CN104963339B - A kind of anchor cable centering holder device - Google Patents

A kind of anchor cable centering holder device Download PDF

Info

Publication number
CN104963339B
CN104963339B CN201510393401.2A CN201510393401A CN104963339B CN 104963339 B CN104963339 B CN 104963339B CN 201510393401 A CN201510393401 A CN 201510393401A CN 104963339 B CN104963339 B CN 104963339B
Authority
CN
China
Prior art keywords
anchor cable
groove
holder device
centering
isolation mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510393401.2A
Other languages
Chinese (zh)
Other versions
CN104963339A (en
Inventor
李洪斌
闫福根
邹德兵
王汉辉
刘权庆
王公彬
樊少鹏
闵征辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201510393401.2A priority Critical patent/CN104963339B/en
Publication of CN104963339A publication Critical patent/CN104963339A/en
Application granted granted Critical
Publication of CN104963339B publication Critical patent/CN104963339B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of anchor cable centering holder device, grout pipe (1), ring positioned at centre are wrapped in the isolation mount (2) of described grout pipe (1) periphery and on the outside of corrugated protective conduits (4) ring of outer layer;The inner groovy (2 2) that arranged for interval caves inward on the external groove (2 1) that arranged for interval is outwards recessed on described isolation mount (2) inwall, described isolation mount (2) outer wall;Steel strand wires (3) are respectively and fixedly provided with described external groove (2 1) and inner groovy (2 2), described corrugated protective conduits (4) are in cylinder and the described isolation mount (2) of parcel;Ring is enclosed with equidistant centering bracket base (7) on described corrugated protective conduits (4) outer wall;It overcomes existing Carcel, the shortcoming of installation difficulty, with reduction prestressd anchor cable loss, it is ensured that the consolidation effect of anchor cable and the advantage of construction quality.

Description

A kind of anchor cable centering holder device
Technical field
It is more specifically a kind of the present invention relates to water conservancy and hydropower, road, bridge, Geotechnical Engineering consolidation process field Anchor cable centering holder device.
Background technology
Since 1960s, Anchor Cable Technique introduced China, the technology obtains widely should in many engineering fields With the achievement especially obtained in terms of water conservancy and hydropower is more notable.At present, anchor cable turn into the Hydraulic and Hydro-Power Engineering dam foundation, side slope, The important technology of underground chamber support reinforcement.Anchor cable is typically formed by high strength steel strand layout arranged side by side, by manual type by its It is pushed in the ground drilling being previously-completed, then first carrying out grouting to its root is adhesively fixed, then is carried out in domatic exposed junction Tensioning is with to being reinforced rock mass application buffer brake.To ensure that anchor cable is not corroded by extraneous medium (underground water, air), anchor cable body Isolation mount is provided between each twisted wire, corrugated protective conduits are externally provided with to medium-height trestle, the main function to medium-height trestle is to ensure anchor cable body Drill center is occupy, anchor cable is had uniform cement grout protection thickness in vitro.
To ensure the construction quality of anchor cable, anchor cable construction must be carried out in strict accordance with related specifications, technical requirements.But in view of Anchor cable construction is that during the complex conditions such as high gradient slope, narrow cavern, practice of construction, anchor cable installs very difficult mostly, Mainly show following problem:
1st, anchor cable difficulty, clamping lock Frequent Accidents are pushed
Anchor cable construction is typically carried out by following operational procedure:Measurement and positioning → pore-creating → anchor cable making → anchor cable installation → anchor Rope grouting → anchor cable grading tension → anchor pier concreting.Wherein, anchor cable is installed and referred to after anchor cable completes, and passes through people Work mode pushes to the anchor cable body completed in the drilling being previously-completed.
(1) in actual anchor cable installation process, due to anchor cable length length (using wide variety of 3000kN grades of anchor cable as Example, its length is generally 30m-50m), borehole wall it is coarse, cause centering bracket tab position and borehole wall frictional resistance Greatly.As anchor cable body is pushed to the increase of length in drilling hole, the frictional resistance born to medium-height trestle is also incrementally increased, and is caused The installation difficulty of anchor cable also increases therewith.Anchor cable length is longer, whole installation process difficulty is bigger.
(2) in anchor cable practice of construction, because its weight is big, (length is generally for 30m-50m 3000kN level anchor cable weight 0.8t-1.3t), therefore in installation process more than ten people even tens people are needed while undertaking and pushing to complete.Work as anchor cable During push, coarse borehole wall easily damages anchor cable accessory and overcoat, or even the friction resistance for causing anchor cable body locally to bear Power is excessive, causes the centering bracket tab position of anchor cable body at this to be stuck in hole, causes Carcel phenomenon.
(3), will in the case of necessity if occur to push the phenomenons such as anchor cable difficulty, Carcel in actual anchor cable work progress Anchor cable is extracted out, and anchor cable body accessory riding position, the damaged condition of overcoat of extraction are checked, anchor cable is have impact on and applies The progress for the industry that works.
2nd, anchor cable body is easily reversed, and loss of prestress is serious
(1) anchor cable to parts such as medium-height trestle, corrugated protective conduits by steel strand wires, isolation mount, constitute, and its mechanical characteristic is Linear flexible object.As the anchor cable body of flexible articles, during carrying and push, anchor cable is known from experience to twist vertically, So that anchor cable shows " twisted shape ".Because anchor cable body has certain rigidity and elasticity, after twisting, anchor cable is known from experience corresponding Automatically generate reactive torque, driving anchor cable is rotated to gyratory directions, but the frictional resistance born due to centering bracket tab part Larger, reactive torque is difficult to overcome frictional resistance, ultimately results in anchor cable body and twisting states are in hole.Cause blast pipe and slip casting The distortion closure of pipe, influences later stage slip casting effect, or need to extract reparation installation again, or even anchor cable is scrapped.
(2) anchor cable body generation axial torsion not only results in blast pipe and distorted with Grouting Pipe, and to later stage anchorage cable stretching It will also result in great adverse effect.Because anchor cable body is in twisted state so that anchor cable twisted wire frictional force in stretching process increases Plus, so that linear loss occurs for anchor force, cause prestressd anchor cable to lose, eventually affect the anchoring effect of anchor cable.
The content of the invention
It is an object of the invention to overcome the shortcomings of existing anchor cable installation difficulty, Carcel and serious loss of prestress, and A kind of anchor cable centering holder device is proposed, which ensure that the anchoring quality of anchor cable.
A kind of anchor cable centering holder device of the present invention, grout pipe, ring positioned at centre are wrapped in described grouting The isolation mount and the corrugated protective conduits positioned at outer layer of pipe periphery;Arranged for interval is outwards recessed on described isolation mount inwall The inner groovy that arranged for interval caves inward on external groove, described isolation mount outer wall;In described external groove and inner groovy Steel strand wires are respectively and fixedly provided with, described corrugated protective conduits are in cylinder and the described isolation mount of parcel;Protected in described ripple Ring is enclosed with equidistant centering bracket base in pipe outer wall.
In the above-mentioned technical solutions:The centering being disposed with prism-shaped alternate along its length of described centering bracket base Bracket tab position and preformed hole.
In the above-mentioned technical solutions:Universal wheel mounting groove, institute are provided with to middle bracket tab position center described The universal wheel mounting groove stated is by the groove seat for caving in hemispherical and in described groove seat, groove lid is constituted.
In the above-mentioned technical solutions:Hollow out inside described groove seat, is provided with reserved in described groove seat and groove lid Screw duct.
In the above-mentioned technical solutions:Universal wheel is installed in described groove seat, described universal wheel is by 1 diameter 14mm Big hard PVC medicine ball and several a diameter of small hard PVC medicine ball compositions of 2.5mm.
In the above-mentioned technical solutions:The axial spacing of described centering bracket base is 1m, described centering bracket base Salient point engages with the groove of described corrugated protective conduits.
In the above-mentioned technical solutions:It is provided with colligation groove in described groove lid, described colligation groove is located at described pre- Stay the both sides in screw duct.
In the above-mentioned technical solutions:Described preformed hole is made up of two rectangular openings and a racetrack annular aperture;Two Two described rectangular openings and a racetrack annular aperture alternate arrangement in the width direction, described racetrack annular aperture are located at two In the middle of individual described rectangular opening.
