CN104954168A - Message analysis based communication fault positioning system - Google Patents

Message analysis based communication fault positioning system Download PDF

Info

Publication number
CN104954168A
CN104954168A CN201510211065.5A CN201510211065A CN104954168A CN 104954168 A CN104954168 A CN 104954168A CN 201510211065 A CN201510211065 A CN 201510211065A CN 104954168 A CN104954168 A CN 104954168A
Authority
CN
China
Prior art keywords
electric power
data network
power data
packet parsing
station end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510211065.5A
Other languages
Chinese (zh)
Other versions
CN104954168B (en
Inventor
马晨骁
王思远
李鸿奎
邓影
李福建
王启龙
牛文惠
龚珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201510211065.5A priority Critical patent/CN104954168B/en
Publication of CN104954168A publication Critical patent/CN104954168A/en
Application granted granted Critical
Publication of CN104954168B publication Critical patent/CN104954168B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention relates to the field of electric power systems, in particular to a message analysis based communication fault positioning system. The system integrally in a star structure takes an electric power data network as a communication channel on the basis of the message analysis technology and comprises a master station end and a plant station end, and the master station end and the plant station end are connected to the electric power data network. The master station end is a managing object and provided with an intelligent fault judgment server, a workstation and an electric power EMS (energy management system); the plant station end is a managed object and comprises a background computer, a substation gateway and PCs (personal computers) arranged at nodes of the electric power data network, and the background computer, the substation gateway and the PCs are provided with message analysis and fault alarm units respectively. The master station end receives alarm information sent by the plant station end to intelligently judge occurrence positions and types of communication faults, and statistics of historical records of communication channel faults can be realized.

Description

A kind of communication failure navigation system based on packet parsing
Technical field
The present invention relates to field of power, particularly a kind of communication failure navigation system based on packet parsing.
Background technology
Along with the development of power automation technology, electronic technology and computer network communication technology, electric power system has entered a high-speed development period, and electric power system is to intelligent, integrated future development.The construction of electric power system develops to horizontal and longitudinal both direction.Transversely, need between different operation systems to carry out data information sharing; In longitudinal direction, transformer substation system and scheduling back-up system, the superior and the subordinate dispatch between back-up system all to be needed to carry out sharing of data message.Presently, sharing of these data messages is mainly realized by electric power data network.Because the needs that electric power safety is produced, require electrical production transfer of data real-time, accurate and safety.But unavoidable generation communication failure in long range propagation process, as stuck in telecontrol communication machine process, communication link joint looseness, communications optical cable damages, communication equipment is subject to stronger electromagnetic interference etc., these faults cause transmission data not conform to the actual conditions, and then affect producers to the grasp of grid operating conditions and judgement.
The overall process of the through transfer of data of application of message, when transfer of data is interfered, will shows as message format and change, or message produces error code, causes electrical energy management system (EMS) to receive incorrect data.
Current disposition is, when a communication failure occurs, dispatching automation class, signal squad, three teams and groups of maintenance protection class carry out checking, processing in respective scope of offical duty, and three groups of personnel rush to the scene respectively and check respective equipment running status.According to statistics, in communication failure, Single Point of Faliure ratio is maximum, and troubleshooting mode so is not only delayed fault handling time, also causes the waste of human and material resources.
Summary of the invention
The present invention, in order to make up the deficiencies in the prior art, provides a kind of communication failure navigation system based on packet parsing.
The present invention is achieved through the following technical solutions:
A kind of communication failure navigation system based on packet parsing, it is characterized in that: described system is based on packet parsing technology, and be communications carrier with electric power data network, entire system is hub-and-spoke configuration, be respectively arranged with the main website end and plant stand end that are connected to electric power data network, described main website end is management object, and be provided with intelligent fault and study and judge server, work station and electric power EMS, described plant stand end is managed object, comprise background computer, telecontrol communication machine and the PC be arranged on each node of electric power data network, described background computer, telecontrol communication machine and PC are all provided with packet parsing and fault warning unit, the intelligent fault of described main website end is studied and judged between server and each plant stand end and is run snmp protocol.
Measure and control device is provided with in transformer station, measure and control device and background computer are connected to station level switch, station level switch connects electric power data network switch, electric power data network switch is connected to the router of electric power data network, the router of electric power data network is connected on electric power data network optical transmitter and receiver, and described telecontrol communication machine is connected on electric power data network switch.
Described main website end is connected on the optical transmitter and receiver of electric power data network by main website major network switch, main website data network switch and router successively, described main website data network switch is connected with PC, this PC is also provided with packet parsing and fault warning unit.
Main website of the present invention end, can the scene of intelligent decision communication failure and fault type by accepting the warning message of plant stand end, and can add up communication port fault history.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated.
Accompanying drawing 1 is structural representation of the present invention.
Accompanying drawing 2 is the packet parsing of plant stand end and the flow chart of fault warning unit.
Accompanying drawing 3 is the work operational flow diagram that main website end intelligent fault studies and judges server.
Embodiment
Accompanying drawing 1 is a kind of specific embodiment of the present invention.This embodiment adopts hub-and-spoke configuration, include main website end and plant stand end, be communications carrier with electric power data network between described main website end and plant stand end, communication is carried out by existing communication port, do not need to lay new passage, because electric power data network bandwidth can reach 100,000,000, the requirement that electrical production data and packet parsing communication failure position system data transmit can be met simultaneously.Described main website end is provided with the intelligent fault that can carry out communication failure location and communication failure analysis and studies and judges server, work station and electric power EMS, described plant stand end comprises background computer, telecontrol communication machine and is arranged on the PC on each node of electric power data network, described PC by ONU, that optical splitter is connected to electric power data is online, described background computer, telecontrol communication machine and PC is all provided with packet parsing and fault warning unit.
Measure and control device is provided with in transformer station, measure and control device and background computer are connected to station level switch, station level switch connects electric power data network switch, electric power data network switch is connected to the router of electric power data network, the router of electric power data network is connected on electric power data network optical transmitter and receiver, and described telecontrol communication machine is connected on electric power data network switch.
Described main website end is connected on the optical transmitter and receiver of electric power data network by main website major network switch, main website data network switch and router successively.Described main website data network switch is connected with PC, this PC is also provided with packet parsing and fault warning unit.
The operation of plant stand end and function:
1. the real-time packet sent of received communication device.
2. resolve real-time packet correctness.If receive error message, then by the packet storage of 1min before and after this message in log file.
3. add up the error message number of times received, after reaching set point, send SNMP alarm bag to main website end.
Operation logic and the process of main website end are:
1. receive the SNMP warning information that the packet parsing of plant stand end and fault warning unit send, according between warning information failure judgement generating region and fault type.
2. long-rangely have access to the log file of packet parsing and fault warning unit and resolve, failure judgement type.
3. when certain channel alarm value reaches set point, send channel abnormal alarm, and by cim interface command EMS switching channel, transfer initial value class passage to malfunction.
4. all passage running statuses of graphical representation in work station, provide visual alerts function.
5. add up channel failure historical information, friendly query interface is provided.

Claims (5)

1. the communication failure navigation system based on packet parsing, it is characterized in that: described system is based on packet parsing technology, and be communications carrier with electric power data network, entire system is hub-and-spoke configuration, be respectively arranged with the main website end and plant stand end that are connected to electric power data network, described main website end is management object, and be provided with intelligent fault and study and judge server, work station and electric power EMS, described plant stand end is managed object, comprise background computer, telecontrol communication machine and the PC be arranged on each node of electric power data network, described background computer, telecontrol communication machine and PC are equipped with packet parsing and fault warning unit.
2. according to claim 1 based on the communication failure navigation system of packet parsing, it is characterized in that: the measure and control device in described background computer and transformer station is connected to station level switch, station level switch connects electric power data network switch, electric power data network switch is connected to the router of electric power data network, the router of electric power data network is connected on electric power data network optical transmitter and receiver, and described telecontrol communication machine is connected on electric power data network switch.
3. according to claim 1 based on the communication failure navigation system of packet parsing, it is characterized in that: described main website end is connected on the optical transmitter and receiver of electric power data network by main website major network switch, main website data network switch and router successively.
4. according to claim 1 based on the communication failure navigation system of packet parsing, it is characterized in that: described main website data network switch is connected with PC, this PC is also provided with packet parsing and fault warning unit.
5. according to claim 1 based on the communication failure navigation system of packet parsing, it is characterized in that: the PC on each node of described electric power data network is that to be connected to electric power data by ONU and optical splitter successively online.
CN201510211065.5A 2015-04-29 2015-04-29 A kind of communication failure navigation system based on packet parsing Expired - Fee Related CN104954168B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510211065.5A CN104954168B (en) 2015-04-29 2015-04-29 A kind of communication failure navigation system based on packet parsing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510211065.5A CN104954168B (en) 2015-04-29 2015-04-29 A kind of communication failure navigation system based on packet parsing

Publications (2)

Publication Number Publication Date
CN104954168A true CN104954168A (en) 2015-09-30
CN104954168B CN104954168B (en) 2016-04-13

Family

ID=54168544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510211065.5A Expired - Fee Related CN104954168B (en) 2015-04-29 2015-04-29 A kind of communication failure navigation system based on packet parsing

Country Status (1)

Country Link
CN (1) CN104954168B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110336698A (en) * 2019-07-05 2019-10-15 精英数智科技股份有限公司 A kind of failure data analyzing method, server and storage medium
CN110503129A (en) * 2019-07-08 2019-11-26 贵州电网有限责任公司 A kind of telemechanical comprehensive analysis of fault method and system of many reference amounts data fusion
CN111131249A (en) * 2019-12-24 2020-05-08 国网北京市电力公司 Data processing method and device
CN114785832A (en) * 2022-04-25 2022-07-22 北京兴竹同智信息技术股份有限公司 Early warning data transmission method and system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107404664B (en) * 2017-07-17 2019-11-05 深圳创维-Rgb电子有限公司 A kind of method, smart machine and storage medium for drawing multiplexer channel UI

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101309178A (en) * 2008-07-03 2008-11-19 中兴通讯股份有限公司 Parsing method and apparatus for automatic exchanging optical network systematic log information
CN102064614A (en) * 2011-01-18 2011-05-18 浙江省电力试验研究院 Method for fault inversion and communication inversion of digital substation based on IEC (International Electrotechnical Commission) 61850 standard
CN102868224A (en) * 2012-09-20 2013-01-09 湖北省电力公司电力科学研究院 Secondary network measurement and multimode decision-making method and device for intelligent substation
CN203027019U (en) * 2012-12-03 2013-06-26 国家电网公司 Telecontrol-channel monitoring and alarming device
CN104135070A (en) * 2014-07-14 2014-11-05 国家电网公司 Diagnosis method for pre-channel fault of power distribution automation system
CN204231029U (en) * 2014-11-28 2015-03-25 国家电网公司 Power remote communication on-line monitoring and Analysis on Fault Diagnosis device
CN204633786U (en) * 2015-04-29 2015-09-09 国网山东省电力公司菏泽供电公司 A kind of communication failure navigation system based on packet parsing

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101309178A (en) * 2008-07-03 2008-11-19 中兴通讯股份有限公司 Parsing method and apparatus for automatic exchanging optical network systematic log information
CN102064614A (en) * 2011-01-18 2011-05-18 浙江省电力试验研究院 Method for fault inversion and communication inversion of digital substation based on IEC (International Electrotechnical Commission) 61850 standard
CN102868224A (en) * 2012-09-20 2013-01-09 湖北省电力公司电力科学研究院 Secondary network measurement and multimode decision-making method and device for intelligent substation
CN203027019U (en) * 2012-12-03 2013-06-26 国家电网公司 Telecontrol-channel monitoring and alarming device
CN104135070A (en) * 2014-07-14 2014-11-05 国家电网公司 Diagnosis method for pre-channel fault of power distribution automation system
CN204231029U (en) * 2014-11-28 2015-03-25 国家电网公司 Power remote communication on-line monitoring and Analysis on Fault Diagnosis device
CN204633786U (en) * 2015-04-29 2015-09-09 国网山东省电力公司菏泽供电公司 A kind of communication failure navigation system based on packet parsing

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110336698A (en) * 2019-07-05 2019-10-15 精英数智科技股份有限公司 A kind of failure data analyzing method, server and storage medium
CN110503129A (en) * 2019-07-08 2019-11-26 贵州电网有限责任公司 A kind of telemechanical comprehensive analysis of fault method and system of many reference amounts data fusion
CN111131249A (en) * 2019-12-24 2020-05-08 国网北京市电力公司 Data processing method and device
CN111131249B (en) * 2019-12-24 2022-08-12 国网北京市电力公司 Data processing method and device
CN114785832A (en) * 2022-04-25 2022-07-22 北京兴竹同智信息技术股份有限公司 Early warning data transmission method and system
CN114785832B (en) * 2022-04-25 2024-01-23 北京兴竹同智信息技术股份有限公司 Early warning data transmission method and system

Also Published As

Publication number Publication date
CN104954168B (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN106253487B (en) Intelligent electric power server applied to intelligent substation Protection control system
CN104954168B (en) A kind of communication failure navigation system based on packet parsing
CN110048507B (en) Automatic inspection method and system for power distribution automation system
CN104683168B (en) A kind of transformer station process layer network communication failure automatic positioning method
CN104601383B (en) A kind of power telecom network fault piecewise analysis method
CN202997696U (en) Intelligent distribution network system based on Beidou satellite communication system
CN103001325A (en) Intelligent network distribution system based on Beidou satellite communication system
KR101476234B1 (en) Diagnostic system for substation network based on iec 61850 standard
CN103926896A (en) Underground explosive-proof power source monitoring system and method based on network
CN205620503U (en) Regional trouble fault -tolerance automatic location system of distribution network feeder
Das et al. Process-to-bay level peer-to-peer network delay in IEC 61850 substation communication systems
CN103166800B (en) Message transmission method for dual-network redundant message bus in cross failure
CN110768845A (en) Intelligent substation process level virtual connection fault positioning system
CN102208996A (en) Network safety surveillance method for intelligent network equipment of digitalized transformer satiation
KR101048496B1 (en) Remote Power Control System Using Distributed Network Protocol
CN201256306Y (en) Intelligent control protection system for high voltage switch
CN102760504A (en) Digital control system for all plant units in nuclear power station and non-nuclear-grade control system and method
CN204633786U (en) A kind of communication failure navigation system based on packet parsing
CN102111017A (en) Automatic remote maintenance system of transforming plant
CN104300681B (en) A kind of station level device node state monitoring method of intelligent substation
CN103296756A (en) Managing and monitoring system for transformer substation
CN202948304U (en) Improved industrially controlled redundant system
CN202696289U (en) Low voltage power distribution monitoring system
CN207459834U (en) A kind of Power Monitored Control System For Underground Mine
Dolezilek et al. Comparing the cost, complexity, and performance of several in-service process bus merging unit solutions based on IEC 61850

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413