CN104986288A - Ship side energy pipeline support - Google Patents

Ship side energy pipeline support Download PDF

Info

Publication number
CN104986288A
CN104986288A CN201510419235.9A CN201510419235A CN104986288A CN 104986288 A CN104986288 A CN 104986288A CN 201510419235 A CN201510419235 A CN 201510419235A CN 104986288 A CN104986288 A CN 104986288A
Authority
CN
China
Prior art keywords
rack body
clamp
guide
pipeline support
energy pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510419235.9A
Other languages
Chinese (zh)
Other versions
CN104986288B (en
Inventor
张理燕
张文杰
郑昕
唐力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN201510419235.9A priority Critical patent/CN104986288B/en
Publication of CN104986288A publication Critical patent/CN104986288A/en
Application granted granted Critical
Publication of CN104986288B publication Critical patent/CN104986288B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a ship side energy pipeline support comprising a support body, two clamping devices and two guide devices arranged opposite to each other. The support body is employed to carry a pipeline; the two clamping devices are oppositely arranged on two end parts of the support body; each clamping device is formed by a clamping assembly; each clamping assembly is formed by a connection plate, a large clamping plate and a small clamping plate; the connection plate is fixedly connected to the bottom surface of the end part of the support body; the large and small clamping plates are respectively connected to two side surfaces of the connection plate; the two guide devices are fixedly connected to the support body; each guide device comprises at least two guide members; and each guide member is fixedly connected to the external side of the support body. The ship side can be clamped by the clamping devices; various pipelines can be sorted by the guide devices; and the ship side energy pipeline support is simply structured and easily tidied up.

Description

Gun wale energy pipeline support
Technical field
The present invention relates to a kind of support, particularly relate to a kind of gun wale energy pipeline support.
Background technology
In order to realize the normal operation of boats and ships, need to arrange a large amount of pipelines in boats and ships, gun wale is also like this.These pipelines are mainly divided into two large classes, one class is the power pipeline for propelling unit service, comprise fuel line, cooling water pipeline and compressed air line etc., another kind of is the pipeline of serving for full ship, comprises fire water pipeline, water supply line, sewage and process pipeline etc.Pipeline is used to carry various working medium, and due to the pressure of working medium, temperature, flow and corrosive difference, the kind and the specification that also just determine pipeline are many.The energy pipeline of the gun wale of current boats and ships is placed mixed and disorderly, can affect carrying out smoothly of ship side operate outside.
Summary of the invention
The technical problem to be solved in the present invention places mixed and disorderly defect to overcome prior art pipeline, provides a kind of gun wale energy pipeline support.
The present invention solves above-mentioned technical matters by following technical proposals:
A kind of gun wale energy pipeline support, its feature is, it comprises:
One rack body, for placing pipeline;
Two fixing devices, be relatively arranged on the both ends of described rack body, fixing device described in each comprises a clamp assembly, described clamp assembly comprises a plate, large clamp and a little clamp, described connecting panel is fixedly connected on the bottom surface of the end of described rack body, and described large clamp and described little clamp are connected to the two sides of described connecting panel;
Two guide piecees be oppositely arranged, be fixedly connected on described rack body, guide piece described in each comprises at least two guides, and guide described in each is fixedly connected on the outside of described rack body, the number of described guide can be set according to actual needs, be convenient to the placement of described pipeline.
Preferably, described rack body is U-tube, comprises the arc pipe that pipe and two is always oppositely arranged, and described in two, arc pipe correspondence is connected to the both ends of described straight pipe, and fixing device described in two is arranged at the end of arc pipe described in two respectively.
Preferably, described in two, guide piece correspondence is arranged at the junction of arc pipe described in two and described straight pipe.
Preferably, described guide is guide pipe, and guide piece described in each comprises guide pipe described in two, and described in two, the line of centers of guide pipe has angle.
Preferably, the bottom welding of described straight pipe has a gusset, and described straight pipe medial center position is welded with leader.Described gusset for increasing the intensity of described straight pipe, and then increases the intensity of described support, arranges described handle mainly for the ease of carrying.
Preferably, fixing device described in each also comprises two brace panels and a set square, brace panel described in two is distributed in the both sides of described rack body, brace panel described in two is arranged in outside described clamp assembly, brace panel described in each is provided with one first through hole, and the junction of brace panel described in each and described clamp assembly is and is welded to connect, described set square one end is welded in described rack body, and the other end is welded in the clamp near described support in described large clamp and described little clamp.Described brace panel is mainly used for the intensity increasing described clamp assembly, prevents the bayonet socket of described clamp assembly to expand.Described set square is mainly used for the Joint strenght increasing arc pipe described in described clamp assembly and two.
Preferably, described large clamp vertical welding is in the side of described connecting panel near described rack body, and described little clamp vertical welding is in the side of described connecting panel away from described rack body.
Preferably, described little clamp top is provided with one first half-round cross hole, and bottom is provided with two second through holes, and outside described little clamp, described in two, the second through hole correspondence is welded with two nuts, and described little clamp is connected by the second through hole bolt described in two with described gun wale; Described large clamp top is provided with one second half-round cross hole.The outside of described little clamp is welded with nut described in two, eliminates the Assembly &Disassembly of nut described in two.
Preferably, the end of described rack body is located in described first half-round cross hole and described second half-round cross hole, and the junction of the end of described rack body and described first half-round cross hole and described second half-round cross hole is and is welded to connect.
Preferably, described connecting panel is welded in the bottom surface of the end of described rack body.
On the basis meeting this area general knowledge, above-mentioned each optimum condition, can combination in any, obtains the preferred embodiments of the invention.
Positive progressive effect of the present invention is:
The present invention utilizes gripping means grips gun wale, and carry out classification by guide piece to all kinds of pipeline and place, structure is simple, and is convenient to arrange.
Accompanying drawing explanation
Fig. 1 is the structural representation of the gun wale energy pipeline support of a preferred embodiment of the present invention.
Fig. 2 is the sectional structure schematic diagram along A-A in Fig. 1.
Fig. 3 is the close-up schematic view of I part in Fig. 2.
Fig. 4 is the sectional structure schematic diagram along B-B in Fig. 3.
Fig. 5 is the sectional structure schematic diagram along C-C in Fig. 3.
Description of reference numerals:
1: rack body
11: straight pipe
12: arc pipe
2: fixing device
21: connecting panel
22: large clamp
221: the second half-round cross holes
23: little clamp
231: the first half-round cross holes
232: the second through holes
233: nut
24: brace panel
241: the first through holes
25: set square
3: guide piece
31: guide pipe
4: gusset
5: handle
Detailed description of the invention
Mode below by embodiment further illustrates the present invention, but does not therefore limit the present invention among described scope of embodiments.
As depicted in figs. 1 and 2, gun wale energy pipeline support comprises rack body 1, two fixing device 2 and two guide piecees be oppositely arranged 3.Wherein, described rack body 1 is for placing described pipeline.Fixing device 2 described in two is relatively arranged on the both ends of described rack body 1, described in each, fixing device 2 comprises a clamp assembly, described clamp assembly comprises the large clamp 22 of a plate 21, one and a little clamp 23, described connecting panel 21 is fixedly connected on the bottom surface of the end of described rack body 1, and described large clamp 22 and described little clamp 23 are connected to the two sides of described connecting panel 21.Guide piece 3 described in two is fixedly connected on described rack body 1, and described in each, guide piece 3 comprises at least two guides, and guide described in each is fixedly connected on the outside of described rack body 1.
As shown in Figure 1, in the present embodiment, described rack body 1 is U-tube, comprise pipe 11 and the two arc pipes 12 be oppositely arranged always, and arc pipe 12 correspondence is connected to the both ends of described straight pipe 11 described in two, described in two, fixing device 2 is arranged at the end of arc pipe 12 described in two respectively.U-tube is symmetrical structure, and structure is simple, and floor area is little.
In other embodiments, described rack body 1 can substitute by other structures, and is not only confined to described U-tube.
As shown in Figure 1, in the present embodiment, guide piece 3 correspondence described in two is arranged at the junction of arc pipe 12 and described straight pipe 11 described in two.Described in two, guide piece 3 is positioned at described junction, is namely positioned at the medium position of described support, is convenient to the placement of described pipeline.
As shown in Figure 1, in the present embodiment, described guide is guide pipe 31, and guide piece 3 described in each comprises guide pipe 31 described in two, and described in two, the line of centers of guide pipe 31 has angle.Guide pipe 31 structure is simple, is set to have angle by guide pipe described in two 31, utilizes described angle, be convenient to block described pipeline.
In other embodiments, described guide piece 3 can substitute by other structures, and is not only confined to guide pipe 31 described in two.
As shown in Figures 2 and 3, in the present embodiment, the bottom welding of described straight pipe 11 has a gusset 4, and described straight pipe 11 medial center position is welded with leader 5.Described gusset 4 is for increasing the intensity of described rack body 1, and described handle 5 is convenient to carrying of described support.
As shown in Figures 2 and 3, in the present embodiment, fixing device 2 described in each also comprises two brace panel 24 and set squares 25, brace panel 24 described in two is distributed in the both sides of described rack body 1, brace panel 24 described in two is arranged in outside described clamp assembly, brace panel 24 described in each is provided with one first through hole 241, and brace panel 24 described in each is with the junction of described clamp assembly and is welded to connect, described set square 25 one end is welded in described rack body 1, and the other end is welded in the clamp near described support in described large clamp 22 and described little clamp 23.Described brace panel 24, for increasing the intensity of described clamp assembly, prevents the bayonet socket of described clamp assembly to expand.Described set square 25 is for increasing the Joint strenght of arc pipe 12 described in described clamp assembly and two.
As shown in Figures 2 and 3, in the present embodiment, described large clamp 22 vertical welding is in the side of described connecting panel 21 near described rack body 1, and described little clamp 23 vertical welding is in the side of described connecting panel 21 away from described rack body 1.Welding operation is simple, and described little clamp 23 is positioned at outside, convenient operation.
As shown in Figure 4 and Figure 5, in the present embodiment, described little clamp 23 top is provided with one first half-round cross hole 231, bottom is provided with two second through holes 232, outside described little clamp 23, described in two, the second through hole 232 correspondence is welded with two nuts 233, and described little clamp 23 is connected by the second through hole 232 bolt described in two with described gun wale; Described large clamp 22 top is provided with one second half-round cross hole 221.Nut described in two 233 is welded on described little clamp 23, simple to operate when dismounting and installation, only need swivel bolt, eliminate dismounting and the installation of nut 233 described in two.
As shown in Figure 4 and Figure 5, in the present embodiment, the end of described rack body 1 is located in described first half-round cross hole 231 and described second half-round cross hole 221, and the junction of the end of described rack body 1 and described first half-round cross hole 231 and described second half-round cross hole 221 is and is welded to connect.The described arc pipe 12 of described rack body 1 is placed in described first half-round cross hole 231 and described second half-round cross hole 221, adds the Joint strenght of described arc pipe 12 and described clamp assembly.
As shown in Figure 4, in the present embodiment, described connecting panel 21 is welded in the bottom surface of the end of described arc pipe 12.Welding operation is simple, connects reliable, and is convenient to connect described large clamp 22 and described little clamp 23.
During use, by described stentplacement at assigned address, described in two, fixing device 2 blocks described gun wale, tight a bolt and be fixed, then pass the first through hole 241 on described brace panel 24 with the rope made of hemp or steel cable, fix above deck, just can carry out sorting placement to described pipeline.
Although the foregoing describe the specific embodiment of the present invention, it will be understood by those of skill in the art that these are only casehistorys, protection scope of the present invention is defined by the appended claims.Those skilled in the art, under the prerequisite not deviating from principle of the present invention and essence, can make various changes or modifications to these embodiments, but these change and amendment all falls into protection scope of the present invention.

Claims (10)

1. a gun wale energy pipeline support, is characterized in that, it comprises:
One rack body, for placing pipeline;
Two fixing devices, be relatively arranged on the both ends of described rack body, fixing device described in each comprises a clamp assembly, described clamp assembly comprises a plate, large clamp and a little clamp, described connecting panel is fixedly connected on the bottom surface of the end of described rack body, and described large clamp and described little clamp are connected to the two sides of described connecting panel;
Two guide piecees be oppositely arranged, are fixedly connected on described rack body, and guide piece described in each comprises at least two guides, and guide described in each is fixedly connected on the outside of described rack body.
2. gun wale energy pipeline support as claimed in claim 1, it is characterized in that, described rack body is U-tube, comprise the arc pipe that pipe and two is always oppositely arranged, and arc pipe correspondence is connected to the both ends of described straight pipe described in two, fixing device described in two is arranged at the end of arc pipe described in two respectively.
3. gun wale energy pipeline support as claimed in claim 2, is characterized in that, described in two, guide piece correspondence is arranged at the junction of arc pipe described in two and described straight pipe.
4. gun wale energy pipeline support as claimed in claim 3, it is characterized in that, described guide is guide pipe, and guide piece described in each comprises guide pipe described in two, and described in two, the line of centers of guide pipe has angle.
5. gun wale energy pipeline support as claimed in claim 2, it is characterized in that, the bottom welding of described straight pipe has a gusset, and described straight pipe medial center position is welded with leader.
6. gun wale energy pipeline support as claimed in claim 1, it is characterized in that, fixing device described in each also comprises two brace panels and a set square, brace panel described in two is distributed in the both sides of described rack body, brace panel described in two is arranged in outside described clamp assembly, brace panel described in each is provided with one first through hole, and the junction of brace panel described in each and described clamp assembly is and is welded to connect, described set square one end is welded in described rack body, and the other end is welded in the clamp near described support in described large clamp and described little clamp.
7. gun wale energy pipeline support as claimed in claim 6, is characterized in that, described large clamp vertical welding is in the side of described connecting panel near described rack body, and described little clamp vertical welding is in the side of described connecting panel away from described rack body.
8. gun wale energy pipeline support as claimed in claim 1, it is characterized in that, described little clamp top is provided with one first half-round cross hole, bottom is provided with two second through holes, outside described little clamp, described in two, the second through hole correspondence is welded with two nuts, and described little clamp is connected by the second through hole bolt described in two with described gun wale; Described large clamp top is provided with one second half-round cross hole.
9. gun wale energy pipeline support as claimed in claim 8, it is characterized in that, the end of described rack body is located in described first half-round cross hole and described second half-round cross hole, and the junction of the end of described rack body and described first half-round cross hole and described second half-round cross hole is and is welded to connect.
10. the gun wale energy pipeline support as described in claim 1-9 any one, it is characterized in that, described connecting panel is welded in the bottom surface of the end of described rack body.
CN201510419235.9A 2015-07-16 2015-07-16 Gun wale energy pipeline support Active CN104986288B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510419235.9A CN104986288B (en) 2015-07-16 2015-07-16 Gun wale energy pipeline support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510419235.9A CN104986288B (en) 2015-07-16 2015-07-16 Gun wale energy pipeline support

Publications (2)

Publication Number Publication Date
CN104986288A true CN104986288A (en) 2015-10-21
CN104986288B CN104986288B (en) 2017-10-03

Family

ID=54298221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510419235.9A Active CN104986288B (en) 2015-07-16 2015-07-16 Gun wale energy pipeline support

Country Status (1)

Country Link
CN (1) CN104986288B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107449387A (en) * 2017-08-31 2017-12-08 浙江工业大学 A kind of simple rod-type sounding instrument fixed mount

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120009193A (en) * 2010-07-23 2012-02-01 삼성중공업 주식회사 operating apparatus for service piping within the ship
CN102673762A (en) * 2012-05-23 2012-09-19 重庆米恒动力机械有限公司 Multifunctional on-hook engine seat for ship
CN203215087U (en) * 2013-04-25 2013-09-25 大连船舶重工集团有限公司 Pipeline support with two-way freedom degree
KR20140012830A (en) * 2012-07-23 2014-02-04 현대중공업 주식회사 Pipe support skid
CN203453624U (en) * 2013-08-21 2014-02-26 江苏海纬集团有限公司 Pipeline-fixing member
CN203628032U (en) * 2013-11-19 2014-06-04 苏州边枫电子科技有限公司 Adjustable cable clamping device
CN203664978U (en) * 2013-12-20 2014-06-25 贾文良 Assembling clamp for outboard engine support and clamping devices
CN203979660U (en) * 2014-06-24 2014-12-03 广州文冲船厂有限责任公司 A kind of ship pipeline suspension bracket fixed structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120009193A (en) * 2010-07-23 2012-02-01 삼성중공업 주식회사 operating apparatus for service piping within the ship
CN102673762A (en) * 2012-05-23 2012-09-19 重庆米恒动力机械有限公司 Multifunctional on-hook engine seat for ship
KR20140012830A (en) * 2012-07-23 2014-02-04 현대중공업 주식회사 Pipe support skid
CN203215087U (en) * 2013-04-25 2013-09-25 大连船舶重工集团有限公司 Pipeline support with two-way freedom degree
CN203453624U (en) * 2013-08-21 2014-02-26 江苏海纬集团有限公司 Pipeline-fixing member
CN203628032U (en) * 2013-11-19 2014-06-04 苏州边枫电子科技有限公司 Adjustable cable clamping device
CN203664978U (en) * 2013-12-20 2014-06-25 贾文良 Assembling clamp for outboard engine support and clamping devices
CN203979660U (en) * 2014-06-24 2014-12-03 广州文冲船厂有限责任公司 A kind of ship pipeline suspension bracket fixed structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107449387A (en) * 2017-08-31 2017-12-08 浙江工业大学 A kind of simple rod-type sounding instrument fixed mount

Also Published As

Publication number Publication date
CN104986288B (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN204956855U (en) Protective barrier
CN104986288A (en) Ship side energy pipeline support
CN201425121Y (en) Cold insulation pipe holder
CN202047367U (en) Integral cable clamp for stayed cables
CN204879070U (en) A pipe clamp for light truck
KR101004010B1 (en) clamp for gas pipe
CN206583582U (en) A kind of complete fast pressure testing device of piping lane pipeline
CN204328327U (en) A kind of pipe-line system and pipeline valve body supporting frame
CN108871941A (en) A kind of structure for pressure test of pipe fitting
KR101378980B1 (en) Apparatus for connecting flange of piping
CN215635396U (en) Construction protection device for pipeline installation
KR200413506Y1 (en) Pipe Supporter for Riser Pipe
CN105987230A (en) Pipe clamp cross arm
CN105987226A (en) Dynamic load pipe clamp cross arm
CN214169891U (en) Building support is with hardware and hardware fastener convenient to butt joint pipeline fast
CN206436152U (en) A kind of adjacent tubes butting joint fixture
CN218348776U (en) Exhaust duct structure of evaporative cooler
CN213420128U (en) Ultralight high strength insulating tube
CN203809930U (en) Novel sealing and connecting structure for pipelines and bend
CN213745231U (en) Outdoor UV pipe clamp of preventing ponding
CN215658788U (en) Flexible pipeline welding platform
CN211853089U (en) Pipe connection device
CN215215313U (en) A sand hole plugging device for pipeline
CN105799885A (en) Suspension type variable angle clamp
CN211906604U (en) Emergency leakage stoppage teaching aid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant