CN105933362A - Project progress monitoring method, device, and system - Google Patents
Project progress monitoring method, device, and system Download PDFInfo
- Publication number
- CN105933362A CN105933362A CN201610551183.5A CN201610551183A CN105933362A CN 105933362 A CN105933362 A CN 105933362A CN 201610551183 A CN201610551183 A CN 201610551183A CN 105933362 A CN105933362 A CN 105933362A
- Authority
- CN
- China
- Prior art keywords
- progress
- report
- data
- terminal
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
- H04L67/025—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/51—Discovery or management thereof, e.g. service location protocol [SLP] or web services
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/60—Scheduling or organising the servicing of application requests, e.g. requests for application data transmissions using the analysis and optimisation of the required network resources
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/75—Indicating network or usage conditions on the user display
Abstract
The invention provides a project progress monitoring method, device, and system. The system includes at least one first terminal which is a mobile terminal, a second terminal, and a cloud platform. The cloud platform sends a progress filling form and progress image indications to the first terminal when the progress filling request of the first terminal is received; the cloud platform stores the progress filing data and image data of construction objects returned by the first terminal; based on the progress filing data and image data returned by the at least one first terminal, the construction progress of different construction objects in the project is summarized to obtain the summarized data of the project progress; and when the data request of the second terminal is received, the summarized data of the project progress is returned to the second terminal. The method, device and system can improve the timeliness and accuracy of the progress filling, and the monitoring personnel can directly know the project progress.
Description
Technical field
The application relates to technical field of data processing, the monitoring of a kind of project progress
Methods, devices and systems.
Background technology
In the process of construction of engineering project, construction speed is to ensureing that duration, quality and cost suffer from very
Important impact.For the progress of reasonable management and control engineering, workmen is needed periodically to make a progress report on a project,
And report corresponding administrative staff.Administrative staff can show the work that workmen reports in terminal
The data of Cheng Jindu, with the construction situation control engineering project.
But existing progress make a report on usually progress personnel at engineering site first by simple for engineering progress data
Recorded on paper, be then return to by computer further according to recording the engineering progress data on paper, carry out progress
Making a report on, the progress that so this may result in makes a report on process complicated and time consumption;And, make a report on number in the progress of getting
According to afterwards, the progress that progress management and control personnel also are difficult to according to these complexity makes a report on data, gets information about
The progress situation of engineering project.
Summary of the invention
In view of this, this application provides the monitoring methods, devices and systems of a kind of project progress, to carry
Promptness that high progress is made a report on and accuracy, and beneficially Schedule monitoring personnel intuitively recognize entering of engineering
Degree situation.
For achieving the above object, the application provides following technical scheme: the monitoring system of a kind of project progress,
Including:
At least one first terminal, described first terminal is mobile terminal;
Second terminal;
And, cloud platform, wherein, described first terminal and the second terminal are put down with described cloud by network
Platform is connected;
Wherein, described first terminal, for determining the construction object that current pending progress is made a report on;To institute
Stating cloud platform to send progress and make a report on request, the request of making a report on of described progress carries that to need the construction of the progress of making a report on right
The information of elephant;The progress receiving the return of described cloud platform makes a report on table and the instruction of progress chart picture;Show
Described progress makes a report on table, and the progress obtaining the described construction object that the progress personnel of making a report on fill in makes a report on data;
Indicate in response to described progress chart picture, obtain the view data characterizing described construction object current schedules;Will
Described progress makes a report on data and described view data is sent to described cloud platform;
Described cloud platform, for when receiving described progress and making a report on request, sends to described first terminal
Described progress makes a report on table and the instruction of progress chart picture;Store the described construction object that described first terminal returns
Progress make a report on data and view data;The progress returned according at least one first terminal described is made a report on
Data and view data, collect the construction speed of construction objects different in engineering, obtain described
The combined data of project progress;When receiving the request of data of described second terminal, for described second terminal
Return the combined data of described project progress;
Described second terminal, for sending described request of data to described cloud platform;Receive described server
The described combined data returned;According to described combined data, represent different constructions in the described engineering of sign right
The progress chart of elephant, the object that at least includes in described progress chart constructing, construction view data corresponding to object
Link and the completion status mark of construction object.
Preferably, described first terminal, the described construction being additionally operable to fill in the acquisition progress personnel of making a report on is right
While the progress of elephant makes a report on data, obtain generate described progress make a report on data process generate the moment and
Described progress makes a report on the mark of personnel;Described progress is being made a report on data and described view data is sent to
While described cloud platform, the mark that described progress generation moment and described progress make a report on personnel is sent to
Described cloud platform;
Described cloud platform makes a report on data and image in the progress returned according at least one first terminal described
Data, when the construction speeds constructing objects different in engineering are collected, specifically for, according to described
The progress that at least one first terminal returns makes a report on data, progress generates moment and described progress reporter
The mark of member, makes a report on personnel's these three dimension carry out engineering construction progress from progress status, time, progress
Collect;
The described progress chart that the most described second terminal shows specifically includes: construction object, construction object
Graph of a correspondence data link, the construction completion status mark of object, progress generation moment and progress are filled out
Corresponding relation between journalist person.
Preferably, described cloud platform is additionally operable to, and is storing the described construction object that described first terminal returns
Progress make a report on data and view data before, according to preset progress rule data, enter described in detection
Degree makes a report on whether data exist data errors;When described progress make a report on data there is data errors time, to institute
Stating first terminal and send instruction information, described information is used for indicating described progress to make a report on personnel's core again
Look into described progress and make a report on data;
Described first terminal, is additionally operable to when receiving described instruction information, and output is verified described progress and filled out
The prompting of count off evidence.
Preferably, described second terminal, it is additionally operable to obtain at least one charg`e d'affaires's task, described charg`e d'affaires's task
Including: information and the progress of at least one construction object of construction speed to be obtained obtain the moment;By institute
State at least one charg`e d'affaires's task and be sent to described cloud platform;
Described cloud platform, is additionally operable to receive at least one charg`e d'affaires's task described that described second terminal sends;
Meet pre-conditioned between the described progress acquisition moment comprised in current time and described charg`e d'affaires's task
Time, send described charg`e d'affaires's task to described first terminal;
Described first terminal is when determining the construction object that current pending progress is made a report on, specifically for, root
The construction object that current pending progress is made a report on is determined according to described charg`e d'affaires's task.
Preferably, described first terminal, it is additionally operable to before making a report on request to described cloud platform transmission progress,
The information of the construction object according to the construction speed described to be obtained comprised in described Pending tasks, generates two
Dimension code, comprises the information of the construction object of described construction speed to be obtained in described Quick Response Code;
The most described first terminal when determining the construction object that current pending progress is made a report on, specifically for,
According to the information of the construction object comprised in the Quick Response Code scanned, determine what current pending progress was made a report on
The information of construction object.
On the other hand, the embodiment of the present application additionally provides a kind of monitoring method of project progress, is applied to cloud
Platform, described method includes:
At least one first terminal transmission progress that reception makes a report on end as progress makes a report on request, described progress
Make a report on request carry need the progress of making a report on construction object information, described first terminal is mobile terminal;
Sending progress to described first terminal and make a report on table and the instruction of progress chart picture, described progress chart picture indicates
For indicating described first terminal to obtain for the view data characterizing described construction object progress;
The progress receiving the described construction object that described first terminal returns makes a report on data and described picture number
According to;
The progress storing described construction object makes a report on data and described view data;
Making a report on data and view data according to described progress, the construction to construction objects different in engineering is entered
Degree collects, and obtains the combined data of described project progress;
When receiving the request of data that the second terminal as progress management and control end sends, for described second eventually
End returns the combined data of described project progress, so that described second terminal represents in the described engineering of sign
The progress chart of different construction objects, at least includes in described progress chart that construction object, construction object are corresponding
Graph data link and the completion status mark of construction object.
Preferably, while the described progress of reception makes a report on data and described view data, also include:
Receive the progress that described first terminal sends generate the moment and fill in described progress and make a report on entering of data
Degree makes a report on the mark of personnel, wherein, described progress generate the moment be generate described progress make a report on data time
Carve;
Described make a report on data and view data according to described progress, construction objects different in engineering are executed
Work progress collects, including:
The progress returned according at least one first terminal described makes a report on data, progress generates moment and institute
The progress of stating makes a report on the mark of personnel, makes a report on personnel's these three dimension carry out from progress status, time, progress
Collecting of engineering construction progress.
Preferably, the progress at described storage described construction object make a report on data and described view data it
Before, also include:
According to preset progress rule data, detect described progress and make a report on whether data exist data errors;
When described progress make a report on data there is data errors time, to described first terminal send instruction information,
Described information is used for indicating described progress to make a report on personnel again verifying described progress and make a report on data.
Preferably, at least one first terminal transmission progress making a report on end in described reception as progress is made a report on
Before request, also include:
Receiving at least one charg`e d'affaires's task described that described second terminal sends, described charg`e d'affaires's task includes:
Information and the progress of at least one construction object of construction speed to be obtained obtain the moment;
The described progress comprised in current time and described charg`e d'affaires's task obtains to meet between the moment presets bar
During part, send described charg`e d'affaires's task to described first terminal;
On the other hand, the embodiment of the present application additionally provides the supervising device of a kind of project progress, is applied to cloud
Platform, described device includes:
First receives unit, for receiving at least one first terminal transmission progress making a report on end as progress
Making a report on request, the information of construction object of the progress of making a report on of needing is carried in the request of making a report on of described progress, and described the
One terminal is mobile terminal;
First transmitting element, makes a report on table and the instruction of progress chart picture for sending progress to described first terminal,
Described progress chart is as instruction is for indicating described first terminal to obtain for characterizing described construction object progress
View data;
Second receives unit, makes a report on for receiving the progress of the described construction object that described first terminal returns
Data and described view data;
Memory cell, makes a report on data and described view data for storing the progress of described construction object;
Data summarization unit, for making a report on data and view data according to described progress, in engineering not
Collect with the construction speed of construction object, obtain the combined data of described project progress;
Second transmitting element, for asking when the data receiving the second terminal transmission as progress management and control end
When asking, return the combined data of described project progress for described second terminal, so that described second terminal
Represent and characterize the progress chart of different construction objects in described engineering, described progress chart at least includes construct right
As, construction object graph of a correspondence data link and construction object completion status mark.
Understand via above-mentioned technical scheme, in the embodiment of the present application, as the mobile end of first terminal
End has the advantages that to be easy to carry about with one, and utilizes this first terminal to fill out in real time such that it is able to be easy to the progress personnel of making a report on
Report the construction speed of each construction object.Meanwhile, first terminal is in entering that the acquisition progress personnel of making a report on make a report on
While degree makes a report on data, the view data characterizing this construction object construction speed can be obtained, the most favourable
More got information about the construction speed of construction object by this view data in Schedule monitoring personnel.And
And, cloud platform is after the progress getting the transmission of this first terminal makes a report on data and view data, right
The construction speeds of different construction objects are collected, so, Schedule monitoring personnel by the second terminal from
After cloud platform gets the data after this collects, can in progress chart simultaneously show construction object,
The view data that construction object is corresponding links and the completion status mark of construction object, can intuitively understand
Progress to difference construction object, it is also possible to intuitively get construction by the link of click view data right
As construction progress at the construction field (site).
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present application, institute in embodiment being described below
The accompanying drawing used is needed to be briefly described, it should be apparent that, the accompanying drawing in describing below is only this Shen
Embodiment please, for those of ordinary skill in the art, on the premise of not paying creative work,
Other accompanying drawing can also be obtained according to the accompanying drawing provided.
Fig. 1 shows the schematic flow sheet of one embodiment of monitoring system of a kind of project progress of the application;
Fig. 2 shows the schematic diagram of a kind of progress chart that the application shows;
Fig. 3 shows the schematic diagram of a kind of progress combined data;
Fig. 4 shows that the flow process of one embodiment of monitoring method of a kind of project progress of the application is illustrated alternately
Figure;
Fig. 5 shows the structural representation of one embodiment of supervising device of a kind of project progress of the application.
Detailed description of the invention
The embodiment of the present application provides the monitoring methods, devices and systems of a kind of project progress, with improve into
Spend the promptness and accuracy made a report on, and beneficially Schedule monitoring personnel intuitively recognize the progress feelings of engineering
Condition.
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is carried out
Clearly and completely describe, it is clear that described embodiment is only some embodiments of the present application, and
It is not all, of embodiment.Based on the embodiment in the application, those of ordinary skill in the art are not doing
Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of the application protection.
See Fig. 1, it illustrates the composition frame of one embodiment of monitoring system of a kind of project progress of the application
Structure schematic diagram.
In the present embodiment, this monitoring system may include that
At least one first terminal 101, described first terminal is mobile terminal;
Second terminal 102;
And, cloud platform 103, wherein, described first terminal and the second terminal are by network and described cloud
Platform is connected.
It should be noted that in the embodiment of the present application, this cloud platform can be that a station server can also
The server cluster being made up of multiple servers.
Wherein, this first terminal 101, for determining the construction object that current pending progress is made a report on;To this
Cloud platform sends progress and makes a report on request, and the request of making a report on of this progress is carried and needed the construction object of the progress of making a report on
Information;The progress receiving the return of this cloud platform makes a report on table and the instruction of progress chart picture;This progress shown
Make a report on table, and the progress obtaining this construction object that the progress personnel of making a report on fill in makes a report on data;In response to this
Progress chart picture indicates, and obtains the view data characterizing this construction object current schedules;This progress is made a report on number
According to this and this view data is sent to this cloud platform.
It is understood that in different engineering projects, construction object would also vary from.As, electricity
As a example by the project of Force system, this construction object can be shaft tower.
Wherein, this view data can be picture, it is also possible to be the video image recorded.Should by characterizing
Construction object current schedules view data can be the most accurate and visual reflect construction object construction enter
Degree.
This cloud platform 103, for when receiving this progress and making a report on request, sends this to this first terminal and enters
Degree makes a report on table and the instruction of progress chart picture;The progress storing this construction object that this first terminal returns is made a report on
Data and view data;The progress returned according to this at least one first terminal makes a report on data and image
Data, collect the construction speed of construction objects different in engineering, obtain collecting of this project progress
Data;When receiving the request of data of this second terminal, return the remittance of this project progress for this second terminal
Total data;
This second terminal 102, for sending this request of data to this cloud platform;Receive what this server returned
This combined data;According to this combined data, represent and characterize the progress chart of different construction objects in this engineering,
This progress chart at least includes view data link and construction object that construction object, construction object are corresponding
Completion status mark.
In the embodiment of the present application, the mobile terminal as first terminal has the advantages that to be easy to carry about with one, from
And can be so that the construction that the progress personnel of making a report on utilize this first terminal to make a report on each construction object in real time is entered
Degree.Meanwhile, first terminal, while the progress that the acquisition progress personnel of making a report on make a report on makes a report on data, can obtain
Take the view data characterizing this construction object construction speed, be so conducive to Schedule monitoring personnel by this figure
The construction speed of construction object is more got information about as data.And, cloud platform get this
Construction speed after the progress that one terminal sends makes a report on data and view data, to difference construction object
Being collected, so, Schedule monitoring personnel get after this collects by the second terminal from cloud platform
After data, construction object, construction view data corresponding to object can be shown in progress chart simultaneously
Link and the completion status mark of construction object, can intuitively recognize the progress of different construction object,
Can also by click on the link of view data intuitively get construction object construction at the construction field (site) enter
Exhibition.
In actual applications, so that Schedule monitoring personnel can more fully get information about each
The process of construction object makes a report on situation, and can determine that progress makes a report on personnel in time, in order to needs with enter
When the degree personnel of making a report on link up, determine that the progress of each project under construction makes a report on personnel in time.
Optionally, in the embodiment of the present application, this first terminal 101, it is additionally operable to obtaining progress reporter
While the progress of the described construction object that member fills in makes a report on data, obtain the described progress of generation and make a report on data
Process generate moment and described progress and make a report on the mark of personnel;Described progress is made a report on data and
While described view data is sent to described cloud platform, the described progress generation moment is filled out with described progress
The mark of journalist person is sent to described cloud platform.
Accordingly, cloud platform 103 the progress returned according at least one first terminal described make a report on data with
And view data, when the construction speeds constructing objects different in engineering are collected, specifically for, depend on
The progress returned according at least one first terminal described makes a report on data, progress generates moment and described progress
Make a report on the mark of personnel, make a report on personnel's these three dimension from progress status, time, progress and carry out engineering and execute
Collecting of work progress.
Accordingly, the described progress chart that the second terminal 102 shows specifically includes: construction object, construction
Object graph of a correspondence data link, the construction completion status mark of object, progress generate the moment and enter
Degree makes a report on the corresponding relation between personnel.
In the embodiment of the present application, the progress chart that the second terminal shows is the data made a report on according to user,
And combine the information such as video pictures, from multiple dimensions, the progress situation of construction object is shown.
May refer to Fig. 2 for the ease of understanding, it illustrates the progress chart shown in the application the second terminal
A kind of possible example.As seen from Figure 2, this progress chart is horizontal with time shaft 201, represents
Go out the progress situation of multiple shaft tower.As Fig. 2 is longitudinally followed successively by from upper to little the picture 202 of shaft tower, construction
The completion status mark 203 of object, video information 204 (as being the link of video), make a report on personnel
Picture or mark 205.
Wherein, different completion status marks 203 characterizes the construction speed that construction object is different.
In the preferred implementation of one, described cloud platform is additionally operable to, and returns storing described first terminal
Before the progress of the described construction object returned makes a report on data and view data, according to preset progress rule
Data, detect described progress and make a report on whether data exist data errors;Make a report on data when described progress to exist
During data errors, send instruction information to described first terminal, described information be used for indicating described in enter
Degree is made a report on personnel and is again verified described progress and make a report on data;
Described first terminal, is additionally operable to when receiving described instruction information, and output is verified described progress and filled out
The prompting of count off evidence.
Illustrate, stagger the time when the progress personnel of making a report on find that progress is filled out, progress on first terminal can be clicked on
Making a report on the error correction button in application, this application can send instructions to cloud platform.Cloud platform is according to corresponding
Error correction algorithm, and combine conventional engineering make a report on data and progress data, the progress that automatically analyzes out may
Fill out the construction object (e.g., shaft tower) of mistake.Meanwhile, the information of the construction object of data errors is returned to
This application of first terminal, this application just can point out the progress personnel of making a report on may fill out the shaft tower of mistake automatically.
So, after the progress personnel of making a report on can select to fill out the shaft tower of mistake and again make a report on, the data after updating
Being sent to cloud platform, cloud platform is according to the progress data of this construction object of data point reuse after updating.
Further, cloud platform determine exist progress make a report on data update time, can according to update after
Progress make a report on data and re-start data summarization, generate combined data.Then, collecting after updating
Data syn-chronization is to the second terminal.
Meanwhile, cloud platform can also record the numbering of the construction object filling out mistake and fill out the progress reporter of mistake
Member and time point, analysis collects, and provides foundation for later decision-making.
Optionally, described second terminal, it is additionally operable to obtain at least one charg`e d'affaires's task, described charg`e d'affaires's task
Including: information and the progress of at least one construction object of construction speed to be obtained obtain the moment;By institute
State at least one charg`e d'affaires's task and be sent to described cloud platform;
Described cloud platform, is additionally operable to receive at least one charg`e d'affaires's task described that described second terminal sends;
Meet pre-conditioned between the described progress acquisition moment comprised in current time and described charg`e d'affaires's task
Time, send described charg`e d'affaires's task to described first terminal;
Described first terminal is when determining the construction object that current pending progress is made a report on, specifically for, root
The construction object that current pending progress is made a report on is determined according to described charg`e d'affaires's task.
As the preferred implementation of one, described first terminal, it is additionally operable to sending to described cloud platform
Before progress makes a report on request, according to the construction of the construction speed described to be obtained comprised in described Pending tasks
The information of object, generates Quick Response Code, and the construction comprising described construction speed to be obtained in described Quick Response Code is right
The information of elephant;
The most described first terminal when determining the construction object that current pending progress is made a report on, specifically for,
According to the information of the construction object comprised in the Quick Response Code scanned, determine what current pending progress was made a report on
The information of construction object.
Concrete, after first terminal receives the propelling movement link comprising charg`e d'affaires's task, it is permissible that progress makes a report on personnel
Point opens propelling movement link, jumps to the map page in respective application, can orient needs in this map
Filling in the position of the construction object of progress, progress is made a report on personnel and is clicked on the object that needs to construct in map, and this is executed
Progress data and the details of work object display.This progress the personnel of making a report on can connect with data wire
First terminal and printer, and click on print button in interface, record the Quick Response Code of construction object information
It is printed.The progress personnel of making a report on can be attached to two-dimension code label on shaft tower, and starts construction.Treat
When needing to make a report on progress, utilize first terminal to scan this Quick Response Code and just can get the letter of this construction object
Breath.
Based on monitoring system as above, see Fig. 2, it illustrates a kind of project progress of the embodiment of the present application
The schematic flow sheet of one embodiment of monitoring method, the present embodiment enters as a example by the execution process of cloud platform side
Row is introduced.The method of the present embodiment may include that
201, at least one first terminal transmission progress that reception makes a report on end as progress makes a report on request.
Wherein, the information of construction object of the progress of making a report on of needing is carried in the request of making a report on of this progress, and this is first eventually
End is mobile terminal.
202, send progress to this first terminal and make a report on table and the instruction of progress chart picture.
Wherein, the instruction of this progress chart picture is used for indicating the acquisition of this first terminal to enter for characterizing this construction object
The view data of degree;
203, the progress receiving this construction object that this first terminal returns makes a report on data and this picture number
According to.
204, the progress storing this construction object makes a report on data and this view data.
205, make a report on data and view data according to this progress, the construction to construction objects different in engineering
Progress collects, and obtains the combined data of this project progress
206, when receive as progress management and control end second terminal send request of data time, for this second
Terminal returns the combined data of this project progress.
Accordingly, the second terminal, according to this combined data, can represent different constructions in this engineering of sign right
The progress chart of elephant, at least includes construct object, construction object graph of a correspondence data link in this progress chart
And the completion status mark of construction object.
Optionally, while the described progress of reception makes a report on data and described view data, also include:
Receive the progress that described first terminal sends generate the moment and fill in described progress and make a report on entering of data
Degree makes a report on the mark of personnel, wherein, described progress generate the moment be generate described progress make a report on data time
Carve;
Described make a report on data and view data according to described progress, construction objects different in engineering are executed
Work progress collects, including:
The progress returned according at least one first terminal described makes a report on data, progress generates moment and institute
The progress of stating makes a report on the mark of personnel, makes a report on personnel's these three dimension carry out from progress status, time, progress
Collecting of engineering construction progress.
Optionally, the progress at described storage described construction object make a report on data and described view data it
Before, also include:
According to preset progress rule data, detect described progress and make a report on whether data exist data errors;
When described progress make a report on data there is data errors time, to described first terminal send instruction information,
Described information is used for indicating described progress to make a report on personnel again verifying described progress and make a report on data.
Optionally, at least one first terminal transmission progress making a report on end in described reception as progress is made a report on
Before request, also include:
Receiving at least one charg`e d'affaires's task described that described second terminal sends, described charg`e d'affaires's task includes:
Information and the progress of at least one construction object of construction speed to be obtained obtain the moment;
The described progress comprised in current time and described charg`e d'affaires's task obtains to meet between the moment presets bar
During part, send described charg`e d'affaires's task to described first terminal;
The monitoring method of a kind of project progress of corresponding the application, the embodiment of the present application additionally provides a kind of work
The supervising device of Cheng Jindu.
Seeing Fig. 5, the structure of one embodiment of supervising device that it illustrates a kind of project progress of the application is shown
Being intended to, this device of the present embodiment can apply to cloud platform.The device of the present embodiment may include that
First receives unit 501, for receive as progress make a report at least one first terminal of end send into
Degree make a report on request, described progress make a report on request carry need the progress of making a report on construction object information, described
First terminal is mobile terminal;
First transmitting element 502, is used for making a report on table to described first terminal transmission progress and progress chart picture refers to
Showing, the instruction of described progress chart picture is used for indicating the acquisition of described first terminal to enter for characterizing described construction object
The view data of degree;
Second receives unit 503, fills out for receiving the progress of the described construction object that described first terminal returns
Count off is according to this and described view data;
Memory cell 504, makes a report on data and described picture number for storing the progress of described construction object
According to;
Data summarization unit 505, for making a report on data and view data according to described progress, in engineering
The construction speed of different construction objects collects, and obtains the combined data of described project progress;
Second transmitting element 506, for when receiving the data that the second terminal as progress management and control end sends
During request, return the combined data of described project progress for described second terminal, so that described second is whole
End represents the progress chart of different construction objects in the described engineering of sign, at least includes construction in described progress chart
Object, construction object graph of a correspondence data link and the completion status mark of construction object.
In this specification, each embodiment uses the mode gone forward one by one to describe, and each embodiment stresses
Being the difference with other embodiments, between each embodiment, identical similar portion sees mutually.
For device disclosed in embodiment, owing to it corresponds to the method disclosed in Example, so describing
Fairly simple, relevant part sees method part and illustrates.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses
The application.Multiple amendment to these embodiments will be aobvious and easy for those skilled in the art
See, generic principles defined herein can in the case of without departing from spirit herein or scope,
Realize in other embodiments.Therefore, the application is not intended to be limited to the embodiments shown herein,
And it is to fit to the widest scope consistent with principles disclosed herein and features of novelty.
Claims (10)
1. the monitoring system of a project progress, it is characterised in that including:
At least one first terminal, described first terminal is mobile terminal;
Second terminal;
And, cloud platform, wherein, described first terminal and the second terminal are put down with described cloud by network
Platform is connected;
Wherein, described first terminal, for determining the construction object that current pending progress is made a report on;To institute
Stating cloud platform to send progress and make a report on request, the request of making a report on of described progress carries that to need the construction of the progress of making a report on right
The information of elephant;The progress receiving the return of described cloud platform makes a report on table and the instruction of progress chart picture;Show
Described progress makes a report on table, and the progress obtaining the described construction object that the progress personnel of making a report on fill in makes a report on data;
Indicate in response to described progress chart picture, obtain the view data characterizing described construction object current schedules;Will
Described progress makes a report on data and described view data is sent to described cloud platform;
Described cloud platform, for when receiving described progress and making a report on request, sends to described first terminal
Described progress makes a report on table and the instruction of progress chart picture;Store the described construction object that described first terminal returns
Progress make a report on data and view data;The progress returned according at least one first terminal described is made a report on
Data and view data, collect the construction speed of construction objects different in engineering, obtain described
The combined data of project progress;When receiving the request of data of described second terminal, for described second terminal
Return the combined data of described project progress;
Described second terminal, for sending described request of data to described cloud platform;Receive described server
The described combined data returned;According to described combined data, represent different constructions in the described engineering of sign right
The progress chart of elephant, the object that at least includes in described progress chart constructing, construction view data corresponding to object
Link and the completion status mark of construction object.
Monitoring system the most according to claim 1, it is characterised in that described first terminal, also uses
While the progress of the described construction object filled in the acquisition progress personnel of making a report on makes a report on data, obtain raw
The process becoming described progress to make a report on data generates moment and described progress and makes a report on the mark of personnel;By institute
The progress of stating makes a report on data and while described view data is sent to described cloud platform, and described progress is raw
The mark becoming moment and described progress to make a report on personnel is sent to described cloud platform;
Described cloud platform makes a report on data and image in the progress returned according at least one first terminal described
Data, when the construction speeds constructing objects different in engineering are collected, specifically for, according to described
The progress that at least one first terminal returns makes a report on data, progress generates moment and described progress reporter
The mark of member, makes a report on personnel's these three dimension carry out engineering construction progress from progress status, time, progress
Collect;
The described progress chart that the most described second terminal shows specifically includes: construction object, construction object
Graph of a correspondence data link, the construction completion status mark of object, progress generation moment and progress are filled out
Corresponding relation between journalist person.
Monitoring system the most according to claim 1, it is characterised in that described cloud platform is additionally operable to,
Store the progress of described construction object that described first terminal returns make a report on data and view data it
Before, according to preset progress rule data, detect described progress and make a report on whether data exist data errors;
When described progress make a report on data there is data errors time, to described first terminal send instruction information, described
Information is used for indicating described progress to make a report on personnel again verifying described progress and make a report on data;
Described first terminal, is additionally operable to when receiving described instruction information, and output is verified described progress and filled out
The prompting of count off evidence.
Monitoring system the most according to claim 1, it is characterised in that described second terminal, also uses
Acting on behalf task in obtaining at least one, described charg`e d'affaires's task includes: at least one of construction speed to be obtained
Information and the progress of construction object obtain the moment;At least one charg`e d'affaires's task described is sent to described cloud
Platform;
Described cloud platform, is additionally operable to receive at least one charg`e d'affaires's task described that described second terminal sends;
Meet pre-conditioned between the described progress acquisition moment comprised in current time and described charg`e d'affaires's task
Time, send described charg`e d'affaires's task to described first terminal;
Described first terminal is when determining the construction object that current pending progress is made a report on, specifically for, root
The construction object that current pending progress is made a report on is determined according to described charg`e d'affaires's task.
Monitoring system the most according to claim 4, it is characterised in that described first terminal, also uses
Before described in Yu Xiang, cloud platform transmission progress makes a report on request, according to described Pending tasks comprises
Construction speed to be obtained construction object information, generate Quick Response Code, described Quick Response Code comprises described in treat
Obtain the information of the construction object of construction speed;
The most described first terminal when determining the construction object that current pending progress is made a report on, specifically for,
According to the information of the construction object comprised in the Quick Response Code scanned, determine what current pending progress was made a report on
The information of construction object.
6. the monitoring method of a project progress, it is characterised in that be applied to cloud platform, described method bag
Include:
At least one first terminal transmission progress that reception makes a report on end as progress makes a report on request, described progress
Make a report on request carry need the progress of making a report on construction object information, described first terminal is mobile terminal;
Sending progress to described first terminal and make a report on table and the instruction of progress chart picture, described progress chart picture indicates
For indicating described first terminal to obtain for the view data characterizing described construction object progress;
The progress receiving the described construction object that described first terminal returns makes a report on data and described picture number
According to;
The progress storing described construction object makes a report on data and described view data;
Making a report on data and view data according to described progress, the construction to construction objects different in engineering is entered
Degree collects, and obtains the combined data of described project progress;
When receiving the request of data that the second terminal as progress management and control end sends, for described second eventually
End returns the combined data of described project progress, so that described second terminal represents in the described engineering of sign
The progress chart of different construction objects, at least includes in described progress chart that construction object, construction object are corresponding
Graph data link and the completion status mark of construction object.
Monitoring method the most according to claim 6, it is characterised in that make a report on receiving described progress
While data and described view data, also include:
Receive the progress that described first terminal sends generate the moment and fill in described progress and make a report on entering of data
Degree makes a report on the mark of personnel, wherein, described progress generate the moment be generate described progress make a report on data time
Carve;
Described make a report on data and view data according to described progress, construction objects different in engineering are executed
Work progress collects, including:
The progress returned according at least one first terminal described makes a report on data, progress generates moment and institute
The progress of stating makes a report on the mark of personnel, makes a report on personnel's these three dimension carry out from progress status, time, progress
Collecting of engineering construction progress.
Monitoring method the most according to claim 6, it is characterised in that in the described construction of described storage
Before the progress of object makes a report on data and described view data, also include:
According to preset progress rule data, detect described progress and make a report on whether data exist data errors;
When described progress make a report on data there is data errors time, to described first terminal send instruction information,
Described information is used for indicating described progress to make a report on personnel again verifying described progress and make a report on data.
Monitoring method the most according to claim 6, it is characterised in that
At least one first terminal transmission progress making a report on end as progress in described reception makes a report on request
Before, also include:
Receiving at least one charg`e d'affaires's task described that described second terminal sends, described charg`e d'affaires's task includes:
Information and the progress of at least one construction object of construction speed to be obtained obtain the moment;
The described progress comprised in current time and described charg`e d'affaires's task obtains to meet between the moment presets bar
During part, send described charg`e d'affaires's task to described first terminal.
10. the supervising device of a project progress, it is characterised in that be applied to cloud platform, described device
Including:
First receives unit, for receiving at least one first terminal transmission progress making a report on end as progress
Making a report on request, the information of construction object of the progress of making a report on of needing is carried in the request of making a report on of described progress, and described the
One terminal is mobile terminal;
First transmitting element, makes a report on table and the instruction of progress chart picture for sending progress to described first terminal,
Described progress chart is as instruction is for indicating described first terminal to obtain for characterizing described construction object progress
View data;
Second receives unit, makes a report on for receiving the progress of the described construction object that described first terminal returns
Data and described view data;
Memory cell, makes a report on data and described view data for storing the progress of described construction object;
Data summarization unit, for making a report on data and view data according to described progress, in engineering not
Collect with the construction speed of construction object, obtain the combined data of described project progress;
Second transmitting element, for asking when the data receiving the second terminal transmission as progress management and control end
When asking, return the combined data of described project progress for described second terminal, so that described second terminal
Represent and characterize the progress chart of different construction objects in described engineering, described progress chart at least includes construct right
As, construction object graph of a correspondence data link and construction object completion status mark.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610551183.5A CN105933362A (en) | 2016-07-13 | 2016-07-13 | Project progress monitoring method, device, and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610551183.5A CN105933362A (en) | 2016-07-13 | 2016-07-13 | Project progress monitoring method, device, and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105933362A true CN105933362A (en) | 2016-09-07 |
Family
ID=56828027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610551183.5A Pending CN105933362A (en) | 2016-07-13 | 2016-07-13 | Project progress monitoring method, device, and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105933362A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107194831A (en) * | 2017-06-01 | 2017-09-22 | 上海宝冶集团有限公司 | BIM and application process of the Quick Response Code in construction management |
CN107291041A (en) * | 2017-08-02 | 2017-10-24 | 广州汉威装饰工程有限公司 | Decorative engineering progress monitoring system |
CN107423449A (en) * | 2017-08-17 | 2017-12-01 | 深圳市海云天科技股份有限公司 | A kind of video record examination progress monitoring method and system |
CN108153219A (en) * | 2018-02-12 | 2018-06-12 | 北京新能正源环境科技有限公司 | Construction speed monitoring system, server and terminal device |
CN109064139A (en) * | 2018-08-08 | 2018-12-21 | 深圳市弘景装饰工程有限公司 | A kind of building decoration engineering management system |
CN111079826A (en) * | 2019-12-13 | 2020-04-28 | 武汉科技大学 | SLAM and image processing fused construction progress real-time identification method |
CN115392808A (en) * | 2022-10-31 | 2022-11-25 | 长春龙佳网络科技有限公司 | Building construction prediction progress and allocation system based on deep learning |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101477549A (en) * | 2009-01-20 | 2009-07-08 | 中国测绘科学研究院 | Knowledge base supported spatial database design method |
CN103544297A (en) * | 2013-10-29 | 2014-01-29 | 上海交通大学 | Public transportation integrated information control system and method based on two-dimensional code technology |
CN103632198A (en) * | 2013-11-04 | 2014-03-12 | 国家电网公司 | Visualized and full-life measurement asset management system based on intelligent mobile terminal |
US20140244429A1 (en) * | 2013-02-28 | 2014-08-28 | Lg Electronics Inc. | Apparatus and method for processing a multimedia commerce service |
CN104217286A (en) * | 2014-08-28 | 2014-12-17 | 国家电网公司 | A power transmission and transformation project design review data system |
CN204102468U (en) * | 2014-08-27 | 2015-01-14 | 安庆职业技术学院 | Possesses the building structure teaching mode of fire demonstration function |
CN104951189A (en) * | 2015-07-08 | 2015-09-30 | 北京恒华伟业科技股份有限公司 | Scheme report generation method and device |
-
2016
- 2016-07-13 CN CN201610551183.5A patent/CN105933362A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101477549A (en) * | 2009-01-20 | 2009-07-08 | 中国测绘科学研究院 | Knowledge base supported spatial database design method |
US20140244429A1 (en) * | 2013-02-28 | 2014-08-28 | Lg Electronics Inc. | Apparatus and method for processing a multimedia commerce service |
CN103544297A (en) * | 2013-10-29 | 2014-01-29 | 上海交通大学 | Public transportation integrated information control system and method based on two-dimensional code technology |
CN103632198A (en) * | 2013-11-04 | 2014-03-12 | 国家电网公司 | Visualized and full-life measurement asset management system based on intelligent mobile terminal |
CN204102468U (en) * | 2014-08-27 | 2015-01-14 | 安庆职业技术学院 | Possesses the building structure teaching mode of fire demonstration function |
CN104217286A (en) * | 2014-08-28 | 2014-12-17 | 国家电网公司 | A power transmission and transformation project design review data system |
CN104951189A (en) * | 2015-07-08 | 2015-09-30 | 北京恒华伟业科技股份有限公司 | Scheme report generation method and device |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107194831A (en) * | 2017-06-01 | 2017-09-22 | 上海宝冶集团有限公司 | BIM and application process of the Quick Response Code in construction management |
CN107291041A (en) * | 2017-08-02 | 2017-10-24 | 广州汉威装饰工程有限公司 | Decorative engineering progress monitoring system |
CN107423449A (en) * | 2017-08-17 | 2017-12-01 | 深圳市海云天科技股份有限公司 | A kind of video record examination progress monitoring method and system |
CN108153219A (en) * | 2018-02-12 | 2018-06-12 | 北京新能正源环境科技有限公司 | Construction speed monitoring system, server and terminal device |
CN109064139A (en) * | 2018-08-08 | 2018-12-21 | 深圳市弘景装饰工程有限公司 | A kind of building decoration engineering management system |
CN111079826A (en) * | 2019-12-13 | 2020-04-28 | 武汉科技大学 | SLAM and image processing fused construction progress real-time identification method |
CN111079826B (en) * | 2019-12-13 | 2023-09-29 | 武汉科技大学 | Construction progress real-time identification method integrating SLAM and image processing |
CN115392808A (en) * | 2022-10-31 | 2022-11-25 | 长春龙佳网络科技有限公司 | Building construction prediction progress and allocation system based on deep learning |
CN115392808B (en) * | 2022-10-31 | 2023-01-13 | 长春龙佳网络科技有限公司 | Building construction prediction progress and allocation system based on deep learning |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105933362A (en) | Project progress monitoring method, device, and system | |
CN107222467B (en) | Method for realizing mobile communication base station panoramic operation and maintenance system | |
CN202058215U (en) | On-line safety inspection system | |
CN205193841U (en) | Information -based collection system of sample | |
CN111612933A (en) | Augmented reality intelligent inspection system based on edge cloud server | |
CN104851142A (en) | Communication line routing inspection tool based on mobile calculation and method | |
CN108718112B (en) | Power grid monitoring system and method based on Beidou navigation system | |
KR101984778B1 (en) | Method for multiple image cooperation on diagnosis exterior wall of structure and apparatus for performing the method | |
CN102736567A (en) | Method and system for centralized test control | |
CN110032148A (en) | For the system of power plant management and the equipment of the 3D dummy model for establishing power plant | |
CN106373034A (en) | Management system for data acquisition process of underground power pipeline | |
CN103514621A (en) | Case and event scene all-true dynamic 3D representation method and reconstruction system | |
CN109522996A (en) | Constant mark object automatic identification control system | |
CN107481162A (en) | A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site) | |
CN106060523A (en) | Methods for collecting and displaying panoramic stereo images, and corresponding devices | |
CN114023138A (en) | Emergency drilling simulation system | |
CN109711504A (en) | Constant mark object automatic recognition control method | |
CN112632415B (en) | Web map real-time generation method and image processing server | |
CN208400183U (en) | A kind of terminal device that electric inspection process personnel use | |
CN112040433A (en) | Data processing method and device | |
CN115077488B (en) | Factory personnel real-time positioning and monitoring system and method based on digital twinning | |
CN104463711B (en) | Power emergency three-dimensional drawing method and system | |
CN111784864A (en) | Power grid equipment management system | |
CN109831736A (en) | A kind of data processing method, device, server and client | |
CN115633147A (en) | Multi-user remote cooperative guidance system based on 5G multiple visual angles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160907 |
|
RJ01 | Rejection of invention patent application after publication |