CN104954102B - A kind of dispatching method of uplink semi-persistent resource user - Google Patents

A kind of dispatching method of uplink semi-persistent resource user Download PDF

Info

Publication number
CN104954102B
CN104954102B CN201410118289.7A CN201410118289A CN104954102B CN 104954102 B CN104954102 B CN 104954102B CN 201410118289 A CN201410118289 A CN 201410118289A CN 104954102 B CN104954102 B CN 104954102B
Authority
CN
China
Prior art keywords
uplink
user
subframe
scheduling
sps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410118289.7A
Other languages
Chinese (zh)
Other versions
CN104954102A (en
Inventor
谌晓清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TD Tech Ltd
Original Assignee
TD Tech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TD Tech Ltd filed Critical TD Tech Ltd
Priority to CN201410118289.7A priority Critical patent/CN104954102B/en
Publication of CN104954102A publication Critical patent/CN104954102A/en
Application granted granted Critical
Publication of CN104954102B publication Critical patent/CN104954102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

This application discloses a kind of dispatching methods of uplink semi-persistent resource user, it include: when channel parameter of eating dishes without rice or wine does not change, activated uplink semi-persistent resource SPS user corresponding to a uplink scheduling subframe, by the uplink scheduling of the wherein uplink SPS user of non-deactivation and/or non-reactivation, the transmitting uplink data subframe corresponding with the uplink scheduling subframe before advanceing to the uplink scheduling subframe is carried out.Using the application, the number of users that the system of can be improved can dispatch effectively improves the specification of system voice business.

Description

A kind of dispatching method of uplink semi-persistent resource user
Technical field
This application involves the dispatching technique in communication system, in particular to a kind of uplink semi-persistent resource (SPS) user's Dispatching method.
Background technique
In TDD system, uplink scheduling and transmitting uplink data are carried out in different subframes, wherein uplink scheduling is under Row subframe carries out.Specifically, for uplink scheduling there are stringent timing requirements, the uplink authorization for passing subframe to specified upstream number is necessary It is issued in corresponding downlink subframe;Otherwise, the interface-free resources that upper line number passes subframe will have to waste.Currently, carrying out uplink The subframe of authorization is scheduled according to User Priority sequence.
In existing user scheduling method, uplink and downlink scheduling uses the PDCCH resource of the same TTI.Descending scheduling is wanted Some essential informations of scheduling system, it is therefore necessary to ensure descending scheduling is gone on smoothly;Uplink authorization can only be in downstream grants After the completion, it just can be carried out, in most cases, the scheduling time of the shared TTI of uplink and downlink scheduling, scheduling time is once more than The time restriction of this TTI, all scheduling results will be dropped.
In view of the processing capacity limitation of existing processor, the number of users that a TTI can be dispatched is very limited, PS in public network Business is relatively more, and the data volume of PS business is bigger, therefore the number of users that single TTI needs to dispatch is fewer, scheduling time pair Throughput of system is influenced there is no apparent.And in private network system, voice service is relatively more, eats dishes without rice or wine needed for individual voice business Resource is fewer, it is possible that following situation: in the case where also remaining interface-free resources, since scheduling time is finished, and voice Business can not be dispatched.Therefore, the specification of voice service is limited to bandwidth of cell and scheduling time simultaneously in private network.
In actual scene, in most cases (subframe of no forward scheduling), single TTI can only dispatch several use to uplink Family, even if the subframe of forward scheduling, the number of users that can be dispatched is also with regard to more than 10.Once occurred following feelings in actual test Condition: the uplink scheduling time is exhausted in 8 SPS users of near point, there remains a large amount of interface-free resources at this time.Therefore, big bandwidth System in, voice service specification is limited to the dispatching of system.
By above situation as it can be seen that in current private network system, the subframe being scheduled is due to scheduling time deficiency, and there are nothings Method is to user the case where carrying out uplink scheduling;Meanwhile the subframe passed in upper line number, any scheduling is not carried out, system is in number The dispatching for passing subframe is unable to get sufficient utilization.
Summary of the invention
The application provides the dispatching method of uplink SPS user a kind of, the number of users that the system of can be improved can dispatch, effectively Improve the specification of system voice business.
To achieve the above object, the application adopts the following technical scheme that:
A kind of dispatching method of uplink semi-persistent resource user, comprising:
When channel parameter of eating dishes without rice or wine does not change, activated uplink semi-persistent money corresponding to a uplink scheduling subframe The uplink scheduling of the wherein uplink SPS user of non-deactivation and/or non-reactivation is advanceed to the uplink tune by source SPS user Transmitting uplink data subframe corresponding with the uplink scheduling subframe before spending subframe carries out.
Preferably, presetting the corresponding relationship of the uplink scheduling subframe and transmitting uplink data subframe.
Preferably, the transmitting uplink data subframe with thereafter and apart from the transmitting uplink data subframe it is nearest one A or multiple uplink scheduling subframes are corresponding.
Preferably, the uplink scheduling of the uplink SPS user of the non-deactivation and/or non-reactivation is advanceed on described Row data transmission subframes are included:
Within the duration of the transmitting uplink data subframe, the SPS of activation for obtaining the uplink scheduling subframe is used Family chained list;For any user activated in SPS user chain table, determine any user in uplink scheduling Whether sub-frame of uplink overhead scheduled in frame mouthful channel parameter changes, if so, not in the transmitting uplink data subframe The scheduling user activated in SPS user chain table, terminates this process;Otherwise, holding in the transmitting uplink data subframe In the continuous time, the uplink SPS user of the non-deactivation activated in SPS user chain table and/or non-reactivation is carried out Row scheduling.
Preferably, the uplink SPS user to the non-deactivation and/or non-reactivation that have activated in SPS user chain table Carrying out uplink scheduling includes:
A, a user is chosen in SPS user chain table as active user from described activated;
B, judge whether the active user needs reactivation or deactivation, if so, not in the transmitting uplink data Otherwise active user described in subframe scheduling carries out uplink scheduling to the active user in the transmitting uplink data subframe;
C, next user is chosen in SPS user chain table as active user from described activated, return step b, until Step b or time-out of current TTI scheduling time have been carried out to all users activated in SPS user chain table.
As seen from the above technical solution, in the application, when channel parameter of eating dishes without rice or wine does not change, to uplink scheduling The corresponding activated uplink semi-persistent resource SPS user of frame uses the wherein uplink SPS of non-deactivation and/or non-reactivation The uplink scheduling at family, the corresponding transmitting uplink data subframe before advanceing to the uplink scheduling subframe carry out.By upper Mode is stated, for the scheduling for not needing to be scheduled the uplink SPS user that information issues, is carried out in transmitting uplink data subframe, On the one hand the scheduling resource of uplink scheduling subframe is saved, to improve the number of users that system can dispatch, on the other hand had The dispatching of transmitting uplink data subframe is utilized in effect.
Detailed description of the invention
Fig. 1 is the flow diagram of uplink SPS user scheduling method in the embodiment of the present application.
Specific embodiment
In order to which the purpose, technological means and advantage of the application is more clearly understood, the application is done below in conjunction with attached drawing It is further described.
Implicit authorization has been carried out after activation or reactivation in uplink SPS user.That is, according to SPS mechanism Principle, activate SPS after, terminal can according to activation SPS when signaling process, in the sky in setting of specific period of sub-frame Mouthful transmitted over resources data, eat dishes without rice or wine to will no longer be required to issue PDCCH and are authorized.
For activated SPS user, uplink scheduling mainly includes following content: 1) occurring in the channel parameter eated dishes without rice or wine When variation, the authorization that PDCCH carries out PHICH is re-issued;2) in reactivation and deactivation, base station issues weight to SPS user Activation and deactivation information;3) relevant information of inside of base station maintenance user scheduling, issues management frame to base band.
1) the in the processing of above-mentioned 3 kinds of uplink schedulings is planted, the case where the configuration variation for the channel parameter eated dishes without rice or wine very Less, at the time of also, the variation of channel parameter accurately can judge that it comes into force by detecting in advance, and then can sentence in advance It is disconnected to go out to need again to authorize it.
2) the in the processing of above-mentioned 3 kinds of uplink schedulings is planted, reactivation and deactivated demand are also to sentence in advance Disconnected.
Above-mentioned the 1) plant and the 2) plant uplink scheduling processing need base station to transmit information to SPS user, it is corresponding to complete Uplink scheduling, therefore, can only according to timing relationship setting uplink scheduling subframe carry out.
3) the in the processing of above-mentioned 3 kinds of uplink schedulings is planted, the relevant information of maintenance user's scheduling and issued to base band Management frame belongs to the scheduling behavior of inside of base station, does not need to transmit information to SPS user.Wherein, " the phase of maintenance user's scheduling Close information " it is not stringent to time requirement, " issuing management frame to base band " is using scheduling as a result, also not high to time requirement.
From the foregoing, it can be seen that in the case where channel parameter of eating dishes without rice or wine does not change, the uplink of non-deactivation or non-reactivation SPS user, uplink scheduling is not necessarily intended to carry out in corresponding uplink scheduling subframe, by the scheduling resource of uplink scheduling subframe More for dispatching unscheduled SPS user and carrying out the user for eating dishes without rice or wine to authorize.
It is not changed in channel parameter of eating dishes without rice or wine when carrying out uplink SPS user scheduling in the application based on above-mentioned consideration In the case of, the scheduling of the uplink SPS user of non-deactivation or non-reactivation is advanceed into transmitting uplink data subframe and is carried out.
It specifically, can be in sky to the corresponding activated uplink semi-persistent resource SPS user of a uplink scheduling subframe A When mouth channel parameter does not change, the uplink scheduling of the wherein uplink SPS user of non-deactivation and/or non-reactivation mentions The preceding transmitting uplink data subframe corresponding with the uplink scheduling subframe A to before uplink scheduling subframe A carries out.
Wherein, between uplink scheduling subframe A and the transmitting uplink data subframe of substitution uplink scheduling subframe A progress uplink scheduling Corresponding relationship, can preset, for example, system default or administrator setting etc..When setting corresponding relationship, a uplink Data transmission subframes can correspond to one or more uplink scheduling subframes, such as transmitting uplink data subframe B and position can be set One or more uplink scheduling subframes after subframe B and nearest apart from subframe B are corresponding.
Illustrate the uplink SPS user scheduling method in the application below by a specific embodiment.It is given in the present embodiment Go out and has carried out the process of uplink scheduling in some transmitting uplink data subframe.Fig. 1 is the dispatching method flow diagram of embodiment, As shown in Figure 1, this method comprises:
Step 100, start to dispatch on transmitting uplink data subframe X.
Step 101, according to preset corresponding relationship, corresponding uplink scheduling of transmitting uplink data subframe X is obtained The SPS user chain table of activation of frame.
The corresponding relationship of corresponding relationship in this step, that is, between transmitting uplink data above-mentioned subframe and uplink scheduling subframe, In this example, it is assumed that transmitting uplink data subframe be located at thereafter, it is corresponding away from a nearest uplink scheduling subframe.This In, the activation SPS user of a uplink scheduling subframe after acquisition transmitting uplink data subframe X and apart from subframe X recently Chained list.
Step 102, a user is chosen from the SPS user chain table of activation of acquisition as active user.
Step 103, judge on sub-frame of uplink scheduled in the corresponding uplink scheduling subframe of active user, whether channel parameter It can change, if so, turning to step 106, otherwise, turn to step 104.
In this step, judge whether channel parameter can changed mode when may is that the PHICH for judging active user Whether the channel parameter at quarter can change.If can change, all users dispatched in same subframe can be impacted, needed PHICH authorization is re-started to these SPS users, then turns to step 106;If will not change, step is turned to 104, per user judges whether to carry out uplink scheduling in transmitting uplink data subframe.
Step 104, judge whether active user needs reactivation or deactivation, if it is, step 107 is turned to, it is no Then, step 105 is turned to.
Specifically, if active user needs reactivation or deactivation, base station is needed to send downlink letter to SPS user Breath, then just needing to turn to step 107, in the uplink scheduling subframe scheduling active user of timing requirements.If active user is not Reactivation is needed, does not also need to deactivate, then going to step 105, carries out active user's in transmitting uplink data subframe Scheduling, to reserve the scheduling that more resources carry out non-SPS user etc. in uplink scheduling subframe.
Step 105, uplink scheduling is carried out to active user, and turns to step 108.
Here be scheduling to the relevant information of maintenance schedule, and issue management frame to base band when base band is needed.
Step 106, terminate in transmitting uplink data subframe not to having activated the user in SPS user chain table to be scheduled This process.
When channel parameter of eating dishes without rice or wine changes, this step is executed.When changing due to channel parameter of eating dishes without rice or wine, for same son All users of frame scheduling can impact, therefore once detect channel parameter of eating dishes without rice or wine and will change, same All users (having activated all users in SPS user chain table) of subframe scheduling cannot be in transmitting uplink data subframe tune Degree requires to carry out uplink scheduling to these users until the uplink scheduling subframe of timing requirements.
Step 107, active user is not scheduled in transmitting uplink data subframe.
As previously mentioned, need base station to photos and sending messages under SPS user if active user needs to deactivate or reactivation, It is thus impossible to carry out corresponding scheduling operation in uplink transmission subframe, and need still in the uplink scheduling of timing requirements Subframe carries out corresponding dispatch deal.
Step 108, using the next user activated in SPS user chain table as active user, return step 103, directly To the user that can not dispatch or time-out of current TTI scheduling time.
By the processing of previous step 103~107, the user of a non-deactivation and non-reactivation is passed in upstream data Defeated subframe is dispatched, next, successively identical processing is carried out to the other users in chained list, until all in chained list User is disposed, or until current TTI scheduling time time-out.
In the present embodiment, what is carried out so that a transmitting uplink data subframe is corresponding with a uplink scheduling subframe as an example is said It is bright, in fact, as previously mentioned, transmitting uplink data subframe can be with multiple uplink scheduling subframes pair when establishing corresponding relationship It answers, in this case, it is necessary to which multiple the multiple of uplink scheduling subframe corresponding to transmitting uplink data subframe have activated SPS to use User in the chained list of family carries out the processing in above step 103~107, or until current TTI scheduling time time-out.
So far, the method flow in the present embodiment terminates.
By the specific implementation of above-mentioned the application as it can be seen that in the application, the time for making full use of line number to pass subframe is carried out Row SPS user scheduling, so that it is guaranteed that there is more time scheduling SPS users, improves the specification of voice service under big bandwidth;Together When, the scheduling time requirement to uplink authorization subframe is reduced, the number of users that the system of improving can dispatch is conducive to promote system It unites the specification of voice service, equally also wins more scheduling times for the more stringent non-SPS user of time requirement, it can be with Dispatch more non-SPS users.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent substitution, improvement and etc. done be should be included within the scope of the present invention.

Claims (5)

1. a kind of dispatching method of uplink semi-persistent resource user characterized by comprising
When channel parameter of eating dishes without rice or wine does not change, activated uplink semi-persistent resource corresponding to a uplink scheduling subframe The uplink scheduling of the wherein uplink SPS user of non-deactivation and non-reactivation is advanceed to uplink scheduling by SPS user Transmitting uplink data subframe corresponding with the uplink scheduling subframe before frame carries out.
2. the method according to claim 1, wherein presetting the uplink scheduling subframe and upstream data biography The corresponding relationship of defeated subframe.
3. according to the method described in claim 2, it is characterized in that, the transmitting uplink data subframe with thereafter and distance The nearest one or more uplink scheduling subframes of the transmitting uplink data subframe are corresponding.
4. the method according to claim 1, wherein the uplink SPS of the non-deactivation and non-reactivation is used The uplink scheduling at family advances to the transmitting uplink data subframe
Within the duration of the transmitting uplink data subframe, the SPS user's chain of activation of the uplink scheduling subframe is obtained Table;For any user activated in SPS user chain table, determine any user in the uplink scheduling subframe institute Whether the sub-frame of uplink overhead mouthful channel parameter of scheduling changes, if so, not in the transmitting uplink data subframe scheduling The user activated in SPS user chain table, terminates this process;Otherwise, the transmitting uplink data subframe it is lasting when In, uplink scheduling is carried out to the uplink SPS user of the non-deactivation activated in SPS user chain table and non-reactivation.
5. according to the method described in claim 4, it is characterized in that, the non-deactivation to having activated in SPS user chain table Carrying out uplink scheduling with the uplink SPS user of non-reactivation includes:
A, a user is chosen in SPS user chain table as active user from described activated;
B, judge whether the active user needs reactivation or deactivation, if so, not in the transmitting uplink data subframe The active user is dispatched, uplink scheduling otherwise is carried out to the active user in the transmitting uplink data subframe;
C, next user is chosen in SPS user chain table as active user, return step b, until to institute from described activated It states and all users in SPS user chain table has been activated to be carried out step b or time-out of current TTI scheduling time.
CN201410118289.7A 2014-03-27 2014-03-27 A kind of dispatching method of uplink semi-persistent resource user Active CN104954102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410118289.7A CN104954102B (en) 2014-03-27 2014-03-27 A kind of dispatching method of uplink semi-persistent resource user

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410118289.7A CN104954102B (en) 2014-03-27 2014-03-27 A kind of dispatching method of uplink semi-persistent resource user

Publications (2)

Publication Number Publication Date
CN104954102A CN104954102A (en) 2015-09-30
CN104954102B true CN104954102B (en) 2019-04-19

Family

ID=54168487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410118289.7A Active CN104954102B (en) 2014-03-27 2014-03-27 A kind of dispatching method of uplink semi-persistent resource user

Country Status (1)

Country Link
CN (1) CN104954102B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111511033B (en) * 2019-01-30 2022-02-08 华为技术有限公司 Resource allocation method and device for short-period semi-persistent scheduling
CN114679404B (en) * 2022-03-22 2024-05-14 北京邮电大学 Method, device and equipment for detecting number of uplink VoLTE users

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132628A (en) * 2006-08-21 2008-02-27 北京三星通信技术研究有限公司 Scheduling request transmission method and device used for voice business
CN101499848A (en) * 2008-01-31 2009-08-05 大唐移动通信设备有限公司 Uplink scheduling method and apparatus
CN102833868A (en) * 2011-06-15 2012-12-19 普天信息技术研究院有限公司 Method for scheduling independent carrier in multi-carrier system based on preassigning

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102123437B (en) * 2011-03-03 2016-02-17 电信科学技术研究院 Power headroom reporting and the scheduling method of subframe, system and equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132628A (en) * 2006-08-21 2008-02-27 北京三星通信技术研究有限公司 Scheduling request transmission method and device used for voice business
CN101499848A (en) * 2008-01-31 2009-08-05 大唐移动通信设备有限公司 Uplink scheduling method and apparatus
CN102833868A (en) * 2011-06-15 2012-12-19 普天信息技术研究院有限公司 Method for scheduling independent carrier in multi-carrier system based on preassigning

Also Published As

Publication number Publication date
CN104954102A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
CN105873225B (en) Resource scheduling method in unlicensed frequency band, base station and licensed assisted access node
CN102104974B (en) Method, device and system for carrying out uplink pre-scheduling processing
CN106255213B (en) It is a kind of configure time domain scheduling unit method and base station
CN104349459B (en) Method, base station and the terminal of dynamic uplink configuration are carried out in a wireless communication system
CN108633098A (en) The method and user equipment of multi-carrier data transmission
EP2120382A3 (en) HARQ process restriction and transmission of non-scheduled control data via uplink channels
WO2012154014A3 (en) Method for transmitting/receiving data in wireless access system, and base station and user equipment for same
CN104105129B (en) Aperiodic CSI report method and user equipment in LTE system
MX345286B (en) Resource configuration method for cluster semi-persistence scheduling, base station, and terminal.
CN102083221A (en) Resource scheduling method and device based on HSDPA (high speed downlink packet access)
CN103428883B (en) A kind of dispatching method of physical downlink control channel resource and equipment
WO2016138841A1 (en) Data transmission method, feedback information transmission method, and related device
CN109314988A (en) Uplink data transmission method, device, equipment and system
CN104981020B (en) The dispatching method of uplink GBR traffic and base station
CN107872892A (en) A kind of wireless resource allocation methods and device
CN108605314A (en) A kind of uplink data transmission method and relevant device
CN107926027B (en) Burst-based transmission scheduling in a wireless communication system
CN104954102B (en) A kind of dispatching method of uplink semi-persistent resource user
CN105610557B (en) SRS sending method and device under a kind of LTE carrier aggregation
CN105763305B (en) A kind of data transmission method and device
TW200706047A (en) Wireless communication method and apparatus for scheduling prioritized data for a plurality of mobile station users
CN103747432B (en) Carrying out uplink pre-scheduling processing method, device and system
CN105517171B (en) It is a kind of in LTE-A network dispatch LTE terminal method and base station
CN104284435A (en) PDCCH dispatching method and equipment
CN104796994B (en) The resource regulating method of wireless communication system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant