CN104959518A - Method for preparing flange plate through die forging technology - Google Patents
Method for preparing flange plate through die forging technology Download PDFInfo
- Publication number
- CN104959518A CN104959518A CN201510357546.7A CN201510357546A CN104959518A CN 104959518 A CN104959518 A CN 104959518A CN 201510357546 A CN201510357546 A CN 201510357546A CN 104959518 A CN104959518 A CN 104959518A
- Authority
- CN
- China
- Prior art keywords
- core material
- machining
- finished product
- core materials
- finished products
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K1/00—Making machine elements
- B21K1/28—Making machine elements wheels; discs
- B21K1/32—Making machine elements wheels; discs discs, e.g. disc wheels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J5/00—Methods for forging, hammering, or pressing; Special equipment or accessories therefor
- B21J5/02—Die forging; Trimming by making use of special dies ; Punching during forging
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Forging (AREA)
Abstract
The invention discloses a method for preparing a flange plate through a die forging technology. The method for preparing the flange plate through the die forging technology comprises the steps that 1 a blank railway wagon is heated, preforming is conducted through swage forging, machining is conducted and core materials are taken out under the condition that finished products have enough machining allowance, and semi-finished products with the core materials taken out are machined to four finished products; 2 the core materials are heated, preforming is conducted through swage forging, machining is conducted, the core materials are taken out under the condition that the finished products have enough machining allowance, and the semi-finished products with the core materials taken out are machined to two finished products; 3 the core materials are heated, preforming is conducted through swage forging, then machining is conducted, the core materials are taken out, and the semi-finished product with the core materials taken out is machined to one finished product. According to the method for preparing the flange plate through the die forging technology, metal has three-dimensional pressure stress action in a forming die, the problem of longitudinal cracking of the broadside of a tamper cake is solved, producing seven finished products by one blank is achieved, waste materials generated by machining are reduced, and using ratio of materials is improved by about 30 %.
Description
Technical field
The present invention relates to metal-pressed machine field, particularly relate to a kind of method adopting loose tooling forging fabrication technique to prepare ring flange.
Background technology
The forging method of aluminium alloy flange dish (external diameter≤φ 800mm) is generally open die forging jumping-up-punching-punching the wad, then carries out machining, obtains finished parts up to specification.Find in forging process, by the method for open die forging jumping-up, when forging ratio >=5.5, the easy side longitudinal cracking of the upsetting cake obtained, and also a blank goes out one or two pieces finished product, and the surplus that machine adds is quite large, and cause the waste of material, efficiency is not high.
Summary of the invention
The object of the invention is for prior art Problems existing, a kind of method adopting loose tooling forging fabrication technique to prepare ring flange is provided.
Above-mentioned purpose is realized by following proposal:
Adopt loose tooling forging fabrication technique to prepare a method for ring flange, it is characterized in that, described method comprises:
The first step: by blank railway carriage, heating, by swage forging upsetting formation, carries out machining when ensureing that finished parts has enough machine-finish allowances and draws out core material, and be four finished products (1) by drawing out the semi-finished product machining after core material, core material (2) gives over to next jumping-up;
Second step: core material (2) is heated, by swage forging upsetting formation, carry out machining when ensureing that finished parts has enough machine-finish allowances and draw out core material, and be two pieces finished product (4) by drawing out the semi-finished product machining after core material, core material (5) gives over to next jumping-up;
3rd step: core material (5) is heated, by swage forging upsetting formation, then carries out machining and draw out core material, and be processed as a finished product (6) by drawing out the semi-finished product after core material.
Beneficial effect of the present invention: the present invention utilizes loose tooling forging, make metal in loose tool, have three-dimensional compressive stress effect, solve the problem of upsetting cake side longitudinal cracking, realize a blank and go out seven finished products, reduce the waste material that machining produces, the utilization rate of material improves nearly 30%, is namely increased to more than 65% from 30%, greatly improves labor productivity; Its forging method is rationally simple and easy, and disposable input die cost is little, and implementation step is clear understandable, significantly reduces costs.
Accompanying drawing explanation
Fig. 1 is principle schematic of the present invention.
Detailed description of the invention
The method that the present invention prepares ring flange comprises:
1, by blank railway carriage, heating, folded forging upsetting core under suitable forging ratio, namely by swage forging upsetting formation, ensureing that carrying out machining under finished parts has enough machines to add surplus 3 situation draws out core material, and be four finished products 1 by drawing out the semi-finished product machining after core material, core material 2 gives over to next jumping-up, and machining is not carried out in its upper and lower end face;
2, core material 2 is heated, select suitable forging ratio, upsetting formation, ensureing that carrying out machining under finished parts has enough machine-finish allowance 3 situations draws out core material, and be two pieces finished product 4 by drawing the semi-finished product machining after core, core material 5 gives over to next jumping-up, and machining is not carried out in its upper and lower end face;
3, core material 5 is heated, jumping-up, then carry out machining and draw out core material, and be a finished product 6 by drawing out the semi-finished product machining after core material, amount to and obtain seven finished products.
For the production technology of 5A02 aluminium alloy flange dish, production craft step comprises:
1, specification Φ 310 × 390mm after blank railway carriage, blank heating temperature is 470 ± 5 oC, jumping-up forging ratio is 2.8 for the first time, final forging temperature >=350 oC, Φ 474 × 140mm is of a size of after jumping-up, core material is of a size of Φ 332 × 140mm, and machining finished product part is of a size of Φ 468 × Φ 352 × 25mm, and number of packages is 4.
2, core material carries out second time jumping-up, and heating-up temperature is 470 ± 5 oC, and forging ratio is 2.2, Φ 474 × 61mm is of a size of after jumping-up, after machining, core material is of a size of Φ 332 × 61mm, and machining finished product part is of a size of Φ 468 × Φ 352 × 25mm, and number of packages is 2.
3, again heated by core material, temperature is 470 ± 5 oC, carries out third time jumping-up, and forging ratio is 2.2, is of a size of Φ 474 × 28mm after jumping-up, and machining obtains finished parts and is of a size of Φ 468 × Φ 352 × 25mm, and number of packages is 1.Total obtains 7, finished product ring flange.
Claims (1)
1. adopt loose tooling forging fabrication technique to prepare a method for ring flange, it is characterized in that, described method comprises:
The first step: by blank railway carriage, heating, by swage forging upsetting formation, carries out machining when ensureing that finished parts has enough machine-finish allowances and draws out core material, and be four finished products (1) by drawing out the semi-finished product machining after core material, core material (2) gives over to next jumping-up;
Second step: core material (2) is heated, by swage forging upsetting formation, carry out machining when ensureing that finished parts has enough machine-finish allowances and draw out core material, and be two pieces finished product (4) by drawing out the semi-finished product machining after core material, core material (5) gives over to next jumping-up;
3rd step: core material (5) is heated, by swage forging upsetting formation, then carries out machining and draw out core material, and be processed as a finished product (6) by drawing out the semi-finished product after core material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510357546.7A CN104959518A (en) | 2015-06-26 | 2015-06-26 | Method for preparing flange plate through die forging technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510357546.7A CN104959518A (en) | 2015-06-26 | 2015-06-26 | Method for preparing flange plate through die forging technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104959518A true CN104959518A (en) | 2015-10-07 |
Family
ID=54213697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510357546.7A Pending CN104959518A (en) | 2015-06-26 | 2015-06-26 | Method for preparing flange plate through die forging technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104959518A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105689615A (en) * | 2016-02-03 | 2016-06-22 | 南昌齿轮锻造厂 | Overlapping type combined forging method |
CN109848360A (en) * | 2019-03-01 | 2019-06-07 | 苏州宝业锻造有限公司 | A kind of simple loose tool forging method for large gear processing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3422050B2 (en) * | 1993-09-17 | 2003-06-30 | 日産自動車株式会社 | Forging method of wheels for cast forged vehicles |
CN1541785A (en) * | 2003-04-30 | 2004-11-03 | Method of forming disk wheels | |
CN101036931A (en) * | 2007-03-05 | 2007-09-19 | 贵州安大航空锻造有限责任公司 | Near-isothermal forging method of GH4169 alloy disc-shaped forging in air |
CN101402163A (en) * | 2007-10-07 | 2009-04-08 | 襄樊市汇聚龙机械制造有限公司 | Bearing ferrule workblank triple external member smithing and molding process |
CN101862807A (en) * | 2010-06-11 | 2010-10-20 | 西安交通大学 | Rotary forging method for large disc type work piece and forging device |
CN201684773U (en) * | 2010-05-25 | 2010-12-29 | 东风汽车有限公司 | Die for forming disc type forging |
-
2015
- 2015-06-26 CN CN201510357546.7A patent/CN104959518A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3422050B2 (en) * | 1993-09-17 | 2003-06-30 | 日産自動車株式会社 | Forging method of wheels for cast forged vehicles |
CN1541785A (en) * | 2003-04-30 | 2004-11-03 | Method of forming disk wheels | |
CN101036931A (en) * | 2007-03-05 | 2007-09-19 | 贵州安大航空锻造有限责任公司 | Near-isothermal forging method of GH4169 alloy disc-shaped forging in air |
CN101402163A (en) * | 2007-10-07 | 2009-04-08 | 襄樊市汇聚龙机械制造有限公司 | Bearing ferrule workblank triple external member smithing and molding process |
CN201684773U (en) * | 2010-05-25 | 2010-12-29 | 东风汽车有限公司 | Die for forming disc type forging |
CN101862807A (en) * | 2010-06-11 | 2010-10-20 | 西安交通大学 | Rotary forging method for large disc type work piece and forging device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105689615A (en) * | 2016-02-03 | 2016-06-22 | 南昌齿轮锻造厂 | Overlapping type combined forging method |
CN109848360A (en) * | 2019-03-01 | 2019-06-07 | 苏州宝业锻造有限公司 | A kind of simple loose tool forging method for large gear processing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102319992B (en) | Method for manufacturing aluminum alloy die forging | |
CN107097049B (en) | A kind of titanium or titanium alloy mobile phone shell processing method | |
KR20200052923A (en) | Modular metal construction molding method | |
CN104139147B (en) | The forging method of T-shaped ring-type forge piece blank reheating in SB564 UNS N06690 alloy large-size | |
CN102179669A (en) | Process for forging planet carrier | |
CN104139145A (en) | Method for forging guide horn mouth forge pieces applied to internal components of nuclear reactor | |
CN101898224A (en) | Forging method of lower sealing head forge piece of one-mega kilowatt nuclear-power reactor pressure vessel | |
CN105728612A (en) | Forging method of large titanium alloy frame class precision forge piece for aviation aircraft | |
CN106270340A (en) | A kind of cold-heading molding technique for manufacturing drive shaft and cold-heading module | |
CN104191181A (en) | Magnesium alloy wheel forging-spinning composite forming method | |
CN103264265A (en) | Extrusion forming process for brake wheel | |
CN104959518A (en) | Method for preparing flange plate through die forging technology | |
CN101596572B (en) | Technological method for producing axle case reinforcing ring | |
CN204035444U (en) | The mould of large-scale interior T-shaped ring-type forge piece blank reheating forging | |
CN104384877A (en) | Processing process of rear axle circular cone driven gear | |
CN101890624A (en) | Method for processing eccentric shaft | |
CN103464674A (en) | Hot forging forming method for duplex fork forged piece | |
CN205926971U (en) | A cold heading die group for making drive shaft | |
CN102658304A (en) | Closed-extrusion and molding method of flange | |
CN104624899A (en) | Forging improving method of 200-kilogram-level TC4-DT titanium alloy | |
CN111761017B (en) | Blank making and forming method for upper and lower forged piece tyre membranes with lug bosses | |
CN102689149A (en) | Continuous press forging precise forming process of automobile retaining frame part | |
CN106363363A (en) | Semi-solid thixo-forging forming technology for steel impeller | |
CN106552943A (en) | One-shot forming manufactures the new technology of cover of sewing machine shuttle peg | |
CN111235503A (en) | Quality improvement and material saving method for nickel-based coarse-grained high-temperature alloy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151007 |