CN104990231B - Control method and device of centralized controller - Google Patents

Control method and device of centralized controller Download PDF

Info

Publication number
CN104990231B
CN104990231B CN201510452327.7A CN201510452327A CN104990231B CN 104990231 B CN104990231 B CN 104990231B CN 201510452327 A CN201510452327 A CN 201510452327A CN 104990231 B CN104990231 B CN 104990231B
Authority
CN
China
Prior art keywords
target device
object equipment
target
control
detection parameters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510452327.7A
Other languages
Chinese (zh)
Other versions
CN104990231A (en
Inventor
吴江勇
苏玉海
金国华
唐杰
贺小林
叶铁英
杨都
殷超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201510452327.7A priority Critical patent/CN104990231B/en
Publication of CN104990231A publication Critical patent/CN104990231A/en
Application granted granted Critical
Publication of CN104990231B publication Critical patent/CN104990231B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Selective Calling Equipment (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a control method and a control device of an integrated controller. Wherein, the method comprises the following steps: receiving an instruction of starting a linkage mode; under the condition of receiving the instruction, carrying out pairing connection on the first target equipment and the second target equipment; and performing linkage control on the first target equipment and the second target equipment which are connected in a pairing manner. The invention solves the technical problem that the intelligent operation of the air conditioner and the fresh air machine is low in the prior art.

Description

The control method and device of Centralized Controller
Technical field
The present invention relates to air-conditioner fields, in particular to the control method and device of a kind of Centralized Controller.
Background technique
New blower, which passes through, adjusts indoor fresh air volume, improves air quality, and room air is made to keep pure and fresh.Existing collection Middle controller be only capable of carrying out air-conditioning and new blower it is individually operated, can not be according to the operation air-conditioning of indoor environment intelligence and fresh air Mode, to reach the living environment of human body the most comfortable.User needs to be separately provided the basic operation mould of air-conditioning and new blower every time Formula or basic parameter reduce the intelligence degree of controller, influence user experience.
For above-mentioned problem, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides a kind of control method of Centralized Controller and devices, at least to solve in the prior art Air conditioner and the newly lower technical problem of blower fan intelligentized operation.
According to an aspect of an embodiment of the present invention, a kind of control method of Centralized Controller is provided, comprising: reception is opened Open the instruction of linkage pattern;In the case where receiving described instruction, first object equipment and the second target device are matched To connection;And to the first object equipment and second target device progress linkage control after pairing connection.
Further, to the first object equipment and second target device progress linkage control after pairing connection It include: to detect the first detection parameters of the first object equipment, and detect the second detection parameters of second target device; Judge whether first detection parameters and second detection parameters and parameter preset are identical respectively;And judging target Under detection parameters and the different situation of the parameter preset, according to the difference of the target detection parameter and the parameter preset Adjust the operational mode of the first object equipment and/or second target device, wherein the target detection parameter includes First detection parameters and/or second detection parameters.
Further, the target detection parameter and the parameter preset include multiple subparameters, are judging target Under detection parameters and the different situation of the parameter preset, according to the difference of the target detection parameter and the parameter preset The operational mode for adjusting the first object equipment and/or the second target device includes: to judge the target detection parameter In the different situation of the parameter preset, calculate and the parameter preset target detection parameter correspondingly Difference;And it controls the first object equipment and second target device and the operational mode is adjusted according to the difference.
Further, judging that first detection parameters and second detection parameters and parameter preset are all the same In the case of, the method also includes: the first object equipment and second target device are controlled according to the parameter preset Operation.
Further, to the first object equipment and second target device progress linkage control after pairing connection Later, the method also includes: obtain timing time from initial time to current time, wherein the initial time is institute State first object equipment and at the time of second target device starts to run according to the parameter preset or control described first At the time of target device and second target device start to adjust operational mode according to the difference;And in the timing Between reach preset time in the case where, return to the first detection parameters for detecting the first object equipment, and detect described second Second detection parameters of target device.
Further, in the case where receiving described instruction, first object equipment and the second target device are matched After connection, the method also includes: obtain the flag bit of the linkage pattern;It is the first mark getting the flag bit It in the case where will position, controls the first object equipment and second target device does not execute any operation, wherein described One flag bit indicates that the linkage pattern is invalid mode;And the flag bit is being got as the second flag bit or third mark In the case of will position, judge whether first detection parameters and second detection parameters and parameter preset are identical respectively, wherein Second flag bit indicates that the linkage pattern is prefabricated mode, and the third flag bit indicates that the linkage pattern is to make by oneself Adopted mode.
Further, in the case where receiving described instruction, first object equipment and the second target device are matched It include: the pairing link order for receiving the first object equipment and second target device to connection;And receive institute After stating pairing link order, controls the first object equipment and second target device realizes pairing connection.
Further, in the case where receiving described instruction, first object equipment and the second target device are matched After connection, the method also includes: when the first object equipment is in the open state, controls second target and set It is standby to be in the open state;Or when the first object equipment is in close state, control at second target device In the closed state.
According to an aspect of an embodiment of the present invention, a kind of control device of Centralized Controller is provided, comprising: receive single Member, for receiving the instruction for opening linkage pattern;Pairing unit, in the case where receiving described instruction, by the first mesh Marking device and the second target device carry out pairing connection;And linkage control unit, for described first after pairing connection Target device and second target device carry out linkage control.
Further, the linkage control unit includes: detection module, for detecting the first of the first object equipment Detection parameters, and detect the second detection parameters of second target device;Judgment module, for judging first inspection respectively It surveys parameter and second detection parameters and whether parameter preset is identical;And adjustment module, for judging target detection Under parameter and the different situation of the parameter preset, adjusted according to the target detection parameter and the difference of the parameter preset The operational mode of the first object equipment and/or the second target device, wherein the target detection parameter includes described first Detection parameters and/or second detection parameters.
Further, the target detection parameter and the parameter preset include multiple subparameters, the adjustment module It include: computational submodule, for counting in the case where judging the target detection parameter and the different situation of the parameter preset Calculate the difference with the parameter preset target detection parameter correspondingly;And control submodule, for controlling It states first object equipment and second target device and the operational mode is adjusted according to the difference.
Further, judging that first detection parameters and second detection parameters and parameter preset are all the same In the case of, the linkage control unit further include: the first control module, for controlling the first object equipment and described second Target device is run according to the parameter preset.
