CN104951189A - Scheme report generation method and device - Google Patents

Scheme report generation method and device Download PDF

Info

Publication number
CN104951189A
CN104951189A CN201510397625.0A CN201510397625A CN104951189A CN 104951189 A CN104951189 A CN 104951189A CN 201510397625 A CN201510397625 A CN 201510397625A CN 104951189 A CN104951189 A CN 104951189A
Authority
CN
China
Prior art keywords
progress
report
state
mark
identification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510397625.0A
Other languages
Chinese (zh)
Inventor
罗新伟
方文
胡宝良
杨志鹏
江春华
陈少坤
庞中山
张淑英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Forever Technology Co Ltd
Original Assignee
Beijing Forever Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Forever Technology Co Ltd filed Critical Beijing Forever Technology Co Ltd
Priority to CN201510397625.0A priority Critical patent/CN104951189A/en
Publication of CN104951189A publication Critical patent/CN104951189A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a scheme report generation method and device. The method comprises steps as follows: acquiring at least one to-be-constructed objective and at least one schedule item from a project, wherein the construction process of the at least to-be-constructed objective comprises part of the at least one schedule item or the whole schedule item; determining the proceeding state involved in the at least schedule item; according to the at least one schedule item comprised in the at least one to-be-constructed objective, generating a schedule report of a first identifier corresponding to the at least one to-be-constructed objective, and marking out a second identifier corresponding to the at least one schedule item comprised in the at least one to-be-constructed objective in the schedule report; according to the proceeding state involved in the at least one schedule item, setting the identification state bound to the second identifier in the at least one schedule report; configuring the trigger condition of change of the identification state of the second identifier. When schedule reporting is performed by the aid of the schedule report generated with the method and the device, the schedule reporting complexity can be reduced, and data missing in schedule reporting can be reduced.

Description

A kind of progress makes a report on table generating method and device
Technical field
The application relates to technical field of data processing, relates to a kind of progress in particular and makes a report on table generating method and device.
Background technology
It is critical data source in Process of Engineering Construction that progress is made a report on, and is made a report on, just can see engineering progress degree, show administration and supervision authorities, carry out macroscopic view the on-the-spot construction situation of control whole piece project of transmitting and converting electricity by the data at each scene.
But due to existing progress, to make a report on process comparatively complicated, progress personnel cannot make a report on data timely and conveniently at engineering site, first engineering progress data simply can only be recorded on paper, then computer is got back to other again according to the engineering progress data be recorded on paper, carry out progress to make a report on, thus cause progress to make a report on process complicated and time consumption; Meanwhile, because mistake or omission may appear in paper record, thus progress data errors is caused.
Summary of the invention
In view of this, this application provides a kind of progress and make a report on table generating method and device, to reduce the complexity that progress is made a report on, reduce progress data errors.
For achieving the above object, the application provides following technical scheme: a kind of progress makes a report on table generating method, comprising:
Obtain at least one target to be onstructed in engineering and at least one progress item; Wherein, the work progress of described target to be onstructed comprises the some or all of progress item at least one progress item described;
Determine to carry out state involved by described progress item;
According to the progress item that described target to be onstructed comprises, generate the progress comprising the first mark corresponding to described target to be onstructed and make a report on table, and make a report in table the second mark indicating the progress item correspondence that described target to be onstructed comprises in described progress;
Involved by described progress item, carry out state, set the identification-state that described progress makes a report on the second mark binding described in table, wherein, described identification-state carries out state described in characterizing, and the different identification-states carried out corresponding to state is different;
Configure the trigger condition that described second mark changes identification-state, described trigger condition is for characterizing the input operation triggering and change described identification-state.
Preferably, described described progress make a report in table indicate the progress item correspondence that described target to be onstructed comprises second mark, comprising:
The second mark indicating the progress item correspondence that described target to be onstructed comprises in the row or column at the first mark place corresponding to target to be onstructed described in table is made a report in described progress.
Preferably, involved by described progress item carry out state comprise following three kinds of sequencings following carry out state:
Described progress item does not start construction, described progress item is in Construction State and described progress item completes construction;
Then the described progress of described setting makes a report on the identification-state of the second mark binding described in table, comprising:
Set three kinds of identification-states that described progress makes a report on the second mark binding described in table, described three kinds of identification-states characterize described three kinds respectively and carry out state.
Preferably, described trigger condition, comprising:
Detect described second mark clicked or tactile by, then the current identification-state of described second mark is changed to the identification-state corresponding to next progress status be in after progress status that described current identification-state characterizes.
Preferably, also comprise:
Make a report on table configuration data for described progress and upload rule, described data upload rule for make a report on when detection progress table complete fill in and available network detected time, upload described progress to given server and make a report on table.
On the other hand, present invention also provides a kind of progress and make a report on table creating device, comprising:
Parameter acquiring unit, for obtaining at least one target to be onstructed in engineering and at least one progress item; Wherein, the work progress of described target to be onstructed comprises the some or all of progress item at least one progress item described;
Status determining unit, carries out state for determining involved by described progress item;
Parameter set unit, for the progress item comprised according to described target to be onstructed, generate the progress comprising the first mark corresponding to described target to be onstructed and make a report on table, and make a report in table the second mark indicating the progress item correspondence that described target to be onstructed comprises in described progress;
Form setting unit, for carrying out state involved by described progress item, set the identification-state that described progress makes a report on the second mark binding described in table, wherein, described identification-state carries out state described in characterizing, and the different identification-states carried out corresponding to state is different;
Form dispensing unit, change the trigger condition of identification-state for configuring described second mark, described trigger condition is for characterizing the input operation triggering and change described identification-state.
Preferably, described parameter set unit, comprising:
First optimum configurations subelement, for the progress item comprised according to described target to be onstructed, generates the progress comprising the first mark corresponding to described target to be onstructed and makes a report on table;
Second optimum configurations subelement, for make a report in described progress target to be onstructed described in table corresponding first mark place row or column in indicate the progress item correspondence that described target to be onstructed comprises second mark.
Preferably, involved by the described progress item determined of described status determining unit carry out state comprise following three kinds of sequencings following carry out state:
Progress item does not start construction, described progress item is in Construction State and described progress item completes construction;
Then described form setting unit, comprising:
Form arranges subelement, and for carrying out state involved by described progress item, set three kinds of identification-states that described progress makes a report on the second mark binding described in table, described three kinds of identification-states characterize described three kinds respectively and carry out state.
Preferably, described form dispensing unit comprises:
Form configuration subelement, the trigger condition of identification-state is changed for configuring described second mark, and described trigger condition is: detect described second mark clicked or tactile by, then the current identification-state of described second mark is changed to the identification-state corresponding to next progress status be in after progress status that described current identification-state characterizes.
Preferably, also comprise:
Data upload setting unit, uploads rule for making a report on table configuration data for described progress, described data upload rule for make a report on when detection progress table complete fill in and available network detected time, upload described progress to given server and make a report on table.
Known via above-mentioned technical scheme, the second mark not only containing the progress item that first of expression target to be onstructed identifies and target to be onstructed is corresponding is made a report in table in the progress generated, also set the identification-state carrying out state for characterizing progress item that the second mark is bound, because this second identifies the identification-state bound and can change, as long as the input operation that user's input meets trigger condition just can trigger the identification-state changing this second mark, just making a report on of the progress status corresponding to progress item corresponding to this construction target can be completed, avoid and loaded down with trivial details make a report on process, reduce form and make a report on complexity, it also avoid and first carry out paper record progress and make a report on progress again and cause data to be made a report on omitting or the problem of makeing mistakes.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme of the embodiment of the present application, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only the embodiment of the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
Fig. 1 shows the schematic flow sheet that a kind of progress of the application makes a report on a table generating method embodiment;
The progress that Fig. 2 shows application the application generation makes a report on the schematic flow sheet that table carries out the embodiment that progress is made a report on;
Fig. 3 shows the structural representation that a kind of progress of the application makes a report on a generating apparatus embodiment.
Embodiment
The embodiment of the present application provides a kind of progress and makes a report on table generating method and device, adjusts, reduce the complexity that progress is made a report on the generative process by making a report on table to progress.
Below in conjunction with the accompanying drawing in the embodiment of the present application, be clearly and completely described the technical scheme in the embodiment of the present application, obviously, described embodiment is only some embodiments of the present application, instead of whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the application's protection.
First make a report on table generating method to a kind of progress of the application to be introduced.
See Fig. 1, it illustrates the schematic flow sheet that a kind of progress of the application makes a report on a table generating method embodiment, the method for the present embodiment can comprise:
101, obtain at least one target to be onstructed in engineering and at least one progress item.
Wherein, the work progress of this target to be onstructed comprises the some or all of progress item at least one progress item.
Can relate to multiple object needing construction in construction work, each object to be onstructed is called a target to be onstructed.As, for building the construction work of the communications facilitys such as shaft tower, each shaft tower is exactly a target to be onstructed.
Progress item represents the stage that this project is current carried out or operation, can recognize the progress extent of engineering based on this progress item.Can be made up of multiple construction stage or operation in construction work, each stage or operation are exactly a progress item.
As, the master operations such as still to build the construction work of the communications facilitys such as shaft tower, the operation in this project can comprise excavation of foundation pit, basis is built, tower erection, Poling Construction, annex installation, and each operation is exactly a progress item.
Be understandable that, because target to be onstructed in engineering is different, operation involved by target to be onstructed also may be different, therefore, the target to be onstructed had only may can comprise a part of progress item at work progress, and the target to be onstructed had then may comprise whole progress items in work progress.
102, determine to carry out state involved by progress item.
Carry out this progress item of status representative each progress item current may have in the process of carrying out and multiplely carry out state, some progress items of target as to be onstructed in this complete, and some progress items not yet go into operation.
Still for communications facility construction work above, when the excavation of foundation pit operation of shaft tower is in and carries out state, this tower erection progress item may not yet go into operation.
103, according to the progress item that target to be onstructed comprises, generate the progress comprising the first mark corresponding to target to be onstructed and make a report on table, and make a report in table the second mark indicating the progress item correspondence that target to be onstructed comprises in this progress.
Make a report in table in the progress of the present embodiment and adopt different mark for marking target to be onstructed and progress item respectively, find out each target to be onstructed more intuitively can make a report on table from this progress, and the progress item under construction target.As, when project to be onstructed is shaft tower, the first mark can be an icon comprising shaft tower; When progress item is foundation ditch excavation, the second mark can comprise picture or the icon of an excavator.
Wherein, the first mark and the second mark are only used to distinguish target to be onstructed and progress item.
104, involved by this progress item, carry out state, set the identification-state that this progress makes a report on the second mark binding in table.
Wherein, this identification-state carries out state for what characterize progress item, and the different identification-states carried out corresponding to state is different.
Progress can be carried out easily make a report in order to follow-up, in the embodiment of the present application, the second mark difference of having bound for characterizing progress item for sign progress item carries out the identification-state of state, thus can be reached the object of carrying out state of input progress item by the identification-state revising this second mark.
Wherein, this identification-state can be understood as the different conditions that the second mark presents.As, this identification-state can be color, the color that different identification-states is corresponding different; And for example, identification-state can be in this mark, add the son mark characterizing different conditions, the son mark that different identification-states is corresponding different, and such as, son mark can be blank, does not namely add any mark; Son mark can also be red flag or pentagram etc.
105, configure the trigger condition that this second mark changes identification-state.
Wherein, this trigger condition is for characterizing the input operation triggering and change identification-state.User can carry out corresponding input operation based on trigger condition, to trigger the identification-state changing this second mark, thus without the need to repeatedly inputting the progress status realizing input progress item correspondence in multiple dialog box.
In the embodiment of the present application, the progress generated makes a report in table the second mark not only containing the progress item that first of expression target to be onstructed identifies and target to be onstructed is corresponding, also set the identification-state carrying out state for characterizing progress item that the second mark is bound, because this second identifies the identification-state bound and can change, as long as the input operation that user's input meets trigger condition just can trigger the identification-state changing this second mark, just making a report on of the progress status corresponding to progress item corresponding to this construction target can be completed, avoid and loaded down with trivial details make a report on process, reduce form and make a report on complexity, it also avoid first paper record progress make a report on progress again and cause data to make a report on the problem of omitting or makeing mistakes.
Be understandable that, setting triggers the trigger condition changing this identification-state in actual applications can multiple possibility.As, can be that after the second mark choosing certain under certain target to be onstructed corresponding to progress item, input predetermined registration operation, triggers the identification-state changing this second mark.
Optionally, in order to improve the convenience that the progress of making a report on makes a report on table further, this trigger condition of setting can be:
Detect the second mark clicked or tactile by, then the current identification-state of this second mark is changed to the identification-state corresponding to next progress status be in after progress status that described current identification-state characterizes.
Wherein, the difference illustrating progress item due to different identification-states carries out state, and for same progress Xiang Eryan, what they were different carries out state also dividing of the sequencing of execution, can according to the order of the sequencing setting progress status of this execution.
Certainly, the order of progress status also can stochastic generation, wishes if the progress status after switching is not still user the progress status that inputs, then this user can by repeatedly click or touch by mode come repeatedly to switch.
Optionally, consider that supvr is generally more concerned about whether this progress item goes into operation, and whether be in carry out in or completed, therefore, involved by progress item carry out state comprise following three kinds of sequencings following carry out state:
Progress item does not start construction, progress item is in Construction State and progress item completes construction;
Accordingly, setting progress makes a report on the identification-state of the second mark binding described in table, can comprise:
Setting progress to make a report in table three kinds of identification-states of the second mark binding, and three kinds of identification-states characterize above these three kinds respectively and carry out state.
It should be noted that, in any one embodiment above, second mark of making a report on the progress item correspondence indicated in table in progress needs to embody the progress item involved by each target to be onstructed, and intuitively can find out the progress item that each target to be onstructed is current carried out.Optionally, in order to can find out intuitively progress item correspondence second mark belonging to first mark, can progress make a report on target to be onstructed in table corresponding first mark place row or column in indicate the progress item correspondence that this target to be onstructed comprises second mark.
Be understandable that, second of the progress item correspondence corresponding to target to be onstructed the mark corresponding with this target to be onstructed first identified and is set to same a line or same row, each progress item involved by target to be onstructed can be found out intuitively.Meanwhile, according to mark this progress item second mark corresponding to identification-state, intuitively can determine which operation is this target to be onstructed carry out, and this operation current carry out state.
For the ease of understanding, can see Fig. 2, the progress that it illustrates the embodiment of the present application generation makes a report on a schematic diagram of table.
This Fig. 2 is still introduced for the construction work of building the communications facilitys such as shaft tower, the longitudinal axis marks project to be onstructed in this chart, i.e. each shaft tower, as N11, N12 etc. of the leftmost side in figure are shaft tower mark.The second mark corresponding to each progress item that transverse axis at the mark place of shaft tower comprises for this shaft tower.As in Fig. 2, N11 has four icon marks with a line, represents the corresponding to four progress items second mark that this shaft tower N11 comprises respectively.That the progress item comprised with each shaft tower is all example mutually in fig. 2.The progress item that in Fig. 2, each shaft tower comprises from left to right is followed successively by: excavation of foundation pit, basis are built, tower erection, Poling Construction.Play first second as, left side to be designated an icon comprising excavator and namely to represent this excavation of foundation pit.
Meanwhile, carrying out state in fig. 2 in order to what distinguish each progress item, is also the different identification-state of this second flag.As, demonstrate red flag in icon and identify this progress item and complete; If there is local color comparatively dark in the icon of the second mark, and other part colours are more shallow, then represent that the progress item of this second mark correspondence is in Construction State; Accordingly, if whole icon is light color, then represent that the progress item of this second mark correspondence not yet starts construction.
Visible, indicate after this shaft tower send second of each comprised progress item the mark and corresponding progress status in a line at shaft tower mark place, that can find out each progress item of each shaft tower very intuitively by the identification-state of the second mark of progress item correspondence carries out state.
Certainly, be that the progress item comprised with each shaft tower is all example mutually in fig. 2, but it is similar to make a report on table for the progress that the progress item that each shaft tower comprises constructs, in the row at only this different target place to be onstructed, the quantity of progress item is different.
Optionally, in order to avoid follow-up data reports after personnel's progress of having made a report at the construction field (site) makes a report on table, due to current cannot interconnection network, and make follow-uply to forget that the progress of this being made a report on makes a report on the situation showing to report, more than the application any one embodiment method in, can also comprise:
Make a report on table configuration data for this progress and upload rule.
Wherein, this data upload rule for make a report on when detection progress table complete fill in and available network detected time, upload described progress to given server and make a report on table.Like this, even if progress makes a report on equipment be in off-line state, user also can carry out progress very timely and makes a report on and report in time.
Certainly, upload rule and be specifically as follows after being linked to network, this locality does not submit data to, the local off-line data of preferential submission, and then submits the progress data that ought front upperly make a report on to.
Making a report on table generating method based on the progress of any one embodiment more than the application generates after progress makes a report on table, user transfers after this progress makes a report on table by mobile terminal, even if also state can be carried out by what click that this second icon triggers progress item corresponding to this second icon of amendment very easily at the construction field (site), thus without the need to being recorded to separately on paper, then getting back to office in typing, thus it is more easy to make progress make a report on process.
Meanwhile, even if the current residing environment of user cannot be networked, make a report on table due to this progress and be configured with data upload rule, user also need not worry to forget uploading data and to cause the problem that delay progress reports.
See Fig. 3, it illustrates the structural representation that a kind of progress of the application makes a report on a table creating device embodiment, the device of the present embodiment can comprise:
Parameter acquiring unit 301, for obtaining at least one target to be onstructed in engineering and at least one progress item; Wherein, the work progress of described target to be onstructed comprises the some or all of progress item at least one progress item described;
Status determining unit 302, carries out state for determining involved by described progress item;
Parameter set unit 303, for the progress item comprised according to described target to be onstructed, generate the progress comprising the first mark corresponding to described target to be onstructed and make a report on table, and make a report in table the second mark indicating the progress item correspondence that described target to be onstructed comprises in described progress;
Wherein, can relate to multiple object needing construction in construction work, each object to be onstructed is called a target to be onstructed.
Progress item represents the stage that this project is current carried out or operation, can recognize the progress extent of engineering based on this progress item.Can be made up of multiple construction stage or operation in construction work, each stage or operation are exactly a progress item.
Form setting unit 304, for carrying out state involved by described progress item, set the identification-state that described progress makes a report on the second mark binding described in table, wherein, described identification-state carries out state described in characterizing, and the different identification-states carried out corresponding to state is different;
Form dispensing unit 305, change the trigger condition of identification-state for configuring described second mark, described trigger condition is for characterizing the input operation triggering and change described identification-state.
Progress can be carried out easily make a report in order to follow-up, in the embodiment of the present application, the second mark difference of having bound for characterizing progress item for sign progress item carries out the identification-state of state, thus can be reached the object of carrying out state of input progress item by the identification-state revising this second mark.
Visible, in the embodiment of the present application, the progress generated makes a report in table the second mark not only containing the progress item that first of expression target to be onstructed identifies and target to be onstructed is corresponding, also set the identification-state carrying out state for characterizing progress item that the second mark is bound, because this second identifies the identification-state bound and can change, as long as the input operation that user's input meets trigger condition just can trigger the identification-state changing this second mark, just making a report on of the progress status corresponding to progress item corresponding to this construction target can be completed, avoid and loaded down with trivial details make a report on process, reduce form and make a report on complexity, it also avoid and first carry out paper record progress and make a report on program again and cause data to be made a report on omitting or the problem of makeing mistakes.
Optionally, described parameter set unit, comprising:
First optimum configurations subelement, for the progress item comprised according to described target to be onstructed, generates the progress comprising the first mark corresponding to described target to be onstructed and makes a report on table;
Second optimum configurations subelement, for make a report in described progress target to be onstructed described in table corresponding first mark place row or column in indicate the progress item correspondence that described target to be onstructed comprises second mark.
Optionally, involved by the described progress item determined of described status determining unit carry out state comprise following three kinds of sequencings following carry out state:
Progress item does not start construction, described progress item is in Construction State and described progress item completes construction;
Then described form setting unit, comprising:
Form arranges subelement, and for carrying out state involved by described progress item, set three kinds of identification-states that described progress makes a report on the second mark binding described in table, described three kinds of identification-states characterize described three kinds respectively and carry out state.
Optionally, in any one embodiment above, described form dispensing unit can comprise:
Form configuration subelement, the trigger condition of identification-state is changed for configuring described second mark, and described trigger condition is: detect described second mark clicked or tactile by, then the current identification-state of described second mark is changed to the identification-state corresponding to next progress status be in after progress status that described current identification-state characterizes.
Preferably, the device of the embodiment of the present application can also comprise:
Data upload setting unit, uploads rule for making a report on table configuration data for described progress, described data upload rule for make a report on when detection progress table complete fill in and available network detected time, upload described progress to given server and make a report on table.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.For device disclosed in embodiment, because it corresponds to the method disclosed in Example, so description is fairly simple, relevant part illustrates see method part.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the application.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from the spirit or scope of the application, can realize in other embodiments.Therefore, the application can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. progress makes a report on a table generating method, it is characterized in that, comprising:
Obtain at least one target to be onstructed in engineering and at least one progress item; Wherein, the work progress of described target to be onstructed comprises the some or all of progress item at least one progress item described;
Determine to carry out state involved by described progress item;
According to the progress item that described target to be onstructed comprises, generate the progress comprising the first mark corresponding to described target to be onstructed and make a report on table, and make a report in table the second mark indicating the progress item correspondence that described target to be onstructed comprises in described progress;
Involved by described progress item, carry out state, set the identification-state that described progress makes a report on the second mark binding described in table, wherein, described identification-state carries out state described in characterizing, and the different identification-states carried out corresponding to state is different;
Configure the trigger condition that described second mark changes identification-state, described trigger condition is for characterizing the input operation triggering and change described identification-state.
2. method according to claim 1, is characterized in that, described described progress make a report in table indicate the progress item correspondence that described target to be onstructed comprises second mark, comprising:
The second mark indicating the progress item correspondence that described target to be onstructed comprises in the row or column at the first mark place corresponding to target to be onstructed described in table is made a report in described progress.
3. method according to claim 1, is characterized in that, involved by described progress item carry out state comprise following three kinds of sequencings following carry out state:
Described progress item does not start construction, described progress item is in Construction State and described progress item completes construction;
Then the described progress of described setting makes a report on the identification-state of the second mark binding described in table, comprising:
Set three kinds of identification-states that described progress makes a report on the second mark binding described in table, described three kinds of identification-states characterize described three kinds respectively and carry out state.
4. the method according to claim 1 or 3, is characterized in that, described trigger condition, comprising:
Detect described second mark clicked or tactile by, then the current identification-state of described second mark is changed to the identification-state corresponding to next progress status be in after progress status that described current identification-state characterizes.
5. method according to claim 1, is characterized in that, also comprises:
Make a report on table configuration data for described progress and upload rule, described data upload rule for make a report on when detection progress table complete fill in and available network detected time, upload described progress to given server and make a report on table.
6. progress makes a report on a table creating device, it is characterized in that, comprising:
Parameter acquiring unit, for obtaining at least one target to be onstructed in engineering and at least one progress item; Wherein, the work progress of described target to be onstructed comprises the some or all of progress item at least one progress item described;
Status determining unit, carries out state for determining involved by described progress item;
Parameter set unit, for the progress item comprised according to described target to be onstructed, generate the progress comprising the first mark corresponding to described target to be onstructed and make a report on table, and make a report in table the second mark indicating the progress item correspondence that described target to be onstructed comprises in described progress;
Form setting unit, for carrying out state involved by described progress item, set the identification-state that described progress makes a report on the second mark binding described in table, wherein, described identification-state carries out state described in characterizing, and the different identification-states carried out corresponding to state is different;
Form dispensing unit, change the trigger condition of identification-state for configuring described second mark, described trigger condition is for characterizing the input operation triggering and change described identification-state.
7. device according to claim 6, is characterized in that, described parameter set unit, comprising:
First optimum configurations subelement, for the progress item comprised according to described target to be onstructed, generates the progress comprising the first mark corresponding to described target to be onstructed and makes a report on table;
Second optimum configurations subelement, for make a report in described progress target to be onstructed described in table corresponding first mark place row or column in indicate the progress item correspondence that described target to be onstructed comprises second mark.
8. device according to claim 6, is characterized in that, involved by the described progress item that described status determining unit is determined carry out state comprise following three kinds of sequencings following carry out state:
Progress item does not start construction, described progress item is in Construction State and described progress item completes construction;
Then described form setting unit, comprising:
Form arranges subelement, and for carrying out state involved by described progress item, set three kinds of identification-states that described progress makes a report on the second mark binding described in table, described three kinds of identification-states characterize described three kinds respectively and carry out state.
9. the device according to claim 6 or 8, is characterized in that, described form dispensing unit comprises:
Form configuration subelement, the trigger condition of identification-state is changed for configuring described second mark, and described trigger condition is: detect described second mark clicked or tactile by, then the current identification-state of described second mark is changed to the identification-state corresponding to next progress status be in after progress status that described current identification-state characterizes.
10. device according to claim 6, is characterized in that, also comprises:
Data upload setting unit, uploads rule for making a report on table configuration data for described progress, described data upload rule for make a report on when detection progress table complete fill in and available network detected time, upload described progress to given server and make a report on table.
CN201510397625.0A 2015-07-08 2015-07-08 Scheme report generation method and device Pending CN104951189A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510397625.0A CN104951189A (en) 2015-07-08 2015-07-08 Scheme report generation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510397625.0A CN104951189A (en) 2015-07-08 2015-07-08 Scheme report generation method and device

Publications (1)

Publication Number Publication Date
CN104951189A true CN104951189A (en) 2015-09-30

Family

ID=54165873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510397625.0A Pending CN104951189A (en) 2015-07-08 2015-07-08 Scheme report generation method and device

Country Status (1)

Country Link
CN (1) CN104951189A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105933362A (en) * 2016-07-13 2016-09-07 北京恒华伟业科技股份有限公司 Project progress monitoring method, device, and system
CN107329944A (en) * 2017-07-04 2017-11-07 武汉斗鱼网络科技有限公司 Report form generation method, device and electronic equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101989336A (en) * 2010-12-09 2011-03-23 北京恒华伟业科技股份有限公司 Power transmission and transformation project schedule management system and method for power system
US20110271220A1 (en) * 2009-07-17 2011-11-03 Steamboat Communications, Inc. Project progess display and monitoring
CN202699118U (en) * 2012-05-22 2013-01-30 深圳市新元素医疗技术开发有限公司 Remote wireless obesity monitor system
CN103297950A (en) * 2012-02-28 2013-09-11 成都谛听科技有限公司 Method for backing up and recovering call records remotely
CN104123502A (en) * 2014-08-18 2014-10-29 中建安装工程有限公司 Mechanical and electrical installation overall-planning system and method based on three-dimensional construction drawing model
CN104539793A (en) * 2014-12-15 2015-04-22 深圳市金立通信设备有限公司 Terminal

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110271220A1 (en) * 2009-07-17 2011-11-03 Steamboat Communications, Inc. Project progess display and monitoring
CN101989336A (en) * 2010-12-09 2011-03-23 北京恒华伟业科技股份有限公司 Power transmission and transformation project schedule management system and method for power system
CN103297950A (en) * 2012-02-28 2013-09-11 成都谛听科技有限公司 Method for backing up and recovering call records remotely
CN202699118U (en) * 2012-05-22 2013-01-30 深圳市新元素医疗技术开发有限公司 Remote wireless obesity monitor system
CN104123502A (en) * 2014-08-18 2014-10-29 中建安装工程有限公司 Mechanical and electrical installation overall-planning system and method based on three-dimensional construction drawing model
CN104539793A (en) * 2014-12-15 2015-04-22 深圳市金立通信设备有限公司 Terminal

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
MAOWEIS55: "《基建管控模块现场部分施工项目部用户手册-上册》", 《HTTPS://WENKU.BAIDU.COM/VIEW/7E576064DDCCDA38376BAF7D.HTML》 *
刘甫迎等: "《Web编程使用技术教程》", 31 August 2009, 高等教育出版社 *
张虎: "《基于ERP的电网基建项目管理系统设计与开发》", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *
王敏: "《移动信息化在电网基建信息系统中的应用研究》", 《2014电力行业信息化年会论文集 》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105933362A (en) * 2016-07-13 2016-09-07 北京恒华伟业科技股份有限公司 Project progress monitoring method, device, and system
CN107329944A (en) * 2017-07-04 2017-11-07 武汉斗鱼网络科技有限公司 Report form generation method, device and electronic equipment

Similar Documents

Publication Publication Date Title
JP2015109011A (en) Field device management apparatus, device information display method, computer program, and recording medium
US10732738B2 (en) System module of customizing screen image based on non-invasive data-extraction system, and method thereof
CN109358549A (en) A kind of intelligent control method and device of excavator
US20170220024A1 (en) Robot control program generation method and apparatus
WO2013190714A1 (en) Automatic operation system and method for automating operation
CN104951189A (en) Scheme report generation method and device
CN107451664B (en) Device maintenance apparatus, device maintenance method, device maintenance program, and recording medium
JP2009116743A (en) Three-dimensional cad system
US20060101346A1 (en) Device and method for designing and planning an operating interface
CN104142897A (en) Visual configuration method for integrated circuit production line monitoring system
CN105474774B (en) Show the device of data used in electronic part mounting
JP6566859B2 (en) Engineering tools
CN111415054B (en) Equipment monitoring management method and system
CN105446280B (en) Industrial stokehold quick-speed generation system and implementation method
CN109416530A (en) A kind of input and output control method, main control device and digital control system from equipment
CN105589694A (en) High-voltage disconnecting switch automatic type selection and technical review filling method
JP2016042386A (en) Field device management apparatus, device information display method, computer program, and recording medium
KR101851263B1 (en) Apparatus for setting multi display of hmi
JP2006301729A (en) Picture preparation method and picture preparation device
CN110414062A (en) A kind of method, apparatus and computer readable storage medium obtaining design drawing
CN103927425A (en) Method for automatically identifying operation points through DXF files
EP4102389A1 (en) Simulation system, simulation method, and simulation program
JP7143376B2 (en) Program and information processing system
CN109766076B (en) Flow control method, device and storage medium
JP6892194B2 (en) Engineering equipment and engineering methods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150930

RJ01 Rejection of invention patent application after publication