention
In order to solve the above technical problems, the specific technical scheme of the present invention is as follows:
A kind of cable outdoor terminal installation environment system, it is characterised in that set including external insulation equipment, temperature control Standby, moisture control unit, temperature cycles equipment and humidity cycle equipment, wherein,
The temperature cycles equipment and humidity cycle equipment, respectively including blower fan and n pipeline, n >=1, pipeline is netted It is distributed and is interconnected, in the duct, pipeline one end includes pipeline opening to assembling;
Temperature cycles equipment is also included installed in pipeline opening, the TEMP electrically connected with the Temperature-controlled appliance Device;
Humidity cycle equipment is also included installed in pipeline opening, the humidity sensor electrically connected with the moisture control unit Device;
The external insulation equipment is used for the space for forming an opposing seal, the Temperature-controlled appliance and temperature cycles Equipment heat-preserving equipment side mounted externally, temperature cycles equipment is arranged on above Temperature-controlled appliance and Temperature-controlled appliance phase Even;Moisture control unit and humidity cycle equipment the heat-preserving equipment opposite side mounted externally, the humidity cycle equipment peace It is connected above moisture control unit with moisture control unit;
The blower fan of the blower fan of the temperature cycles equipment and the humidity cycle equipment, respectively with Temperature-controlled appliance and wet Spend control device electrical connection.
Further, the external insulation equipment includes frame, waterproof awning cloth and thermal insulation board.
Further, the external insulation equipment is divided into m working lining, and each working lining floor height is equal, m >=4, the pipeline Mouth towards each working lining centre position.
A kind of cable outdoor terminal installation environment system building method, applied to above-mentioned system, comprises the following steps:
Step one:Build external insulation equipment:First build and build thermal insulation board after frame again, then in thermal insulation board
Upper covering rain-proof shelter cloth;
Step 2:Build epidemic disaster recycle unit:Pipeline is connected, pipeline is net distribution and is interconnected, by wind Machine is installed in the duct, then mounting temperature sensor and humidity sensor.
Step 3:Epidemic disaster control device is installed:By Temperature-controlled appliance heat-preserving equipment side mounted externally, temperature Recycle unit is arranged on above temperature controller to be connected with temperature controller, and moisture control unit heat-preserving equipment mounted externally is another Side, humidity cycle equipment is arranged on above humidity controller to be connected with humidity controller;
Step 4:Temperature in use control device, by the temperature control in sealed environment at 10~25 DEG C;
Step 5:Using moisture control unit, the relative humidity in sealed environment is controlled in < 70%;
Step 6:Using temperature cycles equipment and humidity cycle equipment, to the temperature and humidity of each working lining
It is adjusted.
Further, 3 DEG C of each working lining local temperature difference < of the step 6, local humidity is poor≤and 10%
Brief description of the drawings
Fig. 1 is mounting structure schematic diagram of the invention;
Fig. 2 is mounting structure top view of the invention.
Embodiment
The embodiment to the present invention is described in detail, it is necessary to illustrate below in conjunction with the accompanying drawings, and these are specific Explanation be to allow those of ordinary skill in the art to be more prone to, clearly understand the present invention, rather than limitation of the invention solution Release.
The present invention is applied to 330kV and above cable outdoor terminal, in installation environment system, sets temperature control to set Standby, moisture control unit, temperature cycles equipment and humidity cycle equipment, make temperature humidity in installment work area uniform.The invention The temperature humidity of installation environment can be effectively controlled in 330kV and above outdoor terminal installation process, is easy to the peace of outdoor terminal Dress.
A kind of cable outdoor terminal installation environment system as shown in Figure 1, 2, including external insulation equipment, temperature control are set Standby, moisture control unit, temperature cycles equipment and humidity cycle equipment, wherein,
External insulation equipment includes frame, waterproof awning cloth and thermal insulation board;External insulation equipment is divided into 4 working linings, each Working lining floor height is equal.
Temperature cycles and humidity cycle equipment, respectively including blower fan and 12 pipelines, pipeline is net distribution and mutually interconnected Logical, the blower fan that manufactures the blower fan of cold wind and can moisturize is respectively mounted in the duct, each work of pipeline opening direction Layer centre position.Temperature cycles equipment utilization blower fan controls air flow, so as to adjust the temperature of regional;Humidity cycle Equipment utilization blower fan controls the moisture in air, so as to adjust the humidity of regional.In every layer of temperature cycles equipment and Temperature sensor and humidity sensor are all respectively mounted in the pipeline opening of humidity cycle equipment, for real-time monitoring temperature and wet Degree, and pass the temperature and humidity data of monitoring back temperature controller and humidity controller, set by controller control temperature cycles Standby and humidity cycle equipment is controlled every layer of temperature and humidity in real time.Temperature is controlled by temperature and humidity controller And humidity, it is ensured that each working lining temperature difference≤3 DEG C, psychrometric difference≤10%.
The space of external insulation equipment formation opposing seal, by Temperature-controlled appliance heat-preserving equipment side mounted externally bottom Portion, temperature cycles equipment is arranged on above temperature controller to be connected with temperature controller;Moisture control unit is mounted externally to be protected Warm another side bottom of equipment, humidity controller is arranged on above humidity controller to be connected with humidity controller.
Building for whole system, comprises the following steps:
Step one:Frame, waterproof awning cloth and thermal insulation board are set up into external insulation equipment, external insulation equipment is a phase To sealed environment, first build and build thermal insulation board after frame again, heat-insulated glue bond is used between thermal insulation board, then in thermal insulation board overlying Lid rain-proof shelter cloth.As shown in Figure 1, 2, the high 12500mm of external insulation equipment, long 13000mm, wide 7000mm, can accommodate three oil Terminal device.
Step 2:Build epidemic disaster recycle unit:Pipeline is connected, pipeline is net distribution and is interconnected, by wind Machine is installed in the duct, then temperature sensor is arranged on into the pipeline opening of temperature cycles equipment, and humidity sensor is installed in humidity The pipeline opening of recycle unit.
Step 3:Humiture equipment is installed:By the Temperature-controlled appliance side bottom of heat-preserving equipment one mounted externally, temperature is followed Ring apparatus is arranged on above temperature controller to be connected with temperature controller, and moisture control unit heat-preserving equipment mounted externally is another Side bottom, humidity controller is arranged on above humidity controller to be connected with humidity controller.
Step 4:Temperature in use control device, the temperature in sealed environment is set in 10~25 DEG C of intervals.
Step 5:Using moisture control unit, by the relative humidity set in sealed environment in < 70%.
Step 6:Using humidity cycle equipment and temperature cycles equipment equipment, the temperature and humidity to each working lining is entered Temperature sensor is installed in row regulation, temperature cycles equipment, real-time testing is carried out to every layer of temperature, by the temperature number of test Value is fed back on Temperature-controlled appliance, and every layer of temperature is controlled in real time by control device control temperature cycles equipment, made Each 3 DEG C of working lining local temperature difference <.Humidity sensor is installed in humidity cycle equipment, every layer of humidity is surveyed in real time Examination, the humidity of test is fed back on moisture control unit, and humidity cycle equipment is controlled to every layer by moisture control unit Humidity controlled in real time, make each working lining local humidity it is poor≤10%.

Claims (3)

1. a kind of cable outdoor terminal installation environment system, including external insulation equipment, Temperature-controlled appliance, humid control are set Standby, temperature cycles equipment and humidity cycle equipment, wherein,
Temperature cycles equipment is included installed in pipeline opening, the temperature sensor electrically connected with the Temperature-controlled appliance;
Humidity cycle equipment is also included installed in pipeline opening, the humidity sensor electrically connected with the moisture control unit;Its It is characterised by:
The temperature cycles equipment and humidity cycle equipment, respectively further comprise blower fan and n pipeline, n >=1, and pipeline is netted point Cloth and it is interconnected, in the duct, pipeline one end includes pipeline opening to assembling, and each pipeline opening is towards centre position;
The external insulation equipment is used for the space for forming an opposing seal, the Temperature-controlled appliance and temperature cycles equipment Heat-preserving equipment side mounted externally, temperature cycles equipment is arranged on above Temperature-controlled appliance to be connected with Temperature-controlled appliance; Moisture control unit and humidity cycle equipment the heat-preserving equipment opposite side mounted externally, the humidity cycle equipment is arranged on It is connected above moisture control unit with moisture control unit;
The blower fan of the blower fan of the temperature cycles equipment and the humidity cycle equipment, respectively with Temperature-controlled appliance and humidity control Control equipment is electrically connected;
The external insulation equipment includes frame, waterproof awning cloth and thermal insulation board;
The external insulation equipment is divided into m working lining, and each working lining floor height is equal, and m >=4, each working lining includes Multiple pipeline openings, each each working lining centre position of pipeline opening direction.
2. a kind of cable outdoor terminal installation environment system building method, it is characterised in that applied to as claimed in claim 1 System, it is characterised in that comprise the following steps:
Step one:Build external insulation equipment:First build and build thermal insulation board after frame again, rain-proof shelter is then covered on thermal insulation board Cloth;
Step 2:Build epidemic disaster recycle unit:Pipeline is connected, pipeline is net distribution and is interconnected, and blower fan is pacified Fill in the duct, then mounting temperature sensor and humidity sensor;
Step 3:Epidemic disaster control device is installed:By Temperature-controlled appliance heat-preserving equipment side mounted externally, temperature cycles Equipment is arranged on above temperature controller to be connected with temperature controller, and moisture control unit heat-preserving equipment mounted externally is another Side, humidity cycle equipment is arranged on above humidity controller to be connected with humidity controller;
Step 4:Temperature in use control device, by the temperature control in sealed environment at 10~25 DEG C;
Step 5:Using moisture control unit, the relative humidity in sealed environment is controlled in < 70%;
Step 6:Using temperature cycles equipment and humidity cycle equipment, the temperature and humidity to each working lining is adjusted.
3. building method according to claim 2, it is characterised in that each working lining local temperature difference < 3 of step 6 DEG C, local humidity is poor≤and 10%.
CN201510402443.8A 2015-07-09 2015-07-09 A kind of cable outdoor terminal installation environment system and building method Active CN104991596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510402443.8A CN104991596B (en) 2015-07-09 2015-07-09 A kind of cable outdoor terminal installation environment system and building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510402443.8A CN104991596B (en) 2015-07-09 2015-07-09 A kind of cable outdoor terminal installation environment system and building method

Publications (2)

Publication Number Publication Date
CN104991596A CN104991596A (en) 2015-10-21
CN104991596B true CN104991596B (en) 2017-10-27

Family

ID=54303414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510402443.8A Active CN104991596B (en) 2015-07-09 2015-07-09 A kind of cable outdoor terminal installation environment system and building method

Country Status (1)

Country Link
CN (1) CN104991596B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117613752B (en) * 2024-01-22 2024-05-03 广州珠江电缆集团(陕西)有限公司 Device convenient to cable construction installation under low temperature environment

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04288436A (en) * 1991-03-15 1992-10-13 Fujitsu Ltd Indoor temperature/humidity setting
CN101922253A (en) * 2009-06-11 2010-12-22 上海邮电设计咨询研究院有限公司 Intelligent thermal-insulating energy-saving communication machine room
CN102763526A (en) * 2012-05-19 2012-11-07 刘跃 Heat-proof moisture-reduction positive-negative pressure ventilated short-grained food bin
CN203179966U (en) * 2013-03-15 2013-09-04 大连融科储能技术发展有限公司 Insulation cabinet for flow cell
CN203145514U (en) * 2013-04-08 2013-08-21 重庆市秀山县供电有限责任公司 Outdoor electrical equipment installing house
CN203615511U (en) * 2013-10-10 2014-05-28 刘华荣 Multifunctional window type air freshening machine
CN203632175U (en) * 2013-11-05 2014-06-04 国家电网公司 Outdoor cable trench moisture removing device
CN204258072U (en) * 2014-12-05 2015-04-08 国家电网公司 A kind of intelligent Rainproof switch cabinet
CN205049991U (en) * 2015-07-09 2016-02-24 江苏安靠智能输电工程科技股份有限公司 Cable outdoor termination installation environment system

Also Published As

Publication number Publication date
CN104991596A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN203161274U (en) Ventilation control system of electric power tunnel
CN104991596B (en) A kind of cable outdoor terminal installation environment system and building method
CN107060194A (en) A kind of prefabricated buildings wall of energy saving temperature controlling
CN205049991U (en) Cable outdoor termination installation environment system
CN206074037U (en) A kind of distribution ring main unit based on Internet of Things becomes more meticulous monitoring system
CN205719280U (en) A kind of mass concrete construction temperature difference alarm device
CN2869646Y (en) Electric mulch-film heating facility
CN204858290U (en) Cubical switchboard intelligence dehumidification system with function regularly dehumidifies
CN207339142U (en) A kind of cable testing bridge
CN206557623U (en) A kind of intelligent heat preserving curing means for concrete structure
CN206961671U (en) A kind of ultra-high voltage transformer station transformer winter construction attemperator
CN206959125U (en) A kind of novel architecture ground heating equipment
CN207926130U (en) A kind of enclosed bus bridge
CN207339143U (en) A kind of cable testing bridge used in high temperature environments
CN106182378A (en) A kind of steam curing system
CN207718242U (en) A kind of novel 10kV ring main units cable vault damp-proof device
CN207200028U (en) A kind of low-tension switch cabinet controlled by PLC
CN206865110U (en) A kind of underground high voltage cable junction box
CN106896846A (en) A kind of outdoor large chemical industry equipment instrument and meter for automation and application method
CN207830754U (en) A kind of process pipe structure
CN206076791U (en) A kind of bench vehicle type electrical resistance furnace power distribution cabinet controller for heat sink
CN104538873B (en) A kind of duct type substation secondary device underground system and method
CN206670831U (en) A kind of wireless temperature measuring device for high-tension cable
CN203336936U (en) Damp-proof device of separated-phase closed buses
CN207321564U (en) Deduster electric heating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant