CN103747432B - Carrying out uplink pre-scheduling processing method, device and system - Google Patents

Carrying out uplink pre-scheduling processing method, device and system Download PDF

Info

Publication number
CN103747432B
CN103747432B CN201410020465.3A CN201410020465A CN103747432B CN 103747432 B CN103747432 B CN 103747432B CN 201410020465 A CN201410020465 A CN 201410020465A CN 103747432 B CN103747432 B CN 103747432B
Authority
CN
China
Prior art keywords
base station
user equipment
attribute information
business
scheduling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410020465.3A
Other languages
Chinese (zh)
Other versions
CN103747432A (en
Inventor
朱俊
王胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201410020465.3A priority Critical patent/CN103747432B/en
Priority claimed from CN201110048088.0A external-priority patent/CN102104974B/en
Publication of CN103747432A publication Critical patent/CN103747432A/en
Application granted granted Critical
Publication of CN103747432B publication Critical patent/CN103747432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The embodiment of the present invention provides a kind of carrying out uplink pre-scheduling processing method, device and system.Wherein, method, including:The business attribute information of user equipment is obtained, the business attribute information is used to judge whether the user equipment may send burst upstream data;If determining that the user equipment may send burst upstream data according to the business attribute information, carrying out uplink pre-scheduling processing is carried out to the user equipment.For prior art needs that the scheduling of uplink burst data could be completed by 8 TTI, the embodiment of the present invention shortens the scheduling time of uplink burst data, can meet higher delay requirement and QoS demand.

Description

Carrying out uplink pre-scheduling processing method, device and system
Technical field
The present embodiments relate to the communications field, more particularly to a kind of carrying out uplink pre-scheduling processing method, device and system.
Background technology
User equipment(User Equipment, hereinafter referred to as:UE)To base station, such as before eNodeB sends data, Need to obtain the uplink scheduling authorization of base station.
In the prior art, base station is general uses the mode that ascending resource is periodically distributed for UE, is being allocated UE Ascending resource on send data.But UE needs abruptly to send data to base station often, such as UE is set with network side It is standby to carry out FTP(File Transfer Protocol, hereinafter referred to as:FTP)During business, it is necessary to abruptly to Base station sends feeding back ACK message.If now UE does not obtain the uplink scheduling authorization of base station, UE, which needs to send to base station, to be adjusted Degree request instruction(Schedule Request Identify, hereinafter referred to as:SRI)Message, base station can report slow for UE distribution Rush zone state report(Buffer State Report, hereinafter referred to as:BSR)Resource, and pass through uplink authorization(Uplink Grant, hereinafter referred to as:UL Grant)Notify UE.In 4 Transmission Time Intervals(Transmission Time Interval, Hereinafter referred to as:TTI)Afterwards, UE can report BSR on the resource to base station;The BSR that base station reports according to UE, it is the up of UE Data distribution uplink transmission resource;Again after 4 TTI, upstream data is sent to base station by UE.
It follows that prior art in the case of UE has burst upstream data for, at least need 8 TTI, could be complete Into the scheduling operation of UE uplink burst data, therefore, processing of the prior art to the UE upstream datas to happen suddenly can not meet compared with High delay requirement, it can not also meet quality of service(Quality of Service, hereinafter referred to as:QoS)Demand.
Chinese patent application CN101835262A discloses a kind of resource allocation methods, including:Base station determines that base station is had time Not busy schedulable resource;Base station judges whether user equipment (UE) has data to be transferred;If judged result, which is UE, data to be transferred, base Stand and actively distribute pre-scheduling resource to UE according to the pre-scheduling data volume pre-set.U.S. Patent application 20090109912A1 Disclose a kind of method and apparatus of pre-scheduling ascending resource.Entire contents are hereby incorporated by reference in present specification.
The content of the invention
The embodiment of the present invention provides a kind of carrying out uplink pre-scheduling processing method, device and system, to cause to the upper of UE bursts The processing of row data meets higher delay requirement.
The embodiment of the present invention provides a kind of carrying out uplink pre-scheduling processing method, including:
The business attribute information of user equipment is obtained, the business attribute information is used to judge that the user equipment whether may be used Burst upstream data can be sent;
If determine that the user equipment may send burst upstream data according to the business attribute information, to the use Family equipment carries out carrying out uplink pre-scheduling processing.
The embodiment of the present invention provides a kind of carrying out uplink pre-scheduling processing unit, including:
First acquisition module, it is used to judge institute for obtaining business attribute information described in the business attribute information of user equipment State whether user equipment may send burst upstream data;
Carrying out uplink pre-scheduling module, if for determining that the user equipment may send burst according to the business attribute information Upstream data, then carrying out uplink pre-scheduling processing is carried out to the user equipment.
The embodiment of the present invention also provides a kind of carrying out uplink pre-scheduling processing system, including:Base station, wherein the base station is including upper The carrying out uplink pre-scheduling processing unit stated, the base station are used to communicate with least one user equipment.
In the embodiment of the present invention, base station can be according to UE business attribute information, it is determined that burst upstream data may be sent UE, and to UE carry out carrying out uplink pre-scheduling processing so that UE can send uplink burst in the resource of carrying out uplink pre-scheduling Data.Need to complete for the scheduling of uplink burst data by 8 TTI accordingly, with respect to prior art, the present invention is real The scheduling time that example shortens uplink burst data is applied, higher delay requirement and QoS demand can be met.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the flow chart of carrying out uplink pre-scheduling processing method one embodiment of the present invention;
Fig. 2 is the flow chart of another embodiment of carrying out uplink pre-scheduling processing method of the present invention;
Fig. 3 is the structural representation of carrying out uplink pre-scheduling processing unit one embodiment of the present invention;
Fig. 4 is the structural representation of another embodiment of carrying out uplink pre-scheduling processing unit of the present invention;
Fig. 5 is the structural representation of carrying out uplink pre-scheduling processing system one embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
The general part that base station and/or terminal in following examples include, is no longer listed one by one.These general portions Part includes but is not limited to:Baseband process component;Middle radio frequency processing part;Transmission part;Processor;Internal memory;Antenna element;Input Output device.Each base station is corresponding with one or more cell.Each cell can service one or more terminals.Terminal bag Include but be not limited to:Mobile phone, notebook computer, wireless communication module.
Fig. 1 is the flow chart of carrying out uplink pre-scheduling processing method one embodiment of the present invention, as shown in figure 1, the present embodiment Method can include:
Step 101, the business attribute information for obtaining user equipment.The business attribute information can be used for judging that user equipment is It is no to send burst upstream data.
For example, base station, for example, eNodeB etc. can in each TTI, perform the present embodiment the step of.
Specifically, base station can obtain UE business attribute information.Base station can UE access cell during, or Person knows the business attribute information during UE sends upstream data.The business attribute information can reflect that UE whether there is The possibility of burst upstream data is sent to base station.
It should be noted that the present embodiment does not limit the particular content of the business attribute information, those skilled in the art As long as it is understood that it can reflect that UE may be incorporated for reality with the presence or absence of any information of the possibility of burst upstream data The technical scheme of existing the present embodiment, moreover, the present embodiment does not limit the business attribute information using base in the prior art yet Stand the information stored, or the information obtained is detected by other technological means.In addition, in the present embodiment, base station is not It is limited to the business attribute information for only obtaining a UE.It can obtain multiple UE service attribute letter in actual implementation process Breath.
If step 102, according to the business attribute information determining that the user equipment may send burst upstream data, Carrying out uplink pre-scheduling processing is carried out to the user equipment.
If base station knows that UE may send burst upstream data, then base station can not according to the business attribute information of acquisition SRI is sent with wait UE, and carrying out uplink pre-scheduling processing can be carried out to UE.In the present embodiment, carrying out uplink pre-scheduling processing can Realized with being handled using the carrying out uplink pre-scheduling of prior art, such as base station can send UL Grant message to UE, UE is being received After the UL Grant message, if burst upstream data, then directly burst upstream data can be sent to base station.
It should be noted that because base station can determine that multiple UE may send burst upstream data, therefore, base station was both Carrying out uplink pre-scheduling processing can be carried out to multiple UE, can also be according to certain strategy, such as priority orders etc., to multiple Some or certain several UE in UE carry out carrying out uplink pre-scheduling processing.
In the present embodiment, base station can according to UE business attribute information, it is determined that the UE of burst upstream data may be sent, And carrying out uplink pre-scheduling processing is carried out to UE, so that UE can send uplink burst data in the resource of carrying out uplink pre-scheduling. Need to complete for the scheduling of uplink burst data by 8 TTI accordingly, with respect to prior art, the present embodiment shortens The scheduling time of uplink burst data, higher delay requirement and QoS demand can be met.
Fig. 2 is the flow chart of another embodiment of carrying out uplink pre-scheduling processing method of the present invention, as shown in Fig. 2 the present embodiment Method can include:
Step 201, the quality of service classification logotype information for obtaining UE.
In order to reduce the execution complexity of the present embodiment, the present embodiment can choose the stored information in base station as industry Business attribute information.Quality of service classification logotype(QoS Class Identifier, hereinafter referred to as:QCI)One kind as therein. QCI can reflect UE service attribute, and whether base station can use QCI information to be used as needs to carry out carrying out uplink pre-scheduling processing to UE Judgement foundation.The QCI information can be during UE accesses network, or initiating business request, and base station is from network side The business attribute information for obtaining and storing.
Step 202, according to quality of service classification logotype information, determine that UE may send burst upstream data.
Base station can determine whether UE can send burst upstream data according to QCI information.
Specifically, for each UE, its corresponding QCI information all be present in base station.Base station can be according to corresponding to UE QCI information, determine the UE with the presence or absence of the possibility for sending burst upstream data.
Because for each UE, it both may only open single business, it is also possible to while multiple business have been opened, Accordingly, in each UE QCI information, the attribute information of single business may both be contains only, it is also possible to include multiple industry The attribute information of business.Therefore, in specific implementation, you can including following two kinds of technical schemes:
If the UE is single business UE, namely the UE has only opened single business, and the business is only contained in its QCI information Attribute information, therefore, base station can determine the UE with the presence or absence of transmission burst upstream data according to the OCI information of the business Possibility;
If the UE is multi-service UE, namely the UE has opened multiple business simultaneously, and each business is contained in its QCI information Attribute information, therefore, base station can according to the QCI information of each business, determine the UE with the presence or absence of send burst upstream data Possibility.For example, base station is if it is determined that in the QCI information of each business, as long as represent should for the QCI information for having a business UE may send burst upstream data, it is determined that the UE there is a possibility that to send burst upstream data.
In one embodiment of the invention, can also be in QCI information, or with information as QCI info class Pre-scheduling attribute information is set.So, it can directly determine that UE may send burst upstream number according to pre-scheduling attribute information According to so as to carry out carrying out uplink pre-scheduling processing.
Step 203, judge whether system-level judgment condition meets, if satisfied, then performing step 204, otherwise terminate.
Because base station carries out carrying out uplink pre-scheduling processing to UE burst upstream data base station may be influenced whether to UE just Often scheduling and the operating characteristics of itself, therefore, the present embodiment can be with initialization system level judgment conditions, so that base station can be with Judged whether that carrying out uplink pre-scheduling can be carried out to the UE that may send burst upstream data according to its system resource or performance.
Specifically, the problem of system resource waste may being introduced due to carrying out uplink pre-scheduling, so in the present embodiment, on The precondition of row pre-scheduling is that ascending load is lighter, Physical Uplink Shared Channel(Physical Uplink Shared Channel, hereinafter referred to as:PUSCH)Channel resource has more than needed.Therefore, the present embodiment can use bandwidth availability ratio as system Judgment condition, when bandwidth availability ratio is more than first threshold, show that PUSCH channel resources may be without more than needed, then base station does not start Carrying out uplink pre-scheduling;And it is less than first threshold, it is more than needed to show that PUSCH channel resources may have, then base station can start up presetting Degree.
The problem of adjacent area interference may also can be introduced due to carrying out uplink pre-scheduling, therefore the present embodiment can also be by pre-scheduling band Width accounts for the ratio of overall system bandwidth as system determination condition, and the ratio that overall system bandwidth is accounted for when pre-scheduling bandwidth is more than the second threshold Value, shows that pre-scheduling bandwidth accounting is higher, then base station does not start carrying out uplink pre-scheduling;When less than Second Threshold, showing pre-scheduling band Wide accounting is not high, then base station can start carrying out uplink pre-scheduling, therefore, the ratio conduct of overall system bandwidth is accounted for using pre-scheduling bandwidth System determination condition, the total bandwidth of carrying out uplink pre-scheduling can be limited, so as to reduce the interference to adjacent area.
In specific implementation, base station can also account for current bandwidth utilization and pre-scheduling bandwidth the ratio of overall system bandwidth It is used as system-level judgment condition.When two parameters meet default condition simultaneously, base station can determine that startup is up presetting Degree processing.
It should be noted that those skilled in the art can be according to factors such as base station system performance requirements, to above-mentioned One threshold value and the size of Second Threshold are configured, and the present embodiment repeats no more.
In addition, the present embodiment, which does not limit base station, yet can only use above two parameter as system determination condition, ability Field technique personnel can enrich the content of system determination using other parameters as needed.For example, due to carrying out uplink pre-scheduling The problem of being also possible to that increase UE energy consumptions can be introduced, therefore base station can also be sentenced using pre-scheduling minimum interval thresholding as system Certainly condition.Pre-scheduled time interval=current scheduling moment-last scheduled moment, when the value at pre-scheduled time interval is less than presetting Minimum interval is spent, then base station does not start carrying out uplink pre-scheduling, so as to reduce UE carrying out uplink pre-scheduling number, and then reduces UE energy consumption.In addition, it is necessary to explanation, can also not have sequencing between above-mentioned steps 202 and step 203.
Step 204, according to the quality of service classification logotype information, obtain the maximum scheduling interval that each user equipment allows With corresponding pre-scheduling data volume.
After determining to carry out carrying out uplink pre-scheduling to UE according to the judgement of step 202 and step 203 once base station, base station can be with According to QCI information, maximum scheduling interval and corresponding pre-scheduling data volume that UE allows are obtained.For example, base station is completed Can be that each UE establishes pre-scheduling attribute list as shown in table 1 after step 204.
Table 1
Step 205, be scheduled moment, the maximum scheduling interval of this be scheduled moment and the permission according to last time, Calculate the priority orders for obtaining each user equipment.
Because base station may determine that multiple UE be present needs to carry out carrying out uplink pre-scheduling processing, but system resource, such as band Width etc. is extremely limited, and therefore, base station can need these UE for carrying out carrying out uplink pre-scheduling processing to form carrying out uplink pre-scheduling queue, And to these UE in carrying out uplink pre-scheduling queue according to priority ranking.
Priority=(Last time is scheduled the moment at-this scheduled moment)/ maximum the scheduling interval allowed.
Wherein, be scheduled moment, this scheduled moment last time is time parameter that base station can directly obtain.
Step 206, the priority orders according to user equipment and corresponding pre-scheduling data volume, to burst may be sent The user equipment of upstream data carries out carrying out uplink pre-scheduling processing.
Base station can carry out carrying out uplink pre-scheduling processing successively according to priority orders to the UE in carrying out uplink pre-scheduling queue. It is understood that once the available system resource in base station is used up, then remaining UE will not be by the carrying out uplink pre-scheduling queue Carry out carrying out uplink pre-scheduling processing.In specific implementation, it is up pre- that base station can use the pre-scheduling data volume in table 1 to carry out UE Dispatch deal.
The present embodiment can design a system-level pre-scheduling master switch Pre-Allocation_Switch, and the switch can Whether need to carry out the carrying out uplink pre-scheduling handling process of step 201~step 206 in the present embodiment with control base station.For example, it is Irrespective of size pre-scheduling master switch is opened, and base station needs to carry out the carrying out uplink pre-scheduling processing stream of step 201~step 206 in the present embodiment Journey;System-level pre-scheduling master switch is closed, and base station need not carry out the up presetting of step 201~step 206 in the present embodiment Spend handling process.
In the present embodiment, base station it is determined that the UE of burst upstream data may be sent, and can lead to according to UE QCI information System-level judgement is crossed, determines whether base station itself can need the UE of carrying out uplink pre-scheduling to carry out carrying out uplink pre-scheduling processing to these. And in scheduling process, each UE priority orders can also be taken into full account, so that base station both can be that possible send The advance dispatching uplink resources of UE of burst upstream data, and can enough avoid shadow of the carrying out uplink pre-scheduling to systematic function as far as possible Ring.Therefore, the present embodiment is for prior art needs that the scheduling of uplink burst data could be completed by 8 TTI, contracting The short scheduling time of uplink burst data, meet higher delay requirement and QoS demand.
Fig. 3 is the structural representation of carrying out uplink pre-scheduling processing unit one embodiment of the present invention, as shown in figure 3, this implementation The device of example, can include:First acquisition module 11 and carrying out uplink pre-scheduling module 12, wherein, the first acquisition module 11 is used to obtain The business attribute information of user equipment is taken, the business attribute information is used to judge whether the user equipment may send burst Upstream data;If carrying out uplink pre-scheduling module 12 is prominent for determining that the user equipment may be sent according to the business attribute information Upstream data is sent out, then carrying out uplink pre-scheduling processing is carried out to the user equipment.
The device of the present embodiment can be used for the method for performing embodiment of the method shown in Fig. 1, its realization principle and technology effect Seemingly, here is omitted for fruit.
Fig. 4 is the structural representation of another embodiment of carrying out uplink pre-scheduling processing unit of the present invention, as shown in figure 4, this reality The device of example is applied on the basis of Fig. 3 shown devices, further, in addition to:The acquisition module 14 of starting module 13 and second.On Row pre-scheduling module 12 can further include:Judging unit 121, the first determining unit 122, the second determining unit 123 and One of pre-scheduling processing unit 124 or its any reasonable combination.Wherein if starting module 13 is less than for current bandwidth utilization The ratio that first threshold and/or pre-scheduling bandwidth account for overall system bandwidth is less than Second Threshold, it is determined that starts described up presetting Module 12 is spent, the first acquisition module 11 is specifically used for the quality of service classification logotype information for obtaining the user equipment;Judge single Member 121 is used to judge that the user equipment is single service user device or multi-service user equipment;First determining unit 122 is used If the user equipment is judged for single service user device in judging unit 121, according to the quality of service classification of single business Identification information, determine that the user equipment may send burst upstream data;If the second determining unit 123 is used for judging unit 121 judge the user equipment for multi-service user equipment, then the quality of service classification mark of each business in the multi-service Know information, determine that the user equipment may send burst upstream data;Pre-scheduling processing unit 124 is used to determine according to first The result that the determining unit 123 of unit 122 or second determines, according to the priority orders of user equipment and corresponding pre-scheduling Data volume carries out carrying out uplink pre-scheduling processing;Second acquisition module 14 is used to, according to the quality of service classification logotype information, obtain The maximum scheduling interval and corresponding pre-scheduling data volume that each user equipment allows;According to last time be scheduled the moment, this is adjusted The maximum scheduling interval of moment and the permission is spent, calculates the priority orders for obtaining each user equipment.
The device of the present embodiment can be used for the method for performing embodiment of the method shown in Fig. 2, its realization principle and technology effect Seemingly, here is omitted for fruit.
Fig. 5 is the structural representation of carrying out uplink pre-scheduling processing system one embodiment of the present invention, as shown in figure 5, this implementation The system of example can include:Base station 1 and user equipment 2, the wherein base station 1 can include the knot of the device shown in above-mentioned Fig. 3 or 4 Structure, it can be used for the method for performing embodiment of the method shown in Fig. 1 or Fig. 2, and its implementing principle and technical effect is similar, herein not Repeat again.It should be noted that a user equipment is illustrate only in the present embodiment, it will be appreciated by those skilled in the art that It is that the user equipment 2 to be communicated with base station 1 can be multiple, and each user equipment 2 can use the side shown in Fig. 1 or Fig. 2 Method communicates with base station 1.
One of ordinary skill in the art will appreciate that all or part of step in the various methods of above-described embodiment is can To instruct correlation by the combination of hardware module or hardware module, the combination of the chipset such as processor and internal memory, or program Hardware, processor, chipset complete, the program can be stored in a computer-readable recording medium, storage medium can With including:Read-only memory(ROM, Read-Only Memory), random access memory(RAM, Random Access Memory), magnetic Disk or CD etc. are various can be with the medium of store program codes.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (7)

  1. A kind of 1. carrying out uplink pre-scheduling processing method, it is characterised in that including:
    Base station obtains the business attribute information of user equipment;
    The base station judges that the user equipment whether there is and sent to the base station in burst according to the business attribute information The possibility of row data;
    When there is a possibility that to send burst upstream data to the base station, the user equipment is carried out at carrying out uplink pre-scheduling Reason;
    Wherein, the business attribute information includes quality of service classification logotype information, the quality of service classification logotype packet Include pre-scheduling attribute information;And the base station judges that the user equipment whether there is to institute according to the business attribute information The possibility that base station sends burst upstream data is stated, including:
    According to the quality of service classification logotype information, judge that the user equipment whether there is and sent to the base station in burst The possibility of row data.
  2. 2. according to the method for claim 1, it is characterised in that the base station judges institute according to the business attribute information State user equipment and whether there is the possibility that burst upstream data are sent to the base station, including:
    According to the pre-scheduling attribute information, judge that the user equipment whether there is to the base station and send burst upstream data Possibility.
  3. A kind of 3. carrying out uplink pre-scheduling processing method, it is characterised in that including:
    Base station obtains the business attribute information of user equipment;
    The base station judges that the user equipment whether there is and sent to the base station in burst according to the business attribute information The possibility of row data, wherein, the business attribute information includes quality of service classification logotype information, the quality of service classification Identification information includes pre-scheduling attribute information;
    When there is a possibility that to send burst upstream data to the base station, the user equipment is carried out at carrying out uplink pre-scheduling Reason;
    Wherein, the business attribute information includes the attribute information of single business, and the base station is believed according to the service attribute Breath, judge that the user equipment whether there is the possibility that burst upstream data are sent to the base station, including:
    According to the attribute information of the single business, judge that the user equipment whether there is to the base station and send burst upstream The possibility of data.
  4. A kind of 4. carrying out uplink pre-scheduling processing method, it is characterised in that including:
    Base station obtains the business attribute information of user equipment;
    The base station judges that the user equipment whether there is and sent to the base station in burst according to the business attribute information The possibility of row data, wherein, the business attribute information includes quality of service classification logotype information, the quality of service classification Identification information includes pre-scheduling attribute information;
    When there is a possibility that to send burst upstream data to the base station, the user equipment is carried out at carrying out uplink pre-scheduling Reason;
    Wherein, the business attribute information includes the attribute information of multiple business, and the base station is believed according to the service attribute Breath, judge that the user equipment whether there is the possibility that burst upstream data are sent to the base station, including:
    According to the attribute information of the multiple business, judge that each business of the user equipment whether there is and sent out to the base station Send the possibility of burst upstream data;
    When any one business there is a possibility that to the base station send burst upstream data, determine the user equipment exist to The base station sends the possibility of burst upstream data.
  5. A kind of 5. carrying out uplink pre-scheduling processing unit, it is characterised in that including:
    Acquisition module, for obtaining the business attribute information of user equipment;
    Carrying out uplink pre-scheduling module, for according to the business attribute information, judging that the user equipment whether there is and being sent out to base station The possibility of burst upstream data is sent, when there is a possibility that to send burst upstream data to the base station, to the user Equipment carries out carrying out uplink pre-scheduling processing;
    Wherein, the business attribute information includes quality of service classification logotype information, the quality of service classification logotype packet Include pre-scheduling attribute information.
  6. 6. device according to claim 5, it is characterised in that the carrying out uplink pre-scheduling module, including:
    Judging unit, for judging that the user equipment is single service user device or multi-service user equipment, wherein working as institute When to state user equipment be single service user device, the business attribute information includes the attribute information of single business;When the use When family equipment is multi-service user equipment, the business attribute information includes the attribute information of multiple business;
    First determining unit, for when the judging unit judges the user equipment for single service user device, according to institute The attribute information of single business is stated, determines that the user equipment whether there is the possibility that burst upstream data are sent to the base station Property;
    Second determining unit, for when the judging unit judges the user equipment for multi-service user equipment, according to institute The attribute information of multiple business is stated, determines that each business of the user equipment whether there is to the base station and sends burst upstream The possibility of data, and when any one business there is a possibility that to send burst upstream data to the base station, it is determined that described User equipment there is a possibility that to send burst upstream data to the base station;
    Pre-scheduling processing unit, for the result according to first determining unit or the determination of the second determining unit, to described User equipment carries out carrying out uplink pre-scheduling processing.
  7. A kind of 7. carrying out uplink pre-scheduling processing system, it is characterised in that including:Base station, wherein, the base station includes such as claim Carrying out uplink pre-scheduling processing unit any one of 5~6, the base station are used to communicate with least one user equipment.
CN201410020465.3A 2011-02-28 2011-02-28 Carrying out uplink pre-scheduling processing method, device and system Active CN103747432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410020465.3A CN103747432B (en) 2011-02-28 2011-02-28 Carrying out uplink pre-scheduling processing method, device and system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410020465.3A CN103747432B (en) 2011-02-28 2011-02-28 Carrying out uplink pre-scheduling processing method, device and system
CN201110048088.0A CN102104974B (en) 2011-02-28 2011-02-28 Method, device and system for carrying out uplink pre-scheduling processing

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201110048088.0A Division CN102104974B (en) 2011-02-28 2011-02-28 Method, device and system for carrying out uplink pre-scheduling processing

Publications (2)

Publication Number Publication Date
CN103747432A CN103747432A (en) 2014-04-23
CN103747432B true CN103747432B (en) 2018-03-09

Family

ID=50504412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410020465.3A Active CN103747432B (en) 2011-02-28 2011-02-28 Carrying out uplink pre-scheduling processing method, device and system

Country Status (1)

Country Link
CN (1) CN103747432B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105188150B (en) * 2015-08-12 2019-06-18 中国电子科技集团公司第七研究所 Reduce the method and system of LTE uplink data transmission delay
CN105188045B (en) * 2015-09-08 2018-11-06 宇龙计算机通信科技(深圳)有限公司 D2D for vehicle communication has found method, apparatus and terminal
CN110178432B (en) * 2017-08-08 2022-07-22 华为技术有限公司 Service data transmission method and device
CN115174030B (en) * 2022-08-26 2024-03-05 北京神经元网络技术有限公司 Low-delay data transmission method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101686189A (en) * 2008-09-26 2010-03-31 华为技术有限公司 Data transmitting method and device
CN101765120A (en) * 2010-01-21 2010-06-30 华为技术有限公司 Method and a device allocating distribution type spectrum resource
CN101835262A (en) * 2010-02-12 2010-09-15 华为技术有限公司 Resource allocation method and equipment
CN101873704A (en) * 2009-04-24 2010-10-27 大唐移动通信设备有限公司 Method, system and equipment for resource scheduling in long-term evolution system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9703425D0 (en) * 1997-02-19 1997-04-09 Univ Cambridge Tech Controlling networks
US7489629B2 (en) * 2004-12-07 2009-02-10 Intel Corporation Methods and media access controller for broadband wireless communications with variable data unit size and delayed data unit construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101686189A (en) * 2008-09-26 2010-03-31 华为技术有限公司 Data transmitting method and device
CN101873704A (en) * 2009-04-24 2010-10-27 大唐移动通信设备有限公司 Method, system and equipment for resource scheduling in long-term evolution system
CN101765120A (en) * 2010-01-21 2010-06-30 华为技术有限公司 Method and a device allocating distribution type spectrum resource
CN101835262A (en) * 2010-02-12 2010-09-15 华为技术有限公司 Resource allocation method and equipment

Also Published As

Publication number Publication date
CN103747432A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN102104974B (en) Method, device and system for carrying out uplink pre-scheduling processing
CN102948205B (en) For method, system and equipment at wireless network initiating communication
US11418999B2 (en) Buffer status report for high priority transmission
Perez-Costa et al. IEEE 802.11 E QoS and power saving features overview and analysis of combined performance [Accepted from Open Call]
US11166270B2 (en) Access method and device for wireless network
CN105991224B (en) A kind of transfer control method and device of upstream data
CN104125615A (en) Dual-band adaptive concurrent handling method and dual-band adaptive concurrent handling device
CN101959236B (en) Traffic control method and device
Sheth et al. Enhancing the energy-efficiency and timeliness of IoT communication in WiFi networks
CN110113808A (en) System and method for power control
CN110324902A (en) Communication means, communication device and system
CN107872892A (en) A kind of wireless resource allocation methods and device
CN106376089A (en) Data transmission method, system, user equipment (UE) and base station
CN103747432B (en) Carrying out uplink pre-scheduling processing method, device and system
CN109586854A (en) Data transmission method and device
CN106604382A (en) Low-power communication method and apparatus
CN107548133A (en) The conversion method and device of transmission means
CN105407490A (en) Implement method and system to allow different communication systems to coexist in license-free frequency band
CN102291729A (en) Excitation and deexcitation component carrier wave
CN110366217A (en) Carrier switch method and apparatus based on the polymerization of asymmetric up-link carrier
CN103874221B (en) A kind of resource regulating method and device
CN106550460A (en) Uplink dispatch method and equipment are carried out in a kind of asymmetric carrier aggregation
CN102291779B (en) User plane data dispatching method
CN101854721B (en) Method, system and device for reporting scheduling information
CN109788572A (en) Processing method and processing device, storage medium, terminal to SR configuration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant