CN104981014B - Descending resource allocation method and base station - Google Patents

Descending resource allocation method and base station Download PDF

Info

Publication number
CN104981014B
CN104981014B CN201410133484.7A CN201410133484A CN104981014B CN 104981014 B CN104981014 B CN 104981014B CN 201410133484 A CN201410133484 A CN 201410133484A CN 104981014 B CN104981014 B CN 104981014B
Authority
CN
China
Prior art keywords
resources
gbr
terminal
business
active user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410133484.7A
Other languages
Chinese (zh)
Other versions
CN104981014A (en
Inventor
谌晓清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TD Tech Ltd
Original Assignee
TD Tech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TD Tech Ltd filed Critical TD Tech Ltd
Priority to CN201410133484.7A priority Critical patent/CN104981014B/en
Publication of CN104981014A publication Critical patent/CN104981014A/en
Application granted granted Critical
Publication of CN104981014B publication Critical patent/CN104981014B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/543Allocation or scheduling criteria for wireless resources based on quality criteria based on requested quality, e.g. QoS

Abstract

A kind of descending resource allocation method of present invention offer and base station, this method include:Period obtains cell downlink GBR traffic satisfaction rate statistical value, which includes RB resources used in business of the priority higher than GBR traffic;According to the RB number of resources and the satisfaction rate statistical value of the PDSCH of current TTI, determine that Non GBR traffics can use RB number of resources in current TTI, when dispatching while possessing the user of GBR traffic and Non GBR traffics, the RB number of resources used by limiting its Non GBR traffic, ensure that the GBR traffic of subsequent user can obtain required RB resources, to ensure that the GBR traffic of subsequent user can reach respective qos requirement.The GBR traffic and Non GBR traffics data for eating dishes without rice or wine to send the user simultaneously authorize well instruction.The number for carrying out downstream grants instruction is reduced, the efficiency of authorization resources CCE is improved.

Description

Descending resource allocation method and base station
Technical field
The invention belongs to wireless mobile telecommunication technology field, it is specifically related to a kind of descending resource allocation method and base station.
Background technology
Long term evolution(Long Term Evolution, hereinafter referred to as LTE)Project is third generation partner program (3rd Generation Partnership Project, hereinafter referred to as 3GPP) tissue push future mobile communications architectural framework. LTE business is all using packet switching service, according to service quality(Quality of Service, hereinafter referred to as QoS)Grade It is broadly divided into guarantee bit rate(Guarantee Bit Rate, hereinafter referred to as GBR)Business and non-guaranteed bit rate(Non- Guarantee Bit Rate, hereinafter referred to as Non-GBR)Business.GBR traffic needs to ensure certain service rate, and Non- GBR traffic is not necessary to guaranty that service rate.GBR traffic, such as streaming media service are relatively high to the delay requirement of data transmission, directly It connects and influences user experience, therefore, it is necessary to be preferably that each GBR traffic carries out resource block(Resource Block, hereinafter referred to as RB)Allocation schedule ensures bit rate requirement to meet it, can be just that Non-GBR business carries out RB scheduling later.
Currently, in LTE system, downlink RB resource allocation schedulings are carried out as unit of business radio bearer.Due to GBR traffic priority is higher than Non-GBR service priority, and base station is preferentially directed to each GBR traffic successively according to service priority Carrying carries out the scheduling of RB resources, is directed to the scheduling that each Non-GBR service bearers carry out resource again later.
It is above-mentioned in the prior art, as unit of service bearer being followed successively by each business datum according to priority carries out RB resources The mode of distribution will be mutually in requisition for multiple scheduling, multi-user's for multiple service bearers corresponding with same user terminal Under scene, excessive scheduling times not only need long scheduling time and excessive control channel unit(Control Channel Element, hereinafter referred to as CCE), lead to too low dispatching efficiency, also result in the RB resources eated dishes without rice or wine divided time Number increases so that the data volume that can be transmitted of eating dishes without rice or wine is reduced, and wastes interface-free resources.
Invention content
For problems of the prior art, the present invention provides a kind of descending resource allocation method and base station, to gram Clothes are carried out downlink RB scheduling of resource in the prior art as unit of service bearer and so that scheduling times are excessive, cause dispatching efficiency low Defect.
The present invention provides a kind of descending resource allocation methods, including:
Periodically acquire downlink GBR traffic satisfaction rate statistical value in cell, the downlink GBR traffic satisfaction rate statistical value packet It includes and has distributed to the RB resources of the GBR traffic and priority of each user terminal in the cell higher than the business of the GBR traffic Ratio of the sum of the number with the RB total number resources of PDSCH;
It is full according to the downlink GBR traffic of the RB number of resources of the PDSCH of the current TTI of current period and previous cycle Meaning rate statistical value determines that the assignable resource RB numbers of Non-GBR business, the current period include N number of in the cell of current TTI The TTI, N are positive integer;
Obtain the RB number of resources needed for the GBR traffic of active user's terminal of current TTI and the RB needed for Non-GBR business Number of resources;
RB number of resources needed for the GBR traffic of active user's terminal is determined as active user's terminal The RB number of resources of GBR traffic distribution;
According to the Non- of the Non-GBR business of the current TTI assignable RB number of resources and active user's terminal RB number of resources needed for GBR traffic is determined as the RB number of resources of the Non-GBR traffic assignments of active user's terminal;
According to the GBR traffic RB resources for distributing to active user's terminal of quantification and Non-GBR business RB moneys Source sends the data of the data and the Non-GBR business of the GBR traffic to active user's terminal, and is provided by CCE Source carries out downstream grants.
The present invention provides a kind of base stations, including:
First acquisition module, for periodically acquiring downlink GBR traffic satisfaction rate statistical value in cell, the downlink GBR Business satisfaction rate statistics includes having distributed to the GBR traffic and priority of each user terminal in the cell higher than the GBR industry The ratio of the sum of RB number of resources of the business of business and the RB total number resources of PDSCH;
First determining module, for according to the RB number of resources of the PDSCH of the current TTI of current period and previous cycle The downlink GBR traffic satisfaction rate statistical value determines the assignable RB number of resources of Non-GBR business, institute in the cell of current TTI It includes N number of TTI to state current period, and N is positive integer;
Second acquisition module, RB number of resources needed for the GBR traffic of active user's terminal for obtaining current TTI and RB number of resources needed for Non-GBR business;
Second determining module is determined as institute for the RB number of resources needed for the GBR traffic according to active user's terminal State the RB number of resources of the GBR traffic distribution of active user's terminal;
Third determining module, for according to the current TTI the assignable RB number of resources of Non-GBR business and described work as RB number of resources needed for the Non-GBR business of preceding user terminal is determined as the Non-GBR traffic assignments of active user's terminal RB number of resources;
Sending module, for according to the GBR traffic RB resources for distributing to active user's terminal of quantification and Non-GBR business RB resources send the number of the data and the Non-GBR business of the GBR traffic to active user's terminal According to, and downstream grants are carried out by CCE resources.
Descending resource allocation method provided by the invention and base station, according to having distributed to each user terminal GBR industry in cell RB number of resources used in business and business of the priority higher than GBR traffic counts periodically to obtain downlink GBR traffic satisfaction rate Value, to be worth in current TTI the assignable RB number of resources of Non-GBR business in the cell based on satisfaction rate statistics, into And when dispatching while possessing the downlink user of GBR traffic and Non-GBR business, get active user's terminal in current TTI GBR traffic and Non-GBR business respectively needed for RB number of resources after, according to Non-GBR business can in the cell in current TTI The RB number of resources of distribution is user terminal Non-GBR business RB resources to limit practical, reaches the GBR for ensureing subsequent user Service rate has enough resources that can dispatch, so that it is guaranteed that the purpose of all GBR traffic QoS.And with determining GBR traffic and The RB resources that Non-GBR business uses respectively send the business datum of corresponding business to the user terminal, and by CCE resources into Row downstream grants indicate.Determine that Non-GBR business can divide in current TTI based on downlink GBR traffic satisfaction rate statistical value The RB total number resources matched ensure that the RB resources for distributing to active user's Non-GBR business do not interfere with follow-up GBR as limitation The QoS of business, while reducing the number that downstream grants instruction is carried out using CCE.In the same of the service quality that ensure that GBR traffic When, for the terminal for possessing GBR traffic and Non-GBR business simultaneously, reduces the number of required downstream grants, improve money The allocation schedule efficiency in source, has saved CCE resources.
Description of the drawings
Fig. 1 is the flow chart of descending resource allocation method embodiment one of the present invention;
Fig. 2 is the flow chart of descending resource allocation method embodiment two of the present invention;
Fig. 3 is the structural schematic diagram of base station embodiment one of the present invention;
Fig. 4 is the structural schematic diagram of base station embodiment two of the present invention.
Specific implementation mode
Fig. 1 is the flow chart of descending resource allocation method embodiment one of the present invention, as shown in Figure 1, provided in this embodiment The method is particularly suitable in LTE system, and the main thought of this method is:Point of RB resources is carried out as unit of user terminal Match, specifically, base station is higher than GBR industry by being already allocated to the GBR traffic and priority of each user terminal in cell to it The downlink RB resource situations that the business of business uses carry out periodic statistics, are satisfied with the cell downlink GBR traffic for obtaining the period Rate counts, and the satisfaction rate statistical value in the above period is reference, determines current transmission time interval in this period respectively (Transmission Time Interval, hereinafter referred to as TTI)In can distribute for Non-GBR business uses in cell RB Number of resources, scheduling while when possessing the user of GBR data and Non-GBR data distribute enough RB resources to GBR traffic, Under the premise of without departing from the assignable RB number of resources of the Non-GBR business of this TTI, active user's Non-GBR traffic assignments RB is given Resource;Both it is simultaneously emitted by the data of the multiple business of user, and had reduced downstream grants number, and CCE resources had been saved, after in turn ensuring The GBR rates of user's GBR traffic of continuous scheduling.It is worth noting that the user terminal described in the present embodiment refers in particular to together When the user terminal with GBR traffic and Non-GBR business, can also be while having the user of multiple same kind business whole End, for example there are multiple GBR traffics, or there are multiple Non-GBR business;But for the terminal for there was only Non-GBR business, by In the terminal for having GBR traffic prior to only having the terminal of Non-GBR business to be dispatched, there was only the end of Non-GBR business in scheduling When end, the GBR traffic of this TTI cells is scheduled to be finished, and the rate of GBR traffic has also been guaranteed, at this point, cell is remaining RB resources used totally by Non-GBR business, do not limited by the available RB number of resources of cell Non-GBR;Or in cell After the terminal scheduling for having GBR traffic, cell Non-GBR business can be updated to cell residue RB resources with RB number of resources Number.
It is provided in this embodiment the method includes:
Step 101 periodically acquires downlink GBR traffic satisfaction rate statistical value in cell, the downlink GBR traffic satisfaction rate Statistical value includes the business of GBR traffic and priority higher than the GBR traffic for having distributed to each user terminal in the cell Ratio with the RB total number resources of PDSCH of the sum of RB number of resources;
In LTE system, enhanced base station(Evolved Node B, hereinafter referred to as eNB)Industry is sent to each user terminal The RB resources used needed for business data are allocated scheduling by the eNB, to realize resource-sharing of each user terminal to resource.It is existing Have in technology, is mainly followed successively by the distribution that each service bearer carries out RB resources using according to the priority of each pending business The technical solution of scheduling, the method provided in this embodiment are as unit of user terminal, to the multiple of same user terminal Service bearer is carried out at the same time RB scheduling of resource.
Specifically, eNB carries out periodic statistics, the above period to cell downlink GBR traffic satisfaction rate in the present embodiment Constraint of the satisfaction rate statistical value as next period RB resource allocations, but it is worth noting that, in system initial launch, ENB can according to the prior art carry out downlink RB resources distribution, or can rule of thumb preset satisfaction rate according to this reality Apply the distribution that the method that example is provided carries out downlink RB resources.
Specifically, since LTE system downlink GBR traffic and Non-GBR business are in Physical Downlink Shared Channel(Physical Downlink Shared Channel, hereinafter referred to as PDSCH)Upper transmission, so the downlink GBR traffic satisfaction in the present embodiment Rate statistical value includes:The GBR traffic and priority that each user terminal in cell has been distributed in this period are higher than the industry of GBR traffic The ratio of the sum of RB number of resources of business and the RB total number resources of PDSCH.
In addition, it is worth noting that, downlink GBR traffic satisfaction rate statistical value why is counted, and be satisfied with the GBR traffic Foundation of the rate statistical value as resource allocation is because the priority of GBR traffic is higher than Non-GBR business, and the guarantor of GBR traffic Card rate must be satisfied for, and reasonably select measurement period that the downlink GBR traffic satisfaction rate statistical value can be made closer The real-time business statistics characteristic of cell, so that the RB resources to PDSCH are carried out for GBR traffic and Non-GBR business Division result it is more reasonable.
Step 102, according to the RB number of resources of the PDSCH of the current TTI of current period and the downlink of previous cycle GBR traffic satisfaction rate statistical value determines the assignable resource RB numbers of Non-GBR business in the cell of current TTI, the current week Phase includes N number of TTI, and N is positive integer;
In LTE system, the dispatching distribution of RB resources is scheduled by minimum time unit of TTI, base station eNB It is responsible for carrying out RB resources unified scheduling and management, so the RB number of resources of its PDSCH that can know current TTI is based on being somebody's turn to do The downlink GBR traffic satisfaction rate statistical value in a upper period for acquisition was counted in RB number of resources and step 101, you can obtain current The assignable resource RB numbers of cell Non-GBR business in the current TTI in period, wherein the current period includes N number of described TTI, N are positive integer.
Step 103 obtains RB number of resources and Non-GBR business needed for the GBR traffic of active user's terminal in current TTI Required RB number of resources;
In current TTI, base station eNB has several business datums to need to issue to different user terminals, it is known that It can includes the identification informations such as type of service, reception address in each business data packet to be, so base station is known that Which user terminal is each business data packet to be sent belong to, and is any type of service, including GBR traffic and Non-GBR business.Base station can integrate the GBR traffic and Non-GBR business for belonging to user terminal respectively, into And the GBR traffic of each user terminal is followed successively by and Non-GBR business is provided according to the dispatching priority of each user terminal sequence Source allocation schedule.Since the scheduling to each user terminal is similar, only explained by taking active user's terminal as an example in the present embodiment Illustrate, which is the pending active user's end determined according to the access sequential or dispatching priority End.
Specifically, eNB needs to obtain the RB number of resources and Non- needed for the GBR traffic of active user's terminal in current TTI RB number of resources needed for GBR traffic, specifically, the modulation coding scheme that can be selected according to active user's terminal (Modulation and Coding Scheme, hereinafter referred to as MCS)Exponent number waits for the GBR industry sent to the current user terminal Business data volume and Non-GBR business datums amount determine the RB number of resources needed for GBR traffic and Non-GBR business.
RB number of resources needed for step 104, the GBR traffic according to active user's terminal is determined as the active user The RB number of resources of the GBR traffic distribution of terminal;
It is step 105, whole according to the assignable RB number of resources of Non-GBR business of the current TTI and the active user RB number of resources needed for the Non-GBR business at end is determined as the RB resources of the Non-GBR traffic assignments of active user's terminal Number;
Step 106, the GBR traffic RB resources and Non-GBR for distributing to active user's terminal according to quantification Business RB resources send the data of the data and the Non-GBR business of the GBR traffic to active user's terminal, and lead to It crosses CCE resources and carries out downstream grants instruction.
In the present embodiment, when eNB knows the RB number of resources and Non- in current TTI needed for active user's terminal GBR traffic In RB number of resources needed for GBR traffic, and the cell of current TTI after the assignable resource RB numbers of Non-GBR business, you can root RB resource allocations are carried out according to the GBR traffic that the RB number of resources needed for active user's terminal GBR traffic is active user's terminal, simultaneously Needed for the assignable resource RB numbers of Non-GBR business in cell in current TTI and active user's terminal Non-GBR business RB number of resources is the Non-GBR business progress RB resource allocations of active user's terminal, and then according to described in quantification The GBR traffic RB resources and Non-GBR business RB resources of active user's terminal send the GBR industry to active user's terminal The data of the data of business and the Non-GBR business, and mandate instruction is carried out by CCE resources.
In the present embodiment, according to distributed to the RB number of resources that each user terminal GBR traffic uses in cell come periodically Downlink GBR traffic satisfaction rate statistical value is obtained, to count to obtain in current TTI Non-GBR in the cell based on the satisfaction rate The assignable RB number of resources of business, and then getting the GBR traffic of active user's terminal and Non-GBR business in current TTI After RB number of resources needed for respectively, reality is determined according to the assignable RB number of resources of cell Non-GBR business in current TTI For the Non-GBR business RB resources of user terminal distribution, and the RB number of resources needed for the GBR traffic according to the user terminal Be determined as the RB number of resources of its GBR traffic distribution, the RB resources used respectively with determining GBR traffic and Non-GBR business to The user terminal sends corresponding data.Determine Non-GBR business current based on downlink GBR traffic satisfaction rate statistical value The RB total number resources that can be distributed in TTI, what this two classes business for determining to same user terminal as limitation was distributed RB resources, while the service quality that ensure that GBR traffic, for same user terminal, it is only necessary to primary distribution scheduling process , the allocation schedule efficiency of resource is substantially increased, CCE resources have been saved.
Fig. 2 is the flow chart of descending resource allocation method embodiment two of the present invention, as shown in Fig. 2, this method includes:
Step 201 periodically acquires downlink GBR traffic satisfaction rate statistical value in cell, the downlink GBR traffic satisfaction rate Statistical value includes the business of GBR traffic and priority higher than the GBR traffic for having distributed to each user terminal in the cell Ratio with the RB total number resources of PDSCH of the sum of RB number of resources;
Step 202, with the RB number of resources of the PDSCH of the current TTI, be multiplied by the downlink GBR traffic satisfaction rate statistics Value obtains the RB number of resources that the GBR traffic of current TTI needs, and with the RB number of resources of the PDSCH of the current TTI, subtracts described The RB number of resources that GBR traffic needs, obtains the assignable resource RB numbers of Non-GBR business of current TTI;
Specifically, in the present embodiment, due to the service quality QoS grade according to business in LTE system, mainly by business It is divided into GBR traffic and Non-GBR business, therefore, ideally, base station can obtain current by following mode GBR traffic and Non-GBR business distinguish assignable resource RB numbers in cell in TTI:
With the RB number of resources of the PDSCH of the current TTI, it is multiplied by the downlink GBR traffic satisfaction rate statistical value, is worked as The RB number of resources that the GBR traffic of preceding TTI needs;
With the RB number of resources of the PDSCH of the current TTI, the RB number of resources that the GBR traffic needs is subtracted, is obtained current The assignable resource RB numbers of Non-GBR business of TTI.
Therefore, it in the present embodiment, can be counted according to downlink GBR traffic satisfaction rate to determine in the current TTI of current period The GBR traffic of all user terminals in cell needs the RB resources that RB number of resources and Non-GBR business to be used can use The number upper limit, and come to carry out resource allocation scheduling to each user terminal in current TTI on this basis.
Step 203, basis channel quality corresponding with active user's terminal, determine and active user's terminal-pair The MCS exponent numbers answered;
Step 204 according to determining MCS exponent numbers and waits for the GBR traffic data volume sent to active user's terminal, obtains Take the RB number of resources needed for the GBR traffic of active user's terminal;
Step 205 according to determining MCS exponent numbers and waits for the Non-GBR business datums sent to active user's terminal Amount, obtains the RB number of resources needed for the Non-GBR business of active user's terminal;
Specifically, after the available RB number of resources of Non-GBR business for knowing all user terminals in current TTI, base The eNB that stands need to obtain the actually required RB number of resources of pending active user's terminal.Wherein, eNB is according to active user end The channel quality at end determines MCS exponent numbers corresponding with active user's terminal, according to determining MCS exponent numbers and waits for described The GBR traffic data volume that active user's terminal is sent, obtains the RB number of resources needed for the GBR traffic of active user's terminal; It according to determining MCS exponent numbers and waits for the Non-GBR business datum amounts sent to active user's terminal, obtains the current use RB number of resources needed for the Non-GBR business of family terminal, the part are the prior art, are repeated no more.
Step 206, the RB number of resources for the GBR traffic distribution for being determined as active user's terminal are that the active user is whole RB number of resources needed for the GBR traffic at end;
Step 207 judges whether the assignable RB number of resources of the Non-GBR business of the current TTI is greater than or equal to institute State the RB number of resources needed for the Non-GBR business of active user's terminal, if more than or be equal to, then follow the steps 208, otherwise, hold Row step 209;
Step 208, the RB number of resources for the Non-GBR traffic assignments for being determined as active user's terminal are the current use RB number of resources needed for the Non-GBR business of family terminal;
Step 209, the RB number of resources for the Non-GBR traffic assignments for being determined as active user's terminal are described current The assignable RB number of resources of Non-GBR business of TTI;
Step 210, with the assignable RB number of resources of the Non-GBR business of the current TTI and active user's terminal Non-GBR traffic assignments RB number of resources difference, update the assignable RB resources of Non-GBR business of the current TTI Number;
Step 211, the GBR traffic RB resources and Non-GBR for distributing to active user's terminal according to quantification Business RB resources send the data of the data and the Non-GBR business of the GBR traffic to active user's terminal, and lead to It crosses CCE resources and carries out mandate instruction.
When eNB has known the actually required RB number of resources of the GBR traffic of active user's terminal and the practical institute of Non-GBR business Need to be finally the current use using the assignable RB number of resources of Non-GBR business in determining cell as evidence after the RB number of resources needed Family terminal determines the RB resources of distribution.
Specifically, since the priority of GBR traffic is higher than Non-GBR business, and the guaranteed rate of GBR traffic must obtain Meet, it is thus determined that the RB number of resources for being the GBR traffic distribution of active user's terminal is the GBR of active user's terminal RB number of resources needed for business.
In practical applications, by reasonably selecting the measurement period of downlink GBR traffic satisfaction rate, it can make adjacent week The statistical property variation of business is little in period cell, so the current TTI being worth to is counted based on downlink GBR traffic satisfaction rate The interior assignable RB number of resources Many times of GBR traffic can meet the need of the GBR traffic of all user terminals in current TTI It asks, at this point, can be the RB number of resources needed for active user's terminal distribution its GBR traffic, and in the GBR industry of all user terminals After business is dispatched, the remaining RB resources of cell are supplied to the terminal for the only Non-GBR business for not obtaining scheduling use, The RB number of resources of Non-GBR traffic assignments just no longer can be distributed RB resource constraints by above-mentioned cell Non-GBR business at this time.
When the Non-GBR business to active user's terminal carries out RB resource allocations, base station eNB first has to judge current Whether the assignable RB number of resources of Non-GBR business is more than or equal to the RB needed for the Non-GBR business of active user's terminal in TTI Number of resources, if it is greater than or equal to, it is determined that the RB number of resources for the Non-GBR traffic assignments of active user's terminal is described works as RB number of resources needed for the Non-GBR business of preceding user terminal;If being less than, it is determined that be the Non- of active user's terminal The RB number of resources of GBR traffic distribution is the assignable RB number of resources of Non-GBR business in the current TTI.Due to Non-GBR industry Business is the satisfaction without carrying out guaranteed rate, therefore, when the assignable RB number of resources of Non-GBR business is less than active user end When the actual needs of end, the Non-GBR business that these assignable RB number of resources are fully allocated to the current user terminal uses .Later, the assignable RB number of resources of the Non-GBR business is updated, that is, subtracts the Non-GBR of active user's terminal RB number of resources needed for business is as the assignable RB number of resources of updated Non-GBR business, with updated assignable Foundation of the RB number of resources as the Non-GBR business RB resource allocations of next pending user terminal.It is worth noting that if Cell current residual RB number of resources is less than the RB number of resources needed for active user's terminal, then all distributes cell residue RB resources The terminal is given, these RB resource priorities are used to send the data of GBR traffic.Finally, base station eNB is worked as according to described in quantification The GBR traffic RB resources and Non-GBR business RB resources of preceding user terminal are sent and the GBR industry to active user's terminal Corresponding business datum of being engaged in and business datum corresponding with the Non-GBR business.
In the present embodiment, the institute in cell in the current TTI of determining current period is counted according to downlink GBR traffic satisfaction rate There are the RB number of resources that the GBR traffic of user terminal needs and the RB number of resources upper limits that Non-GBR business can use, in this TTI GBR traffic scheduling finish before, on this basis limit Non-GBR traffic assignments RB number of resources, in current TTI simultaneously The user terminal for possessing GBR traffic and Non-GBR business carries out resource allocation, since satisfaction rate statistics is to be based on having met The GBR traffic of user demand obtains, therefore can be effectively ensured the QoS requirement of the GBR traffic of user terminal;Separately Outside, GBR traffic and Non-GBR business as unit of user terminal, while for certain user terminal carry out the distribution tune of RB resources Degree, reduces scheduling times and the demand of CCE, the utilization rate of resource is improved while improving dispatching efficiency.
Fig. 3 is the structural schematic diagram of base station embodiment one of the present invention, as shown in figure 3, the base station includes:
First acquisition module 11, for periodically acquiring downlink GBR traffic satisfaction rate statistical value in cell, the downlink GBR traffic satisfaction rate statistics includes having distributed to the GBR traffic and priority of each user terminal in the cell higher than the GBR The ratio of the sum of RB number of resources of the business of business and the RB total number resources of PDSCH;
First determining module 12 is used for the RB number of resources and previous cycle of the PDSCH of the current TTI according to current period The downlink GBR traffic satisfaction rate statistical value, determine the assignable RB number of resources of Non-GBR business in the cell of current TTI, The current period includes N number of TTI, and N is positive integer;
Second acquisition module 13, RB number of resources needed for the GBR traffic of active user's terminal for obtaining current TTI and RB number of resources needed for Non-GBR business;
Second determining module 14 is determined as the RB number of resources needed for the GBR traffic according to active user's terminal The RB number of resources of the GBR traffic distribution of active user's terminal;
Third determining module 15, for according to the assignable RB number of resources of Non-GBR business of the current TTI and described RB number of resources needed for the Non-GBR business of active user's terminal is determined as the Non-GBR business point of active user's terminal The RB number of resources matched;
Sending module 16, for according to the GBR traffic RB resources for distributing to active user's terminal of quantification and Non-GBR business RB resources send the number of the data and the Non-GBR business of the GBR traffic to active user's terminal According to, and downstream grants instruction is carried out by CCE resources.
The base station of the present embodiment can be used for executing the technical solution of embodiment of the method shown in Fig. 1, realization principle and skill Art effect is similar, and details are not described herein again.
Fig. 4 is the structural schematic diagram of base station embodiment two of the present invention, as shown in figure 4, base station provided in this embodiment is in Fig. 3 On the basis of illustrated embodiment, first determining module 12, including:
First computing unit 121, for the RB number of resources of the PDSCH of the current TTI, being multiplied by the downlink GBR industry Business satisfaction rate statistical value obtains the RB number of resources that the GBR traffic of current TTI needs;
Second computing unit 122, for the RB number of resources of the PDSCH of the current TTI, subtracting the current TTI's The RB number of resources that GBR traffic needs, obtains the assignable resource RB numbers of Non-GBR business of current TTI.
Further, second acquisition module 13, including:
First determination unit 131, for according to channel quality corresponding with active user's terminal, determination to be worked as with described The corresponding MCS exponent numbers of preceding user terminal;
First acquisition unit 132, for according to determining MCS exponent numbers and waiting for the GBR sent to active user's terminal Business datum amount obtains the RB number of resources needed for the GBR traffic of active user's terminal;
Second acquisition unit 133, for according to determining MCS exponent numbers and waiting for the Non- sent to active user's terminal GBR traffic data volume obtains the RB number of resources needed for the Non-GBR business of active user's terminal.
Further, the third determining module 15, including:
Judging unit 151, for judging whether the assignable RB number of resources of Non-GBR business is more than in the current TTI Or the RB number of resources needed for the Non-GBR business equal to active user's terminal;
Second determination unit 152, for if more than or be equal to, it is determined that be active user's terminal Non-GBR industry The RB number of resources of business distribution is the RB number of resources needed for the Non-GBR business of active user's terminal;
Third determination unit 153, if for being less than, it is determined that be the Non-GBR traffic assignments of active user's terminal RB number of resources be the current TTI the assignable RB number of resources of Non-GBR business.
Further, the base station further includes:
Update module 21, for the assignable RB number of resources of the Non-GBR business of the current TTI and the current use The difference of the RB number of resources of the Non-GBR traffic assignments of family terminal, the Non-GBR business for updating the current TTI are assignable RB number of resources.
The base station of the present embodiment can be used for executing the technical solution of embodiment of the method shown in Fig. 2, realization principle and skill Art effect is similar, and details are not described herein again.
One of ordinary skill in the art will appreciate that:Realize that all or part of step of above method embodiment can pass through The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer read/write memory medium, the program When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes:ROM, RAM, magnetic disc or light The various media that can store program code such as disk.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, it will be understood by those of ordinary skill in the art that:Its according to So can with technical scheme described in the above embodiments is modified, either to which part or all technical features into Row equivalent replacement;And these modifications or replacements, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (4)

1. a kind of descending resource allocation method, which is characterized in that including:
Periodically acquire descending guarantee bit rate GBR traffic satisfaction rate statistical value in cell, the downlink GBR traffic satisfaction rate Statistical value is to have distributed to the GBR traffic and priority of each user terminal in the cell to have distributed to the cell higher than described The resource block RB total number resources of the business of the GBR traffic of interior each user terminal and the RB resources of Physical Downlink Shared Channel PDSCH The ratio of sum;
According to the RB number of resources of the PDSCH of the current transmission time interval TTI of current period and the downlink of previous cycle GBR traffic satisfaction rate statistical value determines the non-guaranteed assignable RB moneys of bit rate Non-GBR business in the cell of current TTI Source number, the current period include N number of TTI, and N is positive integer;
Obtain the RB number of resources needed for the GBR traffic of active user's terminal of current TTI and the RB resources needed for Non-GBR business Number;
RB number of resources needed for the GBR traffic of active user's terminal is determined as the GBR industry of active user's terminal The RB number of resources of business distribution;
According to the Non-GBR industry of the Non-GBR business of the current TTI assignable RB number of resources and active user's terminal RB number of resources needed for business is determined as the RB number of resources of the Non-GBR traffic assignments of active user's terminal;
According to the GBR traffic RB resources for distributing to active user's terminal of quantification and Non-GBR business RB resources, to Active user's terminal sends the data of the data and the Non-GBR business of the GBR traffic, and passes through control channel list First CCE resources carry out mandate instruction;
The RB number of resources of the PDSCH of the current TTI according to current period and the downlink GBR traffic of previous cycle are full Meaning rate statistical value determines the assignable RB number of resources of Non-GBR business in the cell of current TTI, including:
With the RB number of resources of the PDSCH of the current TTI, it is multiplied by the downlink GBR traffic satisfaction rate statistical value, is obtained current The RB number of resources that the GBR traffic of TTI needs;
With the RB number of resources of the PDSCH of the current TTI, the RB number of resources that the GBR traffic of the current TTI needs is subtracted, is obtained To the assignable RB number of resources of Non-GBR business of current TTI;
RB number of resources needed for the GBR traffic of the active user's terminal for obtaining current TTI and the RB needed for Non-GBR business Number of resources, including:
According to channel quality corresponding with active user's terminal, modulating-coding corresponding with active user's terminal is determined Mode MCS exponent numbers;
It according to determining MCS exponent numbers and waits for the GBR traffic data volume sent to active user's terminal, obtains the current use RB number of resources needed for the GBR traffic of family terminal;
It according to determining MCS exponent numbers and waits for the Non-GBR business datum amounts sent to active user's terminal, works as described in acquisition RB number of resources needed for the Non-GBR business of preceding user terminal;
The Non- of the Non-GBR business according to the current TTI assignable RB number of resources and active user's terminal RB number of resources needed for GBR traffic is determined as the RB number of resources of the Non-GBR traffic assignments of active user's terminal, including:
Judge whether the assignable RB number of resources of the Non-GBR business of the current TTI is more than or equal to active user's terminal Non-GBR business needed for RB number of resources;
If more than or be equal to, it is determined that the RB number of resources for the Non-GBR traffic assignments of active user's terminal is described works as RB number of resources needed for the Non-GBR business of preceding user terminal;
If being less than, it is determined that the RB number of resources for the Non-GBR traffic assignments of active user's terminal is the current TTI The assignable RB number of resources of Non-GBR business.
2. according to the method described in claim 1, it is characterized in that, the Non-GBR business according to the current TTI can divide It is whole that RB number of resources needed for the Non-GBR business of the RB number of resources and active user's terminal matched is determined as the active user After the RB number of resources of the Non-GBR traffic assignments at end, further include:
With the Non-GBR business of the Non-GBR business of the current TTI assignable RB number of resources and active user's terminal The difference of the RB number of resources of distribution updates the assignable RB number of resources of Non-GBR business of the current TTI.
3. a kind of base station, which is characterized in that including:
First acquisition module, for periodically acquiring downlink GBR traffic satisfaction rate statistical value in cell, the downlink GBR traffic Satisfaction rate statistical value has distributed to institute to have distributed to the GBR traffic and priority of each user terminal in the cell higher than described State the ratio of the RB total number resources of the business of the GBR traffic of each user terminal in cell and the RB total number resources of PDSCH;
First determining module, described in the RB number of resources and previous cycle according to the PDSCH of the current TTI of current period Downlink GBR traffic satisfaction rate statistical value determines the assignable RB number of resources of Non-GBR business in the cell of current TTI, described to work as The preceding period includes N number of TTI, and N is positive integer;
Second acquisition module, the RB number of resources needed for the GBR traffic of active user's terminal for obtaining current TTI and Non- RB number of resources needed for GBR traffic;
Second determining module is determined as described work as the RB number of resources needed for the GBR traffic according to active user's terminal The RB number of resources of the GBR traffic distribution of preceding user terminal;
Third determining module, for according to the assignable RB number of resources of Non-GBR business of the current TTI and the current use RB number of resources needed for the Non-GBR business of family terminal is determined as the RB of the Non-GBR traffic assignments of active user's terminal Number of resources;
Sending module, for the GBR traffic RB resources and Non-GBR for distributing to active user's terminal according to quantification Business RB resources send the data of the data and the Non-GBR business of the GBR traffic to active user's terminal, and lead to It crosses CCE resources and carries out mandate instruction;
First determining module, including:
First computing unit, for the RB number of resources of the PDSCH of the current TTI, being multiplied by the downlink GBR traffic satisfaction rate Statistical value obtains the RB number of resources that the GBR traffic of current TTI needs;
Second computing unit, for the RB number of resources of the PDSCH of the current TTI, subtracting the GBR traffic of the current TTI The RB number of resources needed obtains the assignable RB number of resources of Non-GBR business of current TTI;
Second acquisition module, including:
First determination unit, for according to channel quality corresponding with active user's terminal, determining and the active user The corresponding MCS exponent numbers of terminal;
First acquisition unit, for according to determining MCS exponent numbers and waiting for the GBR traffic data sent to active user's terminal Amount, obtains the RB number of resources needed for the GBR traffic of active user's terminal;
Second acquisition unit, for according to determining MCS exponent numbers and waiting for the Non-GBR business sent to active user's terminal Data volume obtains the RB number of resources needed for the Non-GBR business of active user's terminal;
The third determining module, including:
Judging unit, for judging whether the assignable RB number of resources of the Non-GBR business of the current TTI is greater than or equal to institute State the RB number of resources needed for the Non-GBR business of active user's terminal;
Second determination unit, for if more than or be equal to, it is determined that for the Non-GBR traffic assignments of active user's terminal RB number of resources is the RB number of resources needed for the Non-GBR business of active user's terminal;
Third determination unit, if for being less than, it is determined that for the RB resources of the Non-GBR traffic assignments of active user's terminal Number is the assignable RB number of resources of Non-GBR business of the current TTI;
4. base station according to claim 3, which is characterized in that further include:
Update module, for the assignable RB number of resources of the Non-GBR business of the current TTI and active user's terminal Non-GBR traffic assignments RB number of resources difference, update the assignable RB resources of Non-GBR business of the current TTI Number.
CN201410133484.7A 2014-04-02 2014-04-02 Descending resource allocation method and base station Active CN104981014B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410133484.7A CN104981014B (en) 2014-04-02 2014-04-02 Descending resource allocation method and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410133484.7A CN104981014B (en) 2014-04-02 2014-04-02 Descending resource allocation method and base station

Publications (2)

Publication Number Publication Date
CN104981014A CN104981014A (en) 2015-10-14
CN104981014B true CN104981014B (en) 2018-09-25

Family

ID=54276965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410133484.7A Active CN104981014B (en) 2014-04-02 2014-04-02 Descending resource allocation method and base station

Country Status (1)

Country Link
CN (1) CN104981014B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105376764B (en) * 2015-11-25 2019-01-15 中国联合网络通信集团有限公司 A kind of method for building up and system of carrying
CN112261693A (en) * 2020-09-29 2021-01-22 上海擎昆信息科技有限公司 Resource allocation method and device
CN112261692A (en) * 2020-09-29 2021-01-22 上海擎昆信息科技有限公司 Method and device for reserving resources
CN113115375B (en) * 2021-03-17 2022-06-10 中国联合网络通信集团有限公司 Downlink resource block reservation method and device
CN113055948B (en) * 2021-03-17 2022-06-07 中国联合网络通信集团有限公司 Downlink resource block reservation method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232705A (en) * 2007-01-23 2008-07-30 上海无线通信研究中心 Scheduling method of multi service multiplexing supporting medium access control lay
CN101815355A (en) * 2009-02-25 2010-08-25 大唐移动通信设备有限公司 Method and device for downlink scheduling
CN102404860A (en) * 2010-09-14 2012-04-04 中兴通讯股份有限公司 Downlink resource allocation method and device in long term evolution (LTE) system
CN102413570A (en) * 2010-09-20 2012-04-11 株式会社Ntt都科摩 Base station in wireless communication system and resource scheduling method
CN103458520A (en) * 2013-08-23 2013-12-18 京信通信系统(中国)有限公司 Allocation method and device of uplink frequency domain resources

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232705A (en) * 2007-01-23 2008-07-30 上海无线通信研究中心 Scheduling method of multi service multiplexing supporting medium access control lay
CN101815355A (en) * 2009-02-25 2010-08-25 大唐移动通信设备有限公司 Method and device for downlink scheduling
CN102404860A (en) * 2010-09-14 2012-04-04 中兴通讯股份有限公司 Downlink resource allocation method and device in long term evolution (LTE) system
CN102413570A (en) * 2010-09-20 2012-04-11 株式会社Ntt都科摩 Base station in wireless communication system and resource scheduling method
CN103458520A (en) * 2013-08-23 2013-12-18 京信通信系统(中国)有限公司 Allocation method and device of uplink frequency domain resources

Also Published As

Publication number Publication date
CN104981014A (en) 2015-10-14

Similar Documents

Publication Publication Date Title
CN104981017B (en) Uplink resource allocating method and base station
CN104981014B (en) Descending resource allocation method and base station
WO2012007890A1 (en) Apparatus and method for facilitating radio resource dimensioning for communication services
US20090017836A1 (en) Capacity Scheduling Method and System
CN103079279B (en) A kind of resource allocation methods and device
CN102325378A (en) Method and device for controlling physical downlink control channel (PDCCH) transmission
CN102547669A (en) Data buffer status report and uplink resource scheduling methods and equipment
CN103068051A (en) Distribution method and distribution device of downstream resources
CN103687025A (en) Resource allocation method used for LTE system
CN104981020B (en) The dispatching method of uplink GBR traffic and base station
CN102131298B (en) Method for allocating downlink resources
CN103369690B (en) The distribution method of a kind of Radio Resource and device
EP3338499B1 (en) Decreasing free-riding data traffic in uplink scheduling
CN102984802B (en) Resource allocation methods and device
CN109714824B (en) Semi-persistent scheduling resource allocation method and base station
CN102271408B (en) Method for allocating uplink resources in LTE (Long Term Evolution) system
CN102970757B (en) Long-term evolution (LTE) downlink filling resource distribution method based on real-time service
CN103379630B (en) A kind of Physical Downlink Shared Channel resource allocation methods and system
CN101715235A (en) Method for allocating resources and scheduling downlink of LTE FDD system
CN104918334A (en) Method of adjusting service transmission and device
CN110475341B (en) Method and device for resource allocation
CN105766040A (en) Group scheduling method and system for mtc ues
Khorov et al. Reliable low latency communications in LTE networks
CN106341210B (en) The resource allocation methods and system of multicast service
CN105227491B (en) A kind of resource regulating method in electricity consumption wireless access network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant