CN104976961B - Control method of remote automatic tunnel deformation monitoring system - Google Patents

Control method of remote automatic tunnel deformation monitoring system Download PDF

Info

Publication number
CN104976961B
CN104976961B CN201510416389.2A CN201510416389A CN104976961B CN 104976961 B CN104976961 B CN 104976961B CN 201510416389 A CN201510416389 A CN 201510416389A CN 104976961 B CN104976961 B CN 104976961B
Authority
CN
China
Prior art keywords
positioner
monitoring
profile scanning
control unit
scanning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510416389.2A
Other languages
Chinese (zh)
Other versions
CN104976961A (en
Inventor
滕德贵
王大涛
向泽君
谢征海
胡波
冯永能
俞春
李超
周成涛
张恒
石东虹
袁长征
岳仁宾
李凯
肖兴国
欧阳明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Institute Of Surveying And Mapping Science And Technology Chongqing Map Compilation Center
Original Assignee
Chongqing Survey Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Survey Institute filed Critical Chongqing Survey Institute
Priority to CN201510416389.2A priority Critical patent/CN104976961B/en
Publication of CN104976961A publication Critical patent/CN104976961A/en
Application granted granted Critical
Publication of CN104976961B publication Critical patent/CN104976961B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Optical Radar Systems And Details Thereof (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Length Measuring Devices By Optical Means (AREA)
  • Investigating Materials By The Use Of Optical Means Adapted For Particular Applications (AREA)

Abstract

The invention provides a remote automatic tunnel deformation monitoring system, which comprises multiple section scanning device, a positioning device, a reference point, a contorl unit and multiple reflecting prisms. The invention also provides a control method based on the above mentioned remote automatic tunnel deformation monitoring system. The system and the method have the beneficial effects of greatly reducing the monitoring system cost, expanding the coverage range of the monitoring system and improving monitoring integrity.

Description

Tunnel deformation remote automation monitoring system control method
Technical field
The present invention relates to a kind of tunnel safety monitoring technology, more particularly to a kind of tunnel deformation remote automation monitoring system Control method.
Background technology
With the progress of communication, subterranean tunnel facility has become the important component part of urban transporting system.With The extension of urban transportation scale, subterranean tunnel facility local environment also become increasingly complex, and there is massif above some tunnel facilities Or heavy construction component, or even it is also possible to there is other tunnels in tunnel upper or lower section, under massif or heavy construction component Overlapping region between the region and tunnel of side belongs to high risk zone, is susceptible to settle, subsides, the disaster such as displacement, is Disaster prevention and danger avoidance, it is necessary to carry out round-the-clock continual monitoring to the tunnel in high risk zone;It is in prior art, general to adopt High-precision robot measurement is being monitored to tunnel structure deformation;The problem of presence is:Due to robot measurement price height It is high, in Practical Project, normally only robot measurement is laid in the less key area of scope, cause monitored area limited, and Due to robot measurement precise structure, technical sophistication, the maintaining cost in later stage is also very surprising.
The content of the invention
For the problem in background technology, the present invention proposes a kind of tunnel deformation remote automation monitoring system, its wound It is newly:The tunnel deformation remote automation monitoring system by multiple profile scanning devices, positioner, datum mark, Control unit and multiple reflecting prisms composition;High risk zone in tunnel forms monitoring section, in the range of monitoring section, prolongs along tunnel Stretch direction, multiple monitoring sections are set, single monitoring section is overlapped with the tunnel cross section of corresponding position, monitoring section and tunnel The intersection of road inwall forms monitoring line, choose multiple monitoring points monitoring per bar, a reflection is respectively provided with each monitoring point on line Prism;A profile scanning device is provided with each monitoring section, profile scanning device is located on monitoring line, profile scanning dress Put and can make one-dimensional scanning, the plane of scanning motion of profile scanning device is overlapped with monitoring section, on the pedestal of each profile scanning device It is provided with a reflecting prism;Datum mark is arranged at outside the scope of monitoring section, and reflecting prism is provided with datum mark;Positioner sets On the tunnel inner wall being placed in the middle part of monitoring section, positioner can make two-dimensional scan;Profile scanning device and positioner are adopted Transmitting-receiving integrated laser detector;The profile scanning device and positioner are electrically connected with control unit.
In order to solve the problems, such as that robot measurement is with high costs, be difficult to lay on a large scale, the present invention is using lower-cost Transmitting-receiving integrated laser detector building monitoring system, as cost significantly reduces so that the tunnel deformation of the present invention is long-range Automatic monitoring system can be laid on a large scale, even carry out gamut laying to tunnel, meanwhile, it is higher based on Maturity Transmitting-receiving integrated laser detector technology, the accuracy and reliability of monitoring can be protected, then be aided with the control of the present invention Method so that preferable monitoring effect can be obtained using the monitoring system of the present invention program, and have benefited from monitoring range Extension, monitoring it is comprehensive more preferably.
Preferably, the plurality of profile scanning device is located along the same line.
Based on aforementioned schemes, the invention also discloses a kind of tunnel deformation remote automation monitoring system control method, institute The hardware being related to is as it was previously stated, its innovation is:
After tunnel deformation remote automation monitoring system is put up, will be various in tunnel deformation remote automation monitoring system Device is depicted as electronic chart with the relative position in tunnel, and the electronic chart is stored in a control unit;Tunnel deformation is long-range After automatic monitoring system puts into operation, first by step(1)Extremely(3)Mode carry out learning manipulation:
(1)Relative position of the positioner to datum mark with positioner is driven to carry out initial alignment:When positioner is received During the laser signal being reflected back to the reflecting prism of datum, control unit is remembered to the Laser emission direction of positioner Record, meanwhile, control unit also records the distance between positioner and datum mark;In this step, the positioner that recorded Laser emission direction be designated as direction A;The distance between positioner and datum mark are designated as apart from A;
(2)Positioner is driven to carry out initial alignment to multiple profile scanning devices:When positioner receives a certain section During the laser signal that the reflecting prism at scanning means is reflected back, control unit is remembered to the Laser emission direction of positioner Record, meanwhile, control unit also records the distance between positioner and profile scanning device;In this step, what is recorded determines The Laser emission direction of position device is designated as direction B, and multiple profile scanning devices correspond to multiple directions B respectively;Positioner with it is disconnected The distance between Surface scan device is designated as apart from B, and multiple profile scanning devices correspond to multiple apart from B respectively;
(3)Profile scanning device is driven to scan the monitoring point on each self-corresponding monitoring section one by one:Work as section When scanning means receives the laser signal that the reflecting prism at a certain monitoring point is reflected back, control unit is to profile scanning device Laser emission direction recorded, meanwhile, control unit also records the distance between profile scanning device and monitoring point;This In step, the Laser emission direction of the profile scanning device that recorded is designated as direction C, and multiple monitoring points correspond to multiple directions respectively C;The distance between profile scanning device and monitoring point are designated as apart from C, and multiple monitoring points correspond to multiple apart from C respectively;
After learning manipulation terminates, tunnel deformation remote automation monitoring system carries out subsequent operation as follows:
A)Relative position of the datum mark with positioner is repositioned:During repositioning, swashing positioner Light launch angle is adjusted to direction A, after positioner is adjusted in place, and control positioner is to emission laser signal;
If positioner receives corresponding reflected signal, the current distance between positioner and datum mark is obtained, and Calculate current distance and the difference apart from A:If difference is 0, step B is directly entered)If difference is not 0, and difference is sent After to rear technical staff, into step B);When being embodied as, a secure threshold can be set for aforementioned difference, if difference is in peace In full threshold range, then it is assumed that datum mark is not changed with the relative position of positioner, continues directly to subsequent operation, if poor Value surmounts secure threshold scope, then it is assumed that datum mark is changed with the relative position of positioner, now, except continue into Outside row subsequent operation, also need to send the difference to rear technical staff to carry out corresponding analysis process;
If positioner does not receive corresponding reflected signal, into step D);
B)Multiple profile scanning devices are repositioned:Drive positioning unit, makes the laser emission angle of positioner Spend gradually parked a period of time under the conditions of multiple directions B;
When positioner is parked, control positioner is to emission laser signal:If in parked period, positioner is received Corresponding reflected signal, then obtain the current distance between positioner and corresponding profile scanning device, then transmission positioning dress Put continuation to move to next parked position;If in parked period, positioner does not receive corresponding reflected signal, then will be current Profile scanning device corresponding to the B of direction is labeled as treating the diagnostic equipment, and drive positioning unit continues to next parked position to move It is dynamic;
After device to be positioned is all once repositioned to all profile scanning devices, if do not exist treating diagnosis dress Put, then into step C);If the diagnostic equipment is treated in presence, into step E);
C)The current distance for getting is compared apart from B by control unit with corresponding:If all current distances with Each self-corresponding numerical value apart from B is equal, then this operation terminates, and waits the follow-up detection window phase to arrive;If current distance Any one of it is unequal with the corresponding numerical value apart from B, then into step F);With step A)The mode of middle setting secure threshold Similarly, in practical operation, it is to set corresponding threshold value apart from B.
D)Control positioner periodically launches laser signal to datum mark:
If after continuous several cycles, positioner cannot still receive corresponding reflected signal, then control unit is rearward Technical staff sends positioner fault-signal, and enters step B);
If before the end cycle of setting, positioner have received corresponding reflected signal, then control unit is rearward Technical staff sends failure and has excluded signal, meanwhile, the current distance between positioner and datum mark is obtained, and calculates current Distance and the difference apart from A:If difference is 0, step B is directly entered)If difference is not 0, sends the difference to rear skill After art personnel, into step B);
E)Driving positioner to treat the diagnostic equipment carries out level diagnosises operation one by one:
Drive positioning unit, makes the Laser emission angle of positioner gradually treat the direction corresponding to the diagnostic equipment at each Parked a period of time under the conditions of B, the Laser emission angle of positioner are parked in a certain direction B treated corresponding to the diagnostic equipment When, control positioner is to the multiple laser signal of emission:If after emitting times reach the numerical value of setting, corresponding still without receiving Reflected signal, then control unit by it is current it is corresponding treat that the diagnostic equipment is labeled as failure, then drive positioning unit continue to The follow-up direction B movements treated corresponding to the diagnostic equipment;If before emitting times reach the numerical value of setting, have received corresponding anti- Signal is penetrated, is then obtained positioner and is accordingly treated the current distance between the diagnostic equipment, then drive positioning unit continues backward The continuous direction B movements treated corresponding to the diagnostic equipment;
Device to be positioned has all been carried out after one-time positioning diagnostic operation after the diagnostic equipment to all of, if not treating diagnosis dress Put and be marked as failure, then into step C)If needing the diagnostic equipment and being marked as failure, into step G);
F)The current distance for getting is sought after the recovery apart from B with corresponding by control unit, and difference is labeled in electronic chart On correspondence position, the electronic chart for being labelled with difference forms monitoring figure, and monitoring figure is sent to rear technology people by control unit Member, this operation terminate, and wait the follow-up detection window phase to arrive;
G)The current distance for getting is carried out asking poor apart from B by control unit with corresponding, and then, control unit is by difference With the position for treating the diagnostic equipment for being labeled as failure while being labeled on electronic chart, respective electronic map forms malfunction monitoring Malfunction monitoring figure is sent to rear technical staff by figure, control unit, and this operation terminates, and waits the follow-up detection window phase to arrive Come;
Abovementioned steps A)To G)Operation, be designated as resetting bit manipulation, in running, just run one at interval of certain hour It is secondary to reset bit manipulation;
During resetting bit manipulation operation, control unit also Synchronization Control profile scanning device makees following operation:
(One)Transmission profile scanning device is moved along the plane of scanning motion of itself, and profile scanning device is in each monitoring point of correspondence Direction C under the conditions of parked certain hour, when parked, profile scanning device is to emission laser signal:If in parked period, Profile scanning device receives corresponding reflected signal, then obtain the current distance between profile scanning device and monitoring point, then Transmission profile scanning device continues to next parked position to move;If in parked period, profile scanning device is not received accordingly Reflected signal, then the monitoring point corresponding to front direction C is labeled as into point to be confirmed, and be driven profile scanning device continue to Next parked position movement;
All monitoring points are all carried out after single pass after profile scanning device, if there is no point to be confirmed, entered Step(Two)If there is point to be confirmed, into step(Three);
(Two)The current distance for getting is carried out asking poor apart from C by control unit with corresponding:If all of current distance Equal with each self-corresponding numerical value apart from C, then this operation terminates, and waits the follow-up detection window phase to arrive;If current Any one of distance is unequal with the corresponding numerical value apart from C, then control unit is labeled in corresponding difference on electronic chart Corresponding position, respective electronic map forms cross-section monitoring figure, and cross-section monitoring figure is sent to rear technology people by control unit After member, this operation terminates, and waits the follow-up detection window phase to arrive;
(Three)With both direction C corresponding to the monitoring point of to be confirmed both sides as border, control section scanning means pair Region within border is scanned, and in scanning process, profile scanning device outwards persistently launches laser signal;In scanning process, If profile scanning device receives reflected signal corresponding with point to be confirmed, obtain between point to be confirmed and profile scanning device Current distance and record the current laser signal direction of the launch;If after the end of scan, not receiving corresponding reflected signal, then will The point to be confirmed is labeled as trouble point;
If there is no trouble point on all monitoring sections, into step(Two);If there is event on arbitrary monitoring section Barrier point, then control unit the current distance for getting is carried out asking poor apart from C with corresponding, and by difference and position of failure point mark On electronic chart, respective electronic map forms failure cross-section monitoring figure to note, and failure cross-section monitoring figure is sent to by control unit After the technical staff of rear, this operation terminates, and waits the follow-up detection window phase to arrive;
Abovementioned steps(One)Extremely(Three)Operation, be designated as cross-section monitoring operation, in running, at interval of certain hour just Cross-section monitoring operation of operation.
The method have the benefit that:The cost of monitoring system can be greatly reduced so that the covering model of monitoring system Enclose and be expanded, improve the comprehensive of monitoring.
Description of the drawings
The monitoring principle schematic diagram of Fig. 1, the present invention;
Locations of structures schematic diagram at Fig. 2, monitoring section;
Title in figure corresponding to each labelling is respectively:Positioner 1, profile scanning device 2, monitoring point 3.
Specific embodiment
A kind of tunnel deformation remote automation monitoring system, its innovation is:The tunnel deformation remote automation monitoring System is made up of multiple profile scanning devices, positioner, datum mark, control unit and a multiple reflecting prisms;In tunnel High risk zone form monitoring section, in the range of monitoring section, along tunnel bearing of trend, multiple monitoring sections, single monitoring are set Section is overlapped with the tunnel cross section of corresponding position, and monitoring section forms monitoring line with the intersection of tunnel inner wall, is supervising per bar Multiple monitoring points are chosen on survey line, a reflecting prism at each monitoring point, is respectively provided with;It is provided with one to break at each monitoring section Surface scan device, profile scanning device are located on monitoring line, profile scanning device can make one-dimensional scanning, and profile scanning device is swept Retouch plane to overlap with monitoring section, on the pedestal of each profile scanning device, be provided with a reflecting prism;Datum mark is arranged at Outside the scope of monitoring section, reflecting prism on datum mark, is provided with;Positioner is arranged on the tunnel inner wall in the middle part of monitoring section, positioning Device can make two-dimensional scan;Profile scanning device and positioner adopt transmitting-receiving integrated laser detector;The section is swept Imaging apparatus and positioner are electrically connected with control unit.
Further, the plurality of profile scanning device is located along the same line.
A kind of tunnel deformation remote automation monitoring system control method, involved hardware include:The tunnel deformation Remote automation monitoring system is by multiple profile scanning devices, positioner, datum mark, control unit and a multiple reflection ribs Microscope group into;High risk zone in tunnel forms monitoring section, in the range of monitoring section, along tunnel bearing of trend, arranges multiple monitorings Section, single monitoring section are overlapped with the tunnel cross section of corresponding position, and monitoring section forms prison with the intersection of tunnel inner wall Survey line, choose multiple monitoring points monitoring per bar, a reflecting prism is respectively provided with each monitoring point on line;At each monitoring section A profile scanning device is provided with, profile scanning device is located on monitoring line, and profile scanning device can make one-dimensional scanning, section The plane of scanning motion of scanning means is overlapped with monitoring section, and a reflecting prism is provided with the pedestal of each profile scanning device; Datum mark is arranged at outside the scope of monitoring section, and reflecting prism is provided with datum mark;Positioner is arranged at the tunnel in the middle part of monitoring section On road inwall, positioner can make two-dimensional scan;Profile scanning device and positioner adopt transmitting-receiving integrated laser acquisition Device;The profile scanning device and positioner are electrically connected with control unit;Its innovation is:
After tunnel deformation remote automation monitoring system is put up, will be various in tunnel deformation remote automation monitoring system Device is depicted as electronic chart with the relative position in tunnel, and the electronic chart is stored in a control unit;Tunnel deformation is long-range After automatic monitoring system puts into operation, first by step(1)Extremely(3)Mode carry out learning manipulation:
(1)Relative position of the positioner to datum mark with positioner is driven to carry out initial alignment:When positioner is received During the laser signal being reflected back to the reflecting prism of datum, control unit is remembered to the Laser emission direction of positioner Record, meanwhile, control unit also records the distance between positioner and datum mark;In this step, the positioner that recorded Laser emission direction be designated as direction A;The distance between positioner and datum mark are designated as apart from A;
(2)Positioner is driven to carry out initial alignment to multiple profile scanning devices:When positioner receives a certain section During the laser signal that the reflecting prism at scanning means is reflected back, control unit is remembered to the Laser emission direction of positioner Record, meanwhile, control unit also records the distance between positioner and profile scanning device;In this step, what is recorded determines The Laser emission direction of position device is designated as direction B, and multiple profile scanning devices correspond to multiple directions B respectively;Positioner with it is disconnected The distance between Surface scan device is designated as apart from B, and multiple profile scanning devices correspond to multiple apart from B respectively;
(3)Profile scanning device is driven to scan the monitoring point on each self-corresponding monitoring section one by one:Work as section When scanning means receives the laser signal that the reflecting prism at a certain monitoring point is reflected back, control unit is to profile scanning device Laser emission direction recorded, meanwhile, control unit also records the distance between profile scanning device and monitoring point;This In step, the Laser emission direction of the profile scanning device that recorded is designated as direction C, and multiple monitoring points correspond to multiple directions respectively C;The distance between profile scanning device and monitoring point are designated as apart from C, and multiple monitoring points correspond to multiple apart from C respectively;
After learning manipulation terminates, tunnel deformation remote automation monitoring system carries out subsequent operation as follows:
A)Relative position of the datum mark with positioner is repositioned:During repositioning, swashing positioner Light launch angle is adjusted to direction A, after positioner is adjusted in place, and control positioner is to emission laser signal;
If positioner receives corresponding reflected signal, the current distance between positioner and datum mark is obtained, and Calculate current distance and the difference apart from A:If difference is 0, step B is directly entered)If difference is not 0, and difference is sent After to rear technical staff, into step B);
If positioner does not receive corresponding reflected signal, into step D);
B)Multiple profile scanning devices are repositioned:Drive positioning unit, makes the laser emission angle of positioner Spend gradually parked a period of time under the conditions of multiple directions B;
When positioner is parked, control positioner is to emission laser signal:If in parked period, positioner is received Corresponding reflected signal, then obtain the current distance between positioner and corresponding profile scanning device, then transmission positioning dress Put continuation to move to next parked position;If in parked period, positioner does not receive corresponding reflected signal, then will be current Profile scanning device corresponding to the B of direction is labeled as treating the diagnostic equipment, and drive positioning unit continues to next parked position to move It is dynamic;
After device to be positioned is all once repositioned to all profile scanning devices, if do not exist treating diagnosis dress Put, then into step C);If the diagnostic equipment is treated in presence, into step E);
C)The current distance for getting is compared apart from B by control unit with corresponding:If all current distances with Each self-corresponding numerical value apart from B is equal, then this operation terminates, and waits the follow-up detection window phase to arrive;If current distance Any one of it is unequal with the corresponding numerical value apart from B, then into step F);
D)Control positioner periodically launches laser signal to datum mark:
If after continuous several cycles, positioner cannot still receive corresponding reflected signal, then control unit is rearward Technical staff sends positioner fault-signal, and enters step B);
If before the end cycle of setting, positioner have received corresponding reflected signal, then control unit is rearward Technical staff sends failure and has excluded signal, meanwhile, the current distance between positioner and datum mark is obtained, and calculates current Distance and the difference apart from A:If difference is 0, step B is directly entered)If difference is not 0, sends the difference to rear skill After art personnel, into step B);
E)Driving positioner to treat the diagnostic equipment carries out level diagnosises operation one by one:
Drive positioning unit, makes the Laser emission angle of positioner gradually treat the direction corresponding to the diagnostic equipment at each Parked a period of time under the conditions of B, the Laser emission angle of positioner are parked in a certain direction B treated corresponding to the diagnostic equipment When, control positioner is to the multiple laser signal of emission:If after emitting times reach the numerical value of setting, corresponding still without receiving Reflected signal, then control unit by it is current it is corresponding treat that the diagnostic equipment is labeled as failure, then drive positioning unit continue to The follow-up direction B movements treated corresponding to the diagnostic equipment;If before emitting times reach the numerical value of setting, have received corresponding anti- Signal is penetrated, is then obtained positioner and is accordingly treated the current distance between the diagnostic equipment, then drive positioning unit continues backward The continuous direction B movements treated corresponding to the diagnostic equipment;
Device to be positioned has all been carried out after one-time positioning diagnostic operation after the diagnostic equipment to all of, if not treating diagnosis dress Put and be marked as failure, then into step C)If needing the diagnostic equipment and being marked as failure, into step G);
F)The current distance for getting is sought after the recovery apart from B with corresponding by control unit, and difference is labeled in electronic chart On correspondence position, the electronic chart for being labelled with difference forms monitoring figure, and monitoring figure is sent to rear technology people by control unit Member, this operation terminate, and wait the follow-up detection window phase to arrive;
G)The current distance for getting is carried out asking poor apart from B by control unit with corresponding, and then, control unit is by difference With the position for treating the diagnostic equipment for being labeled as failure while being labeled on electronic chart, respective electronic map forms malfunction monitoring Malfunction monitoring figure is sent to rear technical staff by figure, control unit, and this operation terminates, and waits the follow-up detection window phase to arrive Come;
Abovementioned steps A)To G)Operation, be designated as resetting bit manipulation, in running, just run one at interval of certain hour It is secondary to reset bit manipulation;
During resetting bit manipulation operation, control unit also Synchronization Control profile scanning device makees following operation:
(One)Transmission profile scanning device is moved along the plane of scanning motion of itself, and profile scanning device is in each monitoring point of correspondence Direction C under the conditions of parked certain hour, when parked, profile scanning device is to emission laser signal:If in parked period, Profile scanning device receives corresponding reflected signal, then obtain the current distance between profile scanning device and monitoring point, then Transmission profile scanning device continues to next parked position to move;If in parked period, profile scanning device is not received accordingly Reflected signal, then the monitoring point corresponding to front direction C is labeled as into point to be confirmed, and be driven profile scanning device continue to Next parked position movement;
All monitoring points are all carried out after single pass after profile scanning device, if there is no point to be confirmed, entered Step(Two)If there is point to be confirmed, into step(Three);
(Two)The current distance for getting is carried out asking poor apart from C by control unit with corresponding:If all of current distance Equal with each self-corresponding numerical value apart from C, then this operation terminates, and waits the follow-up detection window phase to arrive;If current Any one of distance is unequal with the corresponding numerical value apart from C, then control unit is labeled in corresponding difference on electronic chart Corresponding position, respective electronic map forms cross-section monitoring figure, and cross-section monitoring figure is sent to rear technology people by control unit After member, this operation terminates, and waits the follow-up detection window phase to arrive;
(Three)With both direction C corresponding to the monitoring point of to be confirmed both sides as border, control section scanning means pair Region within border is scanned, and in scanning process, profile scanning device outwards persistently launches laser signal;In scanning process, If profile scanning device receives reflected signal corresponding with point to be confirmed, obtain between point to be confirmed and profile scanning device Current distance and record the current laser signal direction of the launch;If after the end of scan, not receiving corresponding reflected signal, then will The point to be confirmed is labeled as trouble point;
If there is no trouble point on all monitoring sections, into step(Two);If there is event on arbitrary monitoring section Barrier point, then control unit the current distance for getting is carried out asking poor apart from C with corresponding, and by difference and position of failure point mark On electronic chart, respective electronic map forms failure cross-section monitoring figure to note, and failure cross-section monitoring figure is sent to by control unit After the technical staff of rear, this operation terminates, and waits the follow-up detection window phase to arrive;
Abovementioned steps(One)Extremely(Three)Operation, be designated as cross-section monitoring operation, in running, at interval of certain hour just Cross-section monitoring operation of operation.

Claims (1)

1. a kind of tunnel deformation remote automation monitoring system control method, involved hardware include:The tunnel deformation is remote Process automation monitoring system is by multiple profile scanning devices, positioner, datum mark, control unit and a multiple reflecting prisms Composition;High risk zone in tunnel forms monitoring section, in the range of monitoring section, along tunnel bearing of trend, arranges multiple monitorings disconnected Face, single monitoring section are overlapped with the tunnel cross section of corresponding position, and monitoring section forms monitoring with the intersection of tunnel inner wall Line, choose multiple monitoring points monitoring per bar, a reflecting prism is respectively provided with each monitoring point on line;It is equal at each monitoring section A profile scanning device is provided with, profile scanning device is located on monitoring line, and profile scanning device can make one-dimensional scanning, and section is swept The plane of scanning motion of imaging apparatus is overlapped with monitoring section, and a reflecting prism is provided with the pedestal of each profile scanning device;Base It is arranged at outside the scope of monitoring section on schedule, on datum mark, is provided with reflecting prism;Positioner is arranged at the tunnel in the middle part of monitoring section On inwall, positioner can make two-dimensional scan;Profile scanning device and positioner adopt transmitting-receiving integrated laser detector; The profile scanning device and positioner are electrically connected with control unit;It is characterized in that:
After tunnel deformation remote automation monitoring system is put up, by various devices in tunnel deformation remote automation monitoring system Electronic chart is depicted as with the relative position in tunnel, the electronic chart is stored in a control unit;Tunnel deformation remote auto After change monitoring system puts into operation, first learning manipulation is carried out in the way of step (1) to (3):
(1) relative position of the positioner to datum mark with positioner is driven to carry out initial alignment:When positioner As-received During the laser signal that the reflecting prism located on schedule is reflected back, control unit is recorded to the Laser emission direction of positioner, Meanwhile, control unit also records the distance between positioner and datum mark;In this step, the positioner that recorded swash The light direction of the launch is designated as direction A;The distance between positioner and datum mark are designated as apart from A;
(2) positioner is driven to carry out initial alignment to multiple profile scanning devices:When positioner receives a certain profile scanning During the laser signal that the reflecting prism at device is reflected back, control unit is recorded to the Laser emission direction of positioner, Meanwhile, control unit also records the distance between positioner and profile scanning device;In this step, the positioning dress that recorded The Laser emission direction put is designated as direction B, and multiple profile scanning devices correspond to multiple directions B respectively;Positioner is swept with section The distance between imaging apparatus are designated as apart from B, and multiple profile scanning devices correspond to multiple apart from B respectively;
(3) profile scanning device is driven to scan the monitoring point on each self-corresponding monitoring section one by one:Work as profile scanning When device receives the laser signal that the reflecting prism at a certain monitoring point is reflected back, control unit is swashed to profile scanning device The light direction of the launch is recorded, meanwhile, control unit also records the distance between profile scanning device and monitoring point;This step In, the Laser emission direction of the profile scanning device that recorded is designated as direction C, and multiple monitoring points correspond to multiple directions C respectively;It is disconnected The distance between Surface scan device and monitoring point are designated as apart from C, and multiple monitoring points correspond to multiple apart from C respectively;
After learning manipulation terminates, tunnel deformation remote automation monitoring system carries out subsequent operation as follows:
A) relative position to datum mark with positioner is repositioned:During repositioning, the laser of positioner is sent out Angular adjustment is penetrated to direction A, after positioner is adjusted in place, control positioner is to emission laser signal;
If positioner receives corresponding reflected signal, the current distance between positioner and datum mark is obtained, and is calculated Current distance and the difference apart from A:If difference is 0, step B is directly entered), if difference is not 0, after sending the difference to After square technical staff, into step B);
If positioner does not receive corresponding reflected signal, into step D);
B) multiple profile scanning devices are repositioned:Drive positioning unit, make the Laser emission angle of positioner by Secondary a period of time parked under the conditions of multiple directions B;
When positioner is parked, control positioner is to emission laser signal:If in parked period, positioner is received accordingly Reflected signal, then obtain the current distance between positioner and corresponding profile scanning device, then drive positioning unit after Continue to next parked position and move;If in parked period, positioner does not receive corresponding reflected signal, then will work as front direction Profile scanning device corresponding to B is labeled as treating the diagnostic equipment, and drive positioning unit continues to next parked position to move;
After device to be positioned is all once repositioned to all profile scanning devices, if do not exist treating the diagnostic equipment, Into step C);If the diagnostic equipment is treated in presence, into step E);
C) current distance for getting is compared apart from B by control unit with corresponding:If all current distances with each The corresponding numerical value apart from B is equal, then this operation terminates, and waits the follow-up detection window phase to arrive;If in current distance Any one is unequal with the corresponding numerical value apart from B, then into step F);
D) control positioner and periodically launch laser signal to datum mark:
If after continuous several cycles, positioner cannot still receive corresponding reflected signal, then control unit rearward technology Personnel send positioner fault-signal, and enter step B);
If before the end cycle of setting, positioner have received corresponding reflected signal, then control unit rearward technology Personnel send failure and have excluded signal, meanwhile, the current distance between positioner and datum mark is obtained, and calculates current distance With the difference apart from A:If difference is 0, step B is directly entered), if difference is not 0, send the difference to rear technology people After member, into step B);
E) driving positioner to treat the diagnostic equipment carries out level diagnosises operation one by one:
Drive positioning unit, makes the Laser emission angle of positioner gradually treat the direction B bars corresponding to the diagnostic equipment at each Parked a period of time under part, the Laser emission angle of positioner, are controlled a certain when the direction B corresponding to the diagnostic equipment is parked Positioner processed is to the multiple laser signal of emission:If after emitting times reach the numerical value of setting, corresponding anti-still without receiving Penetrate signal, then control unit by it is current it is corresponding treat that the diagnostic equipment is labeled as failure, then drive positioning unit continues to follow-up Treat corresponding to the diagnostic equipment direction B movement;If before emitting times reach the numerical value of setting, have received corresponding reflection letter Number, then obtain and positioner and accordingly treat the current distance between the diagnostic equipment, then drive positioning unit continues to follow-up Treat the direction B movements corresponding to the diagnostic equipment;
Device to be positioned has all been carried out after one-time positioning diagnostic operation after the diagnostic equipment to all of, if not treating diagnostic equipment quilt Failure is labeled as, then into step C), if needing the diagnostic equipment is marked as failure, into step G);
F) current distance for getting is sought after the recovery apart from B with corresponding by control unit, and difference is labeled on electronic chart Correspondence position, the electronic chart for being labelled with difference form monitoring figure, and monitoring figure is sent to rear technical staff by control unit, this Secondary operation terminates, and waits the follow-up detection window phase to arrive;
G) current distance for getting is carried out asking poor apart from B by control unit with corresponding, and then, control unit is by difference and mark The position for treating the diagnostic equipment of failure is designated as while being labeled on electronic chart, respective electronic map forms malfunction monitoring figure, control Malfunction monitoring figure is sent to rear technical staff by unit processed, and this operation terminates, and waits the follow-up detection window phase to arrive;
Abovementioned steps A) to G) operation, be designated as resetting bit manipulation, in running, just run at interval of certain hour and once weigh Positioning action;
During resetting bit manipulation operation, control unit also Synchronization Control profile scanning device makees following operation:
(1) it is driven profile scanning device to move along the plane of scanning motion of itself, side of the profile scanning device in each monitoring point of correspondence The parked certain hour under the conditions of C, when parked, profile scanning device is to emission laser signal:If in parked period, section Scanning means receives corresponding reflected signal, then obtain the current distance between profile scanning device and monitoring point, be then driven Profile scanning device continues to next parked position to move;If in parked period, profile scanning device does not receive corresponding anti- Signal is penetrated, then the monitoring point corresponding to front direction C is labeled as into point to be confirmed, and be driven profile scanning device and continued to next Parked position movement;
All monitoring points are all carried out after single pass after profile scanning device, if there is no point to be confirmed, into step (2), if there is point to be confirmed, into step (three);
(2) current distance for getting is carried out asking poor apart from C by control unit with corresponding:If all of current distance with Each self-corresponding numerical value apart from C is equal, then this operation terminates, and waits the follow-up detection window phase to arrive;If current distance Any one of it is unequal with the corresponding numerical value apart from C, then corresponding difference is labeled in right on electronic chart by control unit Answer at position, respective electronic map forms cross-section monitoring figure, control unit is sent to cross-section monitoring figure after the technical staff of rear, This operation terminates, and waits the follow-up detection window phase to arrive;
(3) with both direction C corresponding to the monitoring point of to be confirmed both sides as border, control section scanning means is to border Within region be scanned, in scanning process, profile scanning device outwards persistently launches laser signal;In scanning process, if disconnected Surface scan device receives reflected signal corresponding with point to be confirmed, then obtain working as between point to be confirmed and profile scanning device Front distance simultaneously records the current laser signal direction of the launch;If after the end of scan, not receiving corresponding reflected signal, then treating this Confirm that point is labeled as trouble point;
If there is no trouble point on all monitoring sections, into step (two);If there is trouble point on arbitrary monitoring section, Then the current distance for getting is carried out asking poor apart from C by control unit with corresponding, and difference and position of failure point are labeled in On electronic chart, respective electronic map forms failure cross-section monitoring figure, and failure cross-section monitoring figure is sent to rear by control unit After technical staff, this operation terminates, and waits the follow-up detection window phase to arrive;
The operation of abovementioned steps () to (three), is designated as cross-section monitoring operation, in running, just runs at interval of certain hour Cross-section monitoring operation.
CN201510416389.2A 2015-07-16 2015-07-16 Control method of remote automatic tunnel deformation monitoring system Active CN104976961B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510416389.2A CN104976961B (en) 2015-07-16 2015-07-16 Control method of remote automatic tunnel deformation monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510416389.2A CN104976961B (en) 2015-07-16 2015-07-16 Control method of remote automatic tunnel deformation monitoring system

Publications (2)

Publication Number Publication Date
CN104976961A CN104976961A (en) 2015-10-14
CN104976961B true CN104976961B (en) 2017-05-03

Family

ID=54273703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510416389.2A Active CN104976961B (en) 2015-07-16 2015-07-16 Control method of remote automatic tunnel deformation monitoring system

Country Status (1)

Country Link
CN (1) CN104976961B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111947590A (en) * 2020-02-17 2020-11-17 北京联睿科科技有限公司 Online detection device, method and system for building deformation

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106197304B (en) * 2016-06-29 2018-10-23 石家庄铁道大学 A kind of Railway Tunnel convergence automatic detection device and detection method
CN107218899A (en) * 2017-06-02 2017-09-29 北斗卫星导航科技邢台有限公司 A kind of deformation high-precision intelligent detection method towards subterranean tunnels such as civil air defense works
CN110345906A (en) * 2018-04-07 2019-10-18 张亚标 The real-time level measurement method and measuring device of tunnel arch top settlement
CN109542116B (en) * 2018-11-23 2022-02-11 重庆交通大学 Three-dimensional cruising method and system for bridge detection

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2272568Y (en) * 1996-11-11 1998-01-14 地质矿产部探矿工艺研究所 Laser measurer for profile of tunnel
CN101246007A (en) * 2007-02-12 2008-08-20 上海地铁运营有限公司 Tunnel convergence monitoring method
CN101943577A (en) * 2010-08-16 2011-01-12 上海地铁盾构设备工程有限公司 Metro tunnel fracture surface deformation detection system
CN102141375A (en) * 2010-12-30 2011-08-03 北京交通大学 Line full section automatic detection system
CN102564393A (en) * 2011-12-28 2012-07-11 北京工业大学 Method for monitoring and measuring full section of tunnel through three-dimensional laser
CN102608963A (en) * 2011-12-28 2012-07-25 北京工业大学 Summarized information monitoring system of tunnel
CN104748695A (en) * 2015-04-10 2015-07-01 清华大学 Method for monitoring early deformation of large-section underground caverns on basis of accurate zone measurement
CN204788272U (en) * 2015-07-16 2015-11-18 重庆市勘测院 Tunnel warp long -range automatic monitoring system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2272568Y (en) * 1996-11-11 1998-01-14 地质矿产部探矿工艺研究所 Laser measurer for profile of tunnel
CN101246007A (en) * 2007-02-12 2008-08-20 上海地铁运营有限公司 Tunnel convergence monitoring method
CN101943577A (en) * 2010-08-16 2011-01-12 上海地铁盾构设备工程有限公司 Metro tunnel fracture surface deformation detection system
CN102141375A (en) * 2010-12-30 2011-08-03 北京交通大学 Line full section automatic detection system
CN102564393A (en) * 2011-12-28 2012-07-11 北京工业大学 Method for monitoring and measuring full section of tunnel through three-dimensional laser
CN102608963A (en) * 2011-12-28 2012-07-25 北京工业大学 Summarized information monitoring system of tunnel
CN104748695A (en) * 2015-04-10 2015-07-01 清华大学 Method for monitoring early deformation of large-section underground caverns on basis of accurate zone measurement
CN204788272U (en) * 2015-07-16 2015-11-18 重庆市勘测院 Tunnel warp long -range automatic monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于地面三维激光扫描技术的隧道全断面变形测量方法;谢雄耀,卢晓智,田海洋,季倩倩,李攀;《岩石力学与工程学报》;20131130;第32卷(第11期);2214-2224 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111947590A (en) * 2020-02-17 2020-11-17 北京联睿科科技有限公司 Online detection device, method and system for building deformation

Also Published As

Publication number Publication date
CN104976961A (en) 2015-10-14

Similar Documents

Publication Publication Date Title
CN104976961B (en) Control method of remote automatic tunnel deformation monitoring system
CN110109466B (en) Autonomous ground polishing robot control system based on multiple sensors
CN101458083B (en) Structure light vision navigation system and method
CN103913116B (en) Large-scale stacking material volume both sides parallel measuring device and method
CN102175156B (en) Automatic height measurement device for crops
CN204788272U (en) Tunnel warp long -range automatic monitoring system
CN100567706C (en) The method and apparatus that is used for altering gateway structure in monitoring mine section
US20160062361A1 (en) Autonomous moving body
JPS58710A (en) Method for determining position of cavity section continuous body excavated and device for executing said method
CN107765683A (en) Instant navigation method of mobile robot
CN105190236A (en) Method and apparatus for projection of BIM information
CN104515514A (en) Measuring Method And Measuring Instrument
US20160371400A1 (en) Installation System and Method for Mapping Components of a Structure
JP2016050876A (en) Hammering inspection recording device
CN115256414A (en) Mining drilling robot and coupling operation method of mining drilling robot and geological and roadway models
CN108195341B (en) Automatic deformation monitoring method for instrument station transfer without need of relearning
CN103309351A (en) Maintenance robot obstacle avoidance planning method
Montero et al. Intelligent robotic system for autonomous crack detection and caracterization in concrete tunnels
Everett et al. Real-world issues in warehouse navigation
CN109488358A (en) Movable-type intelligent advance support system and method for protecting support
JPS5921835A (en) Finishing work of ground to given shape
CN111369669A (en) Method for automatically leveling sprayed surface
JP2000227333A (en) Shape measuring instrument for bridge
US11846718B2 (en) Location measuring system
CN104125398A (en) Radar detection based intelligent tracking equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240320

Address after: No. 6 Qingzhu East Road, Dazhulin Street, Yubei District, Chongqing, 400000

Patentee after: Chongqing Institute of Surveying and Mapping Science and Technology (Chongqing Map Compilation Center)

Country or region after: China

Address before: 400020 Jiangbei District, Chongqing electric measuring Village No. 231

Patentee before: CHONGQING SURVEY INSTITUTE

Country or region before: China