Further, the control device further include: first acquisition unit is used in the linkage control unit to pairing After the first object equipment after connection and second target device carry out linkage control, obtain from initial time to working as The timing time at preceding moment, wherein the initial time is the first object equipment and second target device start by At the time of according to parameter preset operation or the first object equipment and second target device are controlled according to the difference At the time of starting to adjust operational mode;And return unit, for returning in the case where the timing time reaches preset time The first detection parameters of the detection first object equipment are returned, and detect the second detection parameters of second target device.
Further, the control device further include: second acquisition unit, for the pairing unit receive it is described In the case where instruction, after first object equipment and the second target device are carried out pairing connection, the linkage pattern is obtained Flag bit;First control unit, for controlling first mesh in the case where getting the flag bit is the first flag bit Marking device and second target device do not execute any operation, wherein first flag bit indicates that the linkage pattern is Invalid mode;And judging unit, for dividing when getting the flag bit is the second flag bit or third flag bit Do not judge whether first detection parameters and second detection parameters and parameter preset are identical, wherein second mark Position indicates that the linkage pattern is prefabricated mode, and the third flag bit indicates that the linkage pattern is self-defined pattern.
Further, the pairing unit includes: receiving module, for receiving the first object equipment and described second The pairing link order of target device;And second control module controls institute after receiving the pairing link order It states first object equipment and second target device realizes pairing connection.
Further, the control device further include: the second control unit, it is described for being received in the pairing unit In the case where instruction, after first object equipment and the second target device are carried out pairing connection, when the first object equipment When in the open state, control second target device and be in the open state;Or third control unit, for when described When first object equipment is in close state, controls second target device and be in the closed state.
In embodiments of the present invention, using the instruction for receiving unlatching linkage pattern;In the case where receiving instruction, by One target device and the second target device carry out pairing connection;To the first object equipment and the second target device after pairing connection Carry out the mode of linkage control.By receive starting linkage pattern instruction in the case where, choose first object equipment and Second target device carries out linkage control, and the first object equipment of selection is carried out pairing with the second target device and is connected, complete After pairing connection, linkage control, the control of such Centralized Controller are carried out to first object equipment and the second target device Method can reduce user's manual operation, for the air conditioner and new blower that are often used cooperatively, the two can be distinguished It is controlled as first object equipment and the second target device, makes the more intelligent operation of the two, enhance user experience, The operating parameter that air-conditioning and new blower can be optimized according to indoor real time environment situation simultaneously, has reached linkage control air conditioner With the purpose of new blower, to realize the technical effect for reducing manually operated, and then it is hollow to solve the prior art Adjust device and the newly lower technical problem of blower fan intelligentized operation.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the control method of optional Centralized Controller according to an embodiment of the present invention;
Fig. 2 is the flow chart of the control method of another optional Centralized Controller according to an embodiment of the present invention;
Fig. 3 is the schematic diagram of the control method of another optional Centralized Controller according to an embodiment of the present invention;And
Fig. 4 is a kind of schematic diagram of the control device of optional Centralized Controller according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
According to embodiments of the present invention, a kind of embodiment of the method for the control of Centralized Controller is provided, it should be noted that Step shown in the flowchart of the accompanying drawings can execute in a computer system such as a set of computer executable instructions, and It, in some cases, can be to be different from sequence execution institute herein and although logical order is shown in flow charts The step of showing or describing.
Fig. 1 is a kind of flow chart of the control method of optional Centralized Controller according to an embodiment of the present invention, such as Fig. 1 institute Show, this method comprises the following steps S102 to step S106:
Step S102 receives the instruction for opening linkage pattern, and specifically, when needing to realize linkage control, user is sent The instruction of linkage pattern is opened to Centralized Controller, Centralized Controller opens linkage pattern according to the instruction received.
First object equipment and the second target device are carried out pairing company in the case where receiving instruction by step S104 It connects, specifically, if receiving the instruction of starting linkage control, chooses the first object equipment and second that carry out linkage control Target device needs to carry out first object equipment and the second target device to be just able to achieve first object and set after pairing connects The standby linkage control between the second target device.
Step S106, to the first object equipment and the second target device progress linkage control after pairing connection, specifically, After first object equipment and the pairing connection of the second target device, first object equipment and the are realized according to corresponding control rule The linkage control of two target devices.
The control method of Centralized Controller provided by the embodiment of the present invention, by the finger for receiving starting linkage pattern In the case where order, choose first object equipment and the second target device and carry out linkage control, by the first object equipment of selection and Second target device carries out pairing connection, after completing pairing connection, carries out to first object equipment and the second target device Linkage control, the control method of such Centralized Controller can reduce user's manual operation, for the air-conditioning being often used cooperatively It for device and new blower, can be controlled the two as first object equipment and the second target device, make the two more Add intelligent operation, enhances user experience, while air-conditioning and new blower can be optimized according to indoor real time environment situation Operating parameter, achieved the purpose that linkage control air conditioner and new blower, so that realizing reduces manually operated Technical effect, and then solve air conditioner in the prior art and the newly lower technical problem of blower fan intelligentized operation.
According to that above embodiment of the present invention, in the case where receiving instruction, first object equipment and the second target are set It is standby to carry out the pairing link order that pairing connection includes: reception first object equipment and the second target device;Pairing is received to connect After connecing instruction, controls first object equipment and the second target device realizes pairing connection.
Specifically, the first object equipment in the embodiment of the present invention can be air conditioner, and the second target device can be newly Blower, the embodiment of the present invention is by taking air conditioner and new blower as an example.In the linkage control instruction for receiving air conditioner and new blower Later, it needs air conditioner carrying out pairing with new blower to connect, user, which needs to send air conditioner and connects with the pairing of new blower, to be referred to It enables, Centralized Controller controls air conditioner and new blower realizes pairing connection, wherein is empty after receiving pairing link order Adjust device and new blower that can be chosen according to the demand of user.After realizing that air conditioner is connected with the pairing of new blower, The linkage control of air conditioner and new blower can be controlled according to Centralized Controller.
According to that above embodiment of the present invention, in the case where receiving instruction, first object equipment and the second target are set It is standby carry out pairing connection after further include: when first object equipment is in the open state, the second target device of control, which is in, to be opened Open state;Or when first object equipment is in close state, the second target device of control is in close state.
Specifically, it is assumed that first object equipment is air conditioner, and the second target device is new blower, and air conditioner and new blower are real After now pairing connection, so that it may realize the linkage control of air conditioner and new blower.Air conditioner is released the button when the user clicks When, new blower can also be opened, and correspondingly, when releasing the button of new blower, air conditioner can also be opened when the user clicks;When user's point When hitting close button, new blower can also be closed, and correspondingly, when the user clicks when the close button of new blower, air conditioner can also be closed It closes.The control method of Centralized Controller provided in an embodiment of the present invention realizes the linkage control of air conditioner and new blower, reduces The manual operation of user, it is only necessary to click a target device in first object equipment and the second target device unlatching or Close button, correspondingly, another target device can also open or close therewith.
According to that above embodiment of the present invention, first object equipment and the second target device after connecting to pairing link Control includes: to detect the first detection parameters of first object equipment, and detect the second detection parameters of the second target device;Sentencing Under disconnected target detection parameter and the different situation of parameter preset out, adjusted according to target detection parameter and the difference of parameter preset The operational mode of first object equipment and/or the second target device, wherein target detection parameter include the first detection parameters and/ Or second detection parameters.
Specifically, by taking air conditioner and new blower as an example, wherein air conditioner is first object equipment, and new blower is the second mesh Marking device.First detection parameters of Centralized Controller real-time detection air conditioner, and the second detection parameters of new blower are detected, first Detection parameters include: temperature, wind speed;Second detection parameters include: humidity, peculiar smell concentration, gas concentration lwevel and pernicious gas Concentration.In embodiments of the present invention, parameter preset includes: temperature, humidity, wind speed, peculiar smell concentration, gas concentration lwevel and nocuousness Gas concentration.
Fig. 2 is the flow chart of the control method of another optional Centralized Controller according to an embodiment of the present invention, such as Fig. 2 It is shown, this method comprises the following steps S201 to step S207:
Step S201 obtains the flag bit of linkage pattern.
Step S202 controls first object equipment and the second mesh in the case where getting flag bit is the first flag bit Marking device does not execute any operation, wherein the first flag bit linkage pattern is invalid mode.
Step S203 judges the first inspection when getting flag bit is the second flag bit or third flag bit respectively It surveys parameter and the second detection parameters and whether parameter preset is identical, wherein the second flag bit indicates that linkage pattern is prefabricated mode, Third flag bit indicates that linkage pattern is self-defined pattern.
Step S204 is calculated and default ginseng in the case where judging target detection parameter and the different situation of parameter preset The difference of the one-to-one target detection parameter of number controls first object equipment and the second target device according to difference and adjusts operation Mode, wherein target detection parameter includes the first detection parameters and/or the second detection parameters.
Step S205, in the case where judging that the first detection parameters and the second detection parameters and parameter preset are all the same, Control first object equipment and the second target device are run according to parameter preset.
Step S206 obtains the timing time from initial time to current time, wherein initial time is that first object is set At the time of standby and the second target device starts to run according to parameter preset or control first object equipment and the second target device root At the time of starting to adjust operational mode according to difference.
Step S207 returns to the first inspection of detection first object equipment in the case where timing time reaches preset time Parameter is surveyed, and detects the second detection parameters of the second target device.
Specifically, the marker of linkage pattern is obtained, flag bit is the first flag bit, the second flag bit and third mark respectively Will position is indicated, the second flag bit indicates linkage pattern wherein the first flag bit indicates that linkage pattern is invalid mode with " 0 " For prefabricated mode, prefabricated mode is the parameter preset obtained by analyzing best human comfort's environment, is indicated with " 1 " and the Three flag bits indicate linkage pattern be self-defined pattern, indicated with " 2 ", self-defined pattern be user according to their needs, if Set the parameter preset that user itself is comfortable on.If the flag bit that Centralized Controller gets linkage pattern is first identifier position In the case where " 0 ", linkage pattern is invalid mode at this time, and air conditioner and new blower do not execute any operation, directly exit process. If the flag bit for the linkage pattern that Centralized Controller is got is first identifier position " 1 " or the second flag bit " 2 ", will test First detection parameters and the second detection parameters are compared with parameter preset respectively, judge the first detection parameters and the second inspection respectively It surveys parameter and whether parameter preset is identical.
If have in the first detection parameters and the second detection parameters with the different parameter of parameter preset, at this time by this Parameter definition is target component, is calculated in the difference of target component and parameter preset, such as " temperature ", " humidity " and parameter preset " temperature ", " humidity " it is not identical, then " temperature ", " humidity " are exactly target component, calculate in target component and parameter preset The difference of " temperature ", " humidity " adjusts the operational mode of air conditioner and new blower according to difference.Such as target component " temperature ", " humidity " and parameter preset be not identical, then adjusting air conditioner by changing operational mode according to the difference of calculated " temperature " Indoor temperature locating for air conditioner is adjusted, so that " temperature " in target component reach parameter preset, also according to calculating " humidity " difference adjusts new blower and changes operational mode to adjust the humidity of area of space locating for new blower, so that in target component " humidity " reach parameter preset.Likewise, if having other parameters in the first detection parameters and the second detection parameters and presetting Parameter is not identical, adjusts air conditioner using the above method and new blower adjusts operational mode.If the first detection parameters and second Detection parameters are all the same with parameter preset, then control air conditioner and new blower are run according to parameter preset, do not need to sky Device and new blower is adjusted to be adjusted.
At the time of operation since air conditioner and new blower according to parameter preset or air conditioner and new blower are controlled according to difference Value starts to start timing at the time of adjusting operational mode, after timing reaches preset time, returns to the first of detection air conditioner Detection parameters, and the second detection parameters of new blower are detected, it is executed since step S203.
Fig. 3 is the schematic diagram of the control method of another optional Centralized Controller according to an embodiment of the present invention, such as Fig. 3 Shown, the control method of provided Centralized Controller, Centralized Controller include " user interface ", " connection according to the present invention Dynamic functional database ", " data processing unit ", " linkage control order issues interface " and " the first detection parameters and the second detection Parameter obtains interface ".Wherein, " user interface " can be liquid crystal display, click " setting on " user interface " Set/link " button, the page is set into linkage, is chosen on the linkage setting page and opens and closes linkage pattern function, if opening Linkage pattern is opened, it is necessary to pairing be carried out with new blower to the air conditioner of linkage and connected, while in " linkage pattern setting list Linkage pattern is set in member ", wherein linkage pattern includes prefabricated mode and self-defined pattern.In " linkage function database " The first detection parameters of the air conditioner under prefabricated mode and the second detection parameters of new blower are had recorded, it is " pre- as shown in Figure 3 Data processed ", simultaneously " linkage function database " be also recorded air conditioner under self-defined pattern the first detection parameters and new blower The second detection parameters, it is as shown in Figure 3 " self-defining data ".After linkage function is set, by " data processing unit " Work according to " algorithm ", " algorithm " main process shown in Fig. 3 is step S201 to step S207, by " algorithm " come Control the operational mode of air conditioner and new blower.It is obtained at " the first detection parameters and the second detection parameters obtain interface " simultaneously First detection parameters of air conditioner and the second detection parameters of new blower, and " the first detection parameters and the second detection ginseng in figure First detection parameters of real-time display air conditioner and the second detection parameters of new blower at number ".
The embodiment of the invention also provides a kind of control device of Centralized Controller, which is mainly used for executing sheet The control method of Centralized Controller provided by inventive embodiments above content is provided for the embodiments of the invention concentration below The control device of controller does specific introduction.
Fig. 4 is a kind of schematic diagram of the control device of optional Centralized Controller according to an embodiment of the present invention, such as Fig. 4 institute Show, the control device of the Centralized Controller specifically includes that receiving unit 10, pairing unit 20 and linkage control unit 30, in which:
Receiving unit 10 specifically, when needing to realize linkage control, is used for receiving the instruction for opening linkage pattern Family sends the instruction for opening linkage pattern to Centralized Controller, and connection is opened in the instruction that the receiving unit 10 of Centralized Controller receives Dynamic model formula.
Pairing unit 20, in the case where receiving instruction, first object equipment and the second target device to be carried out Pairing connection specifically if receiving the instruction of starting linkage control, chooses the first object equipment that carry out linkage control With the second target device, first object equipment and the second target device are carried out after pairing connects using pairing unit 20, The linkage control being able to achieve between first object equipment and the second target device.
Linkage control unit 30, for carrying out linkage control to the first object equipment and the second target device matched after connecting System, specifically, after first object equipment and the pairing connection of the second target device, linkage control unit 30 is according to corresponding control Rule realizes the linkage control of first object equipment and the second target device.
The control device of Centralized Controller provided in an embodiment of the present invention, by the instruction for receiving starting linkage pattern In the case where, it chooses first object equipment and the second target device and carries out linkage control, by the first object equipment of selection and the Two target devices carry out pairing connection, after completing pairing connection, join to first object equipment and the second target device Dynamic control, the control method of such Centralized Controller can reduce user's manual operation, for the air conditioner being often used cooperatively It for new blower, can be controlled the two as first object equipment and the second target device, make the two more Intelligence operation, enhances user experience, while can optimize air-conditioning and new blower according to indoor real time environment situation Operating parameter has achieved the purpose that linkage control air conditioner and new blower, to realize the skill for reducing manually operated Art effect, and then solve air conditioner in the prior art and the newly lower technical problem of blower fan intelligentized operation.
The control device of Centralized Controller provided in an embodiment of the present invention, pairing unit 20 include: receiving module and second Control module, wherein receiving module is used to receive the pairing link order of first object equipment and the second target device;Second control After molding block is for receiving pairing link order, controls first object equipment and the second target device realizes pairing connection.
After pairing unit 20, device further include: the second control unit and third control unit, wherein the second control Unit is used for when first object equipment is in the open state, and the second target device is in the open state or third control for control Unit processed is used for when first object equipment is in close state, and the second target device of control is in close state.
Specifically, the first object equipment in the embodiment of the present invention can be air conditioner, and the second target device can be newly Blower, the embodiment of the present invention is by taking air conditioner and new blower as an example.In the linkage control instruction for receiving air conditioner and new blower Later, air conditioner is carried out pairing with new blower and connects by pairing unit 20, and user needs to send the pairing of air conditioner and new blower Link order, receiving module is after receiving pairing link order, and the second control module controls air conditioner and new blower is realized Pairing connection, wherein air conditioner and new blower can be chosen according to the demand of user.Realizing air conditioner and new blower Pairing connection after, the linkage control of air conditioner and new blower can be controlled according to Centralized Controller.
Assuming that first object equipment is air conditioner, the second target device is new blower, and air conditioner and new blower realize pairing After connection, so that it may realize the linkage control of air conditioner and new blower.When releasing the button of air conditioner when the user clicks is concentrated The second control unit of controller controls new blower and opens;When the user clicks when close button, Centralized Controller third control unit Control fresh air organ closes.The control method of Centralized Controller provided in an embodiment of the present invention realizes air conditioner and new blower Linkage control reduces the manual operation of user, it is only necessary to click a mesh in first object equipment and the second target device Marking device opens or closes button, and correspondingly, another target device can also open or close therewith.
The control device of Centralized Controller provided by the embodiment of the present invention, after pairing unit 20, device further include: Second acquisition unit, first control unit and judging unit, wherein second acquisition unit is used to obtain the mark of linkage pattern Position;First control unit is used to control first object equipment and second in the case where getting flag bit is the first flag bit Target device does not execute any operation, wherein the first flag bit indicates that linkage pattern is invalid mode;Judging unit is for obtaining Get in the case of flag bit is the second flag bit or third flag bit, judge respectively the first detection parameters and the second detection parameters with Whether parameter preset is identical, wherein the second flag bit indicates that linkage pattern is prefabricated mode, and third flag bit indicates linkage pattern For self-defined pattern.
Specifically, the marker of linkage pattern is obtained using second acquisition unit, flag bit is the first flag bit, the respectively Two flag bits and third flag bit are indicated, the second mark wherein the first flag bit indicates that linkage pattern is invalid mode with " 0 " Will position indicates that linkage pattern is prefabricated mode, and prefabricated mode is the parameter preset obtained by the best human comfort's environment of analysis, It is indicated to indicate that linkage pattern is self-defined pattern with third flag bit with " 1 ", be indicated with " 2 ", self-defined pattern is user According to their needs, the parameter preset that setting user itself is comfortable on.If Centralized Controller gets the mark of linkage pattern In the case that position is first identifier position " 0 ", linkage pattern is invalid mode at this time, and first control unit controls air conditioner and fresh air Machine does not execute any operation, directly exits process.If the flag bit for the linkage pattern that Centralized Controller is got is first identifier Position " 1 " or the second flag bit " 2 ", the first detection parameters and the second detection parameters that will test are compared with parameter preset respectively Compared with judging whether the first detection parameters and the second detection parameters and parameter preset are identical respectively using judging unit.
Linkage control unit 30 includes detection module, judgment module and adjustment module, wherein detection module is for detecting the First detection parameters of one target device, and detect the second detection parameters of the second target device;Judgment module, for sentencing respectively Whether disconnected first detection parameters and the second detection parameters and parameter preset are identical;Adjustment module, for judging target detection Under parameter and the different situation of parameter preset, first object equipment is adjusted according to target detection parameter and the difference of parameter preset And/or second target device operational mode, wherein target detection parameter include the first detection parameters and/or second detection ginseng Number.
Target detection parameter and parameter preset include multiple subparameters, and adjustment module includes: computational submodule and control Submodule, wherein computational submodule, for counting in the case where judging target detection parameter and the different situation of parameter preset Calculate the difference with the one-to-one target detection parameter of parameter preset;Control submodule, for control first object equipment and Second target device adjusts operational mode according to difference.
In addition, in the case where judging that the first detection parameters and the second detection parameters and parameter preset are all the same, linkage Control unit 30 further includes the first control module, is transported for controlling first object equipment and the second target device according to parameter preset Row.
Specifically, using the first detection parameters of detection module detection first object equipment, and the second target device is detected The second detection parameters, judged respectively using judging unit the first detection parameters and the second detection parameters and parameter preset whether phase Together, it is assumed that " temperature ", " humidity " the two parameters and parameter preset in target component be not identical, calculating in adjustment module Module calculates the difference of target component and parameter preset, and the control submodule in adjustment module is according to calculated " temperature " Difference adjusts air conditioner by changing operational mode to adjust indoor temperature locating for air conditioner, so that " the temperature in target component Degree " reaches parameter preset, adjusts new blower institute also according to the new blower change operational mode of " humidity " difference adjusting is calculated The humidity for locating area of space, so that " humidity " in target component reaches parameter preset.Likewise, if the first detection parameters and Have that other parameters are not identical as parameter preset in second detection parameters, the above method is utilized to adjust air conditioner and new blower adjustment fortune Row mode.If the first detection parameters and the second detection parameters and parameter preset are all the same, the control of the first control module is empty It adjusts device and new blower to run according to parameter preset, does not need to be adjusted air conditioner and new blower.
After linkage control unit 30, device further include: first acquisition unit and return unit, wherein first obtains Unit is used to obtain the timing time from initial time to current time, wherein initial time is first object equipment and second At the time of target device starts to run according to parameter preset or control first object equipment and the second target device opened according to difference At the time of beginning to adjust operational mode;Return unit is used in the case where timing time reaches preset time, returns to detection first First detection parameters of target device, and detect the second detection parameters of the second target device.
Specifically, the embodiment provided according to the present invention, for first object equipment with air conditioner, the second target device is fresh air For machine.First acquisition unit obtains at the time of operation since air conditioner and new blower according to parameter preset or control air conditioner At the time of starting to adjust operational mode according to difference with new blower, after timing reaches preset time, return unit returns to inspection The first detection parameters of air conditioner are surveyed, and detect the second detection parameters of new blower, target detection parameter is being judged and is presetting In the different situation of parameter, the difference calculated with the one-to-one target detection parameter of parameter preset, control first are executed Target device and the second target device are according to difference adjusting operational mode, wherein target detection parameter includes the first detection parameters And/or second detection parameters.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (14)

1. a kind of control method of Centralized Controller characterized by comprising
Receive the instruction for opening linkage pattern;
In the case where receiving described instruction, first object equipment and the second target device are subjected to pairing connection;And
To the first object equipment and second target device progress linkage control after pairing connection;
In the case where receiving described instruction, after first object equipment and the second target device are carried out pairing connection, institute State control method further include: when the first object equipment is in the open state, controls second target device and be in institute State open state;Or when the first object equipment is in close state, controls second target device and be in the pass Closed state;
When second target device is in the open state, controls the first object equipment and be in the open state;Or When second target device is in close state, controls the first object equipment and be in the closed state;
Wherein, the linkage pattern includes: invalid mode, prefabricated mode and self-defined pattern.
2. control method according to claim 1, which is characterized in that pairing connection after the first object equipment and Second target device carries out linkage control
The first detection parameters of the first object equipment are detected, and detect the second detection parameters of second target device;
Judge whether first detection parameters and second detection parameters and parameter preset are identical respectively;And
In the case where judging target detection parameter and the different situation of the parameter preset, according to the target detection parameter and institute The difference for stating parameter preset adjusts the operational mode of the first object equipment and/or second target device, wherein described Target detection parameter includes first detection parameters and/or second detection parameters.
3. control method according to claim 2, which is characterized in that the target detection parameter and the parameter preset are equal Including multiple subparameters, in the case where judging target detection parameter and the different situation of the parameter preset, according to the target Detection parameters and the difference of the parameter preset adjust the operational mode packet of the first object equipment and/or the second target device It includes:
In the case where judging the target detection parameter and the different situation of the parameter preset, calculate and the parameter preset The difference of the one-to-one target detection parameter;And
It controls the first object equipment and second target device and the operational mode is adjusted according to the difference.
4. control method according to claim 3, which is characterized in that judging first detection parameters and described In the case that two detection parameters and parameter preset are all the same, the control method further include:
It controls the first object equipment and second target device is run according to the parameter preset.
5. control method according to claim 4, which is characterized in that pairing connection after the first object equipment and After second target device carries out linkage control, the control method further include:
Obtain timing time from initial time to current time, wherein the initial time be the first object equipment and At the time of second target device starts to run according to the parameter preset or the control first object equipment and described the At the time of two target devices start to adjust operational mode according to the difference;And
In the case where the timing time reaches preset time, the first detection ginseng for detecting the first object equipment is returned Number, and detect the second detection parameters of second target device.
6. control method according to claim 2, which is characterized in that in the case where receiving described instruction, by first After target device and the second target device carry out pairing connection, the control method further include:
Obtain the flag bit of the linkage pattern;
In the case where getting the flag bit is the first flag bit, the first object equipment and second target are controlled Equipment does not execute any operation, wherein first flag bit indicates that the linkage pattern is invalid mode;And
When getting the flag bit is the second flag bit or third flag bit, first detection parameters are judged respectively It is whether identical with second detection parameters and parameter preset, wherein second flag bit indicates that the linkage pattern is pre- Molding formula, the third flag bit indicate that the linkage pattern is self-defined pattern.
7. control method according to claim 1, which is characterized in that in the case where receiving described instruction, by first Target device carries out pairing connection with the second target device
Receive the pairing link order of the first object equipment and second target device;And
After receiving the pairing link order, controls the first object equipment and second target device realizes pairing Connection.
8. a kind of control device of Centralized Controller characterized by comprising
Receiving unit, for receiving the instruction for opening linkage pattern;
Pairing unit, in the case where receiving described instruction, first object equipment and the second target device to be matched To connection;And
Linkage control unit, for linking to the first object equipment and second target device matched after connecting Control;
After the pairing unit, the control device further include: the second control unit, for being received in the pairing unit In the case where described instruction, after first object equipment and the second target device are carried out pairing connection, when first mesh When marking device is in the open state, controls second target device and be in the open state;Or third control unit, it is used for When the first object equipment is in close state, controls second target device and be in the closed state;When described When second target device is in the open state, controls the first object equipment and be in the open state;Or work as described second When target device is in close state, controls the first object equipment and be in the closed state;
Wherein, the linkage pattern includes: invalid mode, prefabricated mode and self-defined pattern.
9. control device according to claim 8, which is characterized in that the linkage control unit includes:
Detection module for detecting the first detection parameters of the first object equipment, and detects second target device Second detection parameters;
Judgment module, for judge respectively first detection parameters and second detection parameters and parameter preset whether phase Together;And
Adjustment module, in the case where judging target detection parameter and the different situation of the parameter preset, according to the mesh Mark detection parameters and the difference of the parameter preset adjust the operation mould of the first object equipment and/or the second target device Formula, wherein the target detection parameter includes first detection parameters and/or second detection parameters.
10. control device according to claim 9, which is characterized in that the target detection parameter and the parameter preset It include multiple subparameters, the adjustment module includes:
Computational submodule, for calculating in the case where judging the target detection parameter and the different situation of the parameter preset Out with the difference of the parameter preset target detection parameter correspondingly;And
Control submodule, for controlling the first object equipment and second target device according to difference adjusting Operational mode.
11. control device according to claim 10, which is characterized in that judging first detection parameters and described In the case that second detection parameters and parameter preset are all the same, the linkage control unit further include:
First control module is transported for controlling the first object equipment and second target device according to the parameter preset Row.
12. control device according to claim 11, which is characterized in that the control device further include:
First acquisition unit, in the linkage control unit to the first object equipment and described the after pairing connection After two target devices carry out linkage control, the timing time from initial time to current time is obtained, wherein when the starting It is the first object equipment at quarter and at the time of second target device starts to run according to the parameter preset or control institute State first object equipment and second target device according to the difference start adjust operational mode at the time of;And
Return unit, for returning and detecting the first object equipment in the case where the timing time reaches preset time The first detection parameters, and detect the second detection parameters of second target device.
13. control device according to claim 9, which is characterized in that the control device further include:
Second acquisition unit, for the pairing unit in the case where receiving described instruction, by first object equipment and the After two target devices carry out pairing connection, the flag bit of the linkage pattern is obtained;
First control unit, for controlling the first object in the case where getting the flag bit is the first flag bit Equipment and second target device do not execute any operation, wherein first flag bit indicates that the linkage pattern is nothing Effect mode;And
Judging unit, for judging institute respectively when getting the flag bit is the second flag bit or third flag bit It states the first detection parameters and second detection parameters and whether parameter preset is identical, wherein second flag bit indicates institute Stating linkage pattern is prefabricated mode, and the third flag bit indicates that the linkage pattern is self-defined pattern.
14. control device according to claim 8, which is characterized in that the pairing unit includes:
Receiving module, for receiving the pairing link order of the first object equipment and second target device;And
Second control module controls the first object equipment and described after receiving the pairing link order Two target devices realize pairing connection.
CN201510452327.7A 2015-07-28 2015-07-28 Control method and device of centralized controller Active CN104990231B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510452327.7A CN104990231B (en) 2015-07-28 2015-07-28 Control method and device of centralized controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510452327.7A CN104990231B (en) 2015-07-28 2015-07-28 Control method and device of centralized controller

Publications (2)

Publication Number Publication Date
CN104990231A CN104990231A (en) 2015-10-21
CN104990231B true CN104990231B (en) 2019-04-30

Family

ID=54302085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510452327.7A Active CN104990231B (en) 2015-07-28 2015-07-28 Control method and device of centralized controller

Country Status (1)

Country Link
CN (1) CN104990231B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107036261B (en) * 2017-04-19 2020-11-24 青岛海信电子设备股份有限公司 Control system of machine room air conditioning unit
CN108195036B (en) * 2017-11-28 2020-03-06 珠海格力电器股份有限公司 Air conditioner control method and device
CN113007853A (en) * 2021-02-23 2021-06-22 青岛海信日立空调系统有限公司 Air conditioner
CN115407810B (en) * 2022-09-07 2024-08-27 长城汽车股份有限公司 Vehicle temperature adjusting method and device, vehicle and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881498A (en) * 2009-05-06 2010-11-10 欧威尔空调(中国)有限公司 Multiple connected air conditioning system and control method thereof
CN103994539A (en) * 2013-02-19 2014-08-20 广东美的暖通设备有限公司 Heating and ventilation device with work mode automatically switched and control method thereof
CN104180464A (en) * 2014-08-11 2014-12-03 珠海格力电器股份有限公司 Linkage control method for fresh air machine and air conditioner
CN104596055A (en) * 2014-12-23 2015-05-06 广东美的制冷设备有限公司 Method and device for controlling rotating speed of draught fan of air conditioner

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4016360B2 (en) * 1998-05-20 2007-12-05 株式会社デンソー Air conditioner for vehicles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881498A (en) * 2009-05-06 2010-11-10 欧威尔空调(中国)有限公司 Multiple connected air conditioning system and control method thereof
CN103994539A (en) * 2013-02-19 2014-08-20 广东美的暖通设备有限公司 Heating and ventilation device with work mode automatically switched and control method thereof
CN104180464A (en) * 2014-08-11 2014-12-03 珠海格力电器股份有限公司 Linkage control method for fresh air machine and air conditioner
CN104596055A (en) * 2014-12-23 2015-05-06 广东美的制冷设备有限公司 Method and device for controlling rotating speed of draught fan of air conditioner

Also Published As

Publication number Publication date
CN104990231A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104990231B (en) Control method and device of centralized controller
CN108168042B (en) Air conditioner and control method, device and system thereof
CN107367016B (en) Intelligent control method and device for air conditioner and air conditioner
CN106016583B (en) Control method and control device of air conditioning system and air conditioning system
CN107166657B (en) Air conditioner control method and device and air conditioner
CN107797459B (en) Control method and device of terminal equipment, storage medium and processor
CN104615003B (en) Prompting message sending method and device
CN107844073B (en) Electronic equipment control method, device and system, storage medium and processor
CN105785779B (en) Smart home control method and device
CN108488987A (en) Control method, storage medium and the equipment of the apparatus of air conditioning
CN108895628A (en) Air conditioner control method and device
CN107883536A (en) Parameter adjusting method and device of air conditioning equipment and terminal
CN105423483B (en) Control method and device for operation mode of air conditioner
CN107728482A (en) Control system, control process method and device
CN108181819A (en) Linkage control method, device and system for household electrical appliance and household electrical appliance
CN107388479B (en) Air conditioner control method and device and air conditioner
CN106572228A (en) Volume adjusting method, volume adjusting device and mobile terminal
CN109140665A (en) Method and device for controlling air conditioner and air conditioner device
CN109269036B (en) Cloud control method of multi-split air conditioner and multi-split air conditioner system
CN206094440U (en) Air conditioner control system and air conditioner
CN105371428B (en) Method and device for processing working parameters of air conditioner
CN106016515B (en) Control method, device and system of dehumidifying device
CN109241634A (en) Air conditioner blowing wide-angle determining method and device and air conditioner
CN110736232A (en) Air conditioner control method and device
CN111306720B (en) Method and device for setting air conditioner parameters

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant