CN104950629B - Roll shaft and its manufacture method - Google Patents

Roll shaft and its manufacture method Download PDF

Info

Publication number
CN104950629B
CN104950629B CN201510304609.2A CN201510304609A CN104950629B CN 104950629 B CN104950629 B CN 104950629B CN 201510304609 A CN201510304609 A CN 201510304609A CN 104950629 B CN104950629 B CN 104950629B
Authority
CN
China
Prior art keywords
elastic cord
cord breaker
functional layer
roll shaft
melt adhesive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510304609.2A
Other languages
Chinese (zh)
Other versions
CN104950629A (en
Inventor
王建峰
颜欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Chuangyixing Industrial Co ltd
Original Assignee
SHENZHEN CHUANGYIXING INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN CHUANGYIXING INDUSTRIAL Co Ltd filed Critical SHENZHEN CHUANGYIXING INDUSTRIAL Co Ltd
Priority to CN201510304609.2A priority Critical patent/CN104950629B/en
Publication of CN104950629A publication Critical patent/CN104950629A/en
Application granted granted Critical
Publication of CN104950629B publication Critical patent/CN104950629B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G03PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
    • G03GELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
    • G03G15/00Apparatus for electrographic processes using a charge pattern
    • G03G15/02Apparatus for electrographic processes using a charge pattern for laying down a uniform charge, e.g. for sensitising; Corona discharge devices
    • G03G15/0208Apparatus for electrographic processes using a charge pattern for laying down a uniform charge, e.g. for sensitising; Corona discharge devices by contact, friction or induction, e.g. liquid charging apparatus
    • G03G15/0216Apparatus for electrographic processes using a charge pattern for laying down a uniform charge, e.g. for sensitising; Corona discharge devices by contact, friction or induction, e.g. liquid charging apparatus by bringing a charging member into contact with the member to be charged, e.g. roller, brush chargers
    • G03G15/0233Structure, details of the charging member, e.g. chemical composition, surface properties
    • GPHYSICS
    • G03PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
    • G03GELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
    • G03G15/00Apparatus for electrographic processes using a charge pattern
    • G03G15/06Apparatus for electrographic processes using a charge pattern for developing
    • G03G15/08Apparatus for electrographic processes using a charge pattern for developing using a solid developer, e.g. powder developer
    • G03G15/0806Apparatus for electrographic processes using a charge pattern for developing using a solid developer, e.g. powder developer on a donor element, e.g. belt, roller
    • G03G15/0808Apparatus for electrographic processes using a charge pattern for developing using a solid developer, e.g. powder developer on a donor element, e.g. belt, roller characterised by the developer supplying means, e.g. structure of developer supply roller
    • GPHYSICS
    • G03PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
    • G03GELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
    • G03G15/00Apparatus for electrographic processes using a charge pattern
    • G03G15/14Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base
    • G03G15/16Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base of a toner pattern, e.g. a powder pattern, e.g. magnetic transfer
    • G03G15/1665Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base of a toner pattern, e.g. a powder pattern, e.g. magnetic transfer by introducing the second base in the nip formed by the recording member and at least one transfer member, e.g. in combination with bias or heat
    • G03G15/167Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base of a toner pattern, e.g. a powder pattern, e.g. magnetic transfer by introducing the second base in the nip formed by the recording member and at least one transfer member, e.g. in combination with bias or heat at least one of the recording member or the transfer member being rotatable during the transfer
    • G03G15/1685Structure, details of the transfer member, e.g. chemical composition
    • GPHYSICS
    • G03PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
    • G03GELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
    • G03G15/00Apparatus for electrographic processes using a charge pattern
    • G03G15/20Apparatus for electrographic processes using a charge pattern for fixing, e.g. by using heat
    • G03G15/2003Apparatus for electrographic processes using a charge pattern for fixing, e.g. by using heat using heat
    • G03G15/2014Apparatus for electrographic processes using a charge pattern for fixing, e.g. by using heat using heat using contact heat
    • G03G15/2053Structural details of heat elements, e.g. structure of roller or belt, eddy current, induction heating
    • G03G15/2057Structural details of heat elements, e.g. structure of roller or belt, eddy current, induction heating relating to the chemical composition of the heat element and layers thereof
    • GPHYSICS
    • G03PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
    • G03GELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
    • G03G15/00Apparatus for electrographic processes using a charge pattern
    • G03G15/75Details relating to xerographic drum, band or plate, e.g. replacing, testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • Rolls And Other Rotary Bodies (AREA)

Abstract

A kind of roll shaft, including:Roller core, elastic cord breaker and functional layer.Elastic cord breaker is set on the roller core;Functional layer is set on the elastic cord breaker, and the compression set rate of the functional layer is more than the compression set rate of the elastic cord breaker.Above-mentioned roll shaft is simple to manufacture, cost is low.In addition, additionally provide a kind of manufacture method of roll shaft.

Description

Roll shaft and its manufacture method
Technical field
The present invention relates to printing/copier, more particularly to roll shaft and its manufacture method.
Background technology
Laser printer is by groups such as laser, acousto-optic modulator, high-frequency drive, scanner, synchronizer and light deflectors Into, its act on be binary array modulates information that interface circuit is sent on laser beam, scan afterwards on photoreceptor.Sense Body of light and camera composition electrofax transferring system, the picture and text image being mapped in photosensitive drums are transferred on printing paper, its Principle is identical with duplicator.Laser printer is to set the non-impact output that laser scanner technique and electronic display technology are combined It is standby.Charging roller, light-sensitive roller, laser scanning mechanism, developing apparatus, transfer roll and fixing roller etc. are provided with laser printer.
The roll shaft of printing/duplicator plays the functions such as cleaning, powder feeding, coating in printing/duplicator, but printing/ Under hot and humid environment in duplicator, service life is shorter.
The content of the invention
Based on this, it is necessary to propose a kind of roll shaft and its manufacture method for possessing long service life.
A kind of roll shaft, including:
Roller core;
Elastic cord breaker, is set on the roller core;
Functional layer, is set on the elastic cord breaker, and the compression set rate of the functional layer is more than the elasticity The compression set rate of cushion.
In one of which embodiment, structure that the functional layer is integrally formed.
In one of which embodiment, the elasticity of the elastic cord breaker is more than the elasticity of the functional layer.
In one of which embodiment, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicon Cellular rubber, the functional layer are melamine sponge.
In one of which embodiment, hot melt adhesive layer is further included, the hot melt adhesive layer is arranged on the roller core and described Between elastic cord breaker and/or between the elastic cord breaker and the functional layer.
It is interference fit in one of which embodiment, between the elastic cord breaker and the functional layer.
In one of which embodiment, the internal diameter of the functional layer and the outside diameter difference of the elastic cord breaker are 0.2mm To 1mm.
In one of which embodiment, the thickness of the elastic cord breaker is more than the thickness of the functional layer.
In one of which embodiment, under conditions of 70 DEG C, 80% humidity, the elastic cord breaker and the function The compression set rate of layer is less than 2%.
In one of which embodiment, the hardness of the elastic cord breaker is more than the hardness of the functional layer.
In one of which embodiment, the hardness of the elastic cord breaker is less than the hardness of the functional layer.
A kind of manufacture method of roll shaft, including:
Elastic cord breaker is set on roller core;
Cleaning material bar is stamped into centre bore;
The cleaning material bar is set on the elastic cord breaker by the centre bore;
The cleaning material bar is ground to the functional layer concentric with the roller core, the compression of the functional layer forever becomes Form quotient is more than the compression set rate of the elastic cord breaker.
In one of which embodiment, the elasticity of the elastic cord breaker is more than the elasticity of the functional layer.
In one of which embodiment, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicon Cellular rubber, the functional layer are melamine sponge.
In one of which embodiment, it is additionally included between the roller core and the elastic cord breaker and the elasticity Hot melt adhesive is set between cushion and/or the cleaning material bar, and heats hot melt adhesive.
It is interference fit in one of which embodiment, between the elastic cord breaker and the functional layer.
In one of which embodiment, the internal diameter of the functional layer and the outside diameter difference of the elastic cord breaker are 0.2mm To 1mm.
In one of which embodiment, the thickness of the elastic cord breaker is more than the thickness of the functional layer.
In one of which embodiment, under conditions of 70 DEG C, 80% humidity, the elastic cord breaker and the function The deformation rate of layer is less than 2%.
In one of which embodiment, the hardness of the elastic cord breaker is more than the hardness of the functional layer.
In one of which embodiment, the hardness of the elastic cord breaker is less than the hardness of the functional layer.
Above-mentioned roll shaft and its manufacture method, the work(such as the required cleaning of roll shaft itself, powder feeding, coating are realized by functional layer Can, can guarantee that the functions such as cleaning, powder feeding, coating realizes effect;Elastomeric cushion material is served as using elastic cord breaker, due to bullet The compression set rate of property padded coaming is small, after a protracted use, still can make it that roll shaft overall deformation is small, so as to So that roll shaft has longer service life.Although functional layer compression set rate was both taken full advantage of greatly but had been conducive to clear The advantages of realization of the functions such as clean, powder feeding, coating, although also taking full advantage of elastic cord breaker realizes cleaning, powder feeding, coating etc. Functional effect is bad but the advantages of compression set rate is small.
Brief description of the drawings
Fig. 1 is the structure diagram of the roll shaft in an embodiment;
Fig. 2 is the flow chart of the manufacture method of the roll shaft in an embodiment;
Fig. 3 A- Fig. 3 H are the structure diagram of roll shaft in the fabrication process in an embodiment.
Embodiment
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In attached drawing Give the preferred embodiment of the present invention.But the present invention can realize in many different forms, however it is not limited to this paper institutes The embodiment of description.On the contrary, the purpose for providing these embodiments is made to the disclosure more thorough and comprehensive.
It should be noted that when element is referred to as " being fixedly arranged on " another element, it can be directly on another element Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The normally understood implication of technical staff is identical.Term used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more phases The arbitrary and all combination of the Listed Items of pass.
As shown in Figure 1, the roll shaft 100 in an embodiment, including:Roller core 110, elastic cord breaker 120 and functional layer 130. Elastic cord breaker 120 is set on roller core.Functional layer 130 is set on elastic cord breaker 120.The compression of functional layer 130 is permanent Deformation rate is more than the compression set rate of elastic cord breaker 120.In a specific embodiment, at 70 DEG C, 80% humidity Under conditions of, the compression set rate of elastic cord breaker 120 and functional layer 130 is less than 2%.
The functions such as the required cleaning of roll shaft itself, powder feeding, coating are realized by functional layer, can guarantee that cleaning, powder feeding, painting The functions such as cloth realize effect;Elastomeric cushion material is served as using elastic cord breaker, since the compression of elastomeric cushion material is permanent Deformation rate is small, after a protracted use, still can make it that roll shaft overall deformation is small, so that roll shaft is with longer Service life.Although functional layer compression set rate was both taken full advantage of greatly but had been conducive to the functions such as cleaning, powder feeding, coating The advantages of realizing, although also taking full advantage of elastic cord breaker realizes the bad compression of the functional effects such as cleaning, powder feeding, coating forever The advantages of deformation rate is small long.
In one embodiment, the structure that functional layer 130 is integrally formed.Integrally formed structure causes in functional layer There is no gap, fitting mouth on 130, so that in cleaning, powder feeding, coating process, have effect evenly.Functional layer 130 Specific manufacturing process is drilled and is ground and is molded using a monoblock sponge strip.Certainly, in addition to integrally formed structure, It is bonded or is wrapped in using banding sponge on elastic cord breaker 120 after can also be bent using a bulk of plane sponge. Above-mentioned roll shaft production efficiency is high;Product surface flatness is good, and roughness is small, it is possible to increase sponge scraping property and durability;And Its compact dimensions is convenient to be changed, and is easy to the kind of abundant product.
In one embodiment, the elasticity of elastic cord breaker 120 is more than the elasticity of functional layer 130.Functional layer 130 is typically It is made of the big material of compression set rate, to prevent it from non-reversible deformation occurs, one is provided with below functional layer 130 Layer elastic cord breaker 120.Elastic cord breaker 120 is usually sponge rubber or aerated plastics, its effect is in functional layer 130 When being under pressure, pressure will be absorbed by elastic cord breaker, prevent that functional layer 130 is subject to excessive pressure and occur can not inversion Shape.After pressure disappearance, functional layer 130 and elastic cord breaker 120 can restore to the original state without influencing its function.In a tool In the embodiment of body, elastic cord breaker 120 is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicone sponge, functional layer are Melamine sponge.
In one embodiment, roll shaft 100 further includes hot melt adhesive layer, which is arranged on roller core 110 and elasticity is delayed Rush between layer 120, can also be arranged between elastic cord breaker 120 and functional layer 130, it can in addition contain in roller core 110 and bullet Hot melt adhesive layer is all set between elastic cord breaker 120 and functional layer 130 between property cushion 120.
In a specific embodiment, the bonding agent of 110 surface of roller core coating is hot-melt adhesive powder.The advantages of hot melt adhesive is Melted after heating, during cooling just the adhering object being in contact with it together, and can heat repeatedly and viscosity remains unchanged.But heat The state of melten gel will also select, and be also to glue puckery, 120 nothing of elastic cord breaker if be entangled in hot melt adhesive film on roller core 110, under normality Method is completely set up.Hot-melt adhesive powder can be used, so that it may solve the problems, such as this well.Before applying hot melt adhesives powder, on roller core 110 One layer of tackifying resin solution is coated in advance with, to make hot-melt adhesive powder be sticked to well on roller core 110.It is then placed at baking oven heating Reason, taking-up are dried in the air cool, rubber powder is solidified and is firmly sticked on roller core 110 after melting, and the surface of adhesive layer is become smooth, easily In the operation for being arranged elastic cord breaker 120 of next step.After elastic cord breaker 120 is put on, baking oven heat treatment is placed again into, is taken out Dry in the air cool, hot melt adhesive just melts, solidifies and roller core 110 and elastic cord breaker 120 firmly stick together again.With original above Reason, can also set hot melt adhesive layer between elastic cord breaker 120 and functional layer 130.
It is appreciated that between roller core 110 and elastic cord breaker 120 and between elastic cord breaker 120 and functional layer 130 Hot melt adhesive layer can be set to use hot melt adhesive layer is set.In one embodiment, elastic cord breaker 120 and functional layer It is interference fit between 130.The internal diameter of functional layer 130 and the outside diameter difference of elastic cord breaker 120 are 0.2mm to 1mm.Roller core 110 Can also be interference fit between elastic cord breaker 120.If roller core 110 and elastic cord breaker 120 and elastic cord breaker All it is interference fit between 120 and functional layer 130, then can be omitted hot melt adhesive layer.Material can be utilized when assembling Elasticity elastic cord breaker 120 and functional layer 130 are assembled.Specifically it is referred to the manufacture method of following roll shafts.
In one embodiment, acted on to give full play to the elastic buffer of elastic cord breaker 120, elastic cord breaker 120 Thickness be more than functional layer 130 thickness.Above-mentioned functional layer 130 be mainly cleaning, powder feeding, coating effect, functional layer 130 Compression set rate is more than the compression set rate of elastic cord breaker 120.Elastic cord breaker 120 mainly plays elastic buffer work With preventing functional layer from irreversible deformation occurs.In a specific embodiment, under conditions of 70 DEG C, 80% humidity, bullet Property cushion 120 and functional layer 130 compression set rate be less than 2%.
The hardness of elastic cord breaker 120 and functional layer 130 does not have special requirement.In one embodiment, elastic buffer The hardness of layer 120 is more than the hardness of functional layer 130.In another embodiment, the hardness of elastic cord breaker 120 is less than functional layer 130 hardness.
As shown in Fig. 2, the manufacture method of the roll shaft in an embodiment, including:
S110, elastic cord breaker is set on roller core.
Roll shaft 100 in one embodiment, including:Roller core 110, elastic cord breaker 120 and functional layer 130.Elastic cord breaker 120 are set on roller core.Functional layer 130 is set on elastic cord breaker 120.
As shown in Figure 3A, elastic cord breaker 120 is equipped with through hole 121 matched with roller core 110.Fig. 3 B are elastic buffer Layer 120 is set in the structure diagram on roller core 110.
S120, centre bore is stamped by cleaning material bar.
As shown in Figure 3 C, drilled using drill bit 300 to cleaning material bar 200.Fig. 3 D drill for cleaning material bar 200 Structure diagram afterwards, centre bore 210 are drilled hole.
By roll shaft made from this method, structure that functional layer 130 is integrally formed.Do not have in functional layer 130 gap, It is bonded mouth.The specific manufacturing process of functional layer 130 is drilled and is ground and is molded using a monoblock sponge strip.By by clearly Clean material strips stamp centre bore 210, it is possible to are set on elastic cord breaker 120, and then are ground to functional layer 130。
S130, cleaning material bar is set on elastic cord breaker by centre bore.
As shown in FIGURE 3 E, cleaning material bar 200 is set on elastic cord breaker 120 by centre bore 210.Fig. 3 F are clear Clean material strips 200 are set in the structure diagram on elastic cord breaker 120.
Cleaning material bar, is ground to the functional layer concentric with roller core by S140, and the compression set rate of functional layer is big In the compression set rate of elastic cord breaker.
As shown in Figure 3 G, cleaning material bar 200 is ground using grinding attachment 400.Fig. 3 H is after grinding-shapings The structure diagram of roll shaft 100.
In one embodiment, the elasticity of elastic cord breaker 120 is more than the elasticity of functional layer 130.Functional layer 130 is typically It is made of the big material of compression set rate, to prevent it from non-reversible deformation occurs, one is provided with below functional layer 130 Layer elastic cord breaker 120.Elastic cord breaker 120 is usually sponge rubber or aerated plastics, its effect is in functional layer 130 When being under pressure, pressure will be absorbed by elastic cord breaker, prevent that functional layer 130 is subject to excessive pressure and occur can not inversion Shape.After pressure disappearance, functional layer 130 and elastic cord breaker 120 can restore to the original state without influencing its function.In a tool In the embodiment of body, elastic cord breaker 120 is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicone sponge, functional layer are Melamine sponge.
In one embodiment, roll shaft 100 further includes hot melt adhesive layer, which is arranged on roller core 110 and elasticity is delayed Rush between layer 120 and/or between elastic cord breaker 120 and functional layer 130.
In a specific embodiment, the bonding agent of 110 surface of roller core coating is hot-melt adhesive powder.The advantages of hot melt adhesive is Melted after heating, during cooling just the adhering object being in contact with it together, and can heat repeatedly and viscosity remains unchanged.But heat The state of melten gel will also select, and be also to glue puckery, 120 nothing of elastic cord breaker if be entangled in hot melt adhesive film on roller core 110, under normality Method is completely set up.Hot-melt adhesive powder can be used, so that it may solve the problems, such as this well.Before applying hot melt adhesives powder, on roller core 110 One layer of tackifying resin solution is coated in advance with, to make hot-melt adhesive powder be sticked to well on roller core 110.It is then placed at baking oven heating Reason, taking-up are dried in the air cool, rubber powder is solidified and is firmly sticked on roller core 110 after melting, and the surface of adhesive layer is become smooth, easily In the operation for being arranged elastic cord breaker 120 of next step.After elastic cord breaker 120 is put on, baking oven heat treatment is placed again into, is taken out Dry in the air cool, hot melt adhesive just melts, solidifies and roller core 110 and elastic cord breaker 120 firmly stick together again.With original above Reason, can also set hot melt adhesive layer between elastic cord breaker 120 and functional layer 130.
It is appreciated that between roller core 110 and elastic cord breaker 120 and between elastic cord breaker 120 and functional layer 130 Hot melt adhesive layer can be set to use hot melt adhesive layer is set.In one embodiment, elastic cord breaker 120 and functional layer It is interference fit between 130.The internal diameter of functional layer 130 and the outside diameter difference of elastic cord breaker 120 are 0.2mm to 1mm.Roller core 110 Can also be interference fit between elastic cord breaker 120.If roller core 110 and elastic cord breaker 120 and elastic cord breaker All it is interference fit between 120 and functional layer 130, then can be omitted hot melt adhesive layer.Material can be utilized when assembling Elasticity elastic cord breaker 120 and functional layer 130 are assembled.Such as in step S120 into S140, by punching, being arranged And grinding, there is larger thickness after drilling using cleaning material bar 200, center can be more than with outside diameter is arranged by interference fit The elastic cord breaker 120 in 210 aperture of hole, and be unlikely to burst cleaning material bar 200.
In one embodiment, acted on to give full play to the elastic buffer of elastic cord breaker 120, elastic cord breaker 120 Thickness be more than functional layer 130 thickness.Above-mentioned functional layer 130 has been mainly cleaning action, and the compression of functional layer 130 forever becomes Form quotient is more than the compression set rate of elastic cord breaker 120.Elastic cord breaker 120 mainly plays elastic buffer, prevents work( Irreversible deformation occurs for ergosphere.
The hardness of elastic cord breaker 120 and functional layer 130 does not have special requirement.In one embodiment, elastic buffer The hardness of layer 120 is more than the hardness of functional layer 130.In another embodiment, the hardness of elastic cord breaker 120 is less than functional layer 130 hardness.
Above-mentioned roll shaft manufacture method uses existing elastic cord breaker, and carries out grinding formation to existing cleaning material bar The concentric functional layer with roller core, by existing material simply fabricate into roll shaft, it is simple to manufacture, manufactures Cost is low.
Embodiment described above only expresses the several embodiments of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (16)

  1. A kind of 1. roll shaft, it is characterised in that including:
    Roller core;
    Elastic cord breaker, is set on the roller core;
    Functional layer, is set on the elastic cord breaker, and the compression set rate of the functional layer is more than the elastic buffer The compression set rate of layer, wherein, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicon rubber are extra large Silk floss, the functional layer is melamine sponge, under conditions of 70 DEG C, 80% humidity, the elastic cord breaker and the function The compression set rate of layer is less than 2%;
    Hot melt adhesive layer, is arranged between the roller core and the elastic cord breaker, wherein the hot melt adhesive layer is by the following method It is prepared:By described in tackifying resin solution coating on roller core;Hot-melt adhesive powder is coated on the tackifying resin solution, with Hot melt adhesive layer is formed on the roller core;
    And/or be arranged between the elastic cord breaker and the functional layer, wherein the hot melt adhesive layer is made by the following method It is standby to obtain:By described in tackifying resin solution coating on elastic cord breaker;Hot-melt adhesive powder is coated on the tackifying resin solution, To form hot melt adhesive layer on the elastic cord breaker.
  2. 2. roll shaft as claimed in claim 1, it is characterised in that the structure that the functional layer is integrally formed.
  3. 3. roll shaft as claimed in claim 1, it is characterised in that the elasticity of the elastic cord breaker is more than the bullet of the functional layer Property.
  4. 4. roll shaft as claimed in claim 1, it is characterised in that be that interference is matched somebody with somebody between the elastic cord breaker and the functional layer Close.
  5. 5. roll shaft as claimed in claim 4, it is characterised in that the outside diameter of the internal diameter of the functional layer and the elastic cord breaker Difference is 0.2mm to 1mm.
  6. 6. roll shaft as claimed in claim 1, it is characterised in that the thickness of the elastic cord breaker is more than the thickness of the functional layer Degree.
  7. 7. roll shaft as claimed in claim 1, it is characterised in that the hardness of the elastic cord breaker is more than the hard of the functional layer Degree.
  8. 8. roll shaft as claimed in claim 1, it is characterised in that the hardness of the elastic cord breaker is less than the hard of the functional layer Degree.
  9. A kind of 9. manufacture method of roll shaft, it is characterised in that including:
    By on tackifying resin solution coating roller core;
    Hot-melt adhesive powder is coated on the tackifying resin solution, to form hot melt adhesive layer on the roller core;
    Elastic cord breaker is set on roller core;
    Cleaning material bar is stamped into centre bore;
    The cleaning material bar is set on the elastic cord breaker by the centre bore;
    The cleaning material bar is ground to the functional layer concentric with the roller core, the compression set rate of the functional layer More than the compression set rate of the elastic cord breaker, wherein, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer Gelatin sponge or silicone sponge, the functional layer is melamine sponge, under conditions of 70 DEG C, 80% humidity, the elasticity The deformation rate of cushion and the functional layer is less than 2%.
  10. 10. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the elasticity of the elastic cord breaker is more than institute State the elasticity of functional layer.
  11. 11. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that be additionally included in the roller core and the elasticity Hot melt adhesive is set between the elastic cord breaker and the cleaning material bar between cushion, and heats hot melt adhesive.
  12. 12. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the elastic cord breaker and the functional layer Between be interference fit.
  13. 13. the manufacture method of roll shaft as claimed in claim 12, it is characterised in that the internal diameter of the functional layer and the elasticity The outside diameter difference of cushion is 0.2mm to 1mm.
  14. 14. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the thickness of the elastic cord breaker is more than institute State the thickness of functional layer.
  15. 15. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the hardness of the elastic cord breaker is more than institute State the hardness of functional layer.
  16. 16. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the hardness of the elastic cord breaker is less than institute State the hardness of functional layer.
CN201510304609.2A 2015-06-04 2015-06-04 Roll shaft and its manufacture method Active CN104950629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510304609.2A CN104950629B (en) 2015-06-04 2015-06-04 Roll shaft and its manufacture method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510304609.2A CN104950629B (en) 2015-06-04 2015-06-04 Roll shaft and its manufacture method

Publications (2)

Publication Number Publication Date
CN104950629A CN104950629A (en) 2015-09-30
CN104950629B true CN104950629B (en) 2018-05-08

Family

ID=54165382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510304609.2A Active CN104950629B (en) 2015-06-04 2015-06-04 Roll shaft and its manufacture method

Country Status (1)

Country Link
CN (1) CN104950629B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113511366A (en) * 2021-07-15 2021-10-19 Tcl华星光电技术有限公司 Roller for OLED panel film pasting and OLED panel film pasting method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0102250A2 (en) * 1982-09-01 1984-03-07 Xerox Corporation Mechanisms for providing drag during unwinding of tapes
CN101021699A (en) * 2006-02-15 2007-08-22 富士施乐株式会社 Charging device and image forming apparatus
CN101846920A (en) * 2009-03-27 2010-09-29 富士施乐株式会社 Charging member, process cartridge and image forming apparatus

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5776494B2 (en) * 2010-10-29 2015-09-09 日本ゼオン株式会社 Method for producing polyether rubber

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0102250A2 (en) * 1982-09-01 1984-03-07 Xerox Corporation Mechanisms for providing drag during unwinding of tapes
CN101021699A (en) * 2006-02-15 2007-08-22 富士施乐株式会社 Charging device and image forming apparatus
CN101846920A (en) * 2009-03-27 2010-09-29 富士施乐株式会社 Charging member, process cartridge and image forming apparatus

Also Published As

Publication number Publication date
CN104950629A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
JP2006171607A5 (en)
EP1624349A3 (en) Toner, fixer and image forming apparatus
CN100511007C (en) Developing device and image forming apparatus
CN104950629B (en) Roll shaft and its manufacture method
JP2009271517A5 (en)
CN100578388C (en) Fixing roller, fixing device and image forming device
WO2013067891A1 (en) Processing cartridge
JPS58211175A (en) Copying machine
JP4517796B2 (en) Image forming apparatus and fixing apparatus
JP4628918B2 (en) Developing device and image forming apparatus
JP4687761B2 (en) Cleaning member, cleaning device, image carrier unit, and image forming apparatus
EP0962667A4 (en) Sponge roll and method of manufacturing the same
JP2004333633A (en) Liquid electrophotographic device
JP3765537B2 (en) Liquid developing electrophotographic apparatus
CN210466015U (en) Cleaning structure for selenium drum charging roller
JP4316726B2 (en) Endless belt and image forming apparatus
JPH01113782A (en) Cleaning device
EP1518705A3 (en) Thermal transfer recording material
KR20110000123U (en) Round type seal
JP3749069B2 (en) Electrophotographic equipment
JP2949686B2 (en) Fixing device
JP3632638B2 (en) Thermal pressure fixing device
JPH09258631A (en) Cleaning device
JP2002333781A (en) Cleaning device
CN103930832A (en) Endless belt having meandering prevention guide

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230728

Address after: 528429 No. 40-2, Xiang'an North Road, Huangpu town, Zhongshan City, Guangdong Province

Patentee after: Zhongshan chuangyixing Industrial Co.,Ltd.

Address before: 518103, 3rd and 4th floors of Building A12, Longwangmiao Industrial Zone, East Baishixia, Fuyong Avenue, Fuyong Town, Bao'an District, Shenzhen City, Guangdong Province, China. 2nd, 3rd, and 4th floors of Building A2 and A6

Patentee before: SHENZHEN FANCY CREATION INDUSTRIAL Ltd.