CN104979780A - 严寒地带地埋电缆快速接头施工装置 - Google Patents

严寒地带地埋电缆快速接头施工装置 Download PDF

Info

Publication number
CN104979780A
CN104979780A CN201510419077.7A CN201510419077A CN104979780A CN 104979780 A CN104979780 A CN 104979780A CN 201510419077 A CN201510419077 A CN 201510419077A CN 104979780 A CN104979780 A CN 104979780A
Authority
CN
China
Prior art keywords
chi body
depression bar
cable
joint construction
cold area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510419077.7A
Other languages
English (en)
Other versions
CN104979780B (zh
Inventor
韩友喜
巴清华
黄立新
徐猛
傅求华
张兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Construction Group Co Ltd
Original Assignee
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Anhui Electric Power Construction First Engineering Co Ltd filed Critical Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority to CN201510419077.7A priority Critical patent/CN104979780B/zh
Publication of CN104979780A publication Critical patent/CN104979780A/zh
Application granted granted Critical
Publication of CN104979780B publication Critical patent/CN104979780B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

本发明公开了一种严寒地带地埋电缆快速接头施工装置,具有:尺体(1);其中,尺体(1)一侧设有刻度(11);设置在电缆下端的卡环;一端固定在尺体(1)下端,另一端向外延伸的压杆(2);其中,压杆(2)下端设有与卡环相适配的卡扣(21),端部可固定在电缆上,测量入土深度准确,测量接触后可以方便拆卸。

Description

严寒地带地埋电缆快速接头施工装置
技术领域
本发明属于风力发电基础设施建设技术领域,尤其涉及一种严寒地带地埋电缆快速接头施工装置。
背景技术
风能资源是清洁的可再生能源,风力发电是新能源领域中技术最成熟、最具规模开发条件和商业化前景的发电方式之一。
在实现本发明的过程中,发明人发现现有技术至少存在以下问题:现有技术没有合适设备准确测量电缆的入土深度,使用传统卷尺无法固定,测量结果不准确。
发明内容
本发明所要解决的技术问题是提供一种一端可固定在电缆上,测量入土深度准确,测量接触后可以方便拆卸的严寒地带地埋电缆快速接头施工装置。
为了解决上述技术问题,本发明所采用的技术方案是:一种严寒地带地埋电缆快速接头施工装置,具有:
尺体;其中,所述尺体一侧设有刻度;
设置在电缆下端的卡环;
一端固定在尺体下端,另一端向外延伸的压杆;其中,所述压杆下端设有与所述卡环相适配的卡扣。
所述尺体中部设有可收纳所述压杆的通槽。
所述压杆的长度大于尺体的长度。
上述技术方案中的一个技术方案具有如下优点或有益效果,测量开始时,压杆上的卡扣扣入电缆的卡环内,保证固定,读取刻度尺寸测量电缆入土深度,由于尺体固定在电缆下端,测量结果精确。测量结束后,将压杆压入尺体的通槽内,压杆上的卡扣也向通槽内收缩,从而使卡扣从卡环上脱离,方便取出测量装置。
附图说明
图1为本发明实施例中提供的严寒地带地埋电缆快速接头施工装置的结构示意图;
上述图中的标记均为:1、尺体,11、刻度,2、压杆,21、卡扣。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明实施方式作进一步地详细描述。
参见图1,一种严寒地带地埋电缆快速接头施工装置,具有:
尺体1;其中,尺体1一侧设有刻度11;
设置在电缆下端的卡环;
一端固定在尺体1下端,另一端向外延伸的压杆2;其中,压杆2下端设有与卡环相适配的卡扣21。
尺体1中部设有可收纳压杆2的通槽。
压杆2的长度大于尺体1的长度,方便操作压杆2收入尺体内。
采用上述的结构后,测量开始时,压杆2上的卡扣21扣入电缆的卡环内,保证固定,读取刻度11尺寸测量电缆入土深度,由于尺体1固定在电缆下端,测量结果精确。测量结束后,将压杆2压入尺体1的通槽内,压杆2上的卡扣21也向通槽内收缩,从而使卡扣21从卡环上脱离,方便取出测量装置。
上面结合附图对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种非实质性的改进,或未经改进将本发明的构思和技术方案直接应用于其它场合的,均在本发明的保护范围之内。

Claims (3)

1.一种严寒地带地埋电缆快速接头施工装置,其特征在于,具有:
尺体(1);其中,所述尺体(1)一侧设有刻度(11);
设置在电缆下端的卡环;
一端固定在尺体(1)下端,另一端向外延伸的压杆(2);其中,所述压杆(2)下端设有与所述卡环相适配的卡扣(21)。
2.如权利要求1所述的严寒地带地埋电缆快速接头施工装置,其特征在于,所述尺体(1)中部设有可收纳所述压杆(2)的通槽。
3.如权利要求2所述的严寒地带地埋电缆快速接头施工装置,其特征在于,所述压杆(2)的长度大于尺体(1)的长度。
CN201510419077.7A 2015-07-15 2015-07-15 严寒地带地埋电缆快速接头施工装置 Active CN104979780B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510419077.7A CN104979780B (zh) 2015-07-15 2015-07-15 严寒地带地埋电缆快速接头施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510419077.7A CN104979780B (zh) 2015-07-15 2015-07-15 严寒地带地埋电缆快速接头施工装置

Publications (2)

Publication Number Publication Date
CN104979780A true CN104979780A (zh) 2015-10-14
CN104979780B CN104979780B (zh) 2018-01-05

Family

ID=54276024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510419077.7A Active CN104979780B (zh) 2015-07-15 2015-07-15 严寒地带地埋电缆快速接头施工装置

Country Status (1)

Country Link
CN (1) CN104979780B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8707213D0 (en) * 1986-03-26 1987-04-29 Digital Building Systems Ltd Quantity surveying instrument
CN201731852U (zh) * 2010-05-28 2011-02-02 中铁十四局集团电气化工程有限公司 地铁隧道区间管线支架测量工具
CN201803726U (zh) * 2010-08-25 2011-04-20 罗建新 水准标尺伸缩撑杆
CN102778192A (zh) * 2012-07-30 2012-11-14 天津市电力公司 高压电缆转弯半径测量工具
CN204886030U (zh) * 2015-07-15 2015-12-16 中国能源建设集团安徽电力建设第一工程有限公司 一种严寒地带地埋电缆快速接头施工装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8707213D0 (en) * 1986-03-26 1987-04-29 Digital Building Systems Ltd Quantity surveying instrument
CN201731852U (zh) * 2010-05-28 2011-02-02 中铁十四局集团电气化工程有限公司 地铁隧道区间管线支架测量工具
CN201803726U (zh) * 2010-08-25 2011-04-20 罗建新 水准标尺伸缩撑杆
CN102778192A (zh) * 2012-07-30 2012-11-14 天津市电力公司 高压电缆转弯半径测量工具
CN204886030U (zh) * 2015-07-15 2015-12-16 中国能源建设集团安徽电力建设第一工程有限公司 一种严寒地带地埋电缆快速接头施工装置

Also Published As

Publication number Publication date
CN104979780B (zh) 2018-01-05

Similar Documents

Publication Publication Date Title
CN203657640U (zh) 测量爪可上下移动的游标卡尺
CN202304715U (zh) 一种电杆埋深测量卡尺
CN202452910U (zh) 一种角钢孔准距、端距直读游标卡尺
CN204886030U (zh) 一种严寒地带地埋电缆快速接头施工装置
CN104979780A (zh) 严寒地带地埋电缆快速接头施工装置
CN204240923U (zh) 水电站转子磁轭与大立筋之间间隙的测量装置
CN203432495U (zh) 一种监理用检测保温材料厚度的装置
CN202614117U (zh) 光显内径千分尺接触器
CN201583225U (zh) 一种线束检验板
CN202255171U (zh) 游标卡尺
CN201540083U (zh) 双爪深度卡尺
CN103913107A (zh) 一种电机端盖内止口直径公差测量装置
CN203501957U (zh) 多功能深度尺
CN202836461U (zh) 一种便携式深度测试装置
CN102967219B (zh) 一种孔内槽宽量具
CN202255170U (zh) 游标卡尺
CN203116668U (zh) 电缆专用尺
CN203731988U (zh) 塔材测量尺
CN203978255U (zh) 可测深电缆窨井梯
CN204404969U (zh) 快测螺纹规
CN204346330U (zh) 一种用于测量风力发电机叶片梁帽厚度的量具
CN204988137U (zh) 一种深孔空刀槽测量工具
CN203629722U (zh) 温度测试盒
CN202994058U (zh) 管道不圆度专用游标卡尺
CN203445879U (zh) 一种红外光纤寻障测试仪

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province

Patentee after: China Energy Construction Group Co.,Ltd.

Address before: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province

Patentee before: China Energy Engineering Group Anhui No.1 Electric Power Construction Co.,Ltd.