CN104950629B - Roll shaft and its manufacture method - Google Patents
Roll shaft and its manufacture method Download PDFInfo
- Publication number
- CN104950629B CN104950629B CN201510304609.2A CN201510304609A CN104950629B CN 104950629 B CN104950629 B CN 104950629B CN 201510304609 A CN201510304609 A CN 201510304609A CN 104950629 B CN104950629 B CN 104950629B
- Authority
- CN
- China
- Prior art keywords
- elastic cord
- cord breaker
- functional layer
- roll shaft
- melt adhesive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/02—Apparatus for electrographic processes using a charge pattern for laying down a uniform charge, e.g. for sensitising; Corona discharge devices
- G03G15/0208—Apparatus for electrographic processes using a charge pattern for laying down a uniform charge, e.g. for sensitising; Corona discharge devices by contact, friction or induction, e.g. liquid charging apparatus
- G03G15/0216—Apparatus for electrographic processes using a charge pattern for laying down a uniform charge, e.g. for sensitising; Corona discharge devices by contact, friction or induction, e.g. liquid charging apparatus by bringing a charging member into contact with the member to be charged, e.g. roller, brush chargers
- G03G15/0233—Structure, details of the charging member, e.g. chemical composition, surface properties
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/06—Apparatus for electrographic processes using a charge pattern for developing
- G03G15/08—Apparatus for electrographic processes using a charge pattern for developing using a solid developer, e.g. powder developer
- G03G15/0806—Apparatus for electrographic processes using a charge pattern for developing using a solid developer, e.g. powder developer on a donor element, e.g. belt, roller
- G03G15/0808—Apparatus for electrographic processes using a charge pattern for developing using a solid developer, e.g. powder developer on a donor element, e.g. belt, roller characterised by the developer supplying means, e.g. structure of developer supply roller
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/14—Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base
- G03G15/16—Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base of a toner pattern, e.g. a powder pattern, e.g. magnetic transfer
- G03G15/1665—Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base of a toner pattern, e.g. a powder pattern, e.g. magnetic transfer by introducing the second base in the nip formed by the recording member and at least one transfer member, e.g. in combination with bias or heat
- G03G15/167—Apparatus for electrographic processes using a charge pattern for transferring a pattern to a second base of a toner pattern, e.g. a powder pattern, e.g. magnetic transfer by introducing the second base in the nip formed by the recording member and at least one transfer member, e.g. in combination with bias or heat at least one of the recording member or the transfer member being rotatable during the transfer
- G03G15/1685—Structure, details of the transfer member, e.g. chemical composition
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/20—Apparatus for electrographic processes using a charge pattern for fixing, e.g. by using heat
- G03G15/2003—Apparatus for electrographic processes using a charge pattern for fixing, e.g. by using heat using heat
- G03G15/2014—Apparatus for electrographic processes using a charge pattern for fixing, e.g. by using heat using heat using contact heat
- G03G15/2053—Structural details of heat elements, e.g. structure of roller or belt, eddy current, induction heating
- G03G15/2057—Structural details of heat elements, e.g. structure of roller or belt, eddy current, induction heating relating to the chemical composition of the heat element and layers thereof
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/75—Details relating to xerographic drum, band or plate, e.g. replacing, testing
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- Rolls And Other Rotary Bodies (AREA)
Abstract
A kind of roll shaft, including:Roller core, elastic cord breaker and functional layer.Elastic cord breaker is set on the roller core;Functional layer is set on the elastic cord breaker, and the compression set rate of the functional layer is more than the compression set rate of the elastic cord breaker.Above-mentioned roll shaft is simple to manufacture, cost is low.In addition, additionally provide a kind of manufacture method of roll shaft.
Description
Technical field
The present invention relates to printing/copier, more particularly to roll shaft and its manufacture method.
Background technology
Laser printer is by groups such as laser, acousto-optic modulator, high-frequency drive, scanner, synchronizer and light deflectors
Into, its act on be binary array modulates information that interface circuit is sent on laser beam, scan afterwards on photoreceptor.Sense
Body of light and camera composition electrofax transferring system, the picture and text image being mapped in photosensitive drums are transferred on printing paper, its
Principle is identical with duplicator.Laser printer is to set the non-impact output that laser scanner technique and electronic display technology are combined
It is standby.Charging roller, light-sensitive roller, laser scanning mechanism, developing apparatus, transfer roll and fixing roller etc. are provided with laser printer.
The roll shaft of printing/duplicator plays the functions such as cleaning, powder feeding, coating in printing/duplicator, but printing/
Under hot and humid environment in duplicator, service life is shorter.
The content of the invention
Based on this, it is necessary to propose a kind of roll shaft and its manufacture method for possessing long service life.
A kind of roll shaft, including:
Roller core;
Elastic cord breaker, is set on the roller core;
Functional layer, is set on the elastic cord breaker, and the compression set rate of the functional layer is more than the elasticity
The compression set rate of cushion.
In one of which embodiment, structure that the functional layer is integrally formed.
In one of which embodiment, the elasticity of the elastic cord breaker is more than the elasticity of the functional layer.
In one of which embodiment, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicon
Cellular rubber, the functional layer are melamine sponge.
In one of which embodiment, hot melt adhesive layer is further included, the hot melt adhesive layer is arranged on the roller core and described
Between elastic cord breaker and/or between the elastic cord breaker and the functional layer.
It is interference fit in one of which embodiment, between the elastic cord breaker and the functional layer.
In one of which embodiment, the internal diameter of the functional layer and the outside diameter difference of the elastic cord breaker are 0.2mm
To 1mm.
In one of which embodiment, the thickness of the elastic cord breaker is more than the thickness of the functional layer.
In one of which embodiment, under conditions of 70 DEG C, 80% humidity, the elastic cord breaker and the function
The compression set rate of layer is less than 2%.
In one of which embodiment, the hardness of the elastic cord breaker is more than the hardness of the functional layer.
In one of which embodiment, the hardness of the elastic cord breaker is less than the hardness of the functional layer.
A kind of manufacture method of roll shaft, including:
Elastic cord breaker is set on roller core;
Cleaning material bar is stamped into centre bore;
The cleaning material bar is set on the elastic cord breaker by the centre bore;
The cleaning material bar is ground to the functional layer concentric with the roller core, the compression of the functional layer forever becomes
Form quotient is more than the compression set rate of the elastic cord breaker.
In one of which embodiment, the elasticity of the elastic cord breaker is more than the elasticity of the functional layer.
In one of which embodiment, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicon
Cellular rubber, the functional layer are melamine sponge.
In one of which embodiment, it is additionally included between the roller core and the elastic cord breaker and the elasticity
Hot melt adhesive is set between cushion and/or the cleaning material bar, and heats hot melt adhesive.
It is interference fit in one of which embodiment, between the elastic cord breaker and the functional layer.
In one of which embodiment, the internal diameter of the functional layer and the outside diameter difference of the elastic cord breaker are 0.2mm
To 1mm.
In one of which embodiment, the thickness of the elastic cord breaker is more than the thickness of the functional layer.
In one of which embodiment, under conditions of 70 DEG C, 80% humidity, the elastic cord breaker and the function
The deformation rate of layer is less than 2%.
In one of which embodiment, the hardness of the elastic cord breaker is more than the hardness of the functional layer.
In one of which embodiment, the hardness of the elastic cord breaker is less than the hardness of the functional layer.
Above-mentioned roll shaft and its manufacture method, the work(such as the required cleaning of roll shaft itself, powder feeding, coating are realized by functional layer
Can, can guarantee that the functions such as cleaning, powder feeding, coating realizes effect;Elastomeric cushion material is served as using elastic cord breaker, due to bullet
The compression set rate of property padded coaming is small, after a protracted use, still can make it that roll shaft overall deformation is small, so as to
So that roll shaft has longer service life.Although functional layer compression set rate was both taken full advantage of greatly but had been conducive to clear
The advantages of realization of the functions such as clean, powder feeding, coating, although also taking full advantage of elastic cord breaker realizes cleaning, powder feeding, coating etc.
Functional effect is bad but the advantages of compression set rate is small.
Brief description of the drawings
Fig. 1 is the structure diagram of the roll shaft in an embodiment;
Fig. 2 is the flow chart of the manufacture method of the roll shaft in an embodiment;
Fig. 3 A- Fig. 3 H are the structure diagram of roll shaft in the fabrication process in an embodiment.
Embodiment
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In attached drawing
Give the preferred embodiment of the present invention.But the present invention can realize in many different forms, however it is not limited to this paper institutes
The embodiment of description.On the contrary, the purpose for providing these embodiments is made to the disclosure more thorough and comprehensive.
It should be noted that when element is referred to as " being fixedly arranged on " another element, it can be directly on another element
Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention
The normally understood implication of technical staff is identical.Term used in the description of the invention herein is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more phases
The arbitrary and all combination of the Listed Items of pass.
As shown in Figure 1, the roll shaft 100 in an embodiment, including:Roller core 110, elastic cord breaker 120 and functional layer 130.
Elastic cord breaker 120 is set on roller core.Functional layer 130 is set on elastic cord breaker 120.The compression of functional layer 130 is permanent
Deformation rate is more than the compression set rate of elastic cord breaker 120.In a specific embodiment, at 70 DEG C, 80% humidity
Under conditions of, the compression set rate of elastic cord breaker 120 and functional layer 130 is less than 2%.
The functions such as the required cleaning of roll shaft itself, powder feeding, coating are realized by functional layer, can guarantee that cleaning, powder feeding, painting
The functions such as cloth realize effect;Elastomeric cushion material is served as using elastic cord breaker, since the compression of elastomeric cushion material is permanent
Deformation rate is small, after a protracted use, still can make it that roll shaft overall deformation is small, so that roll shaft is with longer
Service life.Although functional layer compression set rate was both taken full advantage of greatly but had been conducive to the functions such as cleaning, powder feeding, coating
The advantages of realizing, although also taking full advantage of elastic cord breaker realizes the bad compression of the functional effects such as cleaning, powder feeding, coating forever
The advantages of deformation rate is small long.
In one embodiment, the structure that functional layer 130 is integrally formed.Integrally formed structure causes in functional layer
There is no gap, fitting mouth on 130, so that in cleaning, powder feeding, coating process, have effect evenly.Functional layer 130
Specific manufacturing process is drilled and is ground and is molded using a monoblock sponge strip.Certainly, in addition to integrally formed structure,
It is bonded or is wrapped in using banding sponge on elastic cord breaker 120 after can also be bent using a bulk of plane sponge.
Above-mentioned roll shaft production efficiency is high;Product surface flatness is good, and roughness is small, it is possible to increase sponge scraping property and durability;And
Its compact dimensions is convenient to be changed, and is easy to the kind of abundant product.
In one embodiment, the elasticity of elastic cord breaker 120 is more than the elasticity of functional layer 130.Functional layer 130 is typically
It is made of the big material of compression set rate, to prevent it from non-reversible deformation occurs, one is provided with below functional layer 130
Layer elastic cord breaker 120.Elastic cord breaker 120 is usually sponge rubber or aerated plastics, its effect is in functional layer 130
When being under pressure, pressure will be absorbed by elastic cord breaker, prevent that functional layer 130 is subject to excessive pressure and occur can not inversion
Shape.After pressure disappearance, functional layer 130 and elastic cord breaker 120 can restore to the original state without influencing its function.In a tool
In the embodiment of body, elastic cord breaker 120 is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicone sponge, functional layer are
Melamine sponge.
In one embodiment, roll shaft 100 further includes hot melt adhesive layer, which is arranged on roller core 110 and elasticity is delayed
Rush between layer 120, can also be arranged between elastic cord breaker 120 and functional layer 130, it can in addition contain in roller core 110 and bullet
Hot melt adhesive layer is all set between elastic cord breaker 120 and functional layer 130 between property cushion 120.
In a specific embodiment, the bonding agent of 110 surface of roller core coating is hot-melt adhesive powder.The advantages of hot melt adhesive is
Melted after heating, during cooling just the adhering object being in contact with it together, and can heat repeatedly and viscosity remains unchanged.But heat
The state of melten gel will also select, and be also to glue puckery, 120 nothing of elastic cord breaker if be entangled in hot melt adhesive film on roller core 110, under normality
Method is completely set up.Hot-melt adhesive powder can be used, so that it may solve the problems, such as this well.Before applying hot melt adhesives powder, on roller core 110
One layer of tackifying resin solution is coated in advance with, to make hot-melt adhesive powder be sticked to well on roller core 110.It is then placed at baking oven heating
Reason, taking-up are dried in the air cool, rubber powder is solidified and is firmly sticked on roller core 110 after melting, and the surface of adhesive layer is become smooth, easily
In the operation for being arranged elastic cord breaker 120 of next step.After elastic cord breaker 120 is put on, baking oven heat treatment is placed again into, is taken out
Dry in the air cool, hot melt adhesive just melts, solidifies and roller core 110 and elastic cord breaker 120 firmly stick together again.With original above
Reason, can also set hot melt adhesive layer between elastic cord breaker 120 and functional layer 130.
It is appreciated that between roller core 110 and elastic cord breaker 120 and between elastic cord breaker 120 and functional layer 130
Hot melt adhesive layer can be set to use hot melt adhesive layer is set.In one embodiment, elastic cord breaker 120 and functional layer
It is interference fit between 130.The internal diameter of functional layer 130 and the outside diameter difference of elastic cord breaker 120 are 0.2mm to 1mm.Roller core 110
Can also be interference fit between elastic cord breaker 120.If roller core 110 and elastic cord breaker 120 and elastic cord breaker
All it is interference fit between 120 and functional layer 130, then can be omitted hot melt adhesive layer.Material can be utilized when assembling
Elasticity elastic cord breaker 120 and functional layer 130 are assembled.Specifically it is referred to the manufacture method of following roll shafts.
In one embodiment, acted on to give full play to the elastic buffer of elastic cord breaker 120, elastic cord breaker 120
Thickness be more than functional layer 130 thickness.Above-mentioned functional layer 130 be mainly cleaning, powder feeding, coating effect, functional layer 130
Compression set rate is more than the compression set rate of elastic cord breaker 120.Elastic cord breaker 120 mainly plays elastic buffer work
With preventing functional layer from irreversible deformation occurs.In a specific embodiment, under conditions of 70 DEG C, 80% humidity, bullet
Property cushion 120 and functional layer 130 compression set rate be less than 2%.
The hardness of elastic cord breaker 120 and functional layer 130 does not have special requirement.In one embodiment, elastic buffer
The hardness of layer 120 is more than the hardness of functional layer 130.In another embodiment, the hardness of elastic cord breaker 120 is less than functional layer
130 hardness.
As shown in Fig. 2, the manufacture method of the roll shaft in an embodiment, including:
S110, elastic cord breaker is set on roller core.
Roll shaft 100 in one embodiment, including:Roller core 110, elastic cord breaker 120 and functional layer 130.Elastic cord breaker
120 are set on roller core.Functional layer 130 is set on elastic cord breaker 120.
As shown in Figure 3A, elastic cord breaker 120 is equipped with through hole 121 matched with roller core 110.Fig. 3 B are elastic buffer
Layer 120 is set in the structure diagram on roller core 110.
S120, centre bore is stamped by cleaning material bar.
As shown in Figure 3 C, drilled using drill bit 300 to cleaning material bar 200.Fig. 3 D drill for cleaning material bar 200
Structure diagram afterwards, centre bore 210 are drilled hole.
By roll shaft made from this method, structure that functional layer 130 is integrally formed.Do not have in functional layer 130 gap,
It is bonded mouth.The specific manufacturing process of functional layer 130 is drilled and is ground and is molded using a monoblock sponge strip.By by clearly
Clean material strips stamp centre bore 210, it is possible to are set on elastic cord breaker 120, and then are ground to functional layer
130。
S130, cleaning material bar is set on elastic cord breaker by centre bore.
As shown in FIGURE 3 E, cleaning material bar 200 is set on elastic cord breaker 120 by centre bore 210.Fig. 3 F are clear
Clean material strips 200 are set in the structure diagram on elastic cord breaker 120.
Cleaning material bar, is ground to the functional layer concentric with roller core by S140, and the compression set rate of functional layer is big
In the compression set rate of elastic cord breaker.
As shown in Figure 3 G, cleaning material bar 200 is ground using grinding attachment 400.Fig. 3 H is after grinding-shapings
The structure diagram of roll shaft 100.
In one embodiment, the elasticity of elastic cord breaker 120 is more than the elasticity of functional layer 130.Functional layer 130 is typically
It is made of the big material of compression set rate, to prevent it from non-reversible deformation occurs, one is provided with below functional layer 130
Layer elastic cord breaker 120.Elastic cord breaker 120 is usually sponge rubber or aerated plastics, its effect is in functional layer 130
When being under pressure, pressure will be absorbed by elastic cord breaker, prevent that functional layer 130 is subject to excessive pressure and occur can not inversion
Shape.After pressure disappearance, functional layer 130 and elastic cord breaker 120 can restore to the original state without influencing its function.In a tool
In the embodiment of body, elastic cord breaker 120 is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicone sponge, functional layer are
Melamine sponge.
In one embodiment, roll shaft 100 further includes hot melt adhesive layer, which is arranged on roller core 110 and elasticity is delayed
Rush between layer 120 and/or between elastic cord breaker 120 and functional layer 130.
In a specific embodiment, the bonding agent of 110 surface of roller core coating is hot-melt adhesive powder.The advantages of hot melt adhesive is
Melted after heating, during cooling just the adhering object being in contact with it together, and can heat repeatedly and viscosity remains unchanged.But heat
The state of melten gel will also select, and be also to glue puckery, 120 nothing of elastic cord breaker if be entangled in hot melt adhesive film on roller core 110, under normality
Method is completely set up.Hot-melt adhesive powder can be used, so that it may solve the problems, such as this well.Before applying hot melt adhesives powder, on roller core 110
One layer of tackifying resin solution is coated in advance with, to make hot-melt adhesive powder be sticked to well on roller core 110.It is then placed at baking oven heating
Reason, taking-up are dried in the air cool, rubber powder is solidified and is firmly sticked on roller core 110 after melting, and the surface of adhesive layer is become smooth, easily
In the operation for being arranged elastic cord breaker 120 of next step.After elastic cord breaker 120 is put on, baking oven heat treatment is placed again into, is taken out
Dry in the air cool, hot melt adhesive just melts, solidifies and roller core 110 and elastic cord breaker 120 firmly stick together again.With original above
Reason, can also set hot melt adhesive layer between elastic cord breaker 120 and functional layer 130.
It is appreciated that between roller core 110 and elastic cord breaker 120 and between elastic cord breaker 120 and functional layer 130
Hot melt adhesive layer can be set to use hot melt adhesive layer is set.In one embodiment, elastic cord breaker 120 and functional layer
It is interference fit between 130.The internal diameter of functional layer 130 and the outside diameter difference of elastic cord breaker 120 are 0.2mm to 1mm.Roller core 110
Can also be interference fit between elastic cord breaker 120.If roller core 110 and elastic cord breaker 120 and elastic cord breaker
All it is interference fit between 120 and functional layer 130, then can be omitted hot melt adhesive layer.Material can be utilized when assembling
Elasticity elastic cord breaker 120 and functional layer 130 are assembled.Such as in step S120 into S140, by punching, being arranged
And grinding, there is larger thickness after drilling using cleaning material bar 200, center can be more than with outside diameter is arranged by interference fit
The elastic cord breaker 120 in 210 aperture of hole, and be unlikely to burst cleaning material bar 200.
In one embodiment, acted on to give full play to the elastic buffer of elastic cord breaker 120, elastic cord breaker 120
Thickness be more than functional layer 130 thickness.Above-mentioned functional layer 130 has been mainly cleaning action, and the compression of functional layer 130 forever becomes
Form quotient is more than the compression set rate of elastic cord breaker 120.Elastic cord breaker 120 mainly plays elastic buffer, prevents work(
Irreversible deformation occurs for ergosphere.
The hardness of elastic cord breaker 120 and functional layer 130 does not have special requirement.In one embodiment, elastic buffer
The hardness of layer 120 is more than the hardness of functional layer 130.In another embodiment, the hardness of elastic cord breaker 120 is less than functional layer
130 hardness.
Above-mentioned roll shaft manufacture method uses existing elastic cord breaker, and carries out grinding formation to existing cleaning material bar
The concentric functional layer with roller core, by existing material simply fabricate into roll shaft, it is simple to manufacture, manufactures
Cost is low.
Embodiment described above only expresses the several embodiments of the present invention, its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (16)
- A kind of 1. roll shaft, it is characterised in that including:Roller core;Elastic cord breaker, is set on the roller core;Functional layer, is set on the elastic cord breaker, and the compression set rate of the functional layer is more than the elastic buffer The compression set rate of layer, wherein, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer gelatin sponge or silicon rubber are extra large Silk floss, the functional layer is melamine sponge, under conditions of 70 DEG C, 80% humidity, the elastic cord breaker and the function The compression set rate of layer is less than 2%;Hot melt adhesive layer, is arranged between the roller core and the elastic cord breaker, wherein the hot melt adhesive layer is by the following method It is prepared:By described in tackifying resin solution coating on roller core;Hot-melt adhesive powder is coated on the tackifying resin solution, with Hot melt adhesive layer is formed on the roller core;And/or be arranged between the elastic cord breaker and the functional layer, wherein the hot melt adhesive layer is made by the following method It is standby to obtain:By described in tackifying resin solution coating on elastic cord breaker;Hot-melt adhesive powder is coated on the tackifying resin solution, To form hot melt adhesive layer on the elastic cord breaker.
- 2. roll shaft as claimed in claim 1, it is characterised in that the structure that the functional layer is integrally formed.
- 3. roll shaft as claimed in claim 1, it is characterised in that the elasticity of the elastic cord breaker is more than the bullet of the functional layer Property.
- 4. roll shaft as claimed in claim 1, it is characterised in that be that interference is matched somebody with somebody between the elastic cord breaker and the functional layer Close.
- 5. roll shaft as claimed in claim 4, it is characterised in that the outside diameter of the internal diameter of the functional layer and the elastic cord breaker Difference is 0.2mm to 1mm.
- 6. roll shaft as claimed in claim 1, it is characterised in that the thickness of the elastic cord breaker is more than the thickness of the functional layer Degree.
- 7. roll shaft as claimed in claim 1, it is characterised in that the hardness of the elastic cord breaker is more than the hard of the functional layer Degree.
- 8. roll shaft as claimed in claim 1, it is characterised in that the hardness of the elastic cord breaker is less than the hard of the functional layer Degree.
- A kind of 9. manufacture method of roll shaft, it is characterised in that including:By on tackifying resin solution coating roller core;Hot-melt adhesive powder is coated on the tackifying resin solution, to form hot melt adhesive layer on the roller core;Elastic cord breaker is set on roller core;Cleaning material bar is stamped into centre bore;The cleaning material bar is set on the elastic cord breaker by the centre bore;The cleaning material bar is ground to the functional layer concentric with the roller core, the compression set rate of the functional layer More than the compression set rate of the elastic cord breaker, wherein, the elastic cord breaker is polyurethane sponge, ethylene-propylene-diene monomer Gelatin sponge or silicone sponge, the functional layer is melamine sponge, under conditions of 70 DEG C, 80% humidity, the elasticity The deformation rate of cushion and the functional layer is less than 2%.
- 10. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the elasticity of the elastic cord breaker is more than institute State the elasticity of functional layer.
- 11. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that be additionally included in the roller core and the elasticity Hot melt adhesive is set between the elastic cord breaker and the cleaning material bar between cushion, and heats hot melt adhesive.
- 12. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the elastic cord breaker and the functional layer Between be interference fit.
- 13. the manufacture method of roll shaft as claimed in claim 12, it is characterised in that the internal diameter of the functional layer and the elasticity The outside diameter difference of cushion is 0.2mm to 1mm.
- 14. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the thickness of the elastic cord breaker is more than institute State the thickness of functional layer.
- 15. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the hardness of the elastic cord breaker is more than institute State the hardness of functional layer.
- 16. the manufacture method of roll shaft as claimed in claim 9, it is characterised in that the hardness of the elastic cord breaker is less than institute State the hardness of functional layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510304609.2A CN104950629B (en) | 2015-06-04 | 2015-06-04 | Roll shaft and its manufacture method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510304609.2A CN104950629B (en) | 2015-06-04 | 2015-06-04 | Roll shaft and its manufacture method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104950629A CN104950629A (en) | 2015-09-30 |
CN104950629B true CN104950629B (en) | 2018-05-08 |
Family
ID=54165382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510304609.2A Active CN104950629B (en) | 2015-06-04 | 2015-06-04 | Roll shaft and its manufacture method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104950629B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113511366A (en) * | 2021-07-15 | 2021-10-19 | Tcl华星光电技术有限公司 | Roller for OLED panel film pasting and OLED panel film pasting method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0102250A2 (en) * | 1982-09-01 | 1984-03-07 | Xerox Corporation | Mechanisms for providing drag during unwinding of tapes |
CN101021699A (en) * | 2006-02-15 | 2007-08-22 | 富士施乐株式会社 | Charging device and image forming apparatus |
CN101846920A (en) * | 2009-03-27 | 2010-09-29 | 富士施乐株式会社 | Charging member, process cartridge and image forming apparatus |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5776494B2 (en) * | 2010-10-29 | 2015-09-09 | 日本ゼオン株式会社 | Method for producing polyether rubber |
-
2015
- 2015-06-04 CN CN201510304609.2A patent/CN104950629B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0102250A2 (en) * | 1982-09-01 | 1984-03-07 | Xerox Corporation | Mechanisms for providing drag during unwinding of tapes |
CN101021699A (en) * | 2006-02-15 | 2007-08-22 | 富士施乐株式会社 | Charging device and image forming apparatus |
CN101846920A (en) * | 2009-03-27 | 2010-09-29 | 富士施乐株式会社 | Charging member, process cartridge and image forming apparatus |
Also Published As
Publication number | Publication date |
---|---|
CN104950629A (en) | 2015-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2006171607A5 (en) | ||
EP1624349A3 (en) | Toner, fixer and image forming apparatus | |
CN100511007C (en) | Developing device and image forming apparatus | |
CN104950629B (en) | Roll shaft and its manufacture method | |
JP2009271517A5 (en) | ||
CN100578388C (en) | Fixing roller, fixing device and image forming device | |
WO2013067891A1 (en) | Processing cartridge | |
JPS58211175A (en) | Copying machine | |
JP4517796B2 (en) | Image forming apparatus and fixing apparatus | |
JP4628918B2 (en) | Developing device and image forming apparatus | |
JP4687761B2 (en) | Cleaning member, cleaning device, image carrier unit, and image forming apparatus | |
EP0962667A4 (en) | Sponge roll and method of manufacturing the same | |
JP2004333633A (en) | Liquid electrophotographic device | |
JP3765537B2 (en) | Liquid developing electrophotographic apparatus | |
CN210466015U (en) | Cleaning structure for selenium drum charging roller | |
JP4316726B2 (en) | Endless belt and image forming apparatus | |
JPH01113782A (en) | Cleaning device | |
EP1518705A3 (en) | Thermal transfer recording material | |
KR20110000123U (en) | Round type seal | |
JP3749069B2 (en) | Electrophotographic equipment | |
JP2949686B2 (en) | Fixing device | |
JP3632638B2 (en) | Thermal pressure fixing device | |
JPH09258631A (en) | Cleaning device | |
JP2002333781A (en) | Cleaning device | |
CN103930832A (en) | Endless belt having meandering prevention guide |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230728 Address after: 528429 No. 40-2, Xiang'an North Road, Huangpu town, Zhongshan City, Guangdong Province Patentee after: Zhongshan chuangyixing Industrial Co.,Ltd. Address before: 518103, 3rd and 4th floors of Building A12, Longwangmiao Industrial Zone, East Baishixia, Fuyong Avenue, Fuyong Town, Bao'an District, Shenzhen City, Guangdong Province, China. 2nd, 3rd, and 4th floors of Building A2 and A6 Patentee before: SHENZHEN FANCY CREATION INDUSTRIAL Ltd. |