In the above-mentioned technical solutions:The material of described centering bracket base is rigid plastics, described to medium-height trestle bottom Seat size is 360mm × 80mm × 2mm.
In the above-mentioned technical solutions:The height at the centering bracket tab position is 19mm, the size of described rectangular opening For 20mm × 5mm.
The present invention has following technological merit:1st, the frictional resistance to medium-height trestle and borehole wall is significantly reduced, is protected The pre-buried depth of design can smoothly be pushed to by having demonstrate,proved anchor cable, it is to avoid Carcel phenomenon occurs, and improves anchor cable construction efficiency.
Traditional anchor cable body is to the sliding friction of the frictional force of medium-height trestle and borehole wall for boss and hole wall.The present invention Anchor cable centering holder device advantage is that the sliding friction to medium-height trestle and borehole wall effectively can be converted into ten thousand by universal wheel To the rolling friction of wheel spheroid and borehole wall.Under normal conditions, the rolling friction of object only has the 1/ of sliding-frictional resistance 40 to 1/60, therefore, apparatus of the present invention dramatically reduce the frictional resistance that the anchor cable body during anchor cable is pushed is subject to, The installation difficulty of anchor cable is reduced from structure, anchor cable once mounting success rate and construction effect is improved, construction work has been saved It is phase, even more significant for slope reinforcement emergency work.
2nd, ensure after anchor cable installation, anchor cable body is in straight state in drilling, is effectively reduced anchorage cable stretching process Middle loss of prestress, it is ensured that anchorage cable anchoring quality.
Because the invention has universal wheel unit to medium-height trestle, not only reduce anchor cable and push axis frictional resistance, can also reduce The radial direction frictional resistance of anchor cable, makes the voluntarily adjustment smooth-going under rotary torque effect of anchor cable body.Therefore the anchor during push is avoided Cable body twists, it is ensured that after anchor cable installation, and anchor cable is in straight state all the time in drilling.It is this to be in straight shape The anchor cable of state, in stretching process, the linear loss of anchor force is greatly reduced, it is ensured that prestressd anchor cable reaches design volume Definite value.Therefore, present invention reduces prestressd anchor cable loss, it is ensured that the consolidation effect of anchor cable and the construction quality of engineering.
Brief description of the drawings
Fig. 1 is the overall structure diagram of anchor cable.
Fig. 2 is A-A diagrammatic cross-sections in Fig. 1.
Fig. 3 is anchor cable centering holder device drawing of the present invention.
Fig. 4 is anchor cable centering holder device profilograph of the present invention.
Fig. 5 is centering bracket tab position drawing in side sectional elevation.
In figure:Grout pipe 1, isolation mount 2, external groove 2-1, inner groovy 2-2, steel strand wires 3, corrugated protective conduits 4, universal wheel Mounting groove 5, groove seat 5-1, groove lid 5-2, universal wheel 6, centering bracket base 7, centering bracket tab position 7-1, preformed hole 7-2, Colligation groove 7-3.Rectangular opening 8, racetrack annular aperture 9.
Embodiment
The performance that the invention will now be described in detail with reference to the accompanying drawings, but they do not constitute limitation of the invention, only It is for example;Advantages of the present invention will become clearer and be readily appreciated that by illustrating simultaneously.
Shown in reference picture 1-5:A kind of anchor cable centering holder device, grout pipe 1, ring positioned at centre are wrapped in institute The isolation mount 2 and the corrugated protective conduits 4 positioned at outer layer for the periphery of grout pipe 1 stated;Cloth is spaced on the described inwall of isolation mount 2 Put the inner groovy 2-2 that arranged for interval caves inward on the external groove 2-1 being outwards recessed, the described outer wall of isolation mount 2;Described External groove 2-1 and inner groovy 2-2 on be respectively and fixedly provided with steel strand wires 3, described corrugated protective conduits 4 are in cylinder and parcel is described Isolation mount 2;Ring is enclosed with equal intervals to middle bracket base 7 on the described outer wall of corrugated protective conduits 4.
The described centering bracket base 7 centering bracket tab position 7-1 being disposed with prism-shaped alternate along its length With preformed hole 7-2.
Universal wheel mounting groove 5 is provided with to middle bracket tab position 7-1 centers described, described universal wheel is installed Groove 5 is by the groove seat 5-1 for caving in hemispherical and on described groove seat 5-1, groove lid 5-2 is constituted.
Hollow out inside described groove seat 5-1, reserved screw duct is provided with described groove seat 5-1 and groove lid 5-2.
Universal wheel 6 is installed in described groove seat 5-1, described universal wheel 6 is real by the big hard PVCs of 1 diameter 14mm Bulbus cordis and several a diameter of small hard PVC medicine ball compositions of 2.5mm.
The axial spacing of described centering bracket base 7 is 1m, the salient point and described ripple of described centering bracket base 7 The groove engaging of protection pipe 4.
Colligation groove 7-3, described colligation groove 7-3 are provided with described groove lid 5-2 and is located at described reserved screw hole The both sides in road.
Described preformed hole 7-2 is made up of two rectangular openings 8 and a racetrack annular aperture 9;Two squares described in two Shape hole 8 and a racetrack annular aperture 9 alternate arrangement in the width direction, described racetrack annular aperture 9 are located at described in two In the middle of rectangular opening 8.
The material of described centering bracket base 7 is rigid plastics, the described size of centering bracket base 7 for 360mm × 80mm×2mm。
The height of the centering bracket tab position 7-1 is 19mm, and the size of described rectangular opening 8 is 20mm × 5mm.
The Specific construction engineering of the present invention:1st, anchor cable drills:Before anchor cable construction, bored according to construction drawing confirmation request anchor cable Position, direction, aperture and the hole depth in hole.After drilling terminates, water pipe is stretched into bottom hole, drilling carried out by great deal running water Rinse.
2nd, anchor cable makes:By piece strappings such as grout pipe 1, steel strand wires 3 and isolation mounts 2 into a branch of, tie up and incited somebody to action after finishing It loads in corrugated protective conduits 4.
3rd, install to medium-height trestle:It is produced in batches by mould.Centering holder device is installed on ripple protection The outside of pipe 4 (ring parcel), centering bracket base 7 is 1.0m along the axial spacing of anchor cable.Centering bracket base 7 passes through salient point and ripple The groove of line protection pipe 4 engages, and carries out lashing by colligation groove 7-3, prevents centering bracket base 7 and anchor when anchor cable enters hole Cable body produces relative slide.
4th, anchor cable is installed:Anchor cable is installed to be carried out using manual type, and universal wheel friction resistance is made full use of during push The characteristics of power is small, slowly at the uniform velocity promotes to ensure after anchor cable body installation, and it is in drilling still in straight state.
5th, grouting and prestressed stretch-draw:It is in the milk after anchor cable installation, after after grout cures, in straight state Anchor cable carry out tensioning step by step.
Above-mentioned unspecified part is prior art.

Claims (8)

1. a kind of anchor cable centering holder device, it is characterised in that:Grout pipe (1), ring positioned at centre are wrapped in described Grout pipe (1) periphery isolation mount (2) and the corrugated protective conduits (4) positioned at outer layer;On described isolation mount (2) inwall The inner groovy that arranged for interval caves inward on the external groove (2-1) that arranged for interval is outwards recessed, described isolation mount (2) outer wall (2-2);Steel strand wires (3), described corrugated protective conduits (4) are respectively and fixedly provided with described external groove (2-1) and inner groovy (2-2) In cylinder and the described isolation mount (2) of parcel;Ring is enclosed with equal intervals on described corrugated protective conduits (4) outer wall Centering bracket base (7);Described centering bracket base (7) is alternate along its length be disposed with it is convex to medium-height trestle in prism-shaped Play position (7-1) and preformed hole (7-2);Installed in the universal wheel that is provided with to middle bracket tab position (7-1) center Groove (5), described universal wheel mounting groove (5) is by the groove seat (5-1) for caving in hemispherical and the groove in described groove seat (5-1) Cover (5-2) composition.
2. a kind of anchor cable centering holder device according to claim 1, it is characterised in that:Described groove seat (5-1) is internal Hollow out, reserved screw duct is provided with described groove seat (5-1) and groove lid (5-2).
3. a kind of anchor cable centering holder device according to claim 1 or 2, it is characterised in that:In described groove seat (5-1) Universal wheel (6) is inside installed, described universal wheel (6) is a diameter of with several by the big hard PVC medicine balls of 1 diameter 14mm The small hard PVC medicine ball compositions of 2.5mm.
4. a kind of anchor cable centering holder device according to claim 3, it is characterised in that:Described centering bracket base (7) axial spacing is 1m, and the salient point of centering bracket base (7) engages with the groove of corrugated protective conduits (4).
5. a kind of anchor cable centering holder device according to claim 2, it is characterised in that:In described groove lid (5-2) Colligation groove (7-3) is provided with, described colligation groove (7-3) is located at the both sides in described reserved screw duct.
6. a kind of anchor cable centering holder device according to claim 4 or 5, it is characterised in that:Described preformed hole (7-2) It is made up of two rectangular openings (8) and a racetrack annular aperture (9);Described rectangular opening (8) and a racetrack annular aperture (9) Alternate arrangement in the width direction, described racetrack annular aperture (9) is located in the middle of the rectangular opening (8) described in two.
7. a kind of anchor cable centering holder device according to claim 6, it is characterised in that:Described centering bracket base (7) material is rigid plastics, and described centering bracket base (7) size is 360mm × 80mm × 2mm.
8. a kind of anchor cable centering holder device according to claim 7, it is characterised in that:The centering bracket tab position The height of (7-1) is 19mm, and the size of described rectangular opening (8) is 20mm × 5mm.
CN201510393401.2A 2015-07-07 2015-07-07 A kind of anchor cable centering holder device Active CN104963339B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510393401.2A CN104963339B (en) 2015-07-07 2015-07-07 A kind of anchor cable centering holder device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510393401.2A CN104963339B (en) 2015-07-07 2015-07-07 A kind of anchor cable centering holder device

Publications (2)

Publication Number Publication Date
CN104963339A CN104963339A (en) 2015-10-07
CN104963339B true CN104963339B (en) 2017-08-11

Family

ID=54217411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510393401.2A Active CN104963339B (en) 2015-07-07 2015-07-07 A kind of anchor cable centering holder device

Country Status (1)

Country Link
CN (1) CN104963339B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442597B (en) * 2015-12-25 2017-10-13 中铁十四局集团第二工程有限公司 A kind of autonomous supercharging anchor cable and its construction method
CN105804076A (en) * 2016-03-26 2016-07-27 安徽同济建设集团有限责任公司 Pre-stressed anchor cable and foundation pit supporting pre-stressed anchor cable construction method
CN106638591A (en) * 2016-12-14 2017-05-10 长江勘测规划设计研究有限责任公司 Multi-layer nest and coaxial sequencing assembly type anchor cable construction and installation method
CN108505457A (en) * 2018-04-16 2018-09-07 杭州屹方建筑科技有限公司 A kind of method that steel flanged beam cemented rock arch bridge side wall is reinforced

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2284265Y (en) * 1997-01-23 1998-06-17 北京市建筑工程研究院 Non-sticking prestressing anchor tendon
CN2602163Y (en) * 2002-11-25 2004-02-04 谢兵 Anchor wire isolation rack
CN201268849Y (en) * 2008-06-18 2009-07-08 中国葛洲坝集团股份有限公司 External centering support of steel anchor rod
CN203062160U (en) * 2013-01-17 2013-07-17 中建三局第二建设工程有限责任公司 Centering bracket for anchor rod
CN203050746U (en) * 2013-02-21 2013-07-10 浙江普泰克金属制品有限公司 Anchor rod centering machine
CN204780899U (en) * 2015-07-07 2015-11-18 长江勘测规划设计研究有限责任公司 Anchor rope centering support device

Also Published As

Publication number Publication date
CN104963339A (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN104963339B (en) A kind of anchor cable centering holder device
WO2020238501A1 (en) Full-assembly pressure-bearing type variable-diameter steel cage expansion head anchor rod pile system
CA2845460C (en) Continous strand hoop reinforcement for concrete foundations
EP2609258B1 (en) System for anchoring a load
WO2016058275A1 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall thereof and manufacturing method thereof
CN109837895A (en) A kind of big pressure dispersing anchorage cable construction of depth
CN110042844B (en) Construction method of cast-in-situ large-diameter foundation pit supporting tubular pile
EA038513B1 (en) Variable-diameter reinforcing cage for anchor rod or pile foundation and use thereof
CN105339654A (en) Wind turbine foundation
CN112376552B (en) Energy-saving pile foundation and construction method thereof
CN108086334A (en) A kind of recyclable quick prestress anchorage cable and its construction method
CN206396755U (en) A kind of dismountable ecological environment-friendly type anchor pole
CN204780899U (en) Anchor rope centering support device
CN106400784B (en) The construction method of bored concrete pile is made of filling pile cage of reinforcement
CN108661092B (en) Pile body connecting device for self-balancing test pile
CN106400783A (en) Construction method for manufacturing cast-in-place pile through unfolded type reinforcement cage
CN107542086B (en) Anchor cable construction method for filling slope
CN108533269B (en) Corrugated steel concrete retaining wall of ultra-deep vertical shaft and construction method
CN206844109U (en) A kind of prestress anchorage cable
CN110117936A (en) Rotary body device and rotation swivel construction method for bridge pier
CN212153367U (en) Sleeve type variable-diameter steel reinforcement cage and expanded anchor rod pile
EP2788565B1 (en) Horizontal joint assembly between two telescopic wind turbine tower portions and method of installing same
CN106120817B (en) A kind of slope surface building concrete layer landslide-proofing construction technology
CN211690321U (en) Combined pile for civil engineering
CN206467654U (en) Multilayer nest, coaxially point sequence assembly type anchor cable structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant