CN104977855A - Emulated data simulation method for reservoir operation automatic system - Google Patents

Emulated data simulation method for reservoir operation automatic system Download PDF

Info

Publication number
CN104977855A
CN104977855A CN201510395942.9A CN201510395942A CN104977855A CN 104977855 A CN104977855 A CN 104977855A CN 201510395942 A CN201510395942 A CN 201510395942A CN 104977855 A CN104977855 A CN 104977855A
Authority
CN
China
Prior art keywords
data
scene
information
message
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510395942.9A
Other languages
Chinese (zh)
Other versions
CN104977855B (en
Inventor
张金华
姚峰
王建平
赵宇
刘臣亮
陈向飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID WUHAN HIGH VOLTAGE Research Institute
NARI Group Corp
Original Assignee
Nanjing NARI Group Corp
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing NARI Group Corp, State Grid Electric Power Research Institute filed Critical Nanjing NARI Group Corp
Priority to CN201510395942.9A priority Critical patent/CN104977855B/en
Publication of CN104977855A publication Critical patent/CN104977855A/en
Application granted granted Critical
Publication of CN104977855B publication Critical patent/CN104977855B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses an emulated data simulation method for a reservoir operation automatic system. According to the method, through analyzing to-be-simulated and generated data required by the reservoir operation automatic system, an actually running reservoir operation automatic system is simulated and various running scenarios are designed. The simulated and generated data are composed of various raw data on water level, rainfall, unit active and reactive power, unit sate, water-affairs calculation result, hydrologic information, messages and the like. Various running scenarios are designed for system simulated training or system commissioning test. Therefore, the scenario reproduction process for the reservoir operation automatic system is accelerated in different inflow conditions. The training quality and the training efficiency are improved, or the outgoing quality of the reservoir operation automatic system is increased. Meanwhile, the on-site system operation efficiency is increased.

Description

A kind of waterpower scheduling automation emulated data analogy method
Technical field
The present invention relates to a kind of waterpower scheduling automation emulated data analogy method, belong to water conservancy and hydropower technical field of automatic control.
Background technology
Along with the continuous progress of waterpower scheduling automation technical merit and the great attention of each production unit, domestic most hydroelectric power plant and company of net province have all built more complete waterpower scheduling automation, these systems achieve automatic collection, automatic transmission, automatically calculating and process substantially, and advanced applied software is developed on the basis of water leveling platform, these systems have played vital role in daily production, significantly reduce the labour intensity of operator on duty, use decision-making to define very strong supporting role to the control of reservoir.
Along with improving constantly of water adjusting system automatic technology level, system complexity also improves thereupon, also steps gone up new step to the requirement of system final user operational applications ability.The reservoir of important flood control task be assume responsibility in basin for some and in electrical network, assume responsibility for the power station of important electrical generation burden, improve the key that people system's application level on duty and ability to work become protection power station safe operation, system application training becomes an important job.Usual user all complete operation practice and trainings in actual motion system, but some importance and reliability requirement is higher, report and submit the water adjusting system of business information to some important units and department, this training method has larger risk, easily disturbed the normal operation of business by some maloperations, or due to the operating influence of some keys great and dare not operating practice be carried out.Power plant's generally Comparision anxiety on duty during flood season especially flood simultaneously, the personnel paying close attention to watermark protocol information are many, need to carry out carrying out water analysis and making Reservoir Operation Scheme in conjunction with actual rainfall progress simultaneously, it is lower that watermark protocol during this flood carrys out the general frequency of occurrences of several scene, and have more exigence according to training and emulation for this data scene, and need to repeat to reappear this data and carry out several scene.
The engineering larger system integrator that puts into operation adopts configuration type thinking to carry out software development usually in addition; to improve software repeated usage degree and system reliability; after software development completes; engineering staff needs to carry out system configuration according to the service application at each scene, usually to carry out in factory debugging and put into operation the reliability after efficiency and online implementing to improve scene before putting into operation at the scene.Because the debug phase in factory cannot obtain on-the-spot by gathering or communicate the every raw data exchanging and obtain, the inspection of system various functions can only be static check, therefore under different raw data scene, the insufficient system of test verification will expend more Installation and Debugging workload usually at the scene, simultaneously due to some, to carry out several scene longer for recurrence period, may bring more later stage system maintenance work amount to system.
At present about the emulated data analogy method of water adjusting system, the simulation that can only complete definite value produces, ignore the associate feature between every data, as identical carry out water condition under, the change of reservoir level there is certain correlationship with the power generation situation of unit and the rain fall in basin; Simultaneously carry out several scene for some self-defining limit raw data and lack simulation means, the design frequency as exceeded account of the history at some to come under water condition how Simulated Water adjusting system carrys out several situation cannot be simulated by other method.
Summary of the invention
The object of the present invention is to provide a kind of than more comprehensive waterpower scheduling automation emulated data analogy method, introduce the concept that emulated data carrys out several scene, can realize water adjusts emulated data to simulate more truly, realize freely reappearing of some non-common scenes, and some non-common data carry out the self-defined simulation of several scene.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of waterpower scheduling automation emulated data analogy method, comprises the following steps:
1) analyze the feature of the data that waterpower scheduling automation needs simulation to produce, simulation produces these data, and is directly deposited in the table of corresponding storehouse; The described data needing simulation to produce comprise the watermark protocol information that telemetry station gathers, the unit information that unit supervisory system sends, set state information and information about power, the aperture of gate and release floodwatering facility and opening and closing time information, regimen message, water utilities result of calculation;
2) carry out data modeling, be specially:
For watermark protocol information, definition watermark protocol telemetric stations, survey station type and telemeter channel;
For unit information and information about power, installation situation according to waterpower scheduling automation power station carries out unit definition, definition comprises various the waiting of unit active reactive, set state, unit and circuit electricity and simulates raw data period, simulate all kinds raw data default settings of generation as required, according to the set of frequency data generation frequency that data occur;
For gate and release floodwatering facility, according to release floodwatering facility situation definition gatage period;
For water utilities result of calculation, analog simulation period is set according to reservoir reservoir inflow, storage outflow and generating flow period definition situation in waterpower scheduling automation;
Regimen message data illustrates with station number self;
Need to carry out data one-way synchronization according to recovery time point simultaneously, realize the date restoring after analog simulation;
3) carry out data scene editor and definition, be specially:
Data scene comprises historical data scene and self-defining data scene, wherein, historical data scene editor, according to selected time range, defines and generates every historical data scene, according to historic measured data situation, save as various come data scene under said conditions; Self-defining data scene editor, mainly for there will not be in real running environment or recurrent frequency is low carrys out several scene, comprises heavy rain scene and water scene is self-defined;
4) digital simulation is carried out,
As required, extract historic scenery or self-defined scene, the method for digital simulation is specially:
Watermark protocol, unit, gate and release floodwatering facility, water utilities calculate the data first specific data scene of selective extraction, preserve position according to the period defined in each data and database according to current time, data in self-defining data scene are added that the relative time offset of data sequence carries out writing storehouse, thus collection and receive these information and these information write into Databasces are shown accordingly in the actual waterpower scheduling automation operational process of dynamic similation;
Regimen message, owing to belonging to text, is revised corresponding message data and time after obtaining message, is completed the revision of message according to current time after carrying out relative time offset, under writing specified file catalogue, thus completes the simulation of regimen message data.
In aforesaid step 1), unit information comprises meritorious, idle, and set state information comprises set grid-connection, generating, shutdown, stand-by state, and information about power comprises unit electricity and circuit electricity.
In aforesaid step 1), watermark protocol information comprises water level and rainfall, and the feature of rainfall data is: the rule that rainfall raw data produces once counts for reaching the generation of certain value, without producing timing every day during rainfall, several times counting occurs; The feature of waterlevel data is: water level is generally the mode regularly adding luffing and produces data.
In aforesaid step 1), the feature of unit information and information about power data is: it is high that unit data and electric quantity data produce frequency in waterpower scheduling automation, is the Main Basis calculating generating flow and carry out water balanced calculation further.
In aforesaid step 1), the aperture of gate and release floodwatering facility and the data characteristics of opening and closing time information are: the frequency produced in waterpower scheduling automation is low, are to calculate the basis abandoning discharge.
In aforesaid step 1), water utilities result of calculation comprises the period data of the reservoir inflow of reservoir, storage outflow and generating flow, is the direct modeling to water utilities result of calculation.
In aforesaid step 1), the data characteristics of regimen message is: transmit in the mode of text, and the type of message comprises rainfall message, reservoir message, adds report type, and the frequency that data produce has difference in flood season and non-flood period.
Aforesaid step 2) in, survey station type comprises gaging station, precipitation station, water level precipitation station type, telemeter channel comprises that optical fiber is wired, note, marine satellite, big-dipper satellite, GPRS, VHF channel type.
Advantage of the present invention is: invention introduces the concept that emulated data carrys out several scene, can realize water and adjust emulated data to simulate more truly, realize freely reappearing of some historic scenery, and some non-common data carry out the self-defined simulation of several scene; The present invention can produce water adjusting system raw data according to on-site actual situations simulation, be Training Simulation System construction service on the one hand, can be bug check service in system factory on the other hand, thus carry out system test fully, to put into operation efficiency significantly to improve system outgoing and field engineering.
Accompanying drawing explanation
Fig. 1 is external relation and the data flow of existing automation system for reservoir scheduling;
Fig. 2 is emulated data simulation process process flow diagram of the present invention.
Embodiment
Now with embodiment, the present invention is described in further detail by reference to the accompanying drawings.
Need the data gathering and receive multiple external system in usual waterpower scheduling automation operational process, form the business datum of self through calculating and process, then report and submit business information to some interconnected systems.External relation and the data flow of more common automation system for reservoir scheduling refer to Fig. 1, by telemetry station, (transmission channel comprises note channel in water adjusting system safety IIth district, big-dipper satellite channel, fiber channel, marine satellite channel, ultrashort wave (USW) channel etc.) obtain watermark protocol information, unit information is obtained by unit supervisory system, information about power is obtained by calculating fee of electric energy system, the information of acquisition is sent to higher level's water adjusting system and carries out watershed information by water adjusting system safety IIth district to be shared, water adjusting system safety IIth district carries out the mutual of regimen message by water adjusting system safety IIIth district and Hydrology department.Waterpower scheduling automation raw information is transmitted by hardware unit or external system collection usually, under Simulated training environment or the system laboratory debug phase usually cannot to obtain these water adjusting systems easily and run the raw data needed.
The present invention is by analyzing the feature of these categorical datas, and simulation produces these data, and is directly deposited in the table of corresponding storehouse.The data content that water adjusting system needs simulation to produce comprises the watermark protocol information that telemetry station gathers, unit information and the information about power such as set state, unit active reactive, unit electricity, circuit electricity that unit supervisory system sends, the data such as the aperture of gate and release floodwatering facility and opening and closing time, regimen message, water utilities result of calculation, usually the raw data that some are larger, the waterpower scheduling automation of complete function gathers is more, data stream is comparatively complicated, and other raw data data characteristic various types of is as follows:
Watermark protocol
Watermark protocol data normally waterpower scheduling automation gather important raw data, comprise water level and rainfall, data type has from count off certificate and add count off certificate, and the channel of common information transmission has note, the Big Dipper, maritime affairs, wired, VHF etc., and the data of every type have different eigenwerts.The rule that rainfall raw data produces once counts for reaching the generation of certain value, several times counting is there is without producing timing every day during rainfall, water level is generally the mode regularly adding luffing and produces data, by simulation, after producing watermark protocol raw data in the direct table corresponding according to respective rule write into Databasce.
Unit information and information about power
The information such as unit information and information about power mainly comprise that unit is meritorious, idle, set state (mainly refer to unit start, shut down, grid-connected, generating, the state such as subsequent use), unit electricity, circuit electricity; it is higher that unit and electric quantity data produce frequency in waterpower scheduling automation, is the Main Basis calculating generating flow and carry out water balanced calculation further.
Release floodwatering facility
The release floodwatering facility of reservoir mainly comprises the facilities such as floodgate, lower level outlet, construction diversion hole, and gatage and aperture time of origin are the bases abandoning discharge in waterpower scheduling automation, and the frequency that usual data produce is lower.
Water utilities result of calculation
Water utilities result of calculation generally includes reservoir inflow, the period data such as storage outflow and generating flow of reservoir, it is the direct modeling to water utilities result of calculation, usually the great flood warehouse-in water process simulation that frequency is lower is applied to again, to carry out Dispatching Flood simulation.
Regimen message
Regimen message belongs to external data source usually for the waterpower scheduling automation of electric system reservoir, because data are through manual confirmation, the quality of data and Reliability comparotive high, a normally important Data Source when reservoir telemetry station reticular density is rarer.Regimen message transmits in the mode of text, and the type of message comprises rainfall message, reservoir message, adds the types such as report, and the frequency that data produce has certain difference in flood season and non-flood period.
As shown in Figure 2, digital simulation process of the present invention comprises the following steps:
1) data modeling
According to waterpower scheduling automation scale definition watermark protocol telemetric stations, survey station type and telemeter channel, wherein, survey station type comprises the types such as gaging station, precipitation station, water level precipitation station, and telemeter channel comprises the channel types such as optical fiber is wired, note, marine satellite, big-dipper satellite, GPRS, VHF;
Installation situation according to waterpower scheduling automation power station carries out unit definition, and definition comprises various the treating such as unit active reactive, set state, unit and circuit electricity and simulates raw data period; Simulate all kinds raw data default settings of generation as required, according to the set of frequency data generation frequency that data occur;
According to release floodwatering facility situation definition gatage period;
According to reservoir reservoir inflow, storage outflow and generating flow period definition situation in waterpower scheduling automation, analog simulation period is set;
Regimen message data illustrates with station number self;
Need to carry out data one-way synchronization according to recovery time point simultaneously, realize the date restoring after analog simulation.
2) data scene editor and definition
The editor of data scene comprises historical data scene and self-defining data scene, historical data scene editor is according to selected time range, define and generate every historical data scene, according to historic measured data situation, save as various come data scene under said conditions.Historical data scene is selected usually to select according to situations such as the high, medium and low various situation of reservoir level and large, medium and small rain, selects representative and typicalness as far as possible.Self-defining data scene editor is mainly for there will not be in real running environment or recurrent frequency is lower carrys out several scene, mainly comprise heavy rain scene and water scene is self-defined, as in the definition of heavy rain scene, the total amount of a given rainfall and history, different raindrop type distributions can be selected, carry out the distribution of rainfall space-time further according to certain rule, generate self-defined heavy rain data scene; The given design frequency of the self-defined usual meeting of water scene, carries out the temporal distribution of water according to certain rule, then analogue simulation.
3) digital simulation
Carry out self-defining data scene setting according to the unit of waterpower scheduling automation and watermark protocol telemetry station situation, comprise the self-defined situation of change of exerting oneself of unit, the given quantum of rainfall of rainfall at the appointed time carries out rainfall pattern and intensity distribution in scope; Water level specifies variation range to carry out heave distribution.
The method of digital simulation is specially:
Digital simulation is carried out according to dissimilar data according to diverse ways when carrying out digital simulation,
Watermark protocol, unit, gate and water utilities calculate the data first specific data scene of selective extraction, preserve position according to the period in the definition of each data and database according to current time, data in self-defining data scene are added that the relative time offset of data sequence carries out writing storehouse, thus gather in dynamic similation real system operational process and receive these information and these information write into Databasces are shown accordingly.
Regimen message, owing to belonging to text, is revised corresponding message data and time after obtaining message, is completed the revision of message according to current time after carrying out relative time offset, under writing specified file catalogue, thus completes the simulation of regimen message data.
Engineer applied scope of the present invention adjusts Training Simulation System to provide water to adjust raw data source for water on the one hand, realizes history and carrys out several scene and freely reappear or the appearance of self-defined low-frequency data scene; In system factory, the debug phase provides Raw Data Simulation on the other hand, improves debugging and quality inspection in water adjusting system factory, the efficiency thus raising system for field puts into operation.

Claims (8)

1. a waterpower scheduling automation emulated data analogy method, is characterized in that, comprises the following steps:
1) analyze the feature of the data that waterpower scheduling automation needs simulation to produce, simulation produces these data, and is directly deposited in the table of corresponding storehouse; The described data needing simulation to produce comprise the watermark protocol information that telemetry station gathers, the unit information that unit supervisory system sends, set state information and information about power, the aperture of gate and release floodwatering facility and opening and closing time information, regimen message, water utilities result of calculation;
2) carry out data modeling, be specially:
For watermark protocol information, definition watermark protocol telemetric stations, survey station type and telemeter channel;
For unit information and information about power, installation situation according to waterpower scheduling automation power station carries out unit definition, definition comprises various the waiting of unit active reactive, set state, unit and circuit electricity and simulates raw data period, simulate all kinds raw data default settings of generation as required, according to the set of frequency data generation frequency that data occur;
For gate and release floodwatering facility, according to release floodwatering facility situation definition gatage period;
For water utilities result of calculation, analog simulation period is set according to reservoir reservoir inflow, storage outflow and generating flow period definition situation in waterpower scheduling automation;
Regimen message data illustrates with station number self;
Need to carry out data one-way synchronization according to recovery time point simultaneously, realize the date restoring after analog simulation;
3) carry out data scene editor and definition, be specially:
Data scene comprises historical data scene and self-defining data scene, wherein, historical data scene editor, according to selected time range, defines and generates every historical data scene, according to historic measured data situation, save as various come data scene under said conditions; Self-defining data scene editor, mainly for there will not be in real running environment or recurrent frequency is low carrys out several scene, comprises heavy rain scene and water scene is self-defined;
4) digital simulation is carried out,
As required, extract historical data scene or self-defining data scene, the method for digital simulation is specially:
Watermark protocol, unit, gate and release floodwatering facility, water utilities calculate the data first specific data scene of selective extraction, preserve position according to the period defined in each data and database according to current time, data in self-defining data scene are added that the relative time offset of data sequence carries out writing storehouse, thus collection and receive these information and these information write into Databasces are shown accordingly in the actual waterpower scheduling automation operational process of dynamic similation;
Regimen message, owing to belonging to text, is revised corresponding message data and time after obtaining message, is completed the revision of message according to current time after carrying out relative time offset, under writing specified file catalogue, thus completes the simulation of regimen message data.
2. a kind of waterpower scheduling automation emulated data analogy method according to claim 1; it is characterized in that; in described step 1); unit information comprises meritorious, idle; set state information comprises set grid-connection, generating, shutdown, stand-by state, and information about power comprises unit electricity and circuit electricity.
3. a kind of waterpower scheduling automation emulated data analogy method according to claim 1, it is characterized in that, in described step 1), watermark protocol information comprises water level and rainfall, the feature of rainfall data is: the rule that rainfall raw data produces once counts for reaching the generation of certain value, without producing timing every day during rainfall, several times counting occurs; The feature of waterlevel data is: water level is generally the mode regularly adding luffing and produces data.
4. a kind of waterpower scheduling automation emulated data analogy method according to claim 1, it is characterized in that, in described step 1), the feature of unit information and information about power data is: it is high that unit data and electric quantity data produce frequency in waterpower scheduling automation, is the Main Basis calculating generating flow and carry out water balanced calculation further.
5. a kind of waterpower scheduling automation emulated data analogy method according to claim 1, it is characterized in that, in described step 1), the aperture of gate and release floodwatering facility and the data characteristics of opening and closing time information are: the frequency produced in waterpower scheduling automation is low, are to calculate the basis abandoning discharge.
6. a kind of waterpower scheduling automation emulated data analogy method according to claim 1, it is characterized in that, in described step 1), water utilities result of calculation comprises the period data of the reservoir inflow of reservoir, storage outflow and generating flow, is the direct modeling to water utilities result of calculation.
7. a kind of waterpower scheduling automation emulated data analogy method according to claim 1, it is characterized in that, in described step 1), the data characteristics of regimen message is: transmit in the mode of text, the type of message comprises rainfall message, reservoir message, adds report type, and the frequency that data produce has difference in flood season and non-flood period.
8. a kind of waterpower scheduling automation emulated data analogy method according to claim 1, it is characterized in that, described step 2) in, survey station type comprises gaging station, precipitation station, water level precipitation station type, telemeter channel comprises that optical fiber is wired, note, marine satellite, big-dipper satellite, GPRS, VHF channel type.
CN201510395942.9A 2015-07-07 2015-07-07 A kind of waterpower scheduling automation emulates digital simulation method Active CN104977855B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510395942.9A CN104977855B (en) 2015-07-07 2015-07-07 A kind of waterpower scheduling automation emulates digital simulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510395942.9A CN104977855B (en) 2015-07-07 2015-07-07 A kind of waterpower scheduling automation emulates digital simulation method

Publications (2)

Publication Number Publication Date
CN104977855A true CN104977855A (en) 2015-10-14
CN104977855B CN104977855B (en) 2017-06-30

Family

ID=54274464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510395942.9A Active CN104977855B (en) 2015-07-07 2015-07-07 A kind of waterpower scheduling automation emulates digital simulation method

Country Status (1)

Country Link
CN (1) CN104977855B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106682849A (en) * 2017-01-20 2017-05-17 南京南瑞集团公司 Reservoir dispatching system automatic calculation method based on information association
CN110847111A (en) * 2019-08-12 2020-02-28 长江勘测规划设计研究有限责任公司 Method for acquiring hydropower station gate scheduling parameters based on semi-physical simulation
CN112130471A (en) * 2020-09-28 2020-12-25 宁夏水投科技股份有限公司 Simulation data simulation method for water dispatching automation system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4082686B2 (en) * 2002-12-03 2008-04-30 財団法人河川情報センター Real-time dynamic flood simulation system
CN101930566A (en) * 2010-08-12 2010-12-29 西安理工大学 Hydrological experimental simulation system and method based on parallel system
CN102663827A (en) * 2012-03-02 2012-09-12 天津大学 Three-dimensional dynamic whole-process simulation method for storm surge and flood routing in complex flooding areas
CN103530901A (en) * 2013-10-17 2014-01-22 中国测绘科学研究院 Method and system for visualizing dynamic water area by matching with real three-dimensional environment
CN103559375A (en) * 2013-11-22 2014-02-05 华中科技大学 Numerical simulation and visual simulation system for improving water quality of dispatching engineering
CN103559739A (en) * 2013-11-22 2014-02-05 华中科技大学 Digital lake three-dimensional visualized simulation method and simulation platform based on OSG
CN103886135A (en) * 2014-03-03 2014-06-25 国家电网公司 Two-dimensional unsteady-flow numerical model based power engineering location method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4082686B2 (en) * 2002-12-03 2008-04-30 財団法人河川情報センター Real-time dynamic flood simulation system
CN101930566A (en) * 2010-08-12 2010-12-29 西安理工大学 Hydrological experimental simulation system and method based on parallel system
CN102663827A (en) * 2012-03-02 2012-09-12 天津大学 Three-dimensional dynamic whole-process simulation method for storm surge and flood routing in complex flooding areas
CN103530901A (en) * 2013-10-17 2014-01-22 中国测绘科学研究院 Method and system for visualizing dynamic water area by matching with real three-dimensional environment
CN103559375A (en) * 2013-11-22 2014-02-05 华中科技大学 Numerical simulation and visual simulation system for improving water quality of dispatching engineering
CN103559739A (en) * 2013-11-22 2014-02-05 华中科技大学 Digital lake three-dimensional visualized simulation method and simulation platform based on OSG
CN103886135A (en) * 2014-03-03 2014-06-25 国家电网公司 Two-dimensional unsteady-flow numerical model based power engineering location method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王建平等: "虚拟现实技术在水情水调中的应用", 《水电自动化与大坝监测》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106682849A (en) * 2017-01-20 2017-05-17 南京南瑞集团公司 Reservoir dispatching system automatic calculation method based on information association
CN106682849B (en) * 2017-01-20 2020-06-05 南京南瑞集团公司 Water regulation system automatic calculation method based on information association
CN110847111A (en) * 2019-08-12 2020-02-28 长江勘测规划设计研究有限责任公司 Method for acquiring hydropower station gate scheduling parameters based on semi-physical simulation
CN110847111B (en) * 2019-08-12 2021-12-17 长江勘测规划设计研究有限责任公司 Method for acquiring hydropower station gate scheduling parameters based on semi-physical simulation
CN112130471A (en) * 2020-09-28 2020-12-25 宁夏水投科技股份有限公司 Simulation data simulation method for water dispatching automation system

Also Published As

Publication number Publication date
CN104977855B (en) 2017-06-30

Similar Documents

Publication Publication Date Title
Jacobs et al. SOCRATES: A system for scheduling hydroelectric generation under uncertainty
CN103904682B (en) A kind of power forecasting method based on scene mixed model
CN101622952A (en) Water management informatization structure system of irrigation district
CN103714426A (en) Integrated scheduling system for small and medium radial flow type hydropower station group
CN109858725A (en) Collect regimental hydraulic power plant group economical operation integral system platform architecture
CN105467968B (en) A kind of water supply network loss due to leakage based on SOA framework, consumption reduction intelligent management platform
Magro et al. Real time simulator for microgrids
CN105182917A (en) Mid-small-sized hydropower station intelligent control system and method therefor
CN105718686B (en) One kind being based on event driven power distribution network analogue system and its emulation mode
CN104933631A (en) Power distribution network operation online analysis and evaluation system
CN110490363A (en) More days Unit Combination optimization methods of one kind and system
CN104124685A (en) Sample fan method based wind power plant theoretical power computing method
CN104537428A (en) Method for evaluating economic operation considering wind power integration uncertainty
CN104977855A (en) Emulated data simulation method for reservoir operation automatic system
CN103353857A (en) Communication test method of integrated monitoring unit in substation
CN104598698A (en) On-line framework system and water supply pipe network model modeling method based on on-line framework system
CN115809585B (en) Method and system for determining ecological flow of radial hydropower station by balancing WEE relationship
Liu et al. Application and study of internet of things used in rural water conservancy project
Urazayev et al. Distributed Energy Management System with the Use of Digital Twin
CN211628271U (en) Cascade hydropower station group combined dispatching device based on machine learning
CN115067194A (en) Full-pipeline irrigation area measurement and control intelligent irrigation system and method
CN115053795A (en) Data measurement and control method and terminal for irrigation system
Spanel et al. DUtrain Power System Handler-the movement of an Operator Training Simulator Prototype towards an Operational Training System
CN106300673A (en) A kind of intelligent substation adjustment method based on BPM BPM and system
Hulsemann et al. Economic short term scheduling for a run-of-river-plant chain by combined LP and genetic optimization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003

Co-patentee after: STATE GRID WUHAN HIGH VOLTAGE Research Institute

Patentee after: NARI Group Corp.

Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003

Co-patentee before: STATE GRID WUHAN HIGH VOLTAGE Research Institute

Patentee before: NARI Group CORPORATION STATE GRID ELECTRIC POWER INSTITUTE

CP01 Change in the name or title of a patent holder