CN104963690B - A kind of underground obstacle processing method for jacking construction - Google Patents
A kind of underground obstacle processing method for jacking construction Download PDFInfo
- Publication number
- CN104963690B CN104963690B CN201510426776.4A CN201510426776A CN104963690B CN 104963690 B CN104963690 B CN 104963690B CN 201510426776 A CN201510426776 A CN 201510426776A CN 104963690 B CN104963690 B CN 104963690B
- Authority
- CN
- China
- Prior art keywords
- underground obstacle
- jacking construction
- processing method
- soil body
- draw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention provides a kind of underground obstacle processing method for jacking construction, including:Step one:Drilled in push pipe upper horizontal to be onstructed, and cause the hole through the soil body being located between originating active well and receiving active well;Step 2:Draught line is laid in the hole, draw-gear is set in active well is received;Step 3:The metallic plate with pointed tooth is drawn to the soil body by the draw-gear and draught line, is drawn the metallic plate and is moved untill the underground obstacle in the soil body is cut off.The invention provides a kind of underground obstacle processing method for jacking construction, the metallic plate with pointed tooth is dragged in the soil body by draw-gear and draught line, and then realize cutting to underground obstacle, ensure that being normally carried out for follow-up jacking construction, and the method is simple and reliable, with low cost, be easily achieved.
Description
Technical field
The invention belongs to underground space development technical field of construction, a kind of underground obstacle for jacking construction is related generally to
Substance treating method.
Background technology
In jacking construction, when particularly carrying out jacking construction to shallow earthing, if there is tree on the ground of push pipe jacking circuit
Wood, then the root system of trees may invade in push pipe jacking section, formed jacking construction in underground obstacle.Due to push pipe
Machine cannot often cut off tree root, after the cutterhead of push-bench encounters tree root, can slide tree root, and disturbance trees even cause trees to damage
The destruction of bad and ground environment, so in order to ensure being normally carried out for engineering, it usually needs migrate the trees on ground, but this can
The delay significantly of duration can be caused, to engineering using greatly negative effect is brought, can be even difficult to due to ground trees sometimes
Migration, causes cannot implementing for engineering, it is therefore necessary to provide a kind of method for removing underground obstacle.
The content of the invention
It is an object of the invention to provide a kind of underground obstacle processing method for jacking construction, to solve existing skill
Deficiency of the art when jacking construction encounters tree root, it is ensured that the normal construction of engineering.
In order to achieve the above object, the invention provides a kind of underground obstacle processing method for jacking construction, bag
Include:
Step one:Drilled in push pipe upper horizontal to be onstructed, and cause that the hole is run through to be located at and originate active well and reception
The soil body between active well;
Step 2:Draught line is laid in the hole, draw-gear is set in active well is received;
Step 3:The metallic plate with pointed tooth is drawn to the soil body by the draw-gear and draught line, draws institute
Metallic plate is stated to move untill the underground obstacle in the soil body is cut off.
Further, in step one, drilled in push pipe upper horizontal to be onstructed using directional drilling equipment.
Further, in step 2, the draught line is steel strand wires.
Further, in step 3, the metallic plate is steel plate.
Further, in step 3, the pointed tooth on the metallic plate is serrated.
Further, in step 3, the underground obstacle is tree root.
For when pipe-jacking project is constructed, break when other barriers such as root system due to ground trees invade push pipe jacking
Push pipe performance difficulty or situation about cannot implement are caused in face, the invention provides a kind of underground obstacle for jacking construction
Processing method, is dragged the metallic plate with pointed tooth by draw-gear and draught line, and then realize to underground in the soil body
The cutting of barrier, it is ensured that follow-up jacking construction is normally carried out, and the method is simple and reliable, with low cost, be easily achieved.
Brief description of the drawings
Fig. 1 is the flow chart of the underground obstacle processing method for jacking construction provided in an embodiment of the present invention;
Fig. 2 is the profile drilled in the soil body provided in an embodiment of the present invention;
Fig. 3 is the profile that draught line is laid in hole provided in an embodiment of the present invention;
Fig. 4 is the profile that metallic plate is set in the soil body provided in an embodiment of the present invention.
In figure, 1, originate active well, 2, directional drilling equipment, 3, push pipe, 4, hole, 5, steel strand wires, 6, receive active well, 7,
Hydraulic traction device, 8, steel plate, 9, the soil body, 10 tree roots.
Specific embodiment
Specific embodiment of the invention is described in more detail below in conjunction with schematic diagram.According to description below and
Claims, advantages and features of the invention will become apparent from.It should be noted that, accompanying drawing is in the form of simplifying very much and equal
Using non-accurately ratio, only it is used to conveniently, lucidly aid in illustrating the purpose of the embodiment of the present invention.
As shown in figure 1, the embodiment of the invention provides a kind of underground obstacle processing method for jacking construction, wrap
Include:
Step one:In the upper horizontal of push pipe 3 drilling 4 to be onstructed, and so that the hole 4 is run through to be located at originates the He of active well 1
Receive the soil body 9 between active well 2;
Step 2:Draught line is laid in the hole 4, draw-gear is set in active well 2 is received;
Step 3:The metallic plate with pointed tooth is drawn to the soil body 9 by the draw-gear and draught line, draws institute
Metallic plate is stated to move untill the underground obstacle in the soil body 9 is cut off.
In step one, using directional drilling equipment 2 in the upper horizontal of push pipe 3 drilling 4 to be onstructed.
In step 2, the draught line is steel strand wires 5, and the draw-gear is hydraulic traction device 7.
In step 3, the metallic plate is steel plate 8, and the pointed tooth on the metallic plate is serrated, the underground obstacle
Thing is tree root 10.
For when pipe-jacking project is constructed, break when other barriers such as root system due to ground trees invade push pipe jacking
Push pipe performance difficulty or situation about cannot implement are caused in face, the invention provides a kind of underground obstacle for jacking construction
Processing method, is dragged the metallic plate with pointed tooth by draw-gear and draught line, and then realize to underground in the soil body
The cutting of barrier, it is ensured that follow-up jacking construction is normally carried out, and the method is simple and reliable, with low cost, be easily achieved.
The preferred embodiments of the present invention are above are only, any restriction effect is not played to the present invention.Belonging to any
Those skilled in the art, not departing from the range of technical scheme, to the invention discloses technical scheme and
Technology contents make the variation such as any type of equivalent or modification, belong to the content without departing from technical scheme, still
Belong within protection scope of the present invention.
Claims (6)
1. a kind of underground obstacle processing method for jacking construction, it is characterised in that including:
Step one:Drilled in push pipe upper horizontal to be onstructed, and cause that the hole is run through to be located at and originated active well and receive work
The soil body between well;
Step 2:Draught line is laid in the hole, draw-gear is set in active well is received;
Step 3:The metallic plate with pointed tooth is drawn to the soil body by the draw-gear and draught line, draws the gold
Category plate motion is untill the underground obstacle in the soil body is cut off;
The underground obstacle is tree root.
2. the underground obstacle processing method of jacking construction is used for as claimed in claim 1, it is characterised in that in step one
In, drilled in push pipe upper horizontal to be onstructed using directional drilling equipment.
3. the underground obstacle processing method of jacking construction is used for as claimed in claim 1, it is characterised in that in step 2
In, the draught line is steel strand wires.
4. the underground obstacle processing method of jacking construction is used for as claimed in claim 1, it is characterised in that in step 2
In, the draw-gear is hydraulic traction device.
5. the underground obstacle processing method of jacking construction is used for as claimed in claim 1, it is characterised in that in step 3
In, the metallic plate is steel plate.
6. the underground obstacle processing method of jacking construction is used for as claimed in claim 1, it is characterised in that in step 3
In, the pointed tooth on the metallic plate is serrated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510426776.4A CN104963690B (en) | 2015-07-20 | 2015-07-20 | A kind of underground obstacle processing method for jacking construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510426776.4A CN104963690B (en) | 2015-07-20 | 2015-07-20 | A kind of underground obstacle processing method for jacking construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104963690A CN104963690A (en) | 2015-10-07 |
CN104963690B true CN104963690B (en) | 2017-06-27 |
Family
ID=54217751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510426776.4A Active CN104963690B (en) | 2015-07-20 | 2015-07-20 | A kind of underground obstacle processing method for jacking construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104963690B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306357B (en) * | 2020-02-14 | 2022-06-24 | 上海市基础工程集团有限公司 | Construction method for steel top pipe to penetrate foundation stratum based on temporary sleeve butt joint |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1865650A (en) * | 2006-06-22 | 2006-11-22 | 刘明明 | Construction method for push pipe by cooperation of horizontal auger driller and horizontal directional driller |
CN103161454A (en) * | 2011-12-08 | 2013-06-19 | 上海市基础工程有限公司 | Method for horizontal geological exploration by means of directional drilling machine |
CN103527203A (en) * | 2013-10-28 | 2014-01-22 | 镇江安达煤矿专用设备有限公司 | Water spray cutter head of tube push bench |
CN204164493U (en) * | 2014-08-26 | 2015-02-18 | 中国化学工程第六建设有限公司 | A kind of sniffer for jacking construction |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07269287A (en) * | 1994-03-31 | 1995-10-17 | Kubota Corp | Pipe jacking method |
-
2015
- 2015-07-20 CN CN201510426776.4A patent/CN104963690B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1865650A (en) * | 2006-06-22 | 2006-11-22 | 刘明明 | Construction method for push pipe by cooperation of horizontal auger driller and horizontal directional driller |
CN103161454A (en) * | 2011-12-08 | 2013-06-19 | 上海市基础工程有限公司 | Method for horizontal geological exploration by means of directional drilling machine |
CN103527203A (en) * | 2013-10-28 | 2014-01-22 | 镇江安达煤矿专用设备有限公司 | Water spray cutter head of tube push bench |
CN204164493U (en) * | 2014-08-26 | 2015-02-18 | 中国化学工程第六建设有限公司 | A kind of sniffer for jacking construction |
Also Published As
Publication number | Publication date |
---|---|
CN104963690A (en) | 2015-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104179453A (en) | Profile-hole drill | |
CN105804754B (en) | A kind of coal seam is Main aquifer pitshaft method for uncovering coal | |
CN104963690B (en) | A kind of underground obstacle processing method for jacking construction | |
CN103291348A (en) | Fully mechanized coal mining face dust overrunning automatic dust suppression method | |
CN107130997B (en) | Technical method for mining bedding drilling and extracting pressure relief gas on working face of unequal length protective layer | |
CN204703907U (en) | A kind of Novel shield machine | |
CN102972126A (en) | Puncher dedicated for planting trees in deep-hole caves | |
CN104362441A (en) | Grounding grid resistance reduction method for high soil resistivity transformer substation | |
CN106289615A (en) | A kind of protected seam monitor for stress and monitoring method | |
CN106498954A (en) | High steep soil deformation slope retaining structure | |
CN206829659U (en) | Deep basal pit/deep trench anti-collapse operation protection cage | |
WO2018132809A3 (en) | Hydraulic fracturing systems and methods | |
CN108093706A (en) | A kind of agricultural ditching device | |
CN103928773A (en) | Method for improving transformer substation soil moisture content | |
MX2020003155A (en) | Diversion using solid particulates. | |
CN104669926A (en) | Travelling wheel for ploughing | |
CN203891045U (en) | Leakage blocking and grouting device between deep foundation pit fender posts | |
JP6339845B2 (en) | Tunnel construction method | |
CN206204961U (en) | Steep soil deformation slope retaining structure high | |
CN203135006U (en) | Ground wire earth electrode | |
JP2012092520A (en) | Construction method for preventing surface failure of slope | |
CN204370457U (en) | Advanced radial precipitation channel system | |
CN108005714A (en) | Constructing tunnel gushes out gas closure method | |
CN205077459U (en) | Processing structure of speedily carrying out rescue work is blockked up in diversion tunnel import | |
CN107221882A (en) | A kind of leakage conductor installs reconnaissance method